Home / Financial Firm (Unknown - Insurer) / Determination 307946

Determination 307946

Denial of claim - leaking pipes insured event and earth movement exclusion

FirmFinancial Firm (Unknown - Insurer)
Decided2013-08-28
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant
Amount awarded$3,000
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

The applicant's home cracked after leaking pipes were identified, and the FSP denied the claim under the earth movement exclusion. AFCA decided the claim was covered, ordered the FSP to arrange repairs for resultant damage, to contribute up to $3,000 towards the applicant's expert report costs, and to pay Insurance Contracts Act interest.

The applicant established a leaking pipes insured event, and the FSP did not prove the earth movement exclusion applied because the policy covers resulting damage from leaking water.

Issues

Subjects and remedies

home or building damagepay compensationpay interestrepair or rectify

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Case No: 307946 Determination Page 1 of 7 Case number: 307946 General Insurance - Domestic Insurance - Home Building - FSP Decision - Denial of Claim - Exclusion/Condition 22 August 2013 Background 1. The Applicant’s home and contents insurance policy with the FSP insured the Applicant’s building for the sum of $365,000 and contents for the sum of $144,000 subject to a $100 excess. 2. On 15 August 2011 the Applicant contacted the FSP to report severe cracking to his home building which he had been informed had been caused by leaki ng pipes. The FSP appointed a loss adjuster (“EA”) and an engineer (“FM”) to inspect and report on the cause and extent of damage. As a result of the expert reports the FSP denied the Applicant’s claim. 3. The Applicant disputes the denial of his claim. Summa ry of Applicant’s position 4. The Applicant says he appointed building experts to determine the cause of the cracking and to advise him on methods of repair. During this process he was advised the damage was probably caused by leaking pipes and to contact the FSP to report the damage, which he did. 5. Whilst the FSP and its appointed engineer FM say that the damage to the house was not caused from water leaks, the FSP’s own appointed plumber has identified several leaking pipes under the home. 6. He appointed his ow n independent engineer (“DI”) who was involved in the original construction of the home and provided a report from him. “DI” conducted soil tests and provided an opinion confirming the cause of cracking to his home was as a result of the water leaks detected at the site. 7. The Applicant seeks to have his claim accepted and his home repaired. Summary of FSP’s position 8. The damage to the Applicant’s home is near the bathroom and affects the front of the home with cracks showing from the ceiling to the floor, the front part of the home dropping and cracks through tiles and gyprock. Determination Case No: 307946 Determination Page 2 of 7 9. The FSP says when the Applicant first reported the damage to his home he advised he had observed the cracking approximately 18 months prior however believed the cracking was due to soil movement and did not proceed to report the matter to it earlier. 10. On advice from his builder, the Applicant reported the matter to it believing the damage to have been caused by leaking pipes. 11. The FSP appointed a loss adjuster EA. According to EA, the Applicant had noticed a rapid onset of cracking across the centre of the new home. It was reported that the cracks started on the ceiling, a straight line through the bathroom, hallway and dining room and a straight line emanating from the centre of the bathroom. The loss adjuster appointed JH Plumbers to attend the property. JH reported that there were leaking pipes in particular areas of the Applicant’s home. FM Engineers were subsequently appointed to inspect and determine the cause of distress at the Applic ant’s property. The engineer formed the view that the distress at the site was due to settlement of the footings and not directly attributable to the plumbing leak. The FSP denies the Applicant’s claim on the basis that the Applicant has failed to provide evidence to support his claim that an insured event had occurred and in the event that such evidence was provided believes that the general exclusion relating to earth movement would apply. 12. The FSP relies on the following policy provisions of its Product Disclosure Statement (PDS): “ Insured events If Home and/or Contents is shown on your Certificate of Insurance we will cover you for: ... 7. Bursting, leaking, discharging or overflowing water or liquid loss or damage as a result of bursting, leaking, discharging or overflowing water or liquid from:  ...  pipes or plumbing apparatus fixed to pipes  ...” (Pages 9 to 11) “ General exclusions We will not cover you for loss, damage or liability: ... Earth movement ... caused by or arising out of erosion, vibration, subsidence, landslip, landslide, mudslide, collapse, shrinkage or any other earth movement: But we will cover you for: ...  bursting, leaking, discharging or overflowing of water or Case No: 307946 Determination Page 3 of 7 liquid – insured event 7 ...” (Page 24) “ Claims – Your obligations What yo u must do You must  establish that an insured event or incident has occurred ...” (Page 30)” Issues 13. Whether the Applicant has established a prima facie claim under the terms of the policy. 14. Whether the FSP is entitled to deny the Applicant’s claim. Reasons for decision 15. As advised to the parties, FOS has considered it appropriate to expedite the dispute in accordance with the Operational Guidelines to the FOS Terms of Reference. This dispute has not been the subject of a FOS Recommendation and has proceeded directly to Determination. 16. This decision has been made by a Panel consisting of an Ombudsman, a representative with extensive experience in insurance industry matters and a representative with extensive experience in consumer claims. 17. The Panel is satisfied there has been a full exchange of material between the parties and each party has had the opportunity of clarifying the issues which arise from the material. 