Text of the determination
Case No: 309352 Determination Page 1 of 12
Case number: 309352
General Insurance - Domestic Insurance - Residential Strata Title - FSP
Decision - Exclusion / condition
4 September 2013
Background
1. The Body Corporate for a strata titled block of seven home units in Manly,
New South Wales, held a residential strata title insurance policy with the
Financial Services Provider (FSP). The policy covered the building and
common contents for the block of units.
2. The Applicant is the Chairman of the Executive Committee for the Body
Corporate and represents the Body Corporate for the purpose of this
dispute. References in this Determination to “the Applicant” will include both
the Body Corporate and the Applicant.
3. In 2009, after a sewerage pipe leaked and the foundations of the block of
units were affected, cracks formed in some of the walls of Units 1 and 3. A
claim was lodged with the FSP for the damage.
4. The FSP accepted the claim and agreed to cover the cracking to the units.
5. The Applicant does not accept that coverage of the cracks in the units is the
full remedy under the claim and also wants the FSP to pay for underpinning
as recommended by his engineer.
Summary of Applicant’s position
6. The Applicant says that the FSP initially accepted responsibility for the
damage caused by the leaking sewerage pipe. However, it later altered its
position, saying that the initial acceptance was a “sign of goodwill” and that it
was only willing to pay for the repairs to unit 3.
7. He says that engineer “NB” inspected damage to the units and advised that
the leak from the sewerage pipe contributed to settlement around the
foundations of the building. NB also recommended that shallow underpinning
is required to ensure that further damage to the building does not occur.
8. The Applicant says that damage caused by bursting, leaking or overflowing
from a pipe is an exception to the “earth movement” exclusion upon which
the FSP now seeks to rely. He says that the FSP is therefore not able to rely
Determination
Case No: 309352 Determination Page 2 of 12
of the exclusion and should accept responsibility for rectifying all the damage
caused.
Summary of FSP’s position
9. The FSP says that the evidence from its engineer “RJB” indicates that the
building was originally constructed on different foundation materials with
different load bearing capacities. The cause of the cracking to the units was
earth movement or settlement due to this latent defect which has occurred
over an extensive period. It says that NB does not comment on the latent
defect but does note there are differing foundation materials.
10. In addition, the FSP says that according to RJB, the underpinning
recommended by NB is aimed at rectifying the latent defect in an area where
there are obvious signs of old repairs but would not address the area where
the cracked sewerage pipe was located.
11. Further, the FSP does not dispute the recent cracking was caused by
leaking pipe/sewer seepage and that there has been earth movement
because of that seepage. But RJB states that the more recent cracking is as
a result of that leaking which is itself caused by ground movements. That is,
the leaking of the sewer was due to earth movements rather than the
opposite.
12. The FSP denies that it accepted liability for damage caused by the leaking
sewerage pipe and has offered to pay for the repair of the recent cracking
only.
13. It submits that its offer of $4,630 as settlement of the claim is fair and
reasonable in the circumstances.
14. The FSP relies on the following policy provisions:
“ Policy 1 –
What we insure
We insure You up to the sum insured shown for Policy 1 in the Schedule,
against ACCIDENTAL LOSS or DAMAGE to Your Insured Property which
occurs during the Period of Insurance.
...
Exclusions – what we do not insure
1 We will not pay for loss or damage:
...
c caused by lack of maintenance, rust, oxidation, corrosion, Wear,
Tear, fading, gradual corrosion or gradual deterioration, concrete or
brick cancer, developing flaws, wet or dry rot, or failure to maintain
Your Insured Property in a reasonably good state or repair.
...
Case No: 309352 Determination Page 3 of 12
g caused by vibration or from the removal or weakening of or
interference with the support of land or buildings or any other
property, Erosion, subsidence, landslide, mudslide, shrinkage, or any
other Earth Movement or collapse.
