Text of the determination
Case No: 309945 Determination Page 1 of 8
Case number: 309945
General Insurance - Domestic Insurance - Home Building – Flood - FSP
Decision - Denial of claim
6 September 2013
Background
1. The Applicant held a home building and contents insurance policy (the
policy) with the Financial Services Provider (FSP).
2. The Applicant lodged a claim with the FSP for water damage to his home in
Chelmer after it was inundated following the significant weather events in
Queensland in January 2011.
3. The FSP denied the claim on the basis that the damage was caused by
flood, which is specifically excluded under the policy.
4. The Applicant disagrees with the decision and is seeking indemnity for his
loss under the claim.
Summary of Applicant’s position
5. The A pplicant is represented by “CC” and for convenience hereafter
throughout this Determination, the Applicant and his representative will be
referred to as “the Applicant”.
6. The insured property was covered under a home building and contents
insurance policy that provides indemnity for „Accidental Damage‟.
7. The property was extensively damaged during the „Brisbane Floods‟ in
January 2011, with the cost of repairs exceeding $500,000. The Applicant
has been informed of and accepts the Service‟s jurisdictional limits provided
within the Terms of Reference i.e. it may only award up to $280,000, by way
of the Determination.
8. The damage resulted from inundation of the lower level of the property,
which had occurred by the afternoon of 11 January 2011. Water came
across the top of the floorboards, on the upper level, by approximately
3.00pm, on 12 January 2011.
Determination
Case No: 309945 Determination Page 2 of 8
9. The loss claimed did not occur as a result of the event „Flood‟, rather the
Applicant maintains the cause for the loss was:
Due to the acts of a third party, namely the operators of the Wivenhoe
Dam (the dam). The operation of the dam for water releases was not
conducted within the parameters of the dam operation manual.
The inundation of the property was due to such water releases in to the
Brisbane River (the river), from the dam.
Due to flash flooding, this is an insured event.
As a result of an action taken to avoid a flood event.
By another cause covered under the policy.
Summary of FSP’s position
10. The FSP is represented by “H” and for convenience hereafter throughout this
Determination, the FSP and its representative will be referred to as “the
FSP”.
11. The FSP allows for an individual to obtain flood cover by electing for the
“Optional Flood Cover” to be included upon the policy. The FSP notes that
the Applicant had not elected the above noted optional cover and therefore
was not entitled to indemnity for loss or damage arising from this event.
12. The FSP maintains that the available evidence establishes the insured
property was inundated by floodwater and therefore is excluded from cover
under the policy. In determining the cause of the loss, the FSP has relied
upon the evidence made available by the hydrologists‟ panel appointed by
Insurance Council of Australia (ICA), as well as its preferred hydrologists‟
“W”.
13. In respect to the Applicant‟s reference to the damage claimed being due to
the actions of the dam‟s operators, the FSP maintains the proximate and
„effective‟ cause for the loss was flood.
14. In the instance the Service finds that some other factor (such as the actions
of the dam operators) was also a proximate cause of the loss, then flood at
the least will be a concurrent cause. In such circumstances, the application
of the „Wayne Tank principle‟ applies to defeat the claim , in line with the
relevant policy exclusions.
15. The FSP relies on the following policy provisions:
“ General exclusions applying to this policy
…
The policy does not cover:
(b) loss or damage resulting from or caused by:
…
Case No: 309945 Determination Page 3 of 8
flood, unless you have selected flood cover under “Options you can
choose for additional premium”, paid for this option and your Policy
Schedule shows that you are covered for flood.
„Flood‟ means the inundation of normally dry land by water escaping
from any watercourse, lake, canal, dam or reservoir. ”
Issue
16. Whether the damage claimed by the Applicant was caused by flood as
defined by the policy.
Reasons for decision
17. As advised to the parties, FOS has considered it appropriate to elevate the
dispute in accordance with the Operational Guidelines to the FOS Terms of
Reference. This is because of the complex nature of the issues. This dispute
has not been the subject of a FOS Recommendation and has proceeded
directly to Determination.
18. This decision has been made by a Panel consisting of an Ombudsman, a
representative with extensive experience in the insurance industry and a
representative with extensive experience in consumer claims.
19. Prior to arriving at a determination the Panel has read and considered all the
material submitted by the parties to FOS. It notes the parties do not dispute
the following:
The Applicant held an active home building and contents insurance
policy with the FSP at the time of the loss.
The FSP provided and the Applicant received the relevant policy
documentation including the Product Disclosure Statement (PDS).
The policy allows for an insured to include „Optional flood cover‟ upon
the policy. This is achieved by requesting for the optional cover to be
included upon the policy, paying the additional premium and the FSP
noting such upon the policy.
The Applicant did not make such request and therefore the optional
flood cover was not included upon the policy.
The insured property suffered extensive damage arising from the
significant weather event experienced in Queensland in January 2011.
