Home / Financial Firm (Unknown - Insurer) / Determination 307946
Determination 307946
Denial of claim - leaking pipes insured event and earth movement exclusion
Summary
The applicant's home cracked after leaking pipes were identified, and the FSP denied the claim under the earth movement exclusion. AFCA decided the claim was covered, ordered the FSP to arrange repairs for resultant damage, to contribute up to $3,000 towards the applicant's expert report costs, and to pay Insurance Contracts Act interest.
The applicant established a leaking pipes insured event, and the FSP did not prove the earth movement exclusion applied because the policy covers resulting damage from leaking water.
Issues
- Claim denial primary · upheld
“The Panel is not satisfied that the FSP has established that an exclusion applies under the terms of the policy to defeat the Applicant's claim.”
- Inadequate claim investigation secondary · upheld
“the loss adjuster has misunderstood the nature of the information provided by the original plumber JH, DI and FM”
Subjects and remedies
home or building damagepay compensationpay interestrepair or rectify
Text of the determination
Case No: 307946 Determination Page 1 of 7
Case number: 307946
General Insurance - Domestic Insurance - Home Building - FSP Decision -
Denial of Claim - Exclusion/Condition
22 August 2013
Background
1. The Applicant’s home and contents insurance policy with the FSP insured
the Applicant’s building for the sum of $365,000 and contents for the sum of
$144,000 subject to a $100 excess.
2. On 15 August 2011 the Applicant contacted the FSP to report severe
cracking to his home building which he had been informed had been caused
by leaki ng pipes. The FSP appointed a loss adjuster (“EA”) and an engineer
(“FM”) to inspect and report on the cause and extent of damage. As a result
of the expert reports the FSP denied the Applicant’s claim.
3. The Applicant disputes the denial of his claim.
Summa ry of Applicant’s position
4. The Applicant says he appointed building experts to determine the cause of
the cracking and to advise him on methods of repair. During this process he
was advised the damage was probably caused by leaking pipes and to
contact the FSP to report the damage, which he did.
5. Whilst the FSP and its appointed engineer FM say that the damage to the
house was not caused from water leaks, the FSP’s own appointed plumber
has identified several leaking pipes under the home.
6. He appointed his ow n independent engineer (“DI”) who was involved in the
original construction of the home and provided a report from him. “DI”
conducted soil tests and provided an opinion confirming the cause of
cracking to his home was as a result of the water leaks detected at the site.
7. The Applicant seeks to have his claim accepted and his home repaired.
Summary of FSP’s position
8. The damage to the Applicant’s home is near the bathroom and affects the
front of the home with cracks showing from the ceiling to the floor, the front
part of the home dropping and cracks through tiles and gyprock.
Determination
Case No: 307946 Determination Page 2 of 7
9. The FSP says when the Applicant first reported the damage to his home he
advised he had observed the cracking approximately 18 months prior
however believed the cracking was due to soil movement and did not
proceed to report the matter to it earlier.
10. On advice from his builder, the Applicant reported the matter to it believing
the damage to have been caused by leaking pipes.
11. The FSP appointed a loss adjuster EA. According to EA, the Applicant had
noticed a rapid onset of cracking across the centre of the new home. It was
reported that the cracks started on the ceiling, a straight line through the
bathroom, hallway and dining room and a straight line emanating from the
centre of the bathroom. The loss adjuster appointed JH Plumbers to attend
the property. JH reported that there were leaking pipes in particular areas of
the Applicant’s home. FM Engineers were subsequently appointed to inspect
and determine the cause of distress at the Applic ant’s property. The
engineer formed the view that the distress at the site was due to settlement
of the footings and not directly attributable to the plumbing leak. The FSP
denies the Applicant’s claim on the basis that the Applicant has failed to
provide evidence to support his claim that an insured event had occurred
and in the event that such evidence was provided believes that the general
exclusion relating to earth movement would apply.
12. The FSP relies on the following policy provisions of its Product Disclosure
Statement (PDS):
“ Insured events
If Home and/or Contents is shown on your Certificate of Insurance we will
cover you for:
...
