Home / Financial Firm (Unknown - Insurer) / Determination 307499
Determination 307499
Storm and flood related building damage declined under soil movement, flood and late lodgement grounds
Summary
The applicant claimed for building damage linked to the January 2011 storm and flood. The FSP declined under soil movement and flood exclusions, and AFCA found a covered event and no exclusion, directing the FSP to give effect to its scope of works.
The storm-triggered subsidence within 72 hours falls within the covered exception, so the earth movement exclusion does not apply.
Subjects and remedies
home or building damagenatural disasterrepair or rectify
Text of the determination
Case No: 307499 Determination Page 1 of 9
Case number: 307499
General Insurance - Domestic Insurance - Home Building - FSP Decision -
Denial of claim
26 March 2013
Background
1. The Applicant holds a Home and Contents policy which is underwritten by
the Financial Services Provider (FSP). The policy is an accidental damage
policy which was incepted in 2005, as per the FSP‟s records. The policy
covers the building in Thagoona, Queensland, for the sum of $382,900 and
contents for $127,700.
2. The Applicant lodged a claim on 25 June 2012, for damage to the building
arising from storm events on 11 January 2011. The FSP arranged for the
property to be inspected.
3. The FSP declined the claim on the basis that the Applicant had not
established the damage was the result of storms and the policy exclusion
relating to earth movement would preclude payment of the claim.
4. The Applicant disputes the declinature on the basis that storm caused the
damage.
Summary of Applicant’s position
5. The Applicant notes the FSP was well aware of the reactive soils on which
the property was built. If any previous cracking had occurred the Applicant
and her late husband undertook repairs themselves.
6. The Applicant was originally informed that she would h ave to wait for “things
to settle down” so she did. This house is also on a slab footing , but the
damage came from the water not merely the ground soil.
7. The Applicant contends the assessor “S” indicated she would be covered for
the damage.
8. The Applicant submits the main issue is that the property was inundated
during January 2011 and this caused the damage. The Applicant states the
FSP‟s expert “IC” confirmed that the event would have resulted in significant
wetting up of the founding soils. This would have caused the
commencement of additional foundation movements initially from soil
Determination
Case No: 307499 Determination Page 2 of 9
swelling when it was wet and then settling as the soil dried out around the
perimeter after the storm event.
9. The Applicant had believed she was covered for flood and has been
informed that the relevant year did not cover flood. However, she is now
covered for flood for the same premium.
10. The Applicant contends the FSP should have informed her that it would not
pay damage resulting from the earth movement arising from storm/flooding.
Summary of FSP’s position
11. The FSP relies on the following policy terms and conditions:
“We will cover your buildings or contents for loss or damage as a result of
storm, rainwater or wind.
...
We will NOT cover any loss or damage as a result of, or caused by
- Settling, shrinkage or any movement of earth
- Erosion, rust, corrosion, gradual deterioration, wear or tear
...
- Roots from trees, plants, shrubs or grass
...
- A defect in an item, structural defects, or faulty workmanship or design.
...
- flood
12. The FSP relies on the claim lodgement record which states the following:
“INSURED ADVISED EXCESSIVE AMOUNT OF RAINFALL CAUSED
WATER TO INUNDATE PROPERTY. SINCE WATER HAS SETTLED IT HAS
CAUSED MOVEMENT OF RISK PROPERTY DAMAGING INTERNAL
WALLS AND CEILIN GS AND SLIDING DOOR”
13. The FSP relies on its assessor‟s report from which the Panel notes the
following:
The house is a lowset brick home on a slab. The land is quite flat with a
gentle fall to the south. The ground level is approximately level with the
street.
The habitable floor level at the house is approximately 100mm higher
than the yard at the front and approximately 200mm at the rear.
There are interior and exterior signs that the house is moving on its
foundations.
The assessor concluded the damage to the property is the result of soil
and ground movement over an extended period of time. Stormwater is
not the cause of the damage. However, rain does have an effect on the
Case No: 307499 Determination Page 3 of 9
moisture content of the soil and in turn can exacerbate the nominal
movement of the ground.
The following information was provided by the Applicant at the time of
inspection:
The Applicant believed the damage arose from heavy rain in
January 2011. Water did not enter the property but lapped at the
front door
The Applicant had delayed lodging the claim as her husband had
recently died with the funeral being held on 10 January 2011.