However We will pay if the loss or damage is due to:
(ii) bursting, leaking, overflowing or water tanks, pipes, drains,
gutters or other water or liquid carrying apparatus (but not
Flood).
j caused by inherent vice, latent defect...
m due to normal settling, creeping, heaving, seepage, shrinkage, or
expansion of buildings, foundations / footings, walls, bridges,
roadways, kerbing, driveways, paths, garden borders or other
structural improvements.
... ”
Issues
15. Whether the FSP is liable for the damage to Units 1 and 3 of the insured
building or whether the earth settlement issue is a long term issue having
existed prior to the recent sewer line failure and is excluded under the policy.
16. Whether the FSP is required to pay for the underpinning of the building as
recommended by the Applicant’s engineer.
Reasons for decision
17. Due to the nature of the dispute, the FOS has considered it appropriate to
expedite the dispute in accordance with the Operational Guidelines to the
FOS Terms of Reference. Thus, this dispute has not been the subject of a
FOS Recommendation and has proceeded directly to Determination. The
parties have been previously advised that a Determination will be issued in
this case.
18. There has been an exchange of information between the parties and I am
satisfied that each party has had the opportunity to address any issues
raised by the other.
19. It is an accepted principle of general insurance law that an insured bears the
onus to establish, on the face of the facts, that they have suffered a loss
caused by an event to which the policy responds. This is known as a prima
facie claim.
20. Once so established, the onus shifts to the insurer to prove the application of
an exclusion if it seeks to deny or limit its liability for the loss and if it is so
proven, the onus shifts back to the insured to prove that an e xception to the
exclusion applies.
Case No: 309352 Determination Page 4 of 12
21. The policy provides cover for accidental loss or damage. There is no
definition within the policy for “accidental”. The Macquarie Dictionary
describes it as “happening by chance or accident, or unexpectedly” . I accept
that the cracking to the walls of units 1 and 3 was unexpected from the
viewpoint of the Applicant and accordingly, a prima facie claim has been
established.
22. The onus then shifts to the FSP to prove on the balance of probabilities, the
application of a policy exclusion or exclusions or to establish the evidence to
otherwise defeat the claim.
The evidence
Report by NB – 11 November 2009
23. Prior to lodging the claim, the Applicant engaged engineer, NB, and after an
inspection of the property in Octob er 2009, a “Limited Condition Report”
dated 11 November 2009 was produced. He recommended the living room
and kitchen walls were underpinned a nd then the cracking repaired. This
report included the following:
“An inspection of the walls within the living r oom of unit 1 revealed large
cracks propagating diagonally above the doors of two rooms leading off the
eastern living room wall. ... Similar but smaller cracks were evident in the unit
directly above.
An inspection of the sub-floor in this area revealed that excavation works and
renewal of sewer services had been carried out. Evidence of extensive
flooding of the sub-floor was also observed. ...works were carried out to repair
a leaking sewer main
The site slopes to [Ge] Street and is underlain by rock at the rear and soil
near the front of the building. Whilst we cannot determine, from visual
inspection, the extent of the rock bearing of the building foundations it is
clearly evident that foundation settlement has occurred in the vicinity of the
crack.”
Report by RJB – 14 January 2010
24. The FSP appointed assessor “RB” who engaged consulting engineer , RJB,
to provide a report as to the cause of the damage to the unit building.
25. The report by RJB dated 14 January 2010 was produced after an inspection
of the property on the same date. He inspected Units 1 and 3 internally as
well as the subfloor space directly under Unit 1. He noted that the building
was an old style walk-up apartment building approximately 80 years old. He
stated the following about the location of the units relative to the sewerage
line:
“Unit 1 (ground floor) and Unit 3 (first floor directly above Unit 1) are located
on the south-eastern corner of the site which fronts [Ge] Street. The external
side walls of those units run parallel to [Gr] Street, that is in an east-westerly
direction. There is a sewer line that runs parallel to that side wall
Case No: 309352 Determination Page 5 of 12
(approximately 1 metre to the north). That sewer line has recently been
repaired. I understand the sub-floor area in the vicinity of the sewer pipe had
long term flooding issues that went unnoticed for a considerable period of
time.”
