Home / Financial Firm (Unknown - Insurer) / Determination 307223

Determination 307223

Claim amount - partial decline - exclusion/limitations

FirmFinancial Firm (Unknown - Insurer)
Decided2013-04-30
ProductGeneral Insurance · Home building and contents
OutcomeFor the firm
Amount awarded—
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

After a storm and flood inundation, the FSP paid contents and offered a cash settlement for building damage limited to the insured event. AFCA decided the FSP was entitled to reduce its liability because the remaining damage was long-term deterioration and excluded.

Wear and tear, rising damp, structural defects and seepage are excluded, and section 46 of the Insurance Contracts Act does not assist because the exclusions are not directed to pre-existing conditions.

Issues

Subjects and remedies

home or building damagenatural disasterno remedy

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Case No: 307223 Determination Page 1 of 10 Case number: 307223 General Insurance - Domestic Insurance - Home Building - FSP Decision - Claim amount – Partial Decline – Exclusion/Limitations – Section 46 Insurance Contracts Act 1984. 24 April 2013 Background 1. The Applicant held a Home Building and Contents Insurance policy (the policy) with the Financial Services Provider (FSP). 2. The Applicant lodged a claim for damage to the insured property she maintains was due to a significant storm event and subsequent inundation of the insured property. 3. The FSP accepted the claim in so far as the contents were concerned and limited its liability under the claim for the building damage to what it assessed to be due to the insured event. 4. The Applicant remains dissatisfied with the FSP‟s a ssessment of the building damage and is seeking complete indemnity for the damage to her home. Summary of Applicant’s position 5. The FSP has denied components of her flood damage claim which the Applicant strongly disagrees with. She believes the issue is complicated as it is likely the local council also bears some responsibility. She had raised this with the FSP, however, it has elected not to pursue the matter. 6. The Applicant noticed a huge amount of slush and mud surfacing from the ground throughout the property in July 2011. It came as a surprise to her as there did not seem to be any apparent reason. However, as the days passed the problem continued to worsen and she formed the opinion it was due to the council stormwater drain which had not been maintained. 7. She has pursued the council in respect to the drain for quite some time, having elevated her concerns to the local MP. 8. In respect to the flood event, the flood water came through the rear and adjoining properties. It entered her home through the back and as it was unable to escape, it soaked into the carpets. It took two months for the Determination Case No: 307223 Determination Page 2 of 10 property to dry out, during which time mud and water continued to seep and remain under the dwelling, causing damp and mould. 9. The Applicant maintains that she can only reiterate what she advised the FSP i.e. the damage and therefore the claim is the direct result of the Victoria Floods. It is not the result of rising damp over a period of time as alleged by the FSP. The Applicant has considered the FSP‟s submission to the Service and holds the following concerns:  The FSP continuously makes reference to the roof and ceilings of the home, however, this is of no relevance as she has not claimed for the ceilings. Further, water that inundated the home and caused the claimed damage did not come from the roof.  She refutes the FSP‟s reference to „negligent building practices‟ and maintains her home was built to the relevant building standard in place at the time of construction. The FSP‟s reference to building standard AS2870, only came into effect in 1991.  In respect to the FSP‟s reference to a lack of maintenance and repair the Applicant maintains prior to the floods there were no issues and these only became evident when she found herself walking on wet carpet.  She finds it fa scinating that the FSP would issue payment to „O‟ in the amount of $35,000 for the cost of humidifiers and questions whether it would be more practical to settle her for this amount in addition to the $17,369.09, offered under the claim.  It was only after several telephone calls and two months of waiting that the FSP provided her with the engineer‟s report.  At no time had the Applicant applied tape to existing cracks and then painted over them as alleged by the engineer „B‟. The photos provided by B are of the toilet roof and walls, again areas of no interest in this dispute.  The Applicant maintains she had contacted the real estate through which the property was purchased, some three years before the date of loss and it confirmed prior to the sale of the ho me it had passed a building inspection. Further, that renovation works had been completed prior to the sale so as to bring the building up to the required building standards.  The FSP had ripped up the carpets leaving her with exposed concrete floors during winter and it remained in this state until the matter was referred to the Service. She maintains this matter and the FSP‟s management of the claim has caused her undue stress both physically and mentally. 