The Applicant noted cracking to the plasterboard ceiling a couple of
months ago. She had attempted to patch these cracks herself.
The external brickwork was previously damaged from mines doing
blasting work in the area. Repairs had been commenced to these
bricks.
14. The FSP relies on the expert geotechnical engineer‟s report from “IC”. The
Panel notes the following from this report:
IC states the founding soils a re a class „E‟ being subject to extreme
volume changes due to swelling and shrinkage effects. E is a „very
reactive‟ soil type.
The floor slab would have been experiencing ongoing foundation
related movement prior to the flood event of January 2011.
The slab was engineered and built before the inception of the
Australian Standard for residential slab construction. If the variations in
the slab floor levels were compared to the current standards, the floor
levels would be deemed to significantly exceed the allowable
acceptable standards.
IC notes that the rainfall records indicate that 481.3mm of rain fell in the
locale of the Applicant‟s home in January 2011. Unfortunately no daily
rainfall results have been produced for January 2011.IC was informed
by the Applicant that the water remained for 48 hours after the flood
event occurred.
Impacts from the storm event of January 2011 would have resulted in
significant abnormal wetting up of the founding soils including the
commencement of additional foundational movements initially from soil
swelling when wet, then settling as the soil dried out around the
perimeter after the storm event. Most significantly the soil moisture has
been confined beneath the central area of the slab, the soils have
remained hydrated and swollen. Consequently the slab in this area has
remained elevated whilst the extremities have dropped as the soils
have dried and shrunk after the storm event. The result has been a
„mounding effect‟ with the highest floor levels being in the kitchen -
dining floor.
IC was advised by the Applicant that foundation movements had been
causing defects in the building for a protracted period of time prior to
Case No: 307499 Determination Page 4 of 9
the storm event of January 2011. IC considered this evident by the prior
repairs to the cracked brickwork and internal walls/ceilings.
Leaking of plumbing is contributing to soil swell and consequent slab
level variations and resultant defects. The leak has been adjacent to
the bathroom slab edge. This source of moisture will also be
contributing significantly to soil swell and elevated slab levels relative to
the rest of the slab.
The close proximity of trees to the residence will be contributing to
drying of the founding soils and slab settlements at the ends of the slab
and consequential movements of the founding soils.
Defective guttering and downpipes will be allowing wetting up, soil swell
and lifting or heaving of the footings/slab.
15. The policy covers the Applicant‟s building and contents for accidental
damage caused by „an unintentional act, or an unf orseen and uncontrollable
incident‟ and damage resulting from a single storm event.
16. The FSP contends that the Applicant has failed to establish that the cracks
to the walls and ceilings were the result of the storm event that occurred on
11 January 2011. The damage to the property did not occur until
approximately 12 months later and accordingly it is unlikely to be the result
of the storm event from January 2011. The FSP relies on its expert reports in
this regard. The FSP submits that the insured has neither established the
loss was caused by an „unintentional act‟, or by a storm event.
17. Whilst there is no need for the FSP to discuss this matter as the Applicant
has not established the conditions for the policy to respond, the FSP
contends that the policy exclusion of soil movement applies to defeat the
claim. The expert report clearly demonstrates this as a cause of the loss. It
was the shrinkage of the soil that caused the damage and accordingly the
exclusion applies. While the expert report has advised that the storm event
on 11 January 2011 would have resulted in significant abnormal wetting of
the soil, causing it to swell, potentially enlivening the Applicant‟s assertions
in that regard, the FSP contends the loss was not caused by that storm
event. As confirmed by the Applicant, no damage was sustained by the
building following the storm event; the cracks to the walls and ceilings only
occurred in January 2012, which was caused by the movement of earth over
time. Alternatively, as the storm would have caused the swelling, but not the
damage, followed by the shrinkage that caused the damage, then the Wayne
Tank rule would operate to exclude the claim.
18. The FSP further submits that the slab was not built to properly withstand
movement and that the damage is the result of gradual deterioration and
wear and tear.
19. The late lodgement of the claim has prejudiced the FSP and it is entitled to
refuse and/or reduce the claim. While acknowledging the Applicant‟s
bereavement would permit of some delay, it does not consider an elapse of
17 months to be reasonable. The FSP notes the damage may have arisen
Case No: 307499 Determination Page 5 of 9
from flood which is excluded from cover. The extensive delay in lodging the
claim prevented the FSP from obtaining a hydrology report. The delay could
have impacted change in terrains in the area, the drainage modifications, the
extent of the damage which may have been affected and eye witness
accounts. The FSP considers the prejudice is to the extent of the entire
claim.
