Determination 307635

Flooring damage claim declined as pre-inception loss

FirmFinancial Firm (Unknown - Insurer)
Decided2013-08-01
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded—
Non-financial loss$1,000
Amount claimed—
SourceAFCA PDF

Summary

The FSP declined the flooring damage claim on the basis that the damage pre-dated the policy. AFCA found the damage occurred during the cover period, ordered the FSP to cash settle 44% of repair costs with interest, and awarded $1,000 for non-financial loss.

Damage that progressively worsened during the policy period was apportioned pro rata, with the pre-inception portion excluded.

Issues

Subjects and remedies

small businesspay claimpay interestpay non financial loss

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Case No: 307635 Determination Page 1 of 10 Case number: 307635 General Insurance - Small Business - Commercial Property - FSP Decision - Denial of claim 30 July 2013 Background 1. The Applicant is the authorised representative of a company which held a business insurance policy with the Financial Services Provider (FSP). The policy provided cover for damage to a warehouse and office building owned by the insured company. The policy was incepted on 13 June 2009 and was current at the time of the loss. 2. On 3 October 2011, the insured’s broker lodged a claim for damage to the insured premises, which was said to result from water getting into the tiles of the office floor causing cracking. 3. The FSP engaged a loss adjuster to assess the claim and appointed a builder and a structural engineer to report on the cause of the damage. The engineer determined that the damage had been caused by inadequacies in the drainage system at the property. 4. In or around August 2012, the FSP advised the insured’s broker that it accepted the claim for damage to the flooring of the office building , but noted that repairs to the drainage system itself were excluded under the policy. 5. However, on 2 October 2012, the FSP advised the Applicant that, following a further review it had decided to decline the claim for damage to the flooring. The FSP denied the claim on the basis that the damage had been occurring over time since the building was constructed six years earlier and therefore the date of the loss was prior to policy inception. 6. Following a complaint by the Applicant’s broker, the FSP’s Internal Disp ute Resolution departme nt (“IRD”) reviewed the claim. On 29 November 2012, the IRD advised the insured that it had decided to maintain the FSP’s decision to deny the claim on the basis that the loss pre-dated policy exception. The IRD advised that exclusions for movement of foundations and faulty work also applied to the claim. 7. The Applicant disputes the FSP’s decision to deny the claim. The Applicant says that the damage occurred during the period of insurance and is therefore covered under the terms of the policy. Determination Case No: 307635 Determination Page 2 of 10 Summary of Applicant’s position 8. The Applicant is represented by the insured’s broker. For clarity and brevity, submissions made by the insured’s broker will be referred to as having been made by the Applicant for the purposes of this Determination. 9. The Applicant says that the damage to the flooring was caused by water and that this has already been accepted by the FSP. The damage arose as a result of storms which occurred after the policy commenced. 10. The Applicant relies on the report of his own engineer which says that it is not possible to determine when the damage occurred. The Applicant says that the FSP’s engineer appears to have changed his opinion over the course of the claim process, as he initially said it was not possible to say when the damage occurred but later said that it definitely occurred before the inception of the policy. 11. The Applicant says that neither he nor his property manager were aware of the damage before the tenant notified the property manager on 31 August 2011. 12. The Applicant says that the FSP has not handled the claim in a timely manner. While the FSP has said it reviewed and reversed its initial decision following the provision of new information, this is not correct as the information on which the FSP relied to deny the claim was provided prior to the initial acceptance. 13. The Applicant disputes the FSP’s decision to deny the claim and seeks indemnity for the damage to the flooring at the insured premises. Summary of FSP’s position 14. The FSP says that all of the evidence provided by its engineer, its builder, the tenant of the insured premises and the estate agents engaged by both the Applicant and the tenant, indicates that the damage was occurring well before the inception of the policy in June 2009. Accordingly, the damage falls outside the scope of cover under the policy. 