Home / Financial Firm (Unknown - Insurer) / Determination 307635
Determination 307635
Flooring damage claim declined as pre-inception loss
Summary
The FSP declined the flooring damage claim on the basis that the damage pre-dated the policy. AFCA found the damage occurred during the cover period, ordered the FSP to cash settle 44% of repair costs with interest, and awarded $1,000 for non-financial loss.
Damage that progressively worsened during the policy period was apportioned pro rata, with the pre-inception portion excluded.
Issues
- Claim denial primary · upheld“the FSP is not entitled to decline the insured's claim in its entirety”
- Delay secondary · upheld“I am not persuaded that the claim was handled in a reasonable timeframe”
Subjects and remedies
small businesspay claimpay interestpay non financial loss
Related
All Financial Firm (Unknown - Insurer) determinations · Find similar determinations
Text of the determination
Case No: 307635 Determination Page 1 of 10
Case number: 307635
General Insurance - Small Business - Commercial Property - FSP Decision -
Denial of claim
30 July 2013
Background
1. The Applicant is the authorised representative of a company which held a
business insurance policy with the Financial Services Provider (FSP). The
policy provided cover for damage to a warehouse and office building owned
by the insured company. The policy was incepted on 13 June 2009 and was
current at the time of the loss.
2. On 3 October 2011, the insured’s broker lodged a claim for damage to the
insured premises, which was said to result from water getting into the tiles of
the office floor causing cracking.
3. The FSP engaged a loss adjuster to assess the claim and appointed a
builder and a structural engineer to report on the cause of the damage. The
engineer determined that the damage had been caused by inadequacies in
the drainage system at the property.
4. In or around August 2012, the FSP advised the insured’s broker that it
accepted the claim for damage to the flooring of the office building , but noted
that repairs to the drainage system itself were excluded under the policy.
5. However, on 2 October 2012, the FSP advised the Applicant that, following a
further review it had decided to decline the claim for damage to the flooring.
The FSP denied the claim on the basis that the damage had been occurring
over time since the building was constructed six years earlier and therefore
the date of the loss was prior to policy inception.
6. Following a complaint by the Applicant’s broker, the FSP’s Internal Disp ute
Resolution departme nt (“IRD”) reviewed the claim. On 29 November 2012,
the IRD advised the insured that it had decided to maintain the FSP’s
decision to deny the claim on the basis that the loss pre-dated policy
exception. The IRD advised that exclusions for movement of foundations
and faulty work also applied to the claim.
7. The Applicant disputes the FSP’s decision to deny the claim. The Applicant
says that the damage occurred during the period of insurance and is
therefore covered under the terms of the policy.
Determination
Case No: 307635 Determination Page 2 of 10
Summary of Applicant’s position
8. The Applicant is represented by the insured’s broker. For clarity and brevity,
submissions made by the insured’s broker will be referred to as having been
made by the Applicant for the purposes of this Determination.
9. The Applicant says that the damage to the flooring was caused by water and
that this has already been accepted by the FSP. The damage arose as a
result of storms which occurred after the policy commenced.
10. The Applicant relies on the report of his own engineer which says that it is
not possible to determine when the damage occurred. The Applicant says
that the FSP’s engineer appears to have changed his opinion over the
course of the claim process, as he initially said it was not possible to say
when the damage occurred but later said that it definitely occurred before the
inception of the policy.
11. The Applicant says that neither he nor his property manager were aware of
the damage before the tenant notified the property manager on 31 August
2011.
12. The Applicant says that the FSP has not handled the claim in a timely
manner. While the FSP has said it reviewed and reversed its initial decision
following the provision of new information, this is not correct as the
information on which the FSP relied to deny the claim was provided prior to
the initial acceptance.
13. The Applicant disputes the FSP’s decision to deny the claim and seeks
indemnity for the damage to the flooring at the insured premises.
Summary of FSP’s position
14. The FSP says that all of the evidence provided by its engineer, its builder,
the tenant of the insured premises and the estate agents engaged by both
the Applicant and the tenant, indicates that the damage was occurring well
before the inception of the policy in June 2009. Accordingly, the damage falls
outside the scope of cover under the policy.
