Denial of storm and water damage claim - gradual process exclusion

FirmFinancial Firm (Unknown - Insurer)
Decided2013-08-29
ProductGeneral Insurance · Home building and contents
OutcomeFor the firm
Amount awarded—
Non-financial loss—
Amount claimed$29,950
SourceAFCA PDF

Summary

Homeowners sought the balance of about $29,950 for weatherboard and internal wall damage they attributed to a 2010 storm, after the FSP paid $2,585. AFCA found the damage resulted from long-term water exposure and gradual process, which the policy excludes, so no further payment was ordered.

Cover responds only to defined insured events, and damage from gradual deterioration over years falls within the gradual process and settling exclusions.

Issues

Subjects and remedies

home or building damageno remedy

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Case No: 309990 Determination Page 1 of 7 Case number: 309990 General Insurance - Domestic Insurance - Home Building - FSP Decision - Denial of Claim - Exclusion/Condition - Water Damage to Home 26 August 2013 Background 1. The Applicants held a home and contents policy with the Financial Services Provider (FSP) at the relevant time. The policy provided building cover for $392,000 and contents cover for $144,000. 2. On 14 February 2012, the Applicants lodged a claim with the FSP for storm and water damage at their property, dating back to January 2010. 3. The FSP arranged for experts to inspect the home and ultimately covered the Applicants for some damage assessed at $2,585. It otherwise declined the balance of the claim involving work estimated at $29,950. The FSP formed the view that the damage was not a result of a storm event but the result of long term water damage and ingress. The FSP rely on the exclusions in the policy relating to gradual process, shrinkage and settling. 4. The Applicants disagree and seek indemnity for the balance of their loss, which they claim arose as a result of a heavy storm/flooding event. Summary of Applicants ’ position 5. The Applicants say that their home was subjected to an enormous deluge of rain, including falls of 125mm over five hours, on or about 1 January 2010. This affected areas of their weatherboard home and allowed water to ingress into the property every time there was heavy rain after this. Summary of FSP’s position 6. The FSP says that the loss is not identifiable as a storm event and the damage to the weatherboards and interior of the home is consistent with long term water damage and ingress. 7. It has settled the Applicants for the part of the claim that it considers consistent with the policy cover and otherwise is of the view, that the balance does not come within the ambit of the policy. Determination Case No: 309990 Determination Page 2 of 7 8. The FSP relies on the following policy provisions: Pages 15-17 of the Product Disclosure Statement (PDS) “ What you are insured against, and what you are NOT You are insured for loss or damage to your home, contents or both, caused directly by any of the “Insured events” which occur at the site set out in the left column of the following table (except to the extent in the right column of the table)... You are insured against loss or damage caused directly by the following Insured events But not ... b) Storm (including cyclone or hurricane) and/or rain, which may be accompanied by snow, sleet or hail Loss or damage caused by:  ...  water seeping through a wall or floor  fungus, mildew, mould, algae ... h) Bursting, leaking, discharging or overflowing of fixed basins, shower bases, or other fixed apparatus, fixed tanks or fixed pipes used to hold or carry liquid of any kind... Loss or damage which:  occurs gradually over time  ...  is caused by the porous condition of any tiles, grouting or sealant... ... Pages 52-53 of the PDS “ Additional exclusions applying to this Policy ... This policy does not cover: (a) ... (b) loss or damage resulting from or caused by:  ...  inherent defects, structural defects, faulty workmanship, faulty design or any gradual process  ...  settling, shrinkage or expansion in buildings, foundations, walls or pavements” Case No: 309990 Determination Page 3 of 7 Issue 9. Whether and to what extent the Applicants’ loss should be covered under the terms of the FSP’s policy. Reasons for decision 10. I am satisfied that a full exchange of the relevant information has taken place between the respective parties and that each party has had the opportunity of addressing any issues raised. 11. As advised to the parties, FOS has considered it appropriate to expedite the dispute in accordance with the Operational Guidelines to the FOS Terms of Reference. This is because of the nature and complexity of the matter. This dispute has not been the subject of a FOS Recommendation and has proceeded directly to Determination. 12. There is no dispute for this matter that the FSP has provided limited cover to the Applicants under the policy. To this end, it is accepted that the Applicants sustained some measure of loss to which the policy responds, although the FSP formed the view that the majority of the damage claimed was not covered under the policy. 