15. The FSP says that the damage also falls within exclusions under the policy for damage caused by the movement of foundations and/or faulty work. Issues 16. Whether the FSP is entitled to deny t he insured’s claim for damage to the flooring at the insured premises. 17. Whether the Applicant is entitled to compensation for non-financial loss due to the manner in which the FSP has handled the claim. Case No: 307635 Determination Page 3 of 10 Reasons for decision 18. As advised to the parties, this matter has been expedited in accordance with the Operational Guidelines of the Service’s Terms of Reference, due to the complex nature of the issues. Accordingly, this dispute has not been the subject of a Recommendation but has proceeded directly to Deter mination. 19. I am satisfied that there has been an exchange of material between the parties and that each party has had the opportunity to respond to the issues raised therein. 20. The reports prepared by the FSP’s engineer “CC”, following prolonged investigations, identified the cause of the damage as follows:  the flooring of the office at the insured premises suffered damage as a result of inadequate drainage at the site;  the external open stormwater drain embedded into the concrete at the front of the office had not been connected to a proper stormwater drain when the building was constructed in 2006, and therefore would regularly overflow;  this resulted in water seeping from the open stormwater drain into the surrounding soil, leading to an increase in the moisture levels and swelling of the soil underneath the ground floor slab causing it to develop a significant bow running the entire length of the office; and  this in turn caused tiles on the floor to crack and move, as well as damage to the skirting boards as the floor lifted. The sub floor of an upstairs conference room has also been affected. 21. The Applicant’s engineer “S”, reviewed the reports prepared by the FSP’s engineer, CC and did not raise any concerns regarding CC’s findings as to the cause of the damage. Accordingly, I accept that the cause of the damage is not in dispute. The issue in dispute is how the terms of the policy apply in the circumstances of the current claim. Policy provisions 22. The policy covers loss or damage to the insured premises which occurs during the period of cover due to certain defined events, including loss or damage caused by: “bursting, leaking, discharging or overflowing of fixed apparatus, fixed tanks, fixed appliances, fixed pipes or other systems used to hold or carry w ater.” The loss covered includes the reasonable cost of identifying and locating the cause of the damage, but excludes the repair or replacement of the systems themselves.” (the “Escape of Liquid” insured event) . 23. The policy separately provides cover for accidental loss or damage to the insured premises which occurs during the period of cover, and is caused by events other than those covered as defined events. Case No: 307635 Determination Page 4 of 10 24. Both the defined events cover and the accidental damage cover are subject to a number of general exclusions. These include exclusions for loss or damage caused by movement of foundations or faulty work. Date of loss 25. The FSP originally accepted the insured’s claim for the damage to the flooring caused by the inadequate drainage system on the basis that it fell within the Escape of Liquid insured event (see paragraph 22 above). However, the FSP subsequently declined the claim on the basis that the damage had occurred over the period since the building was constructed six years earlier and therefore the date of loss was prior to policy inception. 26. The evidence provided by the current tenant of the property, his real estate agent and the insured’s real estate agent confirms that:  some damage to the floor was apparent when the tenant moved into the premises on 17 September 2009. The tenant described this damage as “a ridge running through the concrete on the ground floor”; and  the damage to the floor had worsened by 31 August 2011, when the tenant sent an email to the insured’s property manager notifying her of the damage. The email noted that the concrete slab had “swelled more to the point that the floor tiles were coming loose”; and  the flooring had deteriorated during September/October 2011, as confirmed by the tenant to the FSP’s assessor when she attended the premises to inspect the damage. 27. In determining the date of the loss, the FSP relied on the reports provided by its engineer, CC. In his report dated 28 September 2012, CC states that:  notwithstanding the observations of the tenant, it was impossible for him “ to even guesstimate ” when the movements in the office floor were first observed, particularly given that the main cause was external site drainage and plumbing inadequacies;  however, as the external site drainage and plumbing inadequacies had been in existence since the building was constructed in 2006, realistically it was possible that the movements in the floor had been developing since not long after the building was first constructed. 