Summary

The complainant's home insurance claim for external roof damage from Cyclone Yasi was partly declined by the insurer, which relied on its consultants finding no cyclone damage. AFCA found the roof battens had lifted from the trusses due to the cyclone, held the insurer liable for the roof damage under the policy, ordered interest on any cash settlement, and ordered a contribution of up to $3,000 towards the complainant's consultant report costs.

Where the insured establishes a prima facie claim from first-hand evidence, the insurer must establish on the balance of probabilities that the loss falls outside cover, and the policy's extra-costs-to-comply-with-building-regulations benefit applies to a replacement roof.

Issues

Subjects and remedies

home or building damagenatural disasterpay claimpay compensationpay interest

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Case No: 308868 Determination Page 1 of 8 Case number: 308868 General Insurance - Domestic Insurance - Home Building & Contents - FSP Decision – Partial Denial of claim 24 September 2013 Background 1. The Applicant held a Home and Contents Insurance Policy (the policy) with the Financial Services Provider (FSP). 2. A claim was lodged under the policy for loss or damage to the insured property sustained during Cyclone Yasi that affected the area on 3 February 2011. 3. The FSP accepted the claim in respect to the internal damage caused by the event. However, it has declined indemnity for costs associated with the repair/replacement of the external roof, on the basis there was no damage caused to it by the insured event. 4. The Applicant remains dissatisfied with the FSP’s decision and is seeking complete indemnity for his loss including the external roof of his home. Summary of Applicant’s position 5. The Applicant maintains that the damage to the roof was due to an insured event. He relies upon the advice made available to him by the consultants (roofer/builders and engineers) he commissioned to undertake an assessment of the roof. 6. The Applicant fails to understand how the FSP can ignore the obvious evidence in respect to the damage to the insured roof. He is seeking for the FSP to cover the cost to repair and/or replace the insured roof under the policy. Summary of FSP’s position 7. The Applicant lodged a claim on 29 June 2012 for damage to the insured property claimed to have occurred on 3 February 2011 arising out of Cyclone Yasi. The FSP accepted the internal damage, however, has declined to provide indemnity for replacement of the roof. Determination Case No: 308868 Determination Page 2 of 8 8. The insured policy provides cover for loss or damage arising from the listed insured events and is not designed to cover all risks. The onus rests wit h the Applicant to establish on the balance of probabilities, that the loss claimed falls within the scope of cover available under the policy. 9. Principally, the dispute between the parties relates to whether the FSP is obliged to indemnify the Applicant for the damage to the roof, claimed to be due to Cyclone Yasi (the cyclone). 10. The FSP maintains that on the basis of its commissioned consultants, which determined there was no evidence of cyclone damage to the roof, it is entitled to decline indemnity to the Applicant. 11. The FSP relies on the following policy provisions: “ Page 9 What we cover We cover loss or damage caused by insured events 1 to 12 When we insure them, your home and contents are covered for loss or damage by the insured events 1 to 12 at the insured address. Examples include events such as fire, theft and storm. For the full range of insured events, see page 55. … Page 10 What we do not cover There are things we do not cover within each insured event, feature and option. You should also refer to page 119 for information on what we do not cover under any part of this policy. … Page 57 Insured events 1 to 12 When covered under this policy, your home and contents are insured for loss or damage at the insured address by any of the 12 insured events, if they happen in the period of insurance. 1. Storm and flood Complete details for this cover We cover Loss and damage caused by storm and flood. … Pages 119-126 What you are not covered for What is not covered under any part of your policy We do not cover loss or damage: Wear, tear, rust or mould Loss or damage caused by wear, tear, rust, fading, gradual deterioration, mould, rising damp, mildew, action of light, atmospheric or climatic conditions, corrosion or rot. unless this is covered under: – insured event 1 (storm and flood) – insured event 2 (burst pipes, leaks and overflows) . ” Case No: 308868 Determination Page 3 of 8 Issue 12. Whether the FSP is entitled to decline indemnity to the Applicant in respect to the insured building’s roof on the basis of the available evidence and in line with the specified policy limitations. Reasons for decision 13. Due to the nature and complexity of the dispute, it has been directly referred to the Panel for Determination in accordance with the Operational Guidelines to the Financial Ombudsman Service’s (FOS) Terms of Reference. 