Text of the determination
Case No: 309051 Determination Page 1 of 13
Case number: 309051
General Insurance - Domestic Insurance - Home Building and Contents - Flood
- FSP Decision - Denial of claim - Exclusion/condition
4 July 2013
Background
1. The Applicants held a home building and contents policy with the Financial
Services Provider (FSP).
2. In January 2011, the Applicants‟ home in Chelmer, Queensland was
inundated with water following severe weather events.
3. The FSP assessed the claim and refused liability on the basis the loss was
caused by flood, which is an exclusion under the policy.
4. The Applicants dispute the decision and sought a review of the claim by the
Financial Ombudsman Service.
5. The FSP obtained a site specific hydrology report and maintained its
decision to refuse liability on the basis of the flood exclusion.
6. The Applicants submit the initial inundation was caused by stormwater runoff
that pooled in the area because of blocked drainage infrastructure.
Summary of Applicant s’ position
7. The Applicants say that the FSP initially refused their claim on the basis of
broad hydrology evidence, not relevant to their site.
8. The Applicants have reviewed Determination 251776 which relates to a
neighbouring property, where it was determined the insurer had to pay the
claim. The factual circumstances of 251776 and their claim, are the same.
9. In Determination 251776, an assessor said:
“I HAVE WALKED [TO THE] PARK/SPORTS AREA... DIRECTLY ACROSS
THE ROAD [FROM THE APPLICANT‟S] HOME AND I HAVE FOUND THAT
THERE IS A LARGE EARTH SPOON DRAIN... THAT RUNS THROUGH
THE PARK.
FROM MY OBSERVATIONS IF THE EXIT DRAINS THAT HAVE BEEN
BUILT AT THE ENDS OF THIS DRAIN BACKED UP AND/OR BECOME
Determination
Case No: 309051 Determination Page 2 of 13
BLOCKED IT COULD BE POSSIBLE THE WATER WOULD FLOW INTO
THE STREET AN D [THE APPLICANT‟S] PROPERTY/HOME...”
10. Stormwater pipes in the area were blocked with debris which prevented
stormwater from draining away. This coupled with water escaping drains
caused a build up of stormwater independent of the Brisbane River
floodwater.
11. Their home was inundated to a level of 18cm by stormwater runoff before
floodwater affected the property.
12. They provide photographic evidence from neighbours, including one
reportedly taken at 5:30am on 12 January 2011, that shows water pooling in
the street due to blocked drains.
13. A neighbour watched the events unfold on the day of the inundation and
reports the home from Determination 251776, which is at the same height as
their home was inundated with water between 12:00pm and 2:00pm on 12
January 2011. They note the home in 251776, was inundated to a level of
80cm. Their home was inundated to a level of 79cm, showing the relevance
in the comparison.
14. Other people affected in the area report that their insurers have paid claims
for initial inundation by stormwater runoff.
15. The Applicants provide a newspaper article where it discusses local concern
that drains in the area are not fitted with backflow devices, to prevent
backflow from the Brisbane River.
16. They note that the water level in the area was lower than the level of the
Brisbane River, indicating the water that first inundated the property was not
from the river. If the water was from backflow, the level would be the same
as the river.
17. A ridge separates Powenyenna Reserve from floodwater coming up Oxley
Road, via Faulkner Park.
18. While much of the information from 251776 was not available, they do have
a document showing the site benchmark for the neighbouring address was
8.1m AHD.
19. The FSP‟s hydrologist said the catchment area was 20 hectares. The
Brisbane City Council provided a drainage plan for 51.4 hectares and the
hydrology amended the estimated catchment area to 51.4 hectares.
However, the map of the area shows a total catchment area of 148 hectares.
This results in a catchment area sufficient to produce the 108% of water
volume needed to inundate the property with catchment flows.
20. The Applicants calculate that with the 148 hectare catchment area and an
estimated 0.245m of rain, there would have been 363,000m 3 of runoff, more
than the 335,000m 3 , the hydrologist estimated would take to inundate the
insured address.
Case No: 309051 Determination Page 3 of 13
21. Further, the hydrologist says the drains are 1800mm in diameter, however,
these were the new drains and the drain at the time of the loss was a single
1200mm drain.