28. At the time CC prepared this report, his understanding was that the damage had first been observed by the tenant around June 2010. However, following receipt of CC’s report, the FSP advised him of the dates the po licy was incepted (June 2009) and the date the tenants moved in and observed the initial damage (September 2009). CC subsequently provided a further report dated 18 October 2012. In his further report, CC stated that: “For this type of upwards deflection and distortion to have permanently developed within the ground floor reinforced concrete slab construction, I can confirm that this must have been occurring and developing over a lengthy period of time prior to the Tenants observing the damage in September 2009, and particularly when taking into account the minimal amount of rainfall which Case No: 307635 Determination Page 5 of 10 occurred between June 2009 and September 2009. … I believe without doubt, to these ground floor and first floor movement problems throughout this Office building they had already commenced well prior to Insurers coming on risk in June 2009…” [sic] 29. Based on CC’s reports, the FSP says that the damage occurred prior to the inception of the policy in June 2009. 30. The Applicant says that:  the policy commenced on 13 June 2009 and no damage to the concrete slab and tiles was observed prior to 17 September 2009; and  there were 31 storms with 147.4mm of rain between the date the policy commenced and the date damage was first observed. 31. The Applicant therefore contends that the proximate cause of the loss should be considered to be any one of the storms between the inception of the policy on 13 June 2009 and the damage first being observed on 17 September 2009. The Applicant says that any subsequent rain would have exacerbated the situation. 32. The Applicant engaged his own engineer, S, to review the reports prepared by the FSP’s engineer and provide an opinion as to the date of the loss. S considered that, due to the progressive and lengthy nature of the damage, the movements in the floor had been occurring prior to June 2009. However, he could not comment on whether the damage had manifested itself between June and September 2009. 33. The Applicant also says that, regardless of when the damage first manifested itself, he was not aware of the damage until the tenant sent an email to the insured’s real estate agent (“JA”) on 31 August 2011 (see paragraph 26 above). The Applicant has provided a statutory declaration from JA confirming that she was not aware of the damage prior to receiving this email. Analysis Date of loss 34. The reports provi ded by both the FSP’s engineer, CC, and the Applicant’s engineer, S, indicate that it is likely that the damage to the flooring of the insured premises had been developing over a long period of time, most likely since the building was constructed in 2006. 35. In my view, the available evidence supports this conclusion, given that the cause of the damage was the inadequate drainage system. This issue has existed since the time the building was constructed and therefore is likely to have gradually impacted the flooring over time, by resulting in an increase in moisture to the subsoil every time there was sufficient rainfall to cause the drain at the front of the property to overflow. Case No: 307635 Determination Page 6 of 10 36. I consider that the available evidence also establishes, on the balance of probabilities, that this issue was manifesting itself before June 2009. 37. The evidence provided does not establish that the damage was actually observed prior to June 2009, as the earliest evidence of actual observation is the tenant’s statement that he observed the damage , when moving in to the premises in September 2009. However, my review of publicly available data from the Bureau of Meteorology supports the FSP’s claim that there was minimal rainfall (of approximately 76.2 ml) between 13 June 2009 and 17 September 2009. I consider that the rainfall figures provided by the FSP are to be preferred over those of the Applicant, as they are based on the figures for the period 13 June 2009 to 17 September 2009, while the figures provided by the Applicant are for the entire months of June to September 2009 inclusive. Further, the figures provided by the FSP are derived from the weather station located in the same suburb as the insured premises. 38. Given the extent of rainfall between June 2009 and September 2009, I consider it unlikely that the damage first became apparent during this period. 39. However, based on the expert evidence as to the underlying cause of the damage and the evidence of the tenant that the damage worsened during the term of the lease, I consider that it is likely that further damage occurred following the inception of the policy in June 2009. 