The insured property is in close proximity to the Brisbane River.
Water initially inundated the lower levels of the insured property on the
afternoon of 11 January and subsequently inundated the top (third) ,
level of the home, on 12 January 2011.
20. The Panel Chair Ombudsman conducted a site visit on 26 August 2013.
Present was the Applicant and a representative of the FSP.
Case No: 309945 Determination Page 4 of 8
21. The Panel is satisfied that, the FSP in providing the Applicant with the
relevant policy documentation and wording has fulfilled its obligations to
inform him of the policy terms, conditions and limitations. Further, the
wording of the policy is clear and unambiguous. There exists an onus upon
the Applicant to read the policy and ensure it provides suitable cover in line
with his needs.
22. The Panel has considered the provisions of the policy and notes that it does
allow for the election to include flood cover upon the policy as optional cover.
Further, the Applicant‟s Certificate of Insurance does not provide that such
cover was included upon the Appli cant‟s policy during the relevant policy
term, the subject of this dispute.
23. The policy, however, does provide indemnity for „Accidental Damage‟ which
also includes damage arising from the listed events within the policy.
Accordingly, under the terms of the policy, the Panel is satisfied that the
Applicant has established a prima facie claim. The onus therefore shifts to
the FSP to establish its entitlement to decline indemnity to the Applicant, in
line with the specified policy limitations.
24. There has been an exchange of material between the parties. Each party is
aware of the issues and has had the opportunity to comment. In these
circumstances the details contained in the relevant hydrological reports will
only be recited in this determination, where considered relevant. The
consultants‟ reports state in part:
“C” Loss adjusters Report dated 31 Januar y 2011
The insured property was noted to be a tri-level house situated on a
sloped property (block).
The height of the habitable floor level above surrounding ground levels
was around 1m. The ground level of the property was not higher than
street level.
Inundation of the property (yard) commenced at around 3.00pm on 11
January, whilst inundation of the house, garage and shed at around
5.00pm the same day.
Water came from the direction of the river which is some 60m
northwest of the house, the water was dirty.
The two lower floors were completely inundated with the top floor
inundated up to around 25cm above floor level.
The Applicant was successful in relocating most contents prior to the
onset of the flooding.
Appears that the loss noted was due to the Brisbane River Flood.
W’s Site Specific Inundation Assessment Report dated 21 May 2013
The report is based on data and background information on rainfall,
drainage and topography obtained from a number of sources, including
an inspection of the property on 16 May 2013.
Case No: 309945 Determination Page 5 of 8
The house was inundated to a maximum depth of approximately 0.2m
above the main (upper) floor level.
A total of 125.3mm of rainfall was recorded at the Green Hill Reservoir
Alert gauge (1.8km northwest of the property) in the period between
0000hrs on 10 January, to 0000hrs on 12 January.
No significant rainfall was recorded after about 5.00pm on 11 January.
The peak hourly rainfall intensity on 11 January was 19.5mm/hr,
recorded in the hour to 11.00am.
A higher rainfall intensity period was recorded for the area early in the
afternoon on 9 January i.e. 26.2mm/hr.
Peak stormwater run-off at the property would have occurred within 10
minutes of peak rainfall intensity. The recorded peak rainfall intensity
was not extreme and was less than the o ne year ARI for Brisbane.
Recorded river water levels at the mouth of Oxley Creek (3.3km
downstream of the property) and at the Jindalee Alert (10.3km
upstream of the property) were obtained. The peak water level of
approximately 9.4mAHD was experienced at the property late on 12
January.
Based on Brisbane City Council records ground levels at the property
range between less than 1mAHD and 10.2mAHD.
The property is located on the banks of the Brisbane River about 300m
upstream of Indooroopilly Bridge. Ground levels fall towards the river
with a small stormwater catchment discharging towards the river via a
stormwater pipe outlet adjacent to the property.
The rear of the property is between 3-4mAHD with the river floodwater
levels reaching 4mAHD by 1.30pm on 11 January. This is consistent
with the observed time of initial inundation reported by the Applicant.
W concluded that the initial and peak inundation of the insured property
above floor level was caused by floodwaters overflowing from the
Brisbane River.
25. The Panel notes with concern that the FSP only sought to obtain a specific
hydrology report for the insured property in May 2013, over two years after
the date of loss and subsequent to the matter being referred to FOS. It would
be reasonable to expect such an expert review would have been arranged
much earlier in the claim process, having regard to the extent of the loss, the
fact the assessor was informed of the timing of the initial inundation and the
topography of the site in question.
Initial inundation of the insured property
26. Notwithstanding the matters discussed in respect to the peak level
inundation of the insured property, the Panel notes the available evidence
does give cause for consideration of the initial inundation of the lower levels
which occurred earlier on 11 January 2011.