14. The Panel consists of an Ombudsman and two Panel members with extensive experience in the insurance industry and consumer claims. 15. The Panel is satisfied that the material has been exchanged and the parties have had the opportunity to respond to the issues raised. 16. Prior to arriving at a Determination, the Panel has read and considered all the material submitted by the parties to FOS. 17. The Panel, having reviewed the submissions of the parties is satisfied the parties do not dispute the following:  The Applicant held a current home building and contents insurance policy with the FSP at the time of loss.  The FSP provided and the Applicant received the relevant policy documentation including the Product Disclosure Statement (PDS) prior to the loss.  The policy provides cover for loss or damage arising from the listed insured events, which includes damage caused by a Cyclone.  The FSP has accepted to cover the internal damage caused by Cyclone Yasi in February 2011, however, maintains that there was no damage to the external roof arising from the event.  Each party has sought the services of and rely upon the advice made available by their commissioned consultants including roofers, builders and engineers. In addition to the submissions the following consultant reports have been exchanged:  T Roofing (Applicant commissioned) and quote of 27 June 2012  T Roofing Statutory Declaration 5 July 2013  AB Builder (FSP commissioned) 9 July 2012  NC Engineer Inspection report (Applicant commissioned) 26 September 2012.  NC Engineer report 22 November 2012. Case No: 308868 Determination Page 4 of 8  JH Engineers (FSP commissioned) 22 October 2012  C Engineer (FSP commissioned) 13 November 2012 and supplementary reports 27 February 2013, 20 May 2013, 19 June 2013 and 6 August 2013  G Engineer (Applicant commissioned) 14 January 2013 and supplementary reports, 18 March 2013, 29 May 2013 and 2 July 2013 18. It is not in dispute that the external surface (decromastic metal tiles), although found to be subject to some wear (to the pebble coating) were in a serviceable condition. The principle issue in dispute between the parties relates to whether or not the cyclone event damaged the internal roof structure, ie lifted and therefore affected/damaged the connections between the timber battens and trusses causing concern regarding the structural integrity of the roof. 19. The FSP maintains that, on the basis of the evidence made available by its commissioned consultants, it is entitled to decline indemnity for the damage to the external roof of the insured property and that greater regard should be given to the opinions/evidence of the engineers as compared to that of the builders/roofers commissioned to the claim. 20. The Panel acknowledges when considering matters of technical engineering expertise it would not be unreasonable to give greater weight to the opinion of an engineer over a builder in circumstances such as this. However, in acknowledging such, in the interests of clarity, the Panel does consider all evidence made available by the disputing parties on its merits prior to coming to a decision regardless of whether this is from a builder or engineer. 21. In this instance, the Panel does not believe it would be reasonable to simply disregard the evidence made available by T (commissioned by the Applicant) or AB (commissioned by the FSP), solely on the basis that the parties subsequently commissioned engineers to the claim. Considering that T and AB were the first two consultants to attend and assess the property, their first hand findings are of great relevance, in particular, given the commissioned engineers clearly disagree on several issues of relevance. Use of nails to secure the connection bet ween the battens and truss/rafter 22. The consultants JH and C appointed by the FSP maintain that usual practice when constructing such roofs is to use two nails. The first nail is installed vertically straight through the batten and into the truss/rafter with a second skew nail then installed to prevent vertical pull during strong winds. The consultants maintain that arising from the use of this second nail, which bends if the batten is forcefully lifted, the batten is prevented from falling back in place under the pressure of foot traffic on the roof. 23. The Applicant’s consultants NC and G maintain that, on the basis of their assessment of the roof structure, they found no evidence of a second nail being used rather it was their opinion that only a single nail was installed to hold the connection between the batten and truss. Further JH and C, Case No: 308868 Determination Page 5 of 8 although referring to standard construction practice in this regard, have not made available any substantiating evidence to show the actual use of two nails; nor is it reasonable to presume standard practice (in the sense of two nails, one straight the other skewed) was followed. 