40. The policy provides cover for damage which occurs during the period of cover. Accordingly, I consider that the Applicant has established a prima facie claim under the policy. Policy exclusions 41. As outlined above, the policy excludes damage “caused by” movement of foundations and faulty work. These exclusions are expressed in the following terms: “ 1(c) movement of foundations (i) vibration, heaving, creeping, shrinkage, settling, or expansion of foundation or supports of Business Property (ii) erosion, subsidence or earth movement unless caused suddenly by a defined event … 1(d) faulty work (i) error in, omission of or wrong design (ii) faulty materials or faulty workmanship provided that this Exclusion 1(d) shall not apply to subsequent loss or damage to Your Business Property occasioned by a peril (not otherwise excluded) resulting from any event referred to in this exclusion.” 42. The courts have determined that a reference in a policy of insurance to damage “caused by” a particular event will generally be taken to refer to the Case No: 307635 Determination Page 7 of 10 proximate cause of the damage. This means the real, predominant or effective cause of the damage. 43. In the current circumstances, the proximate cause of the claimed damage is the inadequate drainage system at the property and in particular, the fact that the external open stormwater drain was not connected to a proper stormwater drain. I consider that this falls within the meaning of “wrong design” or “faulty workmanship” for the purposes of policy exclusion 1(d). 44. However, on its terms, this exclusion does not apply to subsequent loss or damage occasioned by a peril (not otherwise excluded) which results from the relevant faulty work. 45. While the underlying cause of the damage to the flooring at the insured premises was the inadequate drainage system (ie “faulty work”), I consider that the damage was “occasioned by” the overflow of water from the drain, which is a peril which subject to cover under the “Escape of Liquid” insured event (see paragraph 22 ). Accordingly, while exclusion 1(d) operates to exclude the faulty work itself, it does not operate to exclude the resulting damage to the flooring of the insured premises. 46. I note that the exclusion relating to movement of foundations does not apply in the current circumstances, as this was not the proximate cause of the damage, but merely one of a number of successive consequences resulting from the underlying inadequacies in the drainage system. 47. I note that the policy contains a general exclusion for damage caused by faults or defects known to the insured (or to any employee of the insured whose knowledge in law would be imputed to the insured), and not disclosed to the FSP at the time the policy was entered into. 48. The available evidence does not establish that the insured (being the company) or its employees knew about the deficiencies of the drainage system prior to incepting the policy. Accordingly, I do not accept that this exclusion applies. 49. Accordingly, I consider that damage to the insured premises occurred during the period of cover as a result of events within the scope of cover and therefore the FSP is not entitled to decline the insured’s claim in its entirety. 50. However, I accept that the FSP is not liable for damage occurring prior to policy inception on 9 June 2009. 51. Given the expert evidence that the damage has occurred progressively over time, I consider that it is appropriate to apportion liability on a pro rata basis. Given that the building was constructed in 2006, the policy was incepted in June 2009 and the claim was lodged in October 2011, I consider that it is fair in all the circumstances for the FSP to indemnify the insured for 44% of the costs of repairing the damage. Case No: 307635 Determination Page 8 of 10 52. The Applicant’s representative advised the Service on 11 July 2013 that the drainage issues have been rectified although he did not believe that the resulting damage to the flooring had been repaired as yet. I note that the FSP’s engineer recommended that the resulting damage should not be repaired until 12 months after the drainage issues were rectified, to provide time for the sub-soil to dry out. 53. In the event that the resulting damage has not been repaired, I consider that the FSP should obtain a quote for the amount of the repairs and cash settle the Applicant for 44% of the total. I note that during mid-2012 the FSP took steps to obtain a quote for repair of the resulting damage, before it subsequently decided to decline the insured’s claim. As conte mplated at the time, the quote to be obtained should include an allowance for the construction of a temporary floor, to allow the continued use of the premises during the period while the sub-soil is allowed to dry out before the damage to the flooring can be rectified. 54. In the event that the damage to the flooring has already been repaired by the Applicant, the FSP should reimburse the insured for an amount equal to 44% of the repair costs, subject to provision of appropriate invoices. 