13. Upon receiving the initial report of the loss, the FSP dispatched a loss adjuster, “ CE ”, to inspect and report on the home. CE’s first report of 21 February 2012 was based on its inspection of the property on 15 February 2012. CE noted that there was water damage to the internal walls of the home. The female Applicant informed CE that weatherboards in three areas of the home were “deteriorating” but that their plumber had been on the roof and could not identify any obvious signs of water ingress. 14. CE considered that water had overflowed the gutters to enter the wall cavity but decided to retain a builder to inspect the area and report further. This builder, “ HC ” , provided a report dated 17 February 2012 following an inspection of the Applicants’ hom e. 15. HC noted the three exterior wall areas highlighted by the Applicants (being the eastern end of the home, the north east corner and the rear of the home). HC addressed the issues with each area noting that: “[the east end wall has] a considerable amount of rot in random areas... [and] has been soaking in water through the boards and has deteriorated over time... ... the front verandah and north east corner of the house... had minor rot that has occurred by water pooling on the deck, along windows and in weather board stops with the timber absorbing water for long periods of time... [The area]... at the back of the house where the valley meets the fascia... had a tree branch [fall] onto the roof from a recent storm. This area seems not to cope with large storms... It is my opinion that the water would only overflow in storms and is built correctly...” Case No: 309990 Determination Page 4 of 7 16. HC was of the view that the east end wall and the front verandah at the north east corner were subject to long term damage and considered this to have been due to a lack of maintenance. He suggested that the area at the back of the home should be covered and estimated a cost of $2,585. The FSP settled this aspect of the claim. 17. Later, on 26 March 2012, HC completed a second report to address in more detail the other areas not covered by the FSP. He reiterated that there was a “considerable amount” of rot in random areas of the external walls and that these had been exposed through inadequate flashings where the roof levels change, gaps in the wall claddings and a round the windows as well as the shrinking of the weatherboards: “The flashings allow the water to run inside the walls from the edge of flashing and have been running down the walls for a very long time. This is the only explanation for the amount of rot that has occurred.” 18. HC detailed individual areas subject to rot, noting that this has affected all the corners and walls of the home where : “ ... the flashings are short on the ends of the fascia, where soaker flashings have been installed incorrectly and the water is running down the inside of the walls every time it rains”. 19. HC specifically identified the affected areas as: “... [the] front corner of [the] house north side, front verandah walls either side of gable, front to house, south east corner near garage and front area above entry.” 20. In commenting further, HC noted that he had never seen such advanced deterioration in a 14 year old home. He considered that the loss was a “fair claim for insurance” and prepared an additional scope of works for the balance of the work not already quoted, totalling $33,550. 21. Despite this report, the FSP rejected the balance of the claim and informed the Applicants as such, in a letter dated 13 June 2012. 22. The Applicants refused to accept the decision and the FSP retained “ IC ” to provide a further report into the possible causes of the loss, including the roof, the weatherboard exterior and the home in general. The Applicants considered that the damage was first inflicted to their home as a result of heavy rains which affected the local area in January 2010. 23. IC inspected the property on 30 August 2012 and provided a report on 4 September 2012. IC’s observations of the property are summarised as follows:  The weatherboards on the upper western gable above the garage were in a “deteriorated state”, some being split and cracked, which allowed moisture to enter the timber and cause further damage. On the eastern and northern sides of the home, they were similarly deteriorated and this had occurred “over a lengthy period of time”. Th e timbers in the Case No: 309990 Determination Page 5 of 7 flashings above the windows have “rotted out”, though the roof gable flashings were in good condition;  The gutters on the roof on the northern side were not “falling the correct way”. On the southern, western and eastern sides, water had p ooled in the gutter directly above the areas where the weatherboards were worst affected;  Given the retention of water in the gutters, IC suggested that during heavy rains, water would overflow from the vulnerable areas onto the weatherboards, finding cracks and imperfections and causing damage;  There was no evidence of water entering through the roof or damaging the ceiling;  Some of the stumps were starting to “rot out” and had sunk considerably in the area around where the living room is located. 