10. The Applicant acknowledges the FSP‟s apology in r espect to the confusion surrounding its appointment of consultants to provide repair quotes and that they were provided the incorrect scope of works (SOW). However, she is unable to accept this apology because it was not just the one instance. Case No: 307223 Determination Page 3 of 10 Rather this occurred on multiple occasions both prior to and after the claim was partially declined, leading her to believe she was covered for the whole SOW. 11. The Applicant is seeking for the FSP to settle her claim by way of accepting everything that is listed on the full SOW dated 1 June 2012, except anything that has to do with the roof and gutter replacement. Summary of FSP’s position 12. The Applicant lodged a claim on 26 June 2011 and provided the following description: “ My internal doors started to fall off and they are all crooked. I didn't know what caused this. I had someone look under the house today and they have found flood waters have been sitting there for a significant amount of time. In the Victorian floods, the lady next door had flooding up to her lounge room.” 13. The policy is a defined events policy, which does not provide indemnity for all types of risks and specifically excludes cover for certain events and occurrences. 14. The FSP accepted the Applicant‟s claim for damage to the insured property. The contents component has been paid and is not the subject of this dispute. However, it only accepted a limited extent of the building component of the claim on the basis that it is entitled to reduce its liability to only cover the damage assessed to be due to the insured event. 15. The FSP maintains that the damage that remains in dispute between the parties is not the result of the insured event and that in offering the cash settlement of $17,369.05 (for buildings component), it has fulfilled its obligations under the policy. 16. The FSP sought the opinions of several consultants to gain an understanding of the cause of the damage claimed. Also, it maintains the consultants, including the engineer (B), held the necessary expertise to provide their opinions/advice on the cause of the damage. 17. Further, in the absence of any evidence which contradicts the findings of the appointed consultants, the FSP maintains that it is entitled to rely on these findings. 18. Based on their findings the FSP maintains the disputed damage is due to structural defects, poor workmanship, wear and tear, inherent defects, rot and rising damp or seepage in the concrete slab. These circumstances are clearly excluded from cover under the policy. 19. The FSP acknowledges its error and resultant confusion in providing its appointed builders „U‟ and „BB‟ the incorrect SOW to base their repair quotes on in respect to the insured home. The result being these quotes included all Case No: 307223 Determination Page 4 of 10 the damage noted at the insured home and was not limited to only that damage which the FSP assessed to be due to the insured event. 20. The FSP made a decision to ameliorate the untimely provision of the engineer‟s report (some 6 weeks after the inspecti on) by way of indemnifying the Applicant for the cost of damage to the vinyl floor and the ceiling. Also, to provide the Applicant with dehumidifiers for an extended period of time in an attempt to dry out the slab area and assist her regarding health issues arising from the dampness rising from the slab. 21. The FSP has considered section 46 of the Insurance Contracts Act 1984 (the Act) and notes the onus rests with the Applicant to first establish the damage claimed is due to an event insured under the policy. Further, section 46 of the Act does not protect the policyholder against a risk that is not covered under the policy. The Service‟s previous determinations 20563 and 232864, although not to be considered precedents, are relevant to this view. 22. The general poor condition of the property predated the wetter than usual seasonal weather up to the time of its inspection and the issues identified were all maintenance related. Further, the damage was not found to be due to a single storm event, rather was found to be due to an introduction of moisture over an extended period of time. 23. The FSP relies on the following policy provisions: “ Home Insurance Cover – p10 If your home suffers loss or damage caused by an event listed below, we will choose to do one of the following: • repair the damaged portion of your home, • replace your hom e, • compensate you for the amount we would have paid for repair or replacem ent. General exclusions applicable to your policy – pp40-42 You are not covered under any section of this policy for damage, loss or liability caused by, arising from or involving any of the following. … Consequential loss of any kind. Cracking, chipping or scratching. … Water entering your home: • as a result of your failure to perform adequate maintenance on your home, or a structural defect, or faulty design or workmanship, … Wear and tear, lack of maintenance or inherent defect. Case No: 307223 Determination Page 5 of 10 Rust, corrosion, mildew, wet or dry rot, rising damp or seepage and other signs of failure to keep your home in good order and repair. … Structural defects or faulty workmanship, settling, shrinkage or expansion. … Damage caused by water seeping or percolating through walls, roofs or floors. Paying your claim - How we pay a claim for your home p46 Where we pay a claim for your home, we will choose to do one of the following: • repair your ho m e, • replace the damaged portion of your home, • compensate you the amount it would have cost us for repair or replacem ent. If you decide not to repair or replace your home, or do not commence repair or replacement within six months of the date the loss or damage occurred, we will only compensate you for what it would have cost to repair or replace your home at the date of the loss or damage. Glossary of Important Words and Phrases – p54 • Rainwater means rain falling naturally from the sky, including rainwater run-off over the surface of the land and including rainwater overflowing from storm water drains and channels. • Storm means violent wind (including a cyclone or tornado), thunderstorm or heavy fall of rain, snow or hail. ” Issue 24. Whether the FSP is entitled to limit its liability to the Applicant, under the claim, in line with the available evidence and policy provisions. Reasons for decision 25. As advised to the parties, FOS has considered it appropriate to expedite the dispute in accordance with the Operational Guidelines to the FOS Terms of Reference. This is due to the circumstances of the dispute. This dispute has not been the subject of a FOS Recommendation and has proceeded directly to Determination. 