15. The FSP says that the damage also falls within exclusions under the policy
for damage caused by the movement of foundations and/or faulty work.
Issues
16. Whether the FSP is entitled to deny t he insured’s claim for damage to the
flooring at the insured premises.
17. Whether the Applicant is entitled to compensation for non-financial loss due
to the manner in which the FSP has handled the claim.
Case No: 307635 Determination Page 3 of 10
Reasons for decision
18. As advised to the parties, this matter has been expedited in accordance with
the Operational Guidelines of the Service’s Terms of Reference, due to the
complex nature of the issues. Accordingly, this dispute has not been the
subject of a Recommendation but has proceeded directly to Deter mination.
19. I am satisfied that there has been an exchange of material between the
parties and that each party has had the opportunity to respond to the issues
raised therein.
20. The reports prepared by the FSP’s engineer “CC”, following prolonged
investigations, identified the cause of the damage as follows:
the flooring of the office at the insured premises suffered damage as a
result of inadequate drainage at the site;
the external open stormwater drain embedded into the concrete at the
front of the office had not been connected to a proper stormwater drain
when the building was constructed in 2006, and therefore would regularly
overflow;
this resulted in water seeping from the open stormwater drain into the
surrounding soil, leading to an increase in the moisture levels and swelling
of the soil underneath the ground floor slab causing it to develop a
significant bow running the entire length of the office; and
this in turn caused tiles on the floor to crack and move, as well as damage
to the skirting boards as the floor lifted. The sub floor of an upstairs
conference room has also been affected.
21. The Applicant’s engineer “S”, reviewed the reports prepared by the FSP’s
engineer, CC and did not raise any concerns regarding CC’s findings as to
the cause of the damage. Accordingly, I accept that the cause of the damage
is not in dispute. The issue in dispute is how the terms of the policy apply in
the circumstances of the current claim.
Policy provisions
22. The policy covers loss or damage to the insured premises which occurs
during the period of cover due to certain defined events, including loss or
damage caused by:
“bursting, leaking, discharging or overflowing of fixed apparatus, fixed tanks,
fixed appliances, fixed pipes or other systems used to hold or carry w ater.”
The loss covered includes the reasonable cost of identifying and locating the
cause of the damage, but excludes the repair or replacement of the systems
themselves.”
(the “Escape of Liquid” insured event) .
23. The policy separately provides cover for accidental loss or damage to the
insured premises which occurs during the period of cover, and is caused by
events other than those covered as defined events.
Case No: 307635 Determination Page 4 of 10
24. Both the defined events cover and the accidental damage cover are subject
to a number of general exclusions. These include exclusions for loss or
damage caused by movement of foundations or faulty work.
Date of loss
25. The FSP originally accepted the insured’s claim for the damage to the
flooring caused by the inadequate drainage system on the basis that it fell
within the Escape of Liquid insured event (see paragraph 22 above).
However, the FSP subsequently declined the claim on the basis that the
damage had occurred over the period since the building was constructed six
years earlier and therefore the date of loss was prior to policy inception.
26. The evidence provided by the current tenant of the property, his real estate
agent and the insured’s real estate agent confirms that:
some damage to the floor was apparent when the tenant moved into the
premises on 17 September 2009. The tenant described this damage as “a
ridge running through the concrete on the ground floor”; and
the damage to the floor had worsened by 31 August 2011, when the
tenant sent an email to the insured’s property manager notifying her of the
damage. The email noted that the concrete slab had “swelled more to the
point that the floor tiles were coming loose”; and
the flooring had deteriorated during September/October 2011, as
confirmed by the tenant to the FSP’s assessor when she attended the
premises to inspect the damage.
27. In determining the date of the loss, the FSP relied on the reports provided by
its engineer, CC. In his report dated 28 September 2012, CC states that:
notwithstanding the observations of the tenant, it was impossible for him
“ to even guesstimate ” when the movements in the office floor were first
observed, particularly given that the main cause was external site drainage
and plumbing inadequacies;
however, as the external site drainage and plumbing inadequacies had
been in existence since the building was constructed in 2006, realistically it
was possible that the movements in the floor had been developing since
not long after the building was first constructed.