18. The Applicant maintains that based on information provided by a builder, he lodged his claim claiming the damage sustained to the property was caused by water leaks. The water leaks have been confirmed by the FSP’s appointed plumber JH. The Applicant maintains that in the circumstances he has established a prima facie claim for damage for bursting, leaking, discharging or overflowing water or liquid and that the general exclusion for earth movement does not apply in these circumstances. 19. The report from JH provides the following conclusions: “ Conclusion 1/ Leakage was recorded from the laundry bathroom branch drain between approximately 1 metre and 0.9 metres upstream of IO (C) which is possibly positioned below the WC. 2/ Leakage was recorded from the spa bath waste pipe. This leakage is suspected to be positioned adjacent the bathroom floor trap. Case No: 307946 Determination Page 4 of 7 3/ Leakage was recorded from the main bathroom shower cracked floor base. 4/ The IO (D) riser junction was noted to be severely broken. 5/ Leakage at the rate of approximately 8 litres per minute was recorded from the section of sewer drainage between position (C) and position (D). 6/ Leakage at the rate of approximately 6 litres per minute was recorded from the section of sewer drainage between position (C) and position (D). 7/ The stormwater drainage adjacent IO (D) was noted to be broken. This break was going to be repaired by the owner.” 20. The consulting engineer FM subsequently provided a report with respect to the cause and extent of the damage to the Applicant’s property. FM did not conduct any soil tests but considered the pattern of cracking of the Applicant’s building suggested distress due to the ground drying. Any shrinkage of soil close to a building’s footing will likely cause localised settlement according to FM. FM concluded that trees located towards the front of the residence are and have been extracting moisture from around the footings particularly during the recent drought from 2006 to 2010 and this would cause the settlement of the footings which are not directly attributable to any plumbing leak. 21. In response to the report from FM and the denial of his claim, the Applicant provided his own engineer’s report from DI. DI was the engineer at the property when it was originally constructed. DI’s report is based not only on inspection of the property but also on soil tests conducted. DI reached the following conclusions: “In conclusion, we can understand that drying settlement appears to be the cause of the distress observed in the dwelling. However this is not supported by the site soil conditions and the moisture changes which appear to have occurred over the years since the dwelling was built. In particular, even though the trees have dried the soils at the front of the dwelling, these are shallower and less reactive than those at the centre and rear of the house. There is evidence in the borehole logs to suggest that the moisture content in samples from new holes 1 and 2 could be higher than the original samples, which is consistent with swelling due to moisture ingress into the soils. It is also possible that the sewer drain excavation has facilitated the ingress of water into the deeper soil. In our opinion, we accept that some distortion of the footings results from the drying of the soils due to the effects of the trees at the front of the house. This is unlikely to be of a significant magnitude to be the principal cause of the distress. The soils in the area were [sic] the pipe leaks have been identified are significantly more reactive. We consider that the principal cause of the distress to the dwelling is due to excessive differential movements in the footings as the foundation soils swell due to extreme volumetric changes associated with moisture content. These moisture changes are “abnormal” when leaking water pipes cause extraordinary quantities of water t o enter directly into the foundation soil.” 22. The Panel notes from JH’s report that there is no map provided to detail where the leaks are located. The only reference to these identified leaks is Case No: 307946 Determination Page 5 of 7 contained on a site plan of the property prepared by DI. This information is not disputed by the FSP and in the circumstances the Panel accepts that the site map accurately identifies the location of the leaks. 23. The Panel notes “DI” conducted a soil test whereas “FM” did not. The Panel also notes “DI” was the original engineer responsible for the property at the time of construction by the previous owner of the property in 1999. As such, “DI” had access to original soil tests taken at the time. 24. “JH” has clearly identified a number of leaking pipes at the Applicant’s property. “DI” has clearly indicated his opinion on the cause of cracking at the property is due to leaking water pipes which have caused an abnormal amount of water to enter directly into the foundation soil thus causing excessive differential movements in the footings. 25. The FSP in its Notice of Response to the Service acknowledges its appointed experts “JH” and “FM” acknowledge that ’there is a leak present’. 26. Based on the reports an d the FSP’s own partial concession as outlined above, the Panel is satisfied the Applicant has established, on the balance of probabilities, his loss has been caused by an insured event, namely, the leaking of pipes. The onus now shifts to the FSP to prove, on the balance of probabilities, an exclusion applies. 