20. The FSP confirms the policy at the time of the loss did not cover flood. The
flood cover was affected at the renewal from February 2012 onwards. The
renewal occurred in November 2012 and at this time the Applicant was
covered for flood.
Issues
21. Whether the Applicant has established a claimable event unde r the policy of
cover.
22. Whether the FSP has established that an exclusion under the policy applies.
Reasons for decision
23. There has been an exchange of material between each party and the Panel
is satisfied each party has had an opportunity to reply to the issues raised.
24. The Panel has read each party‟s submissions and materials and will only
refer to the relevant submissions and materials raised.
25. This decision has been made by a Panel consisting of an Ombudsman, a
representative with extensive experience in insurance industry matters and a
representative with extensive experience in consumer claims.
26. It is an accepted principle of insurance law that the onus rests with an
insured to prove, upon the balance of probabilities, that they have sustained
a loss caused by an event insured for under the policy in force at the date of
loss [ Regina Fur Co. Ltd v Bossom (1957) 2 Lloyd’s Rep 466]
27. Where the claimant satisfies the onus of proof as above, the burden then
shifts to the insurer to establish that the claim falls within an exclusion from
cover [ Bond air Services Ltd v Hill (1955) 2 Q.B 417; Legal and General
Assurance Society Ltd v The Commonwealth of Australia & Precision
Cranes and Hoists Pty Ltd (1985) 3 ANZ Insurance cases 60-621]
28. The Panel considers that there are two discrete issues (listed above) which it
will review.
Whether the Applicant has established a valid claim under the policy
29. The Panel notes the following policy terms and conditions:
Case No: 307499 Determination Page 6 of 9
“Accidental Damage Cover
We will cover your buildings or contents for any accidental loss or damage.
...
Landslide or subsidence
We will cover your buildings or contents for loss or damage as a result of a
landslide or subsidence.
We will ONLY do this if the loss or damage occurs within 72 hours of
- An earthquake or explosion
- A storm, including rainwater or wind, or
- Liquid escaping from a fixed pipe, or an object attached to a pipe, fixed
gutter, fixed tank or a drain
...
We will cover your buildings or contents for loss or damage caused by water
or liquid. We will also cover the cost of finding where the water or liquid
escaped from, including the cost of repairing any damage that occurs while
looking for the cause”
30. The Applicant has claimed the storm event on 11 January 2011 was
responsible for the movement and subseq uent damage to her property. The
FSP has submitted that due to the time elapsed there is no evidence that the
storm was the cause of the damage.
31. The Panel notes that the expert evidence from IC essentially states that the
storm event of January 2011, would have resulted in significant abnormal
wetting up of the founding soils which would have commenced additional
foundational movements from the soil wetting up and then drying out around
the perimeter after the storm event.
32. IC has also indicated that the other issues of a leaking pipe or guttering may
have assisted the wetting up of the soil at different times.
33. The Panel notes that the storm event, leaking pipe/guttering and building
movement within 72 hours of these events are covered events.
34. The Panel concludes there is sufficient evidence to establish the Applicant
has a prime facie claim under the policy. The Panel will now consider
whether any policy exclusion applies.
Whether the FSP has established that an exclusion to the claim applies
35. First, the Pa nel has considered the FSP‟s submission that it could not obtain
a site specific hydrology report to determine whether flood was the cause of
loss due to the time elapsed. The Panel does not accept this argument. The
Panel is aware that many insurers have obtained site specific hydrology
reports after 12 months time has elapsed. The data utilised by the
hydrologists in considering the matter is often more final and accurate than
the data available shortly after the event. Further, it is quite possible to
request copies of the drainage networks/topography at the time of the
Case No: 307499 Determination Page 7 of 9
incident. Accordingly, the Panel does not consider the time elapsed has
prejudiced the FSP and consequently there is no evidence to support the
flood exclusion should apply in these circumstances.
36. Whilst the FSP has noted the time elapsed between the event and the claim
was substantial, it has nonetheless been able to obtain relevant expert
reports in relation to the cause of damage. The FSP has further not refuted
or questioned the Applica nt‟s statement that she was informed to wait „until
things settled down‟. The Panel also notes with some sympathy that the
Applicant had recently lost her husband just prior to the incident which may
have impacted her ability to pursue the claim more immediately. The Panel
is not minded to penalise the Applicant for the time elapsed, given the
circumstances.