Case No: 309945 Determination Page 6 of 8
27. The Applicant maintains that the initial inundation of the lower level, garage
and shed at the insured property occurred earlier in the afternoon on 11
January. Further, the expert reports made available by the FSP provide that:
a. The insured property was noted to be tri-level house sitting on a sloped
block. The Panel notes that the block slopes down towards the river.
b. The ground level of the property was lower than street level, with the
ground level sloping down from the street towards the river.
c. Inundation of the property i.e. ground level (yard) commenced around
3.00pm on 11 January and inundation of the house, garage and shed
at around 5.00pm on the same day.
d. No significant rainfall in the area of the insured property was recorded
after 5.00pm on 11 January 2011.
e. Stormwater from the surrounding small catchment discharges towards
the river via stormwater pipe outlet adjacent to the property.
28. The Panel Chair Ombudsman‟s site report noted that „R‟ Street runs down
sharply towards the river; given that the parties to the dispute acknowledge
the ultimate inundation of the property can only be attributed to the policy
excluded event of flood, the area of contention now relates to the possibility
of the lower section of the house being inundated by stormwater run-off
(which is not captured by the flood exclusion) prior to the subsequent river
flood.
29. The site report notes the house is the last one at the bottom of the street and
the driveway runs straight on for a small distance but also turns sharply and
significantly down to the right which is the entrance to the three car garage;
just before the garage on the left hand side are the steps up into the main
part of the house, however, from the garage there is also a door which leads
into the house itself. On entering that door there are two or three steps
down, followed by steps up, into the main part of the house.
30. Hypothetically, stormwater may well have come down the driveway, with
some portion of that water turning sharply to the right at the bottom of the
driveway, then following the line of the driveway impacting firstly against the
garage door, with some portion no doubt then penetrating into the garage
itself.
31. In respect of any damage to the interior of the house, the Pane l notes that
the Applicant was not present at the time of any initial inundation and there
were no other witnesses to an initial event, rather the Applicant has formed
the view that there was likely to have been an initial stormwater event.
32. In the Panel‟s view and particularly having considered the site report, there is
insufficient evidence to establish on the balance of probabilities, any such
stormwater would have pooled sufficiently such that it was capable of
causing water damage to the lower section of the interior of the garage or
the home.
Case No: 309945 Determination Page 7 of 8
33. In respect of damage to appliances, external to the house, such as air
conditioning units, the site report noted an air conditioning unit (the unit) in
the lower area around to the side of the pool; however, as tha t unit was also
slightly raised, the Panel, on the balance of probabilities, is not persuaded
the height of any such stormwater inundation would have been sufficient to
impact the unit.
Proximate Cause for the peak inundation at the insured property
34. The Applicant is of the opinion that the ultimate inundation and resultant
damage to his property was not due to the event „Flood‟. Rather, it is his
position that the damage was due to the releases of water from the dam, not
being conducted within the parameter s of the “Dam Operation Manual”.
Essentially, that it was the act of a third party, namely the dam operators
who failed to observe appropriate procedures.
35. The FSP, however, maintains that the water released from the dam
indisputably mixed with water in the river and as such clearly became
indistinguishable in fact and law. The FSP relies on the Wayne Tank
principle to argue that there are two proximate or competing causes that led
to the loss. These dam releases arguably not excluded and water from the
river escaping its bank (flood), which is excluded.
36. The Panel acknowledges the Applicant‟s position in respect to the loss
claimed arising from the actions of a third party. Ho wever, the Panel notes
the Final Report of the Queensland Floods Commission of Inquiry does not
support the Applicant‟s assertion that the ‘damage was due to the releases
of water from the dam not being conducted within the parameters of the Dam
Operation Manual ’ . The evidence supports the view that a substantial portion
of the flooding downstream of the Wivenhoe Dam is attributable to the
particularly intense rainfall over the dam that commenced at approximately
4.00am on 11 January 2011. This rainfall eve nt caused a sharp rise in the
dam‟s level ultimately leading the dam‟s operating engineers to move from a
W3 release strategy (which had been working well up to then) and to adopt a
W4 release strategy from 8.00am on 11 January 2011.
37. In this dispute the property was located some distance from the dam with the
maps showing the property close to the river. At this point down the river the
Panel accepts that all inflows into the river including the heavy rainfall,
surface run-off volumes, water from the Lockyer Creek, Bremer River and
various tributaries together with the dam release would have contributed to
the flood.
38. When one considers the policy‟s flood definition: „Flood means the
inundation of normally dry land by water escaping from any watercourse,
lak e, canal, dam or reservoir‟, then clearly once the variously different
sources of water „escaped‟ the confines of the Brisbane River, then the
resultant inundation is captured by that definition of flood.
Case No: 309945 Determination Page 8 of 8
Determination
39. On the basis of the available information the Panel determines:
The FSP was entitled to refuse indemnity to the Applicant on the grounds
that on the balance of probabilities all the inundation was due to the policy
excluded event of flood.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.