55. In either case, I consider that the FSP should be required to pay interest on the amount paid to the insured, calculated from 29 November 2012 to the date of payment in accordance with section 57 of the Insurance Contracts Act 1984 (Cth). Compensation for non-financial loss 56. The Applicant is dissatisfied with the manner in which the FSP has handled the claim. In particular, the Applicant says that all relevant information was provided to the FSP and its agents in October 2011 and yet the FSP took months to assess the claim before initially accepting it in mid-2012 and then finally rejecting it in October 2012. 57. Under paragraph 9.3(b) of the Service’s Terms of Reference, compensation for non-financial loss (capped at $3,000) may be awarded where there has been an unusual degree or extent of physical inconvenience, time taken to resolve the situation or interference with an insured’s expectation of enjoyment or peace of mind. However, compensation for non-financial loss will not be provided where the policy expressly excludes such liability. 58. The policy expressly excludes liability for “consequential loss of any kind”. While this would prevent the award of compensation for non-financial loss, it does not preclude me from awarding compensation for non-financial loss of the type ref erred to in paragraph 9.3 of the Service’s Terms of Reference. 59. The FSP took approximately 9 months to fully inv estigate the insured’s claim. I accept that identifying the cause of the loss required reasonably extensive investigations by the FSP and that several consultants were engaged to assist in this process. However, I am not persuaded that the claim was handled in a reasonable timeframe. The FSP’s file notes indicate Case No: 307635 Determination Page 9 of 10 that delays arose during the course of the investigation process as a result of misco mmunications between the FSP’s consultants. It is also clear that the insured’s broker , diligently followed up the FSP to progress the claim on a number of separate occasions and passed on the Applicant’s concerns about the delays experienced during the claim process. 60. The FSP’s decision to reverse its initial acceptance of the claim arose when it reviewed the evidence and identified that the tenant had first observed the damage to the flooring in September 2009. The FSP then communicated this information to its engineer who concluded that, in light of the ongoing and progressive nature of the damage and the minimal rainfall in the interim period, this additional information supported the conclusion that the damage was likely to have occurred prior to June 2009. 61. The FSP’s en gineer had previously assumed (based on other information) that the damage was first observed well after the inception of the policy in June 2009 and therefore had not directly addressed the issue of whether it arose prior to June 2009. Accordingly, I do not consider that there was anything untoward in the FSP’s engineer updating his report to reflect additional information of which he was not previously aware, although it is understandable that this may have appeared suspicious to the Applicant, given that the FSP then reversed its decision to accept the insured’s claim. 62. However, it is clear from the available evidence that the tenant had advised the FSP’s loss assessor in October 2011 that he first observed the damage in September 2009. Accordingly, this i nformation was available to the FSP prior to making its initial decision to accept the claim and should have been taken into account for the purposes of making this decision. Based on the FSP’s file notes, it appears that the failure to properly take this information into account occurred because all relevant information was not circulated among the various consultants involved in assessing the insured’s claim. 63. In the circumstances, I consider that the claim took an unusually long time to resolve. Further, I accept that the FSP’s initial acceptance and subsequent denial of the insured’s claim based on information which had been available to it all along, interfered with the Applicant’s peace of mind. 64. In the circumstances, I consider that the FSP should pay the Applicant $1,000 by way of compensation for non-financial loss. Determination 65. On the basis of the available information I determine that:  the FSP is to cash settle the insured for an amount equal to 44% of the costs of repairing the damage to the flooring of the insured premises, in accordance with the process outlined in the Determination;  the FSP is to pay interest on the settlement amount calculated from 29 November 2012 to the date of payment in accordance with section 57 of the Insurance Contracts Act 1984 (Cth); and Case No: 307635 Determination Page 10 of 10  the FSP is to pay compensation of $1,000 to the Applicant for non- financial loss due to its handling of the claim.