26. The report by RJB stated the following with respect to the damage to the
units:
“Inspection of both units in the living rooms and adjacent kitchen areas
showed cracking of various degrees. Some cracking appeared recent while
other cracking had evidence of past attempts at repair.
An inspection of the underfloor space under those same affected areas
indicated that the brick walls were bearing on sandy material. There was also
evidence of long-term settlements as most timber bearers had been packed at
their supports at some stage. This type of packing is not uncommon in most
buildings.
By observation, the settlements have originated in areas remote from the line
of the sewer, for example, at the entrance to the kitchen and at the entry
doors to the front bedrooms. This is confirmed also by noting the location of
the underpinning specified in the [NB] report and also by the direction of the
new cracking.”
27. The author of the report by RJB included his opinion as to the cause of the
damage:
“It is my opinion on that basis that the failure of the sewer pipe was caused by
the same long-term earth movements as those that caused the previously
mentioned long-term cracking. It is also my opinion that the subsequent
flooding from the failed sewer pipe over time locally weakened the foundation
strata and increased the area influenced by the long term earth movements.
...local underpinning can be counterproductive...
...the cracking is not of structural significance and a more practical
approach....is to re render all cracked walls... more cracks will occur ...this
may also be the case if underpinning is adopted.....”
28. The “Comments and Conclusions” section of the RJB report included the
following:
“It is my opinion that the cracking in Units 1 and 3 is due to earth movements
(settlements) that have occurred over an extensive period. The more recent
cracking and movements are due to the extension of the area affected by
long-term settlements as a result of removal of support by the flooding of the
sewer. The break in the sewer in my opinion can be attributed to ground
movements.”
Clarification email from NB – April 2010
29. The Applicant also obtained further details about the cause of the damage
from NB. In an email which is undated (although there is an indication from
the name of the file by which the email was provided to the Service, that it
was written on 27 April 2010), NB stated the following:
Case No: 309352 Determination Page 6 of 12
“I have read the report by [RJB]. The cracking to u nits 1 & 3 is significant as
the extent of the local settlement is extensive and has caused doors to jam
and architraves to distort significantly....
In addition, I have crawled around the foundation space and observed the
area affected by the sewer leak which is indeed in the area that requires
underpinning. Considering the localised nature and extent of settlement I am
confident that the leak was contributed to largely by the sewer leak....” [sic]
30. NB concluded the email by suggesting that if there is any doubt as to the
cause of settlement, it was recommended that a Geotechnical engineer take
samples of the sub-grade and carry out testing.
Second report by RJB – 24 June 2010
31. RJB produced a second report, dated 24 June 2010, after a further
inspection of the property on 18 June 2010 with the Applicant and “ AN ”
builders. He inspected both Units 1 and 3 and the underfloor space below
those apartments.
32. This second report, which was requested after an extension of cracking
appeared since RJB’s 14 January 2010 re port, included the following:
“In Apartment 3 (second floor) I noted an extension of the original crack in the
wall between the living room and the bathroom. There is no evidence along
the line of that crack of prior repair. That crack does not appear in the
corresponding wall in Unit 1 below and, in my opinion, this indicates a tilting of
that section of the building towards the kitchen area where there is clear
evidence of prior settlement and attempts to repair the resulting cracking and
cornice separati on.”
33. The author of the second RJB report said he spoke to the Applicant and
advised him the underpinning recommended by NB would not address this
more recent cracking. He says the configuration of that underpinning
appears to address the long term settleme nts that are remote from the area
of the cracked pipe. He concluded, a practical approach to the current
problem was to cosmetically repair the wall using “heli - bars” to limit the effect
of further movements.