37. The FSP has relied on the exclusions for gradual deterioration and wear and
tear and/or defect. The FSP has based this argument on a statement from
the expert report which it has extrapolated to support its contention. The
Panel does not consider the expert report actually supports such a
conclusion. The expert report states that there was no Australian Standard
for the slab at the time it was constructed. A comparison of the slab to the
current standards would suggest it would not meet the standards. However,
the slab itself cannot be considered defective at the time of construction
given the expert‟s statements. Further, the expert provides no evidence of
accelerated wear and tear or gradual deterioration. Given this, the Panel
considers these exclusions are not properly applicable to this matter.
38. The Panel notes there are two exclusions related to earth movement which
are as follows:
“We will NOT cover any loss or damage as a result of, or caused by
- Settling, shrinkage or any movement of earth
...
- Landslide or subsidence, unless
- we agree to cover the incident as described under „Landslide or
subsidence‟
39. The evidence before the Panel clearly indicates that the storm event in
January 2011 has created an abnormal wetting up of the soil. This would
result in volumetric increases to the soil causing upheave in the highly
reactive soil. IC has indicated that the middle of the slab has remained wet
whilst the perimeter of the slab dried out, creating a mounded effect to the
flooring. The upheave of the soil has clearly had a lasting effect on the slab
positioning.
40. The exclusion relates to damage caused by settling, shrinkage or any
movement of earth. The FSP has argued that the upheave did not cause the
damage but rather the shrinkage caused the damage which is excluded.
Alternatively, the FSP has argued that both shrinkage and upheave have
caused the damage and the Wayne Tank rule applies.
Case No: 307499 Determination Page 8 of 9
41. The Panel notes the engineer considered the uplift of the soil which caused
movement was the result of water inundation from the storm. Insofar as the
uplift of the soil and slab have caused some damage, then as storm would
be seen to be the proximate cause, that is, the effective cause of the
property movement, then the policy would respond.
42. The Panel has also considered whether any of the damage could be said to
be caused by subsidence within 72 hours of the storm inundation which
again is damage which would be covered under the terms of the policy. The
plain English meaning of subsidence is the downward movement of the
ear th, “to sink down or a fall in the level”.
43. There is insufficient evidence regarding the timing of subsidence. IC does
note differential movement as evidenced by the mounding of the floor. It is
unclear when the settlement would have commenced and the timing of
same. IC has also not addressed what would have occurred had the entire
slab settled with earth shrinkage or whether the damage would still have
occurred.
44. The Panel further notes that the Applicant‟s earliest report of the damage at
claim lodgement stated that since the water settled that the building had
commenced moving. This indicates that the movement occurred in close
proximity to the storm. As the water remained for 48 hours prior to receding
then the movement commenced within 72 hours of the event and should
therefore be paid in any event. Accordingly, the Panel is not satisfied that the
exclusion relating to soil movement applies due to the exception relating to
subsidence within 72 hours of storm inundation.
45. It is also noted that another insured event of the leaking pipe and the
guttering may also apply. These items have leaked causing the soil to
remain wet at the location of the bathroom edge slab. Further, it is unclear
whether there has been significant rainfall and water volume entering the soil
(over and above that caused by the January 2011 event) from the guttering.
46. The Panel notes that the storm event and the leaking pipe event appear to
be two separate insured events which have impacted the insured property.
The FSP would be entitled to charge two excesses as a result.
47. The Panel notes the FSP‟s assessor provided a report pursuant to a site visit
on 2/7/12 included within which is a recommended Scope of Works (SoW);
the FSP is directed to give effect to that SoW.
Determination
48. On the basis of the available information the Panel determines the Applicant
has established a claimable event under the policy of cover.
49. On the basis of the available information the Panel determines the FSP has
failed to establish that an exclusion under the policy applies.
Case No: 307499 Determination Page 9 of 9
50. The Panel is satisfied that the Applicant is entitled to coverage, consistent
with the Scope of Works, referred to in paragraph 47 above.
51. The Panel, noting that there are two events leading to the loss, accepts that
the FSP is entitled to charge two excesses in respect to the claimed loss.
52. The Panel have considered whether interest should be applied to this claim.
The Panel is of the opinion that given the delay in lodging the claim that
interest should not apply in these circumstances.