22. Given the issues with the site specific hydrology reports, the Applicants
question what reliance can be placed upon the hydrologist‟s conclusions.
23. Evidence of water inundation in nearby Leybourne Street, the day before the
Brisbane River flooded, is relevant even though it is a different catchment
area, because it is indicative of the heavy rain in the area. There was
inundation to a high level independent of the Brisbane River.
24. Significantly, the hydrologist says that the home was inundated around
6:30am, on 12 January 2011. However, the photographic evidence shows
the home was not inundated until after 12:30pm on 12 January 2011. Again,
the known facts do not accord with the hydrologist‟s conclusions and
estimates.
25. The hydrologist‟s new explanation is that of limited backflo w flooding.
26. However, the policy covers water leaking or escaping from pipes. The flood
exclusion is also narrower than the flood exclusion of the insurer in
Determination 251776, as the FSP‟s wording does not state water that
“cannot enter, because it is full or has overflowed, or is prevented from
entering, because water has already escaped or been released from…” is
flood.
27. Therefore, if water back flowed from the drains or pipes then the loss would
be covered under the policy.
28. The FSP has failed to establish that flood was the cause of the loss and
therefore cannot rely on the policy exclusion. The Applicants say the FSP is
therefore liable for the loss under the policy.
Summary of FSP’s position
29. The FSP says that the expert evidence establishes the loss was caused by
the excluded event of flood and it is entitled to refuse liability.
30. The decision relating to a neighbouring property (251776) is irrelevant as it
relates to a different insurer and each case is determined on its merits. It
should not be pre judiced by the way another insurer‟s policy is applied or the
investigation conducted in that dispute. Further, with flood related matters,
each home must be assessed on its merits and therefore any comment from
an assessor for a neighbouring property does not necessarily apply to the
Applicants‟ property. Further, an assessor is not qualified to draw informed
conclusions as to the movement of water in a local area.
Case No: 309051 Determination Page 4 of 13
31. Even if the local drainage infrastructure had been blocked (which there is no
evidence of) there was insufficient rainwater to build up and inundate the
insured address.
32. The Applicants‟ proposition that the level of water inundation at different
locations will be the same as the level of the Brisbane River is flawed, and
the water heights varied across locations.
33. The ridge the Applicants say would prevent floodwater from reaching the
area is located to the south-east of the Powenyenna Reserve. It would
therefore have no influence on the water flowing from Powenyenna Reserve.
34. Powenyenna Reserve is a low lying area and floodwater entered there from
an unnamed tributary to the north-east and through local stormwater
infrastructure.
35. The newspaper article provided by the Applicants actually says that backflow
from the river has been an issue with the drainage system at the location
and residents wanted devices installed on the infrastructure to prevent this
after the 2011 flood event. This is consistent with the hydrologist‟s
conclusions as to what occurred.
36. It is unclear as to how the Applicants have arrived at stormwater inundation
of 18cm. They were not at the property at the time of inundation.
37. The information from the Bureau of Meteorology indicates there was no
significant rain at the time of the inundation, meaning stormwater runoff
could not have been the cause.
38. Its hydrologist has reviewed the location further and acknowledges the
correct catchment area draining to levels below 7.9m AHD is 51.2 hectares.
Using the rainfall gauge closest to the site for the period of 9 -12 January
2011 inclusive, there was 242mm of rain. The revised runoff generated
would therefore be 124,000m 3 . The area below 7.9m AHD can hold
335,000m 3 .
39. Accordingly, there was insufficient stormwater runoff to cause inundation of
the insured property.
40. The FSP relies on the following policy provisions:
“ Storm
If your home or contents suffer loss or damage caused by
a violent wind, cyclone or tornado
thunderstorm or hail which may be accompanied by rain or snow, or
a sudden, excessive run-off of water as a direct result of a storm in
your local area
…
however
► we will NOT cover loss or damage caused by flood
…
Case No: 309051 Determination Page 5 of 13
Water - leaking or escaping
If your home or contents suffer loss or damage caused by water
leaking or escaping from
pipes
road gutters or curbing
house gutters or drainpipes
…
…
however
► we will NOT cover loss or damage caused by water leaking or escaping
from a
…
stormwater channel or canal
stormwater pipe off the site
…
What you are not covered for
- general exclusions
we will NOT cover
► loss, damage, injury or death that occurs as a result of
flood
…
Glossary
…
flood
is the covering of normally dry land by water escaping or released from the
normal confines of a watercourse or lake, whether or not it is altered or
modified. Flood also includes water escaping from the confines of any
reservoir, channel, canal or dam.