34. AN builders provided a quote to do that work in Unit 3 in the amount of
$4,730 inclusive of GST.
35. RJB went on to provide the following opinion:
“It is my opinion that the long -term settlements that have occurred over the life
of this building are due to a latent defect. That is the building was originally
constructed on different foundation materials having marked difference in
bearing capacity. ...
The new cracking that has occurred since the long-term seepage from a
broken pipe was discovered and rectified is not localised over the site of that
event a nd can, in my opinion, be attributed to the original latent defect.”
Case No: 309352 Determination Page 7 of 12
36. RJB did not provide a further report or inspect the property again but did
answer some questions from the FSP on 1 July 2013 in support of the
application of policy exclusions. Specifically he said:
“ specifically provide comment if any of the following factors contributed
to the damage ;
long term earth movements/settlement ;
“The proximate cause of the long term cracking of certain walls and the
leakage of the sewer is the differential settlements between the sections of
the building supported on different foundation strata.”
latent defects with the Insured Property ;
“The latent defect is the support of the building on different foundation strata.”
faulty material, workmanship, design, plan, specification or
failure of design ;
“I have encountered similar situations of differing foundation conditions at
seaside suburbs in Sydney. The failure (faulty) in design and specification is
the lack of provision to accommodate the resultant differential settlements.
Faulty material and workmanship are not factors.”
Wear, tear, rust, corrosion, gradual deterioration, mould, mildew,
variations in temperature; and failure to maintain the Insured
Property in good condition ;
“The gradual deterioration has been identified in my earlier reports, other
factors raised in this dot point can be excluded, except that in my opinion
there has been an ongoing failure to maintain the property in a good
condition.”
Analysis of the evidence and application to Policy exclusions
37. In its submission, the FSP has made reference to three policy exclusions,
saying it will not pay for loss or damage:
1c - caused by lack of maintenance, rust, oxidation, corrosion, wear,
tear, fading, gradual corrosion or gradual deterioration, concrete
or brick cancer, developing flaws, wet or dry rot, or failure to
maintain Your Insured Property in a reasonably good state of
repair.
1g - caused by vibration or from the removal or weakening of or
interference with the support of land or buildings or any other
property, erosion, subsidence, landslide, mudslide, shrinkage, or
any other Earth Movement or collapse.
1m - due to normal settling, creeping, heaving, seepage, shrinkage, or
expansion of buildings, foundations / footings, walls, bridges,
roadways, kerbing, driveways, paths, garden borders or other
structural improvements.
38. It later added a further item:
1j - caused by inherent vice, latent defect....
Case No: 309352 Determination Page 8 of 12
39. Based on the material presented, it would appear that the FSP seeks to rely
on up to four of the policy exclusions listed above to deny the claim. In order
to succeed, it need only establish on the balance of probabilities, that one
policy exclusion applies.
Exclusion 1c
40. On 1 July 2013 the FSP asked RJB to comment on whether various factors
contributed to the damage to the Applicant’s building including this exclusion.
41. In an email dated 1 July 2013, the author of the reports from RJB stated that
“the graduation deterioration has been identified in [his] previous reports” but
that “other factors raised in this dot point can be excluded”. However, he also
said that in his opinion “there had been an ongoing failure to maintain the
property in good condition.”
42. I have considered the expert opinion with respect to exclusion “1c” relied
upon by the FSP.
43. Although RJB has provided his opinion that the building has not been
maintained in good condition, I note that the exclusion wording actually
rela tes to the failure to maintain the property in “reasonably good state of
repair”. Given the building is approximately 80 years old, I would anticipate
that some cracking would be apparent, regardless of the level of
maintenance and this does not mean that the property is not in “reasonably
good state of repair”.
44. Accordingly, I find on the balance of probabilities that the FSP has failed to
prove that the application of exclusion “1c” with respect to the Applicant’s
claim.