24. The Panel has considered the available evidence, including the very helpful photographs submitted by all the consultants and is satisfied, on the balance of probabilities, that there is only reliable evidence of vertical installation of a single nail to secure the connection between the batten and truss. It is concerning, as this issue emerged as a matter of significant dispute between the consultants and was directly relevant to their arguments, that more definitive investigations were not made by the FSP’s consultants to determine the actual building practices, vis a vis one nail or two, used in the construction of the roof. Battens being pushed back into position under foot traffic on the roof 25. The consultants T and AB both maintain that upon their visit to the insured property, while walking on the roof it felt spongy under body weight and they heard a kind of thumping sound as well. The consultants both formed the opinion that this was because of loose battens, which had lifted due to the cyclone event, being pushed back into position under body weight. 26. They both assessed the roof structure as showing signs of lift across the roof arising from the cyclone event. The battens were found to have separated from the truss and were found to be quite loose, ie could be lifted off the truss with the use of fingers. The report made available by AB (appointed by the FSP) expresses this view in some detail and also provided photographic evidence showing numerous battens which appeared loose and had separated from the truss. 27. In line with the matters discussed above and having regard to the first hand evidence from T and AB, the Panel is not satisfied that it can simply ignore these findings in favour of the opinions of the FSP’s preferred engineers. The opinions provided by T and AB whilst not of a technical nature and/or in regards to a matter of engineering, are firsthand accounts of their experience and what they witnessed/heard during their assessment, which they were adequately qualified to undertake. 28. The fact that they felt the roof to be spongy under foot (not just limited to the far ends of the roof), heard thumping as they walked across the roof, saw and recorded evidence (photos) supporting the use of one nail and again saw and recorded evidence of separation and loose connections between the battens and truss cannot simply be ignored. It must be noted that all this information was recorded by T and AB, before any of the engineers were appointed to the claim and/or attended the insured address. 29. The Panel is satisfied having reviewed all of the evidence that it was possible for the battens to be pushed down into position under the consultants’ body w eight whilst walking on the roof. Further, the available photographic evidence does not support the opinion that the battens were Case No: 308868 Determination Page 6 of 8 found to be suspended upon the nails, due to being prevented from sitting back down upon the truss, because of the use of a second skew nail as suggested by the FSP’s engineer. Separation of the battens from the trusses/rafters 30. The Panel notes that it is not in dispute that NC, whilst undertaking its assessment of the roof structure made use of a screwdriver to test the existence of separation of battens from the truss as well as the strength of the connection between the two. The FSP on the basis of its preferred consultants’ opinions, maintains that NC in using the 190mm screwdriver had possibly applied more force than intended, resulting in the manual separation of the battens from the truss. 31. JH and C also maintain that their assessments did not find any separation of the battens from the truss due to the claimed cyclone event. Although some minor separation is acknowledged, the consultants are of the opinion that these separations were due to the geometry of the truss and would have been present since construction of the roof. JH and C maintain that the connections between the battens and trusses were found to be extremely tight which further supports their opinion that the minor separation witnessed was present since construction of the roof. 32. The Panel acknowledges the opinion of the FSP in respect to NC’s actions regarding the use of a screwdriver and the possible impact this may have had on the battens tested. However, the Panel notes that there is clear evidence of separation (from T and AB) available, prior to any of the engineers (including NC) having access into the roof cavity. The evidence of T and AB, is in complete cont radiction with JH and C’s advice and establishes, on balance, that there was separation of numerous battens from the truss and that connections were found to be loose as opposed to extremely tight. 