27. The FSP was provided a copy of “DI’ s ” report and had the opportunity to have “FM” provide further comment. “FM” says in relation to “DI’s” findings: “As we see it, the fundamental difference between the opinion of [“DI”] and [“FM”] is that we say soil drying settlement is the cause of the cracking distress whereas [“DI”]’s opinion is that “ moisture changes which appear to have occurred over the years since the dwelling was built ” is the cause of the distress. Presumably he is referring to a moisture increase that would cause swelling and heaving of the extremely reactive clay foundation, with the source of moisture coming from the 8 litre per minute pipe leak in the vicinity of the bathroom. While “DI” has conducted further soil testing at the site, we regard the assessment of field moisture content using the tactile plastic limit test to be far less accurate than testing for total suction down the soil profile. Total suction (pF) measurement gives accurate assessment of the affinity of the soil for moisture, in other words, an accurate assessment of its in-situ moisture condition. This is a quantitative assessment method. We also comment that the tabulated comparison of moisture contents and soil react ivity shown on page 2 of [“DI”]’s report, in the second row where it compares BH2 from 1999 with BH1 from 2012, there is a comment that “ Moisture contents appear to be higher in the new samples... ” If we were to apply the plastic limit test as a means of a ssessment as done by [“DI”], then we point out that the moisture content in these two boreholes is exactly the same in 1999 and 2012, both being expressed as greater than plastic limit by the term “>PL”. We further point out that the original 1999 BH2 was taken from somewhere near the centre area of the proposed dwelling footprint whereas the 2012 BH1 was taken in the near vicinity of the leaking drain which, on the basis of Case No: 307946 Determination Page 6 of 7 [“DI”]’s tabulated comparison, means that there has been no increase in moisture content caused by the leaking pipe because the plastic limit assessment of the clay down BH1 profile (2012) has not changed from the 1999 assessment. What this means is that the leak has not increased the moisture content of the soil over and above what it was at the time of testing back in 1999. For soil heave caused by a leaking pipe in the near vicinity of the 2012 BH1 to have played any part in causing damage to the dwelling, it would need to be shown that there was an increase in moisture content. However, the simple comparison of plastic limit tests between 1999 BH2 and 2012 BH1 clearly do not show an increase. In our opinion this serves to reinforce our opinion that settlement caused by soil drying at the front and rear of the property is the sole cause of damage.” 28. The Panel notes that FM has suggested more comprehensive soil tests be undertaken. The FSP’s loss adjuster however considered that as the Applicant’s report identifies moisture changes around the dwelling occurring since the home was constructed and none of these changes a result of a defined event, there was no need to conduct any soil tests. In the Panel’s view, the loss adjuster has misunderstood the nature of the information provided by the original plumber JH, DI and FM. 29. “FM” says by applying the plastic limit test as done by “DI”, the moisture content of the two compared boreholes have both been expressed as greater than plastic limit (indicated by the term “>PL”). The Panel has reviewed the 1999 and 2012 soil tests conducted by “DI” and note the 1999 test results make no mention of the term “>PL”. Whilst the Panel is satisfied “FM” is aware of how this is calculated and may have done so from the information contained in the results of the 1999 soil test, no explanation has been provided to demonstrate how this has been calculated or that the results of the 1999 and 2012 tests are the same. 30. The Panel is also confused over “FM’s” comments regarding the moisture level in the soil being the same in 1999 and 2012 based on the fact the locations of the two relevant boreholes differ. There has been no explanation as to how or why “FM” believes this to be the case. 31. Having considered the competing reports, the Panel believes the report provided by the Applicant from DI to be more reliable than those reports provided by the FSP from FM. The FSP has not commissioned any further soil tests despite the comments by FM and in the circumstances, the only soil tests conducted are those conducted by DI. The conclusions drawn by DI as a result of those tests are reasonable and although FM is critical of those findings, in the Panel’s view, in the absence of having conducted the additional soil tests, the findings of DI are preferred. The FSP relies on the General Exclusion of “Earth movement” as detailed in its PDS. However the Panel notes the exclusion goes on to say: “But we will cover you for: ... Case No: 307946 Determination Page 7 of 7  Bursting, leaking, discharging or overflowing of water or liquid – insured event 7” 32. The Panel is satisfied that the evidence on balance establishes that there were bursting, leaking pipes at the Applicant’s property and the evidence of DI persuasive that the damage to the Applicant’s property has been significantly caused by the bursting, leaking, discharging or overflowing of water or liquid. 33. The Panel is satisfied that the Applicant has established on the balance of probabilities a valid claim under the terms of the policy. The Panel is not satisfied that the FSP has established that an exclusion applies under the terms of the policy to defeat the A pplicant’s clai m. 34. The Panel notes the PDS provides the damaged pipes/water containers which have caused the leaks are not covered. The Applicant is therefore responsible for the repairs to these items at his own cost. The FSP is responsible for all resultant damage. Determination 35. On the basis of the available information the Panel determines the FSP is to meet its liability in accordance with the terms and conditions of the policy The FSP is to arrange the necessary quotations and repairs to the Applicant’s property accor dingly. The Applicant will be responsible for the cost and repair of the relevant leaking pipes and such repairs should be completed prior to the FSP commencing repairs to the property. 36. Further pursuant to Paragraph 9.4 of the Terms of Reference, the FSP m ust contribute to the Applicant’s professional costs associated with him obtaining the report from “DI” up to a maximum of $3 ,000. 37. Insofar as the FSP seeks to cash settle the Applicant’s claim, the FSP is to pay interest in accordance with Section 57 of the Insurance Contracts Act 1984 from 2 February 2012 being the date of the FSP’s IDR decision to date of payment of the claim.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.