Exclusion 1g
45. The first report by RJB concluded that “the failure of the sewer pipe was
caused by the same long term earth movements as those that caused the
(previous) long term cracking” and “the subsequent flooding from the failed
sewer pipe over time, locally weaken ed the foundation strata”. The report
also concluded that “The more recent cracking and movements are due to
the extension of the area affected by long-term settlements as a result of
removal of support by the flooding of the sewer. The break in the sewer can
be attributed to ground movements.”
46. I also note that RJB, in the email of 1 July 2013, commented that:
“The proximate cause of the long term cracking of certain walls and the
leakage of the sewer is the differential settlements between the sections of
the building supported on different foundation strata.”
47. I accept that this fits the descri ption of exclusion “1g” of the policy, insomuch
as this expert says the support of the foundation strata appears to have been
Case No: 309352 Determination Page 9 of 12
removed, weakened or interfered with and this in turn influenced long term
earth movements which are also excluded.
48. I agree that exclusion “1g” is subject to an exception, whereby the FSP will
pay if the loss or damage is due to bursting, leaking, overflowing of water
pipes, drains, gutters or other water or liquid carrying apparatus.
49. However, it is the opinion of RJB that the loss or damage is not ultimately
due to the leaking of the pipes but that the pipes themselves leaked because
of the earth movement.
50. The clarification email from NB indic ates that “the leak (I think is supposed to
read crack) was contributed to largely by the sewer leak.” However, a close
examination of the material from NB leads me to the conclusion that he does
not really comment on the opinion from RJB about the underlying cause of
the damage. In my view, he does not comment definitively on the cause of
settlement but rather recommends that an engineer be engaged to take
samples of the sub grade and carry out testing.
51. Furthermore, in his first report, he notes that the underlay of the site slopes
from rock at the rear to soil near the front of the building and that there is
foundation settlement.
52. Accordingly, in my view the FSP has proven on the balance of probabilities
that this exclusion applies as the expert evidence is that earth movement
has caused the loss and damage. It causes earlier cracking, it caused the
sewer to crack and this in turn caused further movement which caused
further recent cracking. In my view therefore , the FSP is able to rely on this
exclusion to deny liability for the damage in dispute.
Exclusion 1m
53. Exclusion “1m” of the policy relates to “normal” settling, creeping, heaving,
seepage, shrinkage, or expansion of buildings, foundations / footings.
54. Arguably this exclusion does not apply as what has happened here is not
“normal” settling of the foundations but movement caused by differential
settlements in the building supported on different foundations strata.
55. Accordingly, I find that on the balance of probabilities, the FSP has not
proven the appl ication of exclusion “1m” and is not able to rely on this
exclusion to deny liability for the disputed damage.
Exclusion 1j
56. Exclusion “1j” of the policy relates to many factors all of which appear to be
unrelated to “latent defect”. RJB supports the conten tion that there is a latent
defect which is the support of the building on different foundation strata.
Case No: 309352 Determination Page 10 of 12
57. In the absence of expert evidence to the contrary, I find that the FSP has , on
the balance of probabilities, proven the application of exclusion “1j” an d is
able to rely on this exclusion also to deny liability for the disputed damage.
Other issues
58. The Applicant says the FSP accepted responsibility for damage caused by
the leak from the broken sewerage pipe in the foundations but has not paid
for the full remedy – to repair the cracking walls and the foundation affected
by the leak from the pipe.
59. He also complains that the limited remedy offered is not for both Unit 1 and
Unit 3 but for Unit 3 only.
60. The Applicant also complains about the time taken by the FSP to resolve the
dispute.
61. I have considered the correspondence between the parties and note the
FSP’s assessor unequivocally denied the claim in a letter 5 February 2010.
Despite this and despite its expert opinion, by letter dated 24 February 2010,
the FSP said it was prepared to accept the recent “cracking” caused by the
failure of the sewerage pipe and offered to repair this component for $1,100.