7. Bursting,
leaking,
discharging or
overflowing
water or liquid
loss or damage as a result of bursting, leaking,
discharging or overflowing water or liquid from:
...
pipes or plumbing apparatus fixed to pipes
...”
(Pages 9 to 11)
“ General exclusions
We will not cover you for loss, damage or liability:
...
Earth movement
...
caused by or arising out of erosion, vibration, subsidence,
landslip, landslide, mudslide, collapse, shrinkage or any
other earth movement:
But we will cover you for:
...
bursting, leaking, discharging or overflowing of water or
Case No: 307946 Determination Page 3 of 7
liquid – insured event 7 ...”
(Page 24)
“ Claims – Your obligations
What yo u must
do
You must
establish that an insured event or incident has
occurred ...”
(Page 30)”
Issues
13. Whether the Applicant has established a prima facie claim under the terms
of the policy.
14. Whether the FSP is entitled to deny the Applicant’s claim.
Reasons for decision
15. As advised to the parties, FOS has considered it appropriate to expedite the
dispute in accordance with the Operational Guidelines to the FOS Terms of
Reference. This dispute has not been the subject of a FOS
Recommendation and has proceeded directly to Determination.
16. This decision has been made by a Panel consisting of an Ombudsman, a
representative with extensive experience in insurance industry matters and a
representative with extensive experience in consumer claims.
17. The Panel is satisfied there has been a full exchange of material between
the parties and each party has had the opportunity of clarifying the issues
which arise from the material.
18. The Applicant maintains that based on information provided by a builder, he
lodged his claim claiming the damage sustained to the property was caused
by water leaks. The water leaks have been confirmed by the FSP’s
appointed plumber JH. The Applicant maintains that in the circumstances he
has established a prima facie claim for damage for bursting, leaking,
discharging or overflowing water or liquid and that the general exclusion for
earth movement does not apply in these circumstances.
19. The report from JH provides the following conclusions:
“ Conclusion
1/ Leakage was recorded from the laundry bathroom branch drain between
approximately 1 metre and 0.9 metres upstream of IO (C) which is possibly
positioned below the WC.
2/ Leakage was recorded from the spa bath waste pipe. This leakage is
suspected to be positioned adjacent the bathroom floor trap.
Case No: 307946 Determination Page 4 of 7
3/ Leakage was recorded from the main bathroom shower cracked floor base.
4/ The IO (D) riser junction was noted to be severely broken.
5/ Leakage at the rate of approximately 8 litres per minute was recorded from
the section of sewer drainage between position (C) and position (D).
6/ Leakage at the rate of approximately 6 litres per minute was recorded from
the section of sewer drainage between position (C) and position (D).
7/ The stormwater drainage adjacent IO (D) was noted to be broken. This
break was going to be repaired by the owner.”
20. The consulting engineer FM subsequently provided a report with respect to
the cause and extent of the damage to the Applicant’s property. FM did not
conduct any soil tests but considered the pattern of cracking of the
Applicant’s building suggested distress due to the ground drying. Any
shrinkage of soil close to a building’s footing will likely cause localised
settlement according to FM. FM concluded that trees located towards the
front of the residence are and have been extracting moisture from around
the footings particularly during the recent drought from 2006 to 2010 and this
would cause the settlement of the footings which are not directly attributable
to any plumbing leak.
21. In response to the report from FM and the denial of his claim, the Applicant
provided his own engineer’s report from DI. DI was the engineer at the
property when it was originally constructed. DI’s report is based not only on
inspection of the property but also on soil tests conducted. DI reached the
following conclusions:
“In conclusion, we can understand that drying settlement appears to be the
cause of the distress observed in the dwelling. However this is not supported
by the site soil conditions and the moisture changes which appear to have
occurred over the years since the dwelling was built.