28. At the time CC prepared this report, his understanding was that the damage
had first been observed by the tenant around June 2010. However, following
receipt of CC’s report, the FSP advised him of the dates the po licy was
incepted (June 2009) and the date the tenants moved in and observed the
initial damage (September 2009). CC subsequently provided a further report
dated 18 October 2012. In his further report, CC stated that:
“For this type of upwards deflection and distortion to have permanently
developed within the ground floor reinforced concrete slab construction, I can
confirm that this must have been occurring and developing over a lengthy
period of time prior to the Tenants observing the damage in September 2009,
and particularly when taking into account the minimal amount of rainfall which
Case No: 307635 Determination Page 5 of 10
occurred between June 2009 and September 2009. … I believe without doubt,
to these ground floor and first floor movement problems throughout this Office
building they had already commenced well prior to Insurers coming on risk in
June 2009…” [sic]
29. Based on CC’s reports, the FSP says that the damage occurred prior to the
inception of the policy in June 2009.
30. The Applicant says that:
the policy commenced on 13 June 2009 and no damage to the concrete
slab and tiles was observed prior to 17 September 2009; and
there were 31 storms with 147.4mm of rain between the date the policy
commenced and the date damage was first observed.
31. The Applicant therefore contends that the proximate cause of the loss should
be considered to be any one of the storms between the inception of the
policy on 13 June 2009 and the damage first being observed on 17
September 2009. The Applicant says that any subsequent rain would have
exacerbated the situation.
32. The Applicant engaged his own engineer, S, to review the reports prepared
by the FSP’s engineer and provide an opinion as to the date of the loss. S
considered that, due to the progressive and lengthy nature of the damage,
the movements in the floor had been occurring prior to June 2009. However,
he could not comment on whether the damage had manifested itself
between June and September 2009.
33. The Applicant also says that, regardless of when the damage first
manifested itself, he was not aware of the damage until the tenant sent an
email to the insured’s real estate agent (“JA”) on 31 August 2011 (see
paragraph 26 above). The Applicant has provided a statutory declaration
from JA confirming that she was not aware of the damage prior to receiving
this email.
Analysis
Date of loss
34. The reports provi ded by both the FSP’s engineer, CC, and the Applicant’s
engineer, S, indicate that it is likely that the damage to the flooring of the
insured premises had been developing over a long period of time, most likely
since the building was constructed in 2006.
35. In my view, the available evidence supports this conclusion, given that the
cause of the damage was the inadequate drainage system. This issue has
existed since the time the building was constructed and therefore is likely to
have gradually impacted the flooring over time, by resulting in an increase in
moisture to the subsoil every time there was sufficient rainfall to cause the
drain at the front of the property to overflow.
Case No: 307635 Determination Page 6 of 10
36. I consider that the available evidence also establishes, on the balance of
probabilities, that this issue was manifesting itself before June 2009.
37. The evidence provided does not establish that the damage was actually
observed prior to June 2009, as the earliest evidence of actual observation is
the tenant’s statement that he observed the damage , when moving in to the
premises in September 2009. However, my review of publicly available data
from the Bureau of Meteorology supports the FSP’s claim that there was
minimal rainfall (of approximately 76.2 ml) between 13 June 2009 and 17
September 2009. I consider that the rainfall figures provided by the FSP are
to be preferred over those of the Applicant, as they are based on the figures
for the period 13 June 2009 to 17 September 2009, while the figures
provided by the Applicant are for the entire months of June to September
2009 inclusive. Further, the figures provided by the FSP are derived from the
weather station located in the same suburb as the insured premises.
38. Given the extent of rainfall between June 2009 and September 2009, I
consider it unlikely that the damage first became apparent during this period.
39. However, based on the expert evidence as to the underlying cause of the
damage and the evidence of the tenant that the damage worsened during
the term of the lease, I consider that it is likely that further damage occurred
following the inception of the policy in June 2009.
