Background
1. The Applicant held a home and contents policy with the Financial Services
Provider (FSP) which was current at the time of the loss. The policy provided
cover for accidental loss or damage to the Applicant’s home in Chadstone,
Victoria (subject to certain exclusions).
2. On 23 August 2012, the Applicant lodged a claim for damage to her home,
which she said was caused by an earthquake which occurred on 19 June
2012.
3. The FSP engaged a builder (“RP”) to assess the damage to the Applicant’s
home. The builder recom mended that an engineer (“WG”) be appointed to
report on the cause of the damage.
4. Based on WG’s report, the FSP determined that the damage to the
Applicant’s home was not caused by the earthquake but was pre-existing
and due to factors which were excluded under the policy, such as differential
movement of foundations and faulty workmanship. However, the FSP
accepted that some of the damage had been exacerbated by the earthquake
and offered the Applicant a partial settlement of $1,300 (less the applicable
excess of $700).
5. The Applicant disputes the FSP’s partial denial of her claim and seeks
indemnity under the policy for all of the claimed damage.
Summary of Applicant’s position
6. The Applicant says she was not able to report the damage within 72 hours of
the earthquake as required under the policy because she was overseas
when the damage occurred. She reported the damage as soon as possible.
7. The Applicant says that as a result of the unrepaired damage, her home is
now dangerous and a hazard to her small grandchildren. She seeks to have
the damage repaired urgently before an injury occurs.
Determination
Case No: 308633 Determination Page 2 of 7
8. The Applicant disputes the findings of the FSP’s engineer that the damage to
her home arose from movement of the foundations or faulty workmanship.
She says that the house is 32 years old and has never experienced any
structural failure, nor have any claims for structural failure been made during
that time. The Applicant queries why the engineer’s report was preferred
over that of the builder, who concluded that most of the damage to the
Applicant’s house was caused by the earthquake.
9. The Applicant feels that the FSP’s engineer supplied only those photographs
which made her home appear to be in bad condition. She says that there are
other photographs taken by the FSP’s builder which have not been supplied.
The Applicant thinks that the engineer was not objective.
10. The Applicant says that, had she noticed the damage prior to the
earthquake, she would have taken steps to rectify it and would not have
waited for the earthquake to occur before lodging a claim.
Summary of FSP’s position
11. The FSP says that the Applicant has not discharged the onus on her to
establish that her claim falls within the scope of cover under the policy. The
FSP says that the cause of the damage falls within specific exclusions under
the policy.
12. The FSP relies on the report of its engineer (WG), who found that much of
the damage pre-existed the earthquake and was caused by a combination of
factors including differential movement of foundations and faulty
workmanship. The FSP notes that it has since sought further, more detailed
explanations from its engineer as to the cause of particular items of damage.
13. The FSP says it has accepted that the earthquake exacerbated some of the
pre- existing issues at the Applicant’s property. It has accepted full liability for
particular items of damage, where the e ngineer was not able to state
definitively that these were completely unrelated to the earthquake. The FSP
says that it has arranged to cash settle the Applicant for the cost of repairing
this damage.
14. The FSP says the Applicant has not provided any information in support of
her claim or contradicting the findings of the FSP’s engineer. Therefore, the
FSP is entitled to rely on its engineer’s report to decline the remainder of the
Applicant’s claim.
15. Accordingly, the FSP considers that it has adequately discharged its liability
under the policy.
16. The FSP relies on the following policy provisions:
“ Accidental Damage cover
What is covered
Your schedule will specify whether you home or contents, or both are insured.
Case No: 308633 Determination Page 3 of 7
Your home and/or your contents are covered for accidental loss or damage
during the period of insurance. They are covered only if you own them, or are
liable for them.
...
What we will not pay for
We will not cover your home or contents for any loss or damage caused by:
▼ Landslide, subsidence, earth movement or erosion except where such loss
or damage is directly caused by and occurs within 72 hours of the following:
▼ flood, storm, tsunami, hail, storm or wind,
▼ explosion
▼ earthquake, or
▼ Escaping liquid.
▼ Settling or shrinkage.
...
▼ Rust, corrosion, gradual deterioration, depreciation, wear or tear.
...
▼ Inherent defects, structural defects, faulty workmanship or faulty design.”
Issue
17. Whether the FSP’s settlement offer represents an appropriate settlement of
the Applicant’s claim in accor dance with the terms of the policy.