26. I have reviewed the submissions of the parties in relation to the terms and conditions of the policy and will only refer to the relevant submissions and materials raised. 27. I am satisfied the parties do not dispute the following: Case No: 307223 Determination Page 6 of 10  The Applicant held an active home building and contents policy with the FSP at the time of loss.  The FSP provided and the Applicant received the relevant policy documentation including the Product Disclosure Statement (PDS).  There occurred an insured event “Storm, hail or rainwater” in the vicinity of the insured property in February 2011, which resulted in the partial inundation of the home (rear section), as well as inundation of the sub-floor area of the dwelling.  The insured event resulted in significant damage to the insured contents within the home as well as damage to the insured building.  The FSP has provided indemnity for the contents loss and an offer in respect to the building damage has been put to the Applicant in respect to building damage. However, the extent of damage to the building covered under the policy remains in contention between the parties.  The Applicant had owned the insured property for approximately three years before the date of loss. Further, she had been in communication with the local council and Member in respect to concerns she had with the street gutter/drain for a few years before the date of loss. 28. I have been provided with multiple consultants‟ reports for consideration and I am satisfied that these have been exchanged between the parties, each having had the opportunity to comment. In the interest of brevity I will only restate information from these reports I find necessary in providing this Determination. These report provide: Assessor’s Report  The date of assessment was 5 July 2011.  The Applicant advised that in early February 2011, the property was inundated with stormwater. It entered the back section of the home i.e. bathroom, laundry and toilet.  The Applicant advised that a significant amount of water had sat around the home for some time after the event.  She found the home began to show signs and effects of movement. Internal doors had fallen off and others wouldn‟t close.  The assessor noted water damage to the ceiling within the home.  She purchased the property approximately three years before the date of loss.  She was advised that the assessor would recommend the appointment of an engineer to inspect the stumps and foundations of the home. Case No: 307223 Determination Page 7 of 10 Builder’s Report  A site visit was undertaken on 22 July 2011.  The age of the home was estimated to be around 100 years, it being a weatherboard construction with corrugated iron roof.  He found no signs of storm damage to the roof and noted it to be in poor condition due to its age. The roofing, flashings and guttering, all required replacement.  The overall condition of the dwelling was noted to be poor. B’s Engineer Report dated 18 September 2011  An inspection was undertaken on 3 August 2011.  The Applicant advised that she purchased the property three years prior at which time a building report was obtained, however, the report was not available.  Further, she was advised the house was restumped prior to her purchase, however, B on inspecting the dwelling concluded that this was clearly not the case.  Heavy rainfall did not reach the house floor level and simply caused extensive surface water flow around the home.  It was noted to be a single storey weatherboard structure with an iron roof and timber floor which stood on a mixture of bush logs and red gum stumps to the front two rooms. The rest of the dwelling comprised a concrete slab floor roughly poured over the top of the existing stumps, bearers and joists.  The sub-floor timber and stumps were noted to be in generally very poor condition with many stumps effectively rotted out below ground level. Numerous packers had been installed (previously) to re-level the flooring.  The concrete that had been poured in numerous sections was not reinforced and no plastic vapour barriers used in the construction. B suspected the concrete floor was installed by the previous owner shortly before the sale and likely this was done without building approval.  The house had been recently repainted with many cracks/gaps simply covered by masking tape and painted over.  In general the property was found to be in poor structural condition with extensive decay of the sub-floor members, very poor quality and finish of internal linings and decay in the base of some of the wall frames.  There had clearly been previous movement in the floor as evidenced by the packers over the top of several stumps and a brick pier added to reduce the span of a severely rotted bearer. Case No: 307223 Determination Page 8 of 10  The rotted stumps were not the result of the rainfall event but were assessed to clearly be long term damage. The dwelling would have been in a very similar condition prior to the stormwater inundation event.  There was no evidence of significant new cracking suggesting recent movement. There was extreme dampness in the concrete floor, which is why the FSP had removed the carpets and there was cracking in the chimney and decay in floorboards to the front section.  The land surrounding the dwelling has a moderate fall to the north. With good surface drainage, the water would not be able to sit around the house for a significant length of time. There was no distinct hollow under the dwelling that would facilitate ponding of water.  