Flood is not covered by this Policy.
…
storm
is a violent wind, cyclone, tornado, thunderstorm or hail which may be
accompanied by rain or snow, or a sudden, excessive run-off of water as a
direct result of a storm in your local area. It does not include persistent rain by
itself.”
Issues
41. Whether the initial inundation was caused by stormwater runoff or flood?
42. Whether the FSP is entitled to refuse liability for the claim under the terms
and conditions of the policy?
Case No: 309051 Determination Page 6 of 13
Reasons for decision
43. As advised to the parties, the Financial Ombudsman Service has considered
it appropriate to elevate the dispute in accordance with the Operational
Guidelines to the Terms of Reference. This is because of the potential
amount of the claim and the issues to be considered. This dispute has not
been the subject of a FOS Recommendation and has proceeded directly to
Determination.
44. The decision has been made by a Panel of three decision makers, including
an Ombudsman and decision makers with experience in the insurance
industry and consumer rights.
The Policy
45. It is not in dispute that the FSP provided and the Applicants received a copy
of the Product Disclosure Statement (PDS). The Panel has reviewed the
FSP‟s PDS and is satisfied that the policy covers loss caused by the insured
event of „storm‟ , but excludes loss caused by flood, broadly defined as water
escaping or released from a watercourse or dam.
46. The policy also covers water escaping pipes, road gutters or curbing, house
gutters or drainpipes but not water from a stormwater channel or canal.
47. The policy also excludes inundation caused by flood, which is defined as water
which has e scaped from a watercourse or lake…or from the confines of any
reservoir, channel, canal or dam.
Whether the initial inundation was caused by stormwater runoff or flood?
48. At law, the onus to establish a loss is caused by an event covered under the
policy rests with the insured. This is known as establishing a prima facie
claim under the policy.
49. Once an insured has met their onus of establishing a prima facie claim, if an
insurer seeks to refuse the claim on the basis of an exclusion in the policy,
the onus shifts to the insurer to establish the exclusion it relies upon, applies
to the circumstances of the claim.
50. The Applicants say the loss was caused by a build-up of stormwater runoff
that occurred due to the drainage infrastructure in the location being blocked.
51. The FSP says that even if all the drains in the area were blocked there was
insufficient rain to allow stormwater runoff to inundate the insured address.
Rather, floodwater from the Brisbane River inundated the insured address.
52. The Panel notes that various submissions have been provided by the parties
in support of their respective positions. As both parties have had the
opportunity to peruse the material upon which the other relies, the Panel
does not intend to quote the information in detail, other than where
specifically relevant to its decision.
Case No: 309051 Determination Page 7 of 13
53. The first assessment report, dated 23 January 2011, relevantly states that
water was building up in the nearby reserve and the home was inundated
fro m the front street. The Applicants evacuated the property at “7:30am ON
TUESDAY” (11 January 2011). It also states the home was inundated at
“midday” although no date is noted. The report concluded that a hydrologist
should be appointed and the loss appeared to be from flood.
54. The FSP provides a site specific hydrologist report from “W” dated 5 March
2013. The report provides the following information:
Powenyenna Reserve, a large open park lies to the north of the insured
property. An unnamed tributary drai ns the low-lying area to the
northeast.
There is a ridge 600m to the west of the insured property at an
elevation of 17m AHD.
The ground level at the insured address is between 7.9m AHD and
8.5m AHD.
The Applicants were reportedly not at the site inspection, but AT, noted
as a representative of the Applicants, said:
the area used to drain via a creek, however, the Council installed
a “barrel drain” or stormwater pipe to drain the area. The drain
was blocked with rubbish in January 2011 and it drains to an open
channel that was full with debris and vegetation.
the water level in the vicinity of the property on the day of the
inundation was lower than the level of the Brisbane River.
the initial inundation occurred to a level of 20cm above the ground
floor and occurred approximately 4 to 5 hours before the “ultimate
flooding” of the property.