Reasons for decision
18. As advised to the parties, the Service has considered it appropriate to
expedite this dispute in accordance with the Operational Guidelines to the
Service’s Terms of Reference. Accordingly, this dis pute has not been the
subject of a Recommendation and has proceeded directly to Determination.
19. I am satisfied that there has been a full exchange of materials between the
parties and that each party has had the opportunity to address any issues
raised therein.
20. It is an accepted principle of general insurance law that an insured bears the
onus of establishing, on the balance of probabilities, that they have suffered
a loss caused by an event to which the policy responds. This is known as a
prima facie claim. Should this onus be discharged, it is then the responsibility
of the insurer to establish, on the balance of probabilities, that it is entitled to
deny liability for the claim.
21. The primary matter in dispute between the parties relates to the cause of
da mage to various areas of the Applicant’s home.
Case No: 308633 Determination Page 4 of 7
Cause of damage
22. The FSP initially engaged a builder (RP) to assess the damage to the
Applicant’s home. RP attended the Applicant’s home on 28 August 2012 and
noted that:
“... there is significant movement in the structural integrity of external brick
walls as well as brick piers supporting the back tile deck.”
23. While a copy of RP’s report has not been provided to the Service,
correspondence provided by the FSP indicates that RP concluded that the
damage to the Applicant’s property was caused by the earthquake.
24. However, RP suggested that an engineer (WG) be appointed to inspect the
property and determine the cause of the damage. I accept that WG is
appropriately qualified to comment on such matters.
25. In his initial report dated 17 September 2012, WG stated that:
“... the resulting damage is not as a direct result of the earthquake event,
however may have been exacerbated by the event.”
26. The FSP declined the claim on the basis of WG’s ini tial report. However,
following a complaint by the Applicant, the FSP’s Internal Dispute Resolution
department reviewed this decision and concluded that WG’s initial report
was ambiguous. Accordingly, the FSP asked WG to clarify which items of
damage to the property were attributable solely to foundation movement
and/or faulty workmanship and which may have been exacerbated by the
earthquake.
27. WG provided a more detailed version of his initial report (and further
explanatory material), in which he identified the following items of damage as
having been caused by pre-existing conditions:
Brickwork cracks above the laundry windo w (to the north) – WG
considered that these cracks were caused by local weakness in the brick
wall because of the placement of an air vent, which resulted in cracking
following movement of foundations. WG also observed evidence of pre-
existing cracks in the surrounding area.
Cracks to the brick wall (to the east) and above the front porch – WG
noted that this cracking was not typical of lateral building movement
caused by earthquakes and may have resulted from the external walls of
the building not being articulated so as to allow for possible expansion and
movement in the brickwork.
Crack in the 230 wall (to the west) supporting the concrete balcony – WG
concluded that this crack was pre-existing, given the evidence of
attempted mortar repair work to the brickwork.
Cracks to the first floor balcony tiles and the tiles at ground level below the
balcony – WG noted that earthquake damage would have resulted in
movement throughout the entire tiled area and would have caused
damage to the intersection between the balcony and the wall of the house,
Case No: 308633 Determination Page 5 of 7
whereas the actual damage was localised and the area of intersection was
in good condition. After having regard to additional information provided by
the Applicant about the damage she had observed to the cracked balcony
tiles (and certain remedial measures she had taken prior to WG’s
inspection), WG confirmed that the cracking damage arose from
inadequate bedding and/or loss of adhesion/support to the underside of
the tiles. WG also noted that further cracking damage may have been
caused if the tiles were removed, modified and replaced without bedding,
during the remedial repairs undertaken by the Applicant.
The timber boundary fence along the west – WG considered that the
rotation of the timber post was due to deterioration of the post at the base
or the footing having rotted.
Poor workmanship to the balcony face tiles to the south-west – WG noted
that the tiles were of different sizes and missing mortar.
Water stain marks and ‘flaky’ paint to the balcony slab and external stair
soffit – WG considered that the water damage was caused by water
running down the building, while the flaky paint may have resulted from
one or more of temperature, humidity, moisture ingress, insufficient
surface preparation and the failure of the waterproof membrane over the
balcony slab.
28. WG’s more detailed report identifie d the following four items as having been
exacerbated by the earthquake:
poor workmanship in the construction of the brick piers (to the south)
supporting the first floor balcony, which had moved slightly relative to the
balcony slab;
a vertical crack in the brick wall to the south-east and below the balcony
slab soffit;
a protruding brick to the south-east of the house at the first floor; and
cracked glass to the south-east corner of the balcony enclosure.