40. The policy provides cover for damage which occurs during the period of
cover. Accordingly, I consider that the Applicant has established a prima
facie claim under the policy.
Policy exclusions
41. As outlined above, the policy excludes damage “caused by” movement of
foundations and faulty work. These exclusions are expressed in the following
terms:
“ 1(c) movement of foundations
(i) vibration, heaving, creeping, shrinkage, settling, or expansion of
foundation or supports of Business Property
(ii) erosion, subsidence or earth movement unless caused suddenly by a
defined event
…
1(d) faulty work
(i) error in, omission of or wrong design
(ii) faulty materials or faulty workmanship
provided that this Exclusion 1(d) shall not apply to subsequent loss or
damage to Your Business Property occasioned by a peril (not otherwise
excluded) resulting from any event referred to in this exclusion.”
42. The courts have determined that a reference in a policy of insurance to
damage “caused by” a particular event will generally be taken to refer to the
Case No: 307635 Determination Page 7 of 10
proximate cause of the damage. This means the real, predominant or
effective cause of the damage.
43. In the current circumstances, the proximate cause of the claimed damage is
the inadequate drainage system at the property and in particular, the fact
that the external open stormwater drain was not connected to a proper
stormwater drain. I consider that this falls within the meaning of “wrong
design” or “faulty workmanship” for the purposes of policy exclusion 1(d).
44. However, on its terms, this exclusion does not apply to subsequent loss or
damage occasioned by a peril (not otherwise excluded) which results from
the relevant faulty work.
45. While the underlying cause of the damage to the flooring at the insured
premises was the inadequate drainage system (ie “faulty work”), I consider
that the damage was “occasioned by” the overflow of water from the drain,
which is a peril which subject to cover under the “Escape of Liquid” insured
event (see paragraph 22 ). Accordingly, while exclusion 1(d) operates to
exclude the faulty work itself, it does not operate to exclude the resulting
damage to the flooring of the insured premises.
46. I note that the exclusion relating to movement of foundations does not apply
in the current circumstances, as this was not the proximate cause of the
damage, but merely one of a number of successive consequences resulting
from the underlying inadequacies in the drainage system.
47. I note that the policy contains a general exclusion for damage caused by
faults or defects known to the insured (or to any employee of the insured
whose knowledge in law would be imputed to the insured), and not disclosed
to the FSP at the time the policy was entered into.
48. The available evidence does not establish that the insured (being the
company) or its employees knew about the deficiencies of the drainage
system prior to incepting the policy. Accordingly, I do not accept that this
exclusion applies.
49. Accordingly, I consider that damage to the insured premises occurred during
the period of cover as a result of events within the scope of cover and
therefore the FSP is not entitled to decline the insured’s claim in its entirety.
50. However, I accept that the FSP is not liable for damage occurring prior to
policy inception on 9 June 2009.
51. Given the expert evidence that the damage has occurred progressively over
time, I consider that it is appropriate to apportion liability on a pro rata basis.
Given that the building was constructed in 2006, the policy was incepted in
June 2009 and the claim was lodged in October 2011, I consider that it is fair
in all the circumstances for the FSP to indemnify the insured for 44% of the
costs of repairing the damage.
Case No: 307635 Determination Page 8 of 10
52. The Applicant’s representative advised the Service on 11 July 2013 that the
drainage issues have been rectified although he did not believe that the
resulting damage to the flooring had been repaired as yet. I note that the
FSP’s engineer recommended that the resulting damage should not be
repaired until 12 months after the drainage issues were rectified, to provide
time for the sub-soil to dry out.
53. In the event that the resulting damage has not been repaired, I consider that
the FSP should obtain a quote for the amount of the repairs and cash settle
the Applicant for 44% of the total. I note that during mid-2012 the FSP took
steps to obtain a quote for repair of the resulting damage, before it
subsequently decided to decline the insured’s claim. As conte mplated at the
time, the quote to be obtained should include an allowance for the
construction of a temporary floor, to allow the continued use of the premises
during the period while the sub-soil is allowed to dry out before the damage
to the flooring can be rectified.