Stormwater drainage infrastructure is located to the south and east of
Powenyenna Oval. A shallow grassed open channel conveys
stormwater runoff in a north-easterly direction around the oval and
towards an unnamed tributary. Overland flow from the channel enters
the stormwater drains via an inlet near the intersection of Oxley Road
and Glenwood Street.
Rainfall at the Toowong gauge, 3km north of the insured property
indicates 100mm of rain fell in the 24 hours from 9:00am on 9 January
2011. There was little rain in the next 24 hours until between 10:00am
and 5:00pm on 11 January 2011, where approximately 50mm fell. The
peak rainfall had an Annual Recurrence Interval of 1 year.
Due to the small catchment area, it is unlikely stormwater runoff could
have inundated the insured property.
Case No: 309051 Determination Page 8 of 13
If all the drains were blocked and the unnamed tributary was impeded
from discharging water into the Brisbane River, the total volume of
water that could pond in the area from a 20 hectare catchment area is
25,000m 3 .
The volume of water required to fill the area below the insured site level
of 7.9m AHD is 335,000m 3 . Accordingly, stormwater runoff could not
have inundated the insured property.
In reviewing the Brisbane River heights in conjunction with the
elevation of the insured site, the site would have been initially
inundated with floodwater around 6:30am on 12 January 2011.
As water in the Brisbane River began to rise, water would have back
flowed up Prices Creek, the unnamed tributary and local stormwater
infrastructure, inundating low lying areas included Powenyenna
Reserve.
Residents may also have seen water surcharging from stormwater
drains at the low point of Chelmer Street East, prior to the overtopping
of the southern bank of the Brisbane River. The photograph provided
by the Applicants taken at 5:30am on 12 January 2011 shows water
pooling in this location.
The process of floodwater backing up the drainage infrastructure from
the Brisbane River appears to be well known by the locals given the
newspaper article provided by the Applicants refers to this issue.
CONCLUSION
“ In our opinion, the inundation of the property at [address] was caused
by water escaping the normal confines of the Brisbane River and
travelling upstream through the unnamed tributary, local storm water
drainage infrastructure and on to wards the site. Storm water drains in
the vicinity of Chelmer Street E ast are likely to have “backed - up” prior
to the overland inundation of the property from the Brisbane River.”
55. The Applicants disputed the hydrologist‟s report and findings, noting the
Brisbane City Council engineers planned drainage infrastructure for a
catchment area of 51.4 hectares, being significantly more than the 20
hectares nominated by the W.
56. The Applicants submitted that W‟s calculations were i ncorrect and using the
total rain gauge data from Mt Cootha of 242mm from 9 -12 January 2011,
with the correct calculation there would have been enough runoff to inundate
the site.
57. W provided a response to the Applicants‟ submissions in a report dated 29
April 2013. It provided the following information:
Case No: 309051 Determination Page 9 of 13
It acknowledges the catchment area is approximately 51.2 hectares
and that rainfall recorded for 12 January 2011 is relevant. However,
these issues do not materially affect the cause of flooding to the
insured address.
Even using the higher rain gauge measurements of 242mm from Mt
Cootha, the revised total volume of runoff generated from the local
catchment draining to the storage area would be approximately
124,000m 3 . This conservatively assumes there was no rainfall loss via
soil infiltration.
The total area below 7.9m AHD is 25 hectares, not 35% of 20 hectares
as suggested by the Applicants. The potential volume of water that can
be stored in this area is 335,000m 3 . This represents an average depth
across the area below 7.9m AHD, of approximately 1.4m.
Even with these conservative methods, the total volume of water
generated from runoff would only be a one third of the volume required
to inundate the insured property.
In relation to the Applicants‟ concerns with the Brisbane River heights
and the heights of water at various locations, the photograph provided
by the Applicants showing Chelmer Street East at 5:30am on 12
January 2011, appears to show water to a depth of around 200 to
300mm. This represents a level of about 6.5m AHD. At the same time
the interpolated Brisbane River height near the mouth of the unnamed
tributary was 7.8m AHD, a difference of 1.3m.