In particular, even though the trees have dried the soils at the front of the
dwelling, these are shallower and less reactive than those at the centre and
rear of the house. There is evidence in the borehole logs to suggest that the
moisture content in samples from new holes 1 and 2 could be higher than the
original samples, which is consistent with swelling due to moisture ingress into
the soils. It is also possible that the sewer drain excavation has facilitated the
ingress of water into the deeper soil.
In our opinion, we accept that some distortion of the footings results from the
drying of the soils due to the effects of the trees at the front of the house. This
is unlikely to be of a significant magnitude to be the principal cause of the
distress. The soils in the area were [sic] the pipe leaks have been identified
are significantly more reactive.
We consider that the principal cause of the distress to the dwelling is due to
excessive differential movements in the footings as the foundation soils swell
due to extreme volumetric changes associated with moisture content. These
moisture changes are “abnormal” when leaking water pipes cause
extraordinary quantities of water t o enter directly into the foundation soil.”
22. The Panel notes from JH’s report that there is no map provided to detail
where the leaks are located. The only reference to these identified leaks is
Case No: 307946 Determination Page 5 of 7
contained on a site plan of the property prepared by DI. This information is
not disputed by the FSP and in the circumstances the Panel accepts that the
site map accurately identifies the location of the leaks.
23. The Panel notes “DI” conducted a soil test whereas “FM” did not. The Panel
also notes “DI” was the original engineer responsible for the property at the
time of construction by the previous owner of the property in 1999. As such,
“DI” had access to original soil tests taken at the time.
24. “JH” has clearly identified a number of leaking pipes at the Applicant’s
property. “DI” has clearly indicated his opinion on the cause of cracking at
the property is due to leaking water pipes which have caused an abnormal
amount of water to enter directly into the foundation soil thus causing
excessive differential movements in the footings.
25. The FSP in its Notice of Response to the Service acknowledges its
appointed experts “JH” and “FM” acknowledge that ’there is a leak present’.
26. Based on the reports an d the FSP’s own partial concession as outlined
above, the Panel is satisfied the Applicant has established, on the balance of
probabilities, his loss has been caused by an insured event, namely, the
leaking of pipes. The onus now shifts to the FSP to prove, on the balance of
probabilities, an exclusion applies.
27. The FSP was provided a copy of “DI’ s ” report and had the opportunity to
have “FM” provide further comment. “FM” says in relation to “DI’s” findings:
“As we see it, the fundamental difference between the opinion of [“DI”] and
[“FM”] is that we say soil drying settlement is the cause of the cracking
distress whereas [“DI”]’s opinion is that “ moisture changes which appear to
have occurred over the years since the dwelling was built ” is the cause of the
distress. Presumably he is referring to a moisture increase that would cause
swelling and heaving of the extremely reactive clay foundation, with the
source of moisture coming from the 8 litre per minute pipe leak in the vicinity
of the bathroom.
While “DI” has conducted further soil testing at the site, we regard the
assessment of field moisture content using the tactile plastic limit test to be far
less accurate than testing for total suction down the soil profile.
Total suction (pF) measurement gives accurate assessment of the affinity of
the soil for moisture, in other words, an accurate assessment of its in-situ
moisture condition. This is a quantitative assessment method.
We also comment that the tabulated comparison of moisture contents and soil
react ivity shown on page 2 of [“DI”]’s report, in the second row where it
compares BH2 from 1999 with BH1 from 2012, there is a comment that
“ Moisture contents appear to be higher in the new samples... ” If we were to
apply the plastic limit test as a means of a ssessment as done by [“DI”], then
we point out that the moisture content in these two boreholes is exactly the
same in 1999 and 2012, both being expressed as greater than plastic limit by
the term “>PL”.
We further point out that the original 1999 BH2 was taken from somewhere
near the centre area of the proposed dwelling footprint whereas the 2012 BH1
was taken in the near vicinity of the leaking drain which, on the basis of
Case No: 307946 Determination Page 6 of 7
[“DI”]’s tabulated comparison, means that there has been no increase in
moisture content caused by the leaking pipe because the plastic limit
assessment of the clay down BH1 profile (2012) has not changed from the
1999 assessment. What this means is that the leak has not increased the
moisture content of the soil over and above what it was at the time of testing
back in 1999.