33. The Panel is satisfied that the Applicant has been able to establish, on the balance of probabilities, that there was separation of the battens from the trusses/rafters as well as loose connections between the two timbers. It is not satisfied that the FSP has been successful in establishing the above did not exist and/or that there was no damage to the battens and trusses caused by Cyclone Yasi. 34. In saying that, the Panel does acknowledge and finds to be reasonable the position of the FSP that there would exist greater flexibility/sponginess at both ends of the roof arising from the increased distance between installation of trusses. However, the Panel does not accept that this in any way diminishes the fact that there is reasonable evidence to establish the existence of separation of numerous battens from the trusses which would in all reasonableness be considered consistent with a cyclone event. Case No: 308868 Determination Page 7 of 8 Capacity of the connections between the battens and trusses/rafters to resist uplift of the roof during the cyclone 35. The Panel acknowledges that there is a certain consensus between all the engineers appointed to the claim, that regardless of whether a si ngle or two nails was used in the construction of the roof, the connections between the battens and trusses should logically have been strong enough to weather the storm, ie the pressures applied by Cyclone Yasi based on the recorded wind speeds and location of the home. 36. However, that remains the extent of the consensus between the differing consultants in this regard, with JH and C maintaining that this fact establishes the damage claimed (roof) could not have been due to the cyclone, whilst NC and G hold the opinion, that the most likely cause for the separation was still Cyclone Yasi. 37. The Panel has carefully considered all the evidence made available by the parties and is satisfied that having accepted the existence of a prima facie claim, the onus rests with the FSP to establish, on the balance of probabilities, its entitlement to limit its liability under the claim in line with the policy. The Panel is satisfied that the evidence made available by the Applicant’s preferred engineers coupled with the r eports from AB and T are the more probable/credible having regard to the physical evidence. 38. Further, having regard to the nature and actual damage (separation/lifting) to the roof structure of the insured dwelling, the Panel is satisfied that this, on the balance of probabilities, is consistent with the type of damage which would reasonably be accepted to occur arising from a cyclone event. It may be the case that theoretically the connections should have held under the pressure of Cyclone Yasi, however, it is a reasonable conclusion to find that actually this was not the case. 39. In the absence of compelling evidence to the contrary from the FSP, which establishes, on the balance of probabilities, that this component of damage (subject to this dispute) was caused by circumstances specifically excluded under the policy, the Panel is satisfied that the Applicant has established a prima facie claim which includes an entitlement to cover for the damage to the roof reasonably accepted to be due to the cyclone event. POLICY WORDING 40. Having reviewed the policy the Panel notes that there are additional responsibilities upon the FSP under the policy, the relevant provision being: “ 4. Extra costs to comply with the latest home building regulations Some key points Comes with - Home cover Benefit We pay extra to upgrade damaged parts of your home to comply with the latest building regulations (eg. solar design to assist with heating and cooling, insulation in ceilings and walls, building to withstand cyclones, bushfires). When - Repairing damage to your home. Case No: 308868 Determination Page 8 of 8 Main exclusion - We won’t pay for things that should have been part of your home when it was built. ” 41. The Panel notes the suggested scope of works is for a complete roof replacement. Further, there is reference to the possible absence of similar roof metal tiles that have cyclone rating and so replacement with colour bond sheeting was suggested. In line with the terms of the policy, the Panel is satisfied that the FSP is obliged to pay the extra costs to comply with the latest home building regulations, which in this instance would reasonably include the requirement that the new roof be built in line with current building standards to withstand cyclones. Determination 42. The Panel determines the FSP is liable to meet the Applicant’s claim for the damage to the roof and any resultant damage in accordance with the terms of the policy and insofar as a new roof is to be constructed/replaced, it is to be of a standard that complies with the latest building regulations. 43. Insofar as the FSP determines to cash settle the claim, the FSP is to pay interest upon such cash payment in line with Section 57 of the Insurance Contracts Act 1984 , from 10 December 2012 (date of its final decision) to the date such payment is issued to the Applicant. 44. Further, insofar as the Applicant may have incurred costs obtaining relevant consultant reports in pursuing this dispute, the Panel determines pursuant to paragraph 9.4 of the Terms of Reference that the FSP contribute up to a maximum of $3,000 towards the cost of supplying the Consultant reports from NC and G engineering, subject to the Applicant providing proof as to the amount of costs incurred.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.