54. In the event that the damage to the flooring has already been repaired by the
Applicant, the FSP should reimburse the insured for an amount equal to 44%
of the repair costs, subject to provision of appropriate invoices.
55. In either case, I consider that the FSP should be required to pay interest on
the amount paid to the insured, calculated from 29 November 2012 to the
date of payment in accordance with section 57 of the Insurance Contracts
Act 1984 (Cth).
Compensation for non-financial loss
56. The Applicant is dissatisfied with the manner in which the FSP has handled
the claim. In particular, the Applicant says that all relevant information was
provided to the FSP and its agents in October 2011 and yet the FSP took
months to assess the claim before initially accepting it in mid-2012 and then
finally rejecting it in October 2012.
57. Under paragraph 9.3(b) of the Service’s Terms of Reference, compensation
for non-financial loss (capped at $3,000) may be awarded where there has
been an unusual degree or extent of physical inconvenience, time taken to
resolve the situation or interference with an insured’s expectation of
enjoyment or peace of mind. However, compensation for non-financial loss
will not be provided where the policy expressly excludes such liability.
58. The policy expressly excludes liability for “consequential loss of any kind”.
While this would prevent the award of compensation for non-financial loss, it
does not preclude me from awarding compensation for non-financial loss of
the type ref erred to in paragraph 9.3 of the Service’s Terms of Reference.
59. The FSP took approximately 9 months to fully inv estigate the insured’s
claim. I accept that identifying the cause of the loss required reasonably
extensive investigations by the FSP and that several consultants were
engaged to assist in this process. However, I am not persuaded that the
claim was handled in a reasonable timeframe. The FSP’s file notes indicate
Case No: 307635 Determination Page 9 of 10
that delays arose during the course of the investigation process as a result of
misco mmunications between the FSP’s consultants. It is also clear that the
insured’s broker , diligently followed up the FSP to progress the claim on a
number of separate occasions and passed on the Applicant’s concerns
about the delays experienced during the claim process.
60. The FSP’s decision to reverse its initial acceptance of the claim arose when
it reviewed the evidence and identified that the tenant had first observed the
damage to the flooring in September 2009. The FSP then communicated this
information to its engineer who concluded that, in light of the ongoing and
progressive nature of the damage and the minimal rainfall in the interim
period, this additional information supported the conclusion that the damage
was likely to have occurred prior to June 2009.
61. The FSP’s en gineer had previously assumed (based on other information)
that the damage was first observed well after the inception of the policy in
June 2009 and therefore had not directly addressed the issue of whether it
arose prior to June 2009. Accordingly, I do not consider that there was
anything untoward in the FSP’s engineer updating his report to reflect
additional information of which he was not previously aware, although it is
understandable that this may have appeared suspicious to the Applicant,
given that the FSP then reversed its decision to accept the insured’s claim.
62. However, it is clear from the available evidence that the tenant had advised
the FSP’s loss assessor in October 2011 that he first observed the damage
in September 2009. Accordingly, this i nformation was available to the FSP
prior to making its initial decision to accept the claim and should have been
taken into account for the purposes of making this decision. Based on the
FSP’s file notes, it appears that the failure to properly take this information
into account occurred because all relevant information was not circulated
among the various consultants involved in assessing the insured’s claim.
63. In the circumstances, I consider that the claim took an unusually long time to
resolve. Further, I accept that the FSP’s initial acceptance and subsequent
denial of the insured’s claim based on information which had been available
to it all along, interfered with the Applicant’s peace of mind.
64. In the circumstances, I consider that the FSP should pay the Applicant
$1,000 by way of compensation for non-financial loss.
Determination
65. On the basis of the available information I determine that:
the FSP is to cash settle the insured for an amount equal to 44% of the
costs of repairing the damage to the flooring of the insured premises, in
accordance with the process outlined in the Determination;
the FSP is to pay interest on the settlement amount calculated from 29
November 2012 to the date of payment in accordance with section 57 of
the Insurance Contracts Act 1984 (Cth); and
Case No: 307635 Determination Page 10 of 10
the FSP is to pay compensation of $1,000 to the Applicant for non-
financial loss due to its handling of the claim.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.