29. WG’s report also noted that some minor degree of f oundation movement
may have occurred, given the cracking to the brickwork. WG considered that
this was typical of differential foundation movement resulting from volume
changes to the moderately reactive founding material in the area. WG
concluded that the sudden shaking from the earthquake may have resulted
in some of the cracking appearing or possibly widening.
30. The Applicant disputes WG’s findings on the basis that:
the FSP’s builder (RP) who initially inspected the damage was satisfied
that the damage had arisen from earthquake and took photographs
demonstrating that her home was in good condition; and
the house is approximately 32 years old and has never suffered any sort of
structural failure in the past, which means it cannot be doing so now (other
than as a result of the earthquake).
Case No: 308633 Determination Page 6 of 7
31. WG’s reports include a number of photographs of the damage to the
Applicant’s property. At the request of the Service, the FSP has also
provided copies of the photographs taken by RP for consideration. Although
the Applicant maintains that there are additional photographs which have not
been provided, the FSP denies that this is the case. In any event, I consider
that the photographs provided are sufficient to provide a good illustration of
the damage to the Applicant’s ho me. I am not persuaded that the provision
of any additional photographs (should they exist) would necessarily be
beneficial to the Applicant’s case.
32. While I accept that the FSP’s builder (RP) conclude d that the damage was
caused by the earthquake, he also considered that it was necessary for an
engineer to be appointed to determine the cause of the damage. RP’s report
may also have been influenced by his understanding that the Applicant had
witnessed the damage occurring during the earthquake, which subsequently
turned out to be incorrect.
33. In my view, the reports and additional explanatory material provided by WG
set out in detail the various areas of damage to the Applicant’s property, and
provide a considered explanation of the causes thereof. In light of this, and
given the expertise of engineers in relation to structural matters, I consider
that the report of WG should be preferred over that of RP.
34. While the Applicant disputes the findings of WG, she has not provided any
evidence from suitably qualified persons to suggest the damage for which
she is claiming arose as a result of the earthquake. I am not persuaded by
the Applicant’s contention that the home cannot be suffering from structural
issues resulting from the movement of foundations, merely because such
issues have not been identified in the past.
35. Accordingly, in the absence of conflicting information, I consider that the FSP
is entitled to rely on the findings of its engineer (WG) as to the cause of the
damage. Based on WG’s findings, the items of damage identified as
resulting from “pre - existing conditions” would fall within various exclusions
under the policy for settling or shrinkage, gradual deterioration, wear or tear,
structural defects and faulty workmanship.
36. I have also had regard to publicly available information on the website of
Geoscience Australia ( Australia’s national geosciences agency ), which is a
statutory agency within the portfolio of the Commonwealth Department of
Resources, Energy and Tourism. This information indicates that:
the epicentre of the 19 June 2012 earthquake was 16 kilometres west of
Moe; and
although the earthquake could have been felt by people within an
estimated 252 kilometres radius of the epicentre, it could only have caused
damage within an estimated 20 kilometre radius.
37. The Applicant’s house is located approximately 120 kilometres from the
epicentre of the 19 June 2012 earthquake. Accordingly, I consider that the
Case No: 308633 Determination Page 7 of 7
information available from GeoScience Australia, supports the conclusion
that the damage to the Applicant’s house was not caused by the earthquake.
Settlement offer
38. The FSP decided to accept liability for the four items of damage identified in
WG’s report as having been exacerbated by the earthquake. I consider that
the FSP’s decision in this regard was reasonable in the circumstances,
having regard to the available evidence.
39. Under the terms of the policy, the FSP had the right to choose to arrange for
the repair of the damage to the Applicant’s property or, alternatively, pay her
the amount which it would cost the FSP to repair the damage. The FSP
elected to cash settle the Applicant for the cost of repairing that part of the
damage for which it had accepted liability and offered her the amount of
$1,300, based on a quote provided by its builder (RP).
40. The Applicant disputes that the amount offered is sufficient to properly repair
the damage. However, the Applicant has not provided any information to
support this.
41. In the absence of any conflicting information, I consider that the FSP is
entitled to rely on the quote provided by RP in determining the amount of its
settlement offer. I therefore consider that the FSP acted reasonably in
offering the Applicant a cash settlement of $1,300 to repair the four items of
damage for which it had accepted liability.
Determination
42. On the basis of the available information I determine that the FSP’s
settlement offer represents an appropriate settlement of the Applicant’s claim
in accordance with the terms of the policy.