62. This was not accepted by the Applicant as his quotes to repair loss and
damage were significantly more. Discussions ensued and by email dated 2
June 2010, the FSP wrote to the Applicant to say there is a
miscommunication and that the FSP is not “covering all costs associated
with this job.”
63. As a result, the Applicant and RJB attended the site again on 18 June 2010
“to assist with the identification of areas that are the subject of the claim.”
64. It is clear that RJB is still of the view that the broken pipe is still attributable
to the original latent defect but recommends a “practical approach” which is
to cosmeti cally repair the wall in Unit 3 using “heli - bars.” The cost of this
repair is $4,730.
65. A further offer is then made by the FSP’s assessor by email dated 14 July
2010. The relevant parts say:
“The offer now being made is based on more recent cracking which the
building consultant believes can be attributed to a burst pipe issue previously
repaired by the (Applicant). However, regarding the remaining cracking issues
the building has, there is evidence of previous attempts to patch-repair these
cracks which have re-opened. These cracks are considered long-term being
the result of settlement of the building over a lengthy period of time and they
have not been considered in the building consultant’s considerations as far as
admissible damage is concerned.
... although (RJB) points out in his report that in view of the age and condition
of the building, the underpinning recommendation is impractical and in his
view will not be cost effective for the owners. This was pointed out to the
(Applicant) at the time of their recent meeting.
Case No: 309352 Determination Page 11 of 12
Once all insurance and non-related insurance repairs have been attended to,
please pass on a repair invoice to enable us to recommend to (the FSP) a
payment of $4,630 be made to the (Applicant) .”
66. The FSP addresses this issue in its letter dated 23 July 2013. Essentially it
says the expert opinion was always unequivocal that it could deny the claim
and that: “at no time did (the FSP) undertake to remedy events excluded
under the policy but merely made an offer in goodwill .”
67. The letter dated 24 February 2010 does not say the offer is made for
goodwill reasons but says the FSP is prepared to accept the recent cracking
caused by the failure of the sewer pipe. The FSP does not say at any stage
it will repair all damage. It is not clear to me why the FSP decided to
reconsider its position regarding the claim, as it is clear from is expert report
that it could deny the claim completely. In the light of those circumstances, I
am prepared to accept that it did make a small offer to repair recent c racking
as a goodwill gesture only. The FSP’s position is confirmed in its email of 14
July 2010 so by that time the Applicant is in no doubt of the FSP’s position
and could act to protect his interests accordingly.
68. The FSP explains that its offer is for Unit 3 only as it says its expert opinion
is that only this unit is affected by recent events and that the other cracking
is long term damage which is excluded on the basis of its expert opinion.
Whatever the basis of the offer, in all the circumstances, I accept it is a
goodwill offer only and one that in my view considering the expert evidence ,
it does not have to make at all.
69. In short, the FSP contends it has made a settlement offer of $4,630 for the
repair to the cracking in Unit 3 as a goodwill gesture and says this offer is fair
in all the circumstances where the damage has been caused by events
excluded under the policy. I agree.
70. As for the delays complained of by the Applicant, I agree the time taken to
finalise the FSP’s position was not optimum but I do not find the delay is so
unacceptable that it warrants any further compensation paid to the Applicant
by the FSP because I do not consider there was such an unusual degree of
time taken that it has interfered with the Applicant’s expectation of enjoym ent
or peace of mind that warrants an award of compensation pursuant to the
Terms of Reference.
Determination
71. On the basis of the available information and for the reasons stated , I
determine that the FSP is able to rely on two policy exclusions and therefore
is not liable for the cracking damage to the Applicant’s building.
Case No: 309352 Determination Page 12 of 12
72. I further determine for the same reasons that the FSP is not liable for the
underpinning to the Applicant’s building.
73. If the Applicant accepts this Determination, the FSP is to pay to the Applicant
the sum of $4,630 for the repair to the cracking in Unit 3.