The variances can be explained by the capacity of hydraulic controls
that connect the areas to the Brisbane River. W notes that the Brisbane
City Council report says the unnamed tributary (that has the potential to
back up water to the Powenyenna Reserve) is connected at
Queenscroft Street with an 1800mm pipe culvert and a 2400mm square
box gutter.
The road level at Queenscroft Street is 8.5m AHD. The low point
between the catchment and the Prices Creek is located in the vicinity of
Oxley Road and is around 8m AHD.
If the Brisbane River is below 8m AHD the ability for the Brisbane River
to inundate the area will be controlled by the hydraulic capacity of the
drainage infrastructure. Due to the limited capacity of the infrastructure,
it is expected that a difference will occur between the level of the
Brisbane River and the level observed at the oval.
The photograph provided by the Applicants indicates that between
5:30am and 12:39pm on 12 January 2011, there was a 1.6m increase
in the water level at the reserve. Given the small catchment, an
increase of this size would require hundreds of millilitres of rainfall on
12 January 2011. A significant increase in water level could only have
occurred with the backflow from the Brisbane River.
Case No: 309051 Determination Page 10 of 13
The inundation of a property in Leybourne Street, has no relevance to
the insured property as they are in different catchment areas.
58. The Applicants responded, noting the following issues:
The amended catchment area of 51.4 hectares is additional to the
original 20 hectares. However, the map shows the entire catchment is
actually 148 hectares, which is sufficient to produce the 108% of water
needed to inundate the insured property with stormwater runoff. With
148 hectares and 245mm of rain, it would produce 363,000m 3 of water,
being more than the 335,000m 3 required to inundate the insured
property.
The Council replaced a 1200mm drain with two 1800mm drains after
the flood event.
W‟s reports include a number of actual errors and amendments, raising
serious question as to what reliance can be placed upon W‟s
conclusions. W‟s estimate of a 20 hectare catchment area appears to
be nothing short of guesswork.
The photographic evidence does not support W‟s conclusion that the
inundation would have occurred at 6:30am on 12 January 2011. As W
has been shown to be wrong, W‟s comments and view cannot be
accepted.
If backfl ow was the cause of the inundation, the FSP‟s policy covers
water from pipes and therefore the loss is covered either way.
The FSP has failed to prove that flood water was the cause of the loss
and its evidence contains errors and has been revised.
Discussion
59. In reviewing the information provided by the parties, the Panel accepts that
W‟s reports do contain some errors of fact.
60. First, it is acknowledged that the catchment area should have been in the
vicinity of 51 hectares, not 20 hectares as first quoted.
61. It also appears the pipe near the reserve was only 1200mm at the time of the
loss and was later replaced with two 1800mm pipes. However, on that note,
W says that the limited drainage would affect the difference between the
Brisbane River height and the water on the reserve. Arguably, smaller pipes
would only exacerbate that issue further.
62. The Panel notes that both parties have provided submissions that (despite
some issues) do appear on the face of the facts to have merit.
63. However, of significance is the photograph taken at 5:30am on 12 January
2011, showing water pooling at Chelmer Street and Chelmer Street East. As
Case No: 309051 Determination Page 11 of 13
noted by the hydrologist, in order for rainwater alone to rise enough between
5:30am and the reported inundation after 12:00pm, there would need to be
hundreds of millilitres of rain in the area.
64. The Panel notes that daily rainfall data represents a 24-hour period to
9.00am on the nominated day, that is, rainfall for 12 January 2011 would be
for 24 hours from 9.00am on 11 January to 9,00am on 12 January. The
Panel notes from the ICA reports that little to no rain fell in the area from late
afternoon on 11 January 2011, with no rain recorded at all, at many locations
during 12 January 2011. As such there is no evidence of rainfall such as to
cause a significant rise within a few hours. In the Panel‟s view this is a
significant issue that adds some credence to the hydrologist‟s overall
conclusions.
65. The Panel also notes that the hydrologist estimated that the site was first
inundated at about 6.30am, on 12 January 2011 and does not dispute that
the home itself was first inundated between 12.noon and 2.00pm, on 12
January 2011. That timing further supports the view that rainwater would not
have caused flooding at that time.