For soil heave caused by a leaking pipe in the near vicinity of the 2012 BH1 to
have played any part in causing damage to the dwelling, it would need to be
shown that there was an increase in moisture content. However, the simple
comparison of plastic limit tests between 1999 BH2 and 2012 BH1 clearly do
not show an increase.
In our opinion this serves to reinforce our opinion that settlement caused by
soil drying at the front and rear of the property is the sole cause of damage.”
28. The Panel notes that FM has suggested more comprehensive soil tests be
undertaken. The FSP’s loss adjuster however considered that as the
Applicant’s report identifies moisture changes around the dwelling occurring
since the home was constructed and none of these changes a result of a
defined event, there was no need to conduct any soil tests. In the Panel’s
view, the loss adjuster has misunderstood the nature of the information
provided by the original plumber JH, DI and FM.
29. “FM” says by applying the plastic limit test as done by “DI”, the moisture
content of the two compared boreholes have both been expressed as
greater than plastic limit (indicated by the term “>PL”). The Panel has
reviewed the 1999 and 2012 soil tests conducted by “DI” and note the 1999
test results make no mention of the term “>PL”. Whilst the Panel is satisfied
“FM” is aware of how this is calculated and may have done so from the
information contained in the results of the 1999 soil test, no explanation has
been provided to demonstrate how this has been calculated or that the
results of the 1999 and 2012 tests are the same.
30. The Panel is also confused over “FM’s” comments regarding the moisture
level in the soil being the same in 1999 and 2012 based on the fact the
locations of the two relevant boreholes differ. There has been no explanation
as to how or why “FM” believes this to be the case.
31. Having considered the competing reports, the Panel believes the report
provided by the Applicant from DI to be more reliable than those reports
provided by the FSP from FM. The FSP has not commissioned any further
soil tests despite the comments by FM and in the circumstances, the only
soil tests conducted are those conducted by DI. The conclusions drawn by
DI as a result of those tests are reasonable and although FM is critical of
those findings, in the Panel’s view, in the absence of having conducted the
additional soil tests, the findings of DI are preferred. The FSP relies on the
General Exclusion of “Earth movement” as detailed in its PDS. However the
Panel notes the exclusion goes on to say:
“But we will cover you for:
...
Case No: 307946 Determination Page 7 of 7
Bursting, leaking, discharging or overflowing of water or liquid – insured
event 7”
32. The Panel is satisfied that the evidence on balance establishes that there
were bursting, leaking pipes at the Applicant’s property and the evidence of
DI persuasive that the damage to the Applicant’s property has been
significantly caused by the bursting, leaking, discharging or overflowing of
water or liquid.
33. The Panel is satisfied that the Applicant has established on the balance of
probabilities a valid claim under the terms of the policy. The Panel is not
satisfied that the FSP has established that an exclusion applies under the
terms of the policy to defeat the A pplicant’s clai m.
34. The Panel notes the PDS provides the damaged pipes/water containers
which have caused the leaks are not covered. The Applicant is therefore
responsible for the repairs to these items at his own cost. The FSP is
responsible for all resultant damage.
Determination
35. On the basis of the available information the Panel determines the FSP is to
meet its liability in accordance with the terms and conditions of the policy
The FSP is to arrange the necessary quotations and repairs to the
Applicant’s property accor dingly. The Applicant will be responsible for the
cost and repair of the relevant leaking pipes and such repairs should be
completed prior to the FSP commencing repairs to the property.
36. Further pursuant to Paragraph 9.4 of the Terms of Reference, the FSP m ust
contribute to the Applicant’s professional costs associated with him obtaining
the report from “DI” up to a maximum of $3 ,000.
37. Insofar as the FSP seeks to cash settle the Applicant’s claim, the FSP is to
pay interest in accordance with Section 57 of the Insurance Contracts Act
1984 from 2 February 2012 being the date of the FSP’s IDR decision to date
of payment of the claim.