Most dampness under the dwelling would be from ground water seepage down the slope rather than from a single rainfall event.  The soils in the area comprise of only low to moderate reactive clays which would be subject to only limited movement following wetting and drying phases.  If any recent subsidence movement had occurred as a result of water inundation, it would only have been due to the extremely poor condition of the stumps.  The main issue is the dampness of the concrete floor, which B maintains is not due to a single heavy rainfall event. Rather, it is due to general dampness in the soils under the dwelling seeping through the concrete slab, due to the absence of a plastic vapour barrier.  There is no evidence of significant heave movement within this house that would indicate a leaking pipe or plumbing fixture.  B concluded that the house had reached the end of its useful life. The damages to the dwelling were pre-existing to the heavy rainfall events earlier in the year, that caused the water inundation. 29. I have carefully considered the available evidence and I am satisfied that the dispute before me is not in respect to the roof and ceiling of the insured dwelling or the damage to the contents which occurred as a result of the insured event. There is no dispute that an insured event, which resulted in the inundation of the insured property, did occur. Therefore, the Applicant has established a prima facie claim. The onus rests with the FSP to establish an entitlement to reduce its liability under the claim in line with the policy. 30. On the basis of the consultants‟ reports and supporting photographic evidence, I am satisfied that it is reasonable to conclude that the property was in a generally very poor condition from before the February 2012 insured event. It is evident that over the course of its life the dwelling has been subject to long term earth movement/subsidence, which is supported by the fact that there existed long term cracking, installation of packers over the top of several stumps. Case No: 307223 Determination Page 9 of 10 31. Further, although the flood/ storm event in February 2012, may have contributed to its poor condition, it was only to an extent of possibly exacerbating a gradual deterioration process (to which the home was subject to) due to age, wear and tear, earth movement/subsidence, gradual deterioration of the stumps and bearers and moisture seepage into the concrete slab over time. 32. I acknowledge the Applicant‟s concern in respect to what she was advised by the real estate at the time of purchasing the property and the fact that she had not applied the masking tape to the pre-existing cracks, present in the dwelling, prior to it being repaired. I accept that any contribution and/or her knowledge of these issues has not been established to any extent whatsoever. 33. In saying that, although I am not satisfied that the Applicant was responsible or aware of the masking of the cracks etc, this does not change the fact that damage in itself establishes the home was subject to ongoing ground movement over a long period of time and prior to the insured event in February 2011. I have also considered the Applicant‟s reference to the council drains not being maintained and this being one of the reasons for the property being inundated on the date of loss. 34. Although, this may very well be the case (the blocked drain contributed to the inundation), the FSP in accepting to cover the loss determined to be due to the recent insured event (inundation of her property including contents) has satisfied its obligations under the policy in this regard. It is not liable under the policy to cover costs associated with repairing or replacing the storm drain, only the resultant damage. Nor, is it required under the policy to represent and/or assist the Applicant in her dealings with the local council in this regard. 35. Reference has been made to the possible application of section 46 of the Act and whether this allows any protection to the Applicant under the circumstances subject to the claim. A summary of section 46 provides: “ Section 46 of the Insurance Contracts Act 1984 provides that if a claim is made in respect of a loss that occurred in whole or in part as a result of a defect or imperfection in a thing and the insured was not aware of the defect or a reasonable person in the circumstances could not be expected to have been aware of the defect or imperfection the insurer may not rely on an exclusion clause that refers to the condition of the thing before the contract was entered into. ” 36. As noted above, section 46 prevents an insurer from relying on an exclusion clause that refers to the condition of a thing before the contract was entered into , if the Applicant (or a reasonable person) was not aware of the defect or condition which wholly or partly caused the damage claimed for. 37. The case of Nelson v The Hollard Insurance Company Pty Ltd [2010] NSWSC 199 states that section 46 of the Act does not apply to an exclusion of an event which makes no reference to when the event occurs. Therefore Case No: 307223 Determination Page 10 of 10 only exclusions which refer to a condition existing befo re entry into the contract of insurance are affected by section 46. 38. In this dispute, the exclusion clauses relied upon by the FSP apply generally and are not temporal in nature. The exclusion clauses are not directed to defects which pre-existed the commencement of the Policy. Accordingly, I am not satisfied that section 46 assists the Applicant in this dispute. Determination 39. On the basis of the available information I determine the FSP was entitled to reduce its liability under the claim to only the damage it reasonably assessed to be due to the insured event in February 2012.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.