24. IC attri buted the damage to “wear, tear and gradual deterioration over a number of years”. There was “no evidence” to suggest that the damage was related to a recent or past storm event. The expert suggested: “The damage probably began after the drought broke, onc e subsurface moisture was able to [affect] the stumps, they began to fail and caused water to build up in the gutters. Once heavy rain came the gutters overflow onto the weatherboards resulting in the deterioration process of the timbers.” 25. To address the i ssues raised by the FSP’s experts and in order to better establish the cause of the loss, the Applicants retained three experts to investigate the cause of the loss, “ MA ” , “ DC ” and “ UP ” . 26. MA, a builder, provided a report dated 22 December 2012 in which he a lso found that there was “extensive rot” throughout the external walls of the home. He ventured that it arose from water entering the wall cavities and being trapped. He could not be certain of the point of entry without removing walls in the home. He noted: “I believe that the amount of water entry required to cause such damage [to the home] located in almost every external wall would most certainly have to be attributed to roof water entering the cavity through the lower roof area via gable flashings and[/]or spouting and running down between the inside face of the board. This water has obviously been entering the cavity for a substantial period of time but has gone undetected until the resulting rot became visual on the external face.” 27. DC, a “self -employe d painter and decorator” wrote on 16 October 2012 that he did some “interior work” for the Applicants in 2009/10, with the intent to later look at the external areas. He stated that in 2011 there was a “rapid deterioration of the weatherboards” and that it was clear there had been water damage and that a builder would be required to replace some of them. DC considered that: “... this water damage may well have been caused by these severe storms and rain events.” Case No: 309990 Determination Page 6 of 7 28. UP, a plumber, provided a brief report dated 8 April 2013 in which he suggested that: “... the damage to the weather boards cannot be attributed to the gutters or downpipes on the dwelling as the damage is above those fixtures (ie gutters, downpipes). The dwelling has an appropriate number of downpipes for its size, and there was no damage to flashings or roof to indicate leakage of any kind.” 29. The Applicants submit that the policy provides cover for storm damage at the home and contend that they have provided ample evidence (through newspaper reports) of the heavy storms that have affected their local area. I accept that this has been the case but the commercial intent of an accident- related insurance policy is to provide cover for insured events. 30. There is no doubt that the Applicants’ home has been su bject to periods of heavy rainfall on several occasions over the years. The evidence however, does not establish that all of the damage sustained to the Applicants’ property could be related to the storm event in 2010. On the contrary, the evidence from the experts (including HC, IC, MA and DC) indicates that the losses occurred over a period of time. 31. I accept that HC considered the loss should be covered, however, this view seems to be based on an apparent misunderstanding of the extent of cover provided by the policy. 32. In my view, the damage to the Applicants’ property was most likely sustained through the constant and regular exposure to the elements, including the overflow of gutters which apparently spilt on to the weatherboards and affected the integrity of these (and other) areas over a lengthy period of time. 33. Opinion is divided as to whether the design of the gutters was adequate, although given that the photographs showed areas where water would be retained, I am inclined to the belief that they were likely not. Either way, it would appear that overflow from these gutters has led to water soaking into the weatherboards. 34. The policy provides, that damage resulting from or caused by settling, shrinking or expansion of buildings, foundation boards or pavements, inherent defects, structural defects, faulty workmanship, faulty design and any gradual process, is excluded from cover. 35. I am satisfied having considered all of the evidence presented in this matter, that most likely the damage to the Applicants’ property was as a result of gradual process aggravated by the movement in the foundations of the property and accordingly, I am satisfied that the policy does not respond to the Applicants’ claim. Case No: 309990 Determination Page 7 of 7 Determination 36. On the basis of the available information, I determine that the FSP is not obliged to cover the Applicants for their loss.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.