66. Having carefully considered all of the evidence, the Panel is of the view that
on the balance of probabilities, the water which first inundated the
Applicants‟ home , would have been a combination of rainwater, which had
accumulated at the local reserve, together with water which has escaped the
confines of the Brisbane River and backflowed up the tributary, along the
stormwater infrastructure, towards the site.
67. Although the hydrologist reports that backflow from drainage infrastructure
was a cause of the water level in and around Chelmer Street, the Applicants
say that even if that was the case, the policy responds to such an event and
further relies on Determination 251776 in support of their claim.
68. However, the Panel notes that the Applicants ‟ policy does not cover flood or
water that escapes from stormwater infrastructure.
69. In Determination 251776, the Panel was satisfied that the inundation
occurred as a result of both stormwater runoff and backflow from pipes.
However, the insurer‟s policy in 251776 , specifically stated that water
escaping water mains, drains, pipes and street gutters was not flood and
was covered by the policy. Therefore in 251776, the water that back flowed
was not excluded under the policy.
70. The FSP‟s policy has a general flood exclusion that does not contain an
exception for water escaping pipes or drains. This is a significant difference
between the two policies.
71. The Applicants‟ policy co verage in regard to water escaping from pipes, is
subject to the general flood exclusion. On the other hand, the policy in
respect to 251776, provides a specific exception for pipes and drains within
the flood definition.
Case No: 309051 Determination Page 12 of 13
72. Determination 251776 states:
“Both the FSP and the Applicants have provided credible but conflicting expert
evidence concerning the possibility of the risk address being initially inundated
by stormwater run-off or back-flow. It is difficult based on the information
provided for the Panel to determine which expert evidence should be afforded
more weight. The Panel is assisted by the site inspection which was
conducted and by the policy definition. Unlike some policies, the Applicants‟
policy provides cover for back-flow inundation regardless of the source of that
water. That is providing the Applicants can establish on the balance of
probability that inundation occurred through stormwater run-off from areas
surrounding the site or water escaping from any water main, drain, pipe, street
gutter, guttering or surface, then cover is offered and the inundation would not
be excluded by the flood exclusion.
The Applicants have provided several photographs of the local area, including
the main drain opposite their home which is clearly blocked with debris. In the
Panel‟s view, it is likely in the circumstances that there would have been
inundation of the property from stormwater run-off in the area and in particular
from water escaping the water mains, drains, pipes, street gutter or guttering
or surface. The Panel accepts that this inundation would have occurred prior
to the ultimate inundation of the property by a combination of water escaping
the drains and flood water.”
73. Based on these comments, in 251776 the Panel accepted that a
combination of stormwater runoff and water escaping pipes and drains was
the cause of the initial loss and that the policy did not exclude such a loss.
As such, the outcome of Determination 251776, does not assist the
Applicants in this instance.
74. Further, it is established legal principle that water backing up stormwater
infrastructure because a watercourse is in flood, or water that cannot enter a
watercourse that is already in flood, is considered floodwater.
75. In this case, any backflow from the Brisbane River via drainage infrastructure
would be considered floodwater. The policy also specifically excludes water
escaping stormwater infrastructure such as a stormwater channel or a canal.
76. As the Panel accepts the water that inundated the property would have been
a mix of stormwater runoff and backflow, it finds the loss is not covered by
the policy.
77. The Wayne Tank legal principle broadly dictates that where there are two
causes of a loss where one is covered and the other in excluded, the
excluded cause prevails to exclude the loss. As it applies to this case, if a
mix of stormwater runoff and backflow caused the loss, the event would not
be covered.
78. The Panel acknowledges that the Applicants have provided a well presented
and well argued submission that has raised some issues with the expert
hydrology from the FSP.
Case No: 309051 Determination Page 13 of 13
79. However, for their claim to succeed the Applicants need to demonstrate that
stormwater runoff alone, independent of any other cause inundated the
property at or after 12:00pm on 12 January 2011. Based on the available
evidence, the Panel is not persuaded that stormwater alone was the
proximate cause of the loss. Rather the Panel is persuaded that the home
was first inundated by a mixture of stormwater and floodwater (as defined in
the policy) and as such the FSP would be entitled to rely on its flood
exclusion to refuse the claim.
Determination
80. On the basis of the available information the Panel determines the FSP is
entitled to refuse liability.