Claim for explosion-related building damage denied
Summary
The insured claimed about $107,658 for building damage she attributed to vibrations from controlled explosions 1.3km away, and the insurer denied it relying on exclusions and an engineer's soil-movement report. AFCA found the insurer had not proved an excluded cause and ordered it to pay the claim with interest.
Under the accidental damage extension the insurer bore the onus of proving an excluded cause on the balance of probabilities, and its engineer's evidence on shrink-swell soil movement was not sufficient to do so.
Issues
- Claim denial primary · upheld
“The FSP is to pay the claim in accordance with the terms of the policy and pay interest under section 57 of the Insurance Contracts Act from 24 April 2012.”
- Product terms interpretation secondary · unclear
“The Panel finds the Applicant is able to establish damage from an event covered under the accidental damage extension, so no further consideration of the defined event is needed.”
Subjects and remedies
home or building damagepay claimpay interest
Text of the determination
Case No: 306958 Determination Page 1 of 8
Case number: 306958
General Insurance - Domestic Insurance - Home Building - FSP Decision -
Denial of claim
06 May 2014
Summary
Description
Claim under a Home Building Contents policy for damage sustained
from a series of controlled explosions near the premises in March 2011.
The FSP has declined the claim relying on policy exclusions.
Basis of Determination
The Policy is a defined events policy with optional accidental damage.
If the property was not damaged by a defined e vent, then it sustained
accidental damage within the terms of the policy cover.
The FSP has not established on the balance of probabilities the
application of any relevant exclusion clause.
Determination
The FSP is to pay the claim in accordance with the terms of the policy
and pay interest under section 57 of the Insurance Contracts Act from
24 April 2012 to date of payment of the claim.
Background
1. The Applicant’s home was insured under a Home Insurance policy
underwritten by the Financial Services Provider (FSP). The policy provides
cover against defined events and includes an optional accidental damage
extension which the Applicant has taken.
2. On 25 November 2011 the Applicant lodged a claim under the policy for
damage to her home caused by vibrations arising from a series of controlled
explosions carried out by the authorities over a period of about one week.
The authorities detonated a quantity of explosives about 1.3 kilometres from
the Applicant’s home on about 20 March 2011.
Determination
Case No: 306958 Determination Page 2 of 8
3. The FSP denied the claim on the grounds as there was no scorching to the
building the loss did not fall within an insured event and that based on the
evidence of an engineer commissioned by it, the damage was due to soil
type and insufficient footings
4. The Applicant states her home was damaged by explosion and that
explosion damage is covered by her policy. She contends the engineer’s
report is flawed and that the FSP’s interpretation of the insuring clause is
incorrect. Additionally the reference to flame within the insured e vents
relates to damage claims arising from fire and not explosion. The Applicant’s
claim is in the sum of $107,658.49.
Summary of Applicant’s position
5. The Applicant has appointed a lawyer to present her case. Any reference to
the Applicant in this Determination will include her representative.
6. The Applicant points to a number of inconsistencies with the engineer’s
report relied on by the FSP.
7. In the Applicant’s view the engineer’s report is hardly unequivocal in its
findings. It is in various parts based o n conjecture and surmise so that the
conclusion that the damage is due to earth movement is not well reasoned.
8. She argues the report is weak in its reasoning and conclusion and the FSP
has wrongly relied on it to deny the claim.
9. In support of her claim the Applicant submitted the following direct evidence
of the cause for the damage:
Her observation of the effect of the blasting and that the damage
appeared immediately after it.
Complaints by other residents of the effect of the blasting on their
property.
Reports from a builder and a plumber who describe the effect of the
blasting on her building.
10. The Applicant further argues that the loss falls within an insured event. She
contends the claim is not excluded because:
The policy covers loss by explosion.
Reference to flames in the policy wording applies to claims arising from
fire and not explosion. Explosion is dealt with as a separate event.
In the alternative, there was flame present within the explosion. The
policy merely requires that there be flame.
11. The Applicant contends that damage arose from a single event in that it
would be impractical or unreasonable to expect a policyholder to identify
which blast caused which part of the damage.
Case No: 306958 Determination Page 3 of 8
Summary of FSP’s position
12. The FSP relies substantially on an engi neer’s report commissioned by it.
13. The FSP contends it was entitled to deny the claim on the following grounds:
a. There was no insured event – the home did not suffer damage from
direct flames or scorching.
b. A thorough geotechnical assessment of the damage discovered shrink-
swell reactivity within the soil.
14. The FSP submits these issues are excluded from cover provided by the
policy as there was no insured event and erosion or earth movement
including shrinkage is excluded.
15. The FSP relies on the following policy terms:
“General exclusions – apply to the overall policy
Unless included in additional cover, we will not cover loss, damage or legal
liability caused by:
...
erosion or earth movement, including shrinkage;
subsidence and landslide, unless it happens immediately following an
earthquake or explosion;
...
Insured events
We will cover you for loss or damage to your building and/or contents caused
by the events detailed in this section. The loss or damage must occur at the
insured address. ...
...
Fire and explosion
You are covered for loss or damage as a result of fire or explosion. We will
also pay up to $100 to repair or replace the item that exploded if the item
would have been covered under your type of policy (building or contents).
You are not covered:
for bushfire for the first 48 hours of this policy unless:
- this policy is replacing another home insurance policy without a
gap in cover or change in sum insured, or
- you have entered into a contract to purchase or lease the insured
address;
where there is no flame (such as scorching);
where the fire has not escaped the normal confines of a heating or
cooking appliance; or
Case No: 306958 Determination Page 4 of 8
explosions resulting in a claim for liquid damage to the building or
contents. These claims will be treated as a claim under the escape of
liquid event. Please refer to page 21.
Issues
16. Under what circumstances the policy responds to claims for damage caused
by explosion.
17. Whether damage to the Applicant’s home was caused by an insured event
or by an excluded event.
Reasons for decision
Policy terms
18. The Panel has read and considered the detailed arguments submitted by
both parties in relation to application of the policy terms relevant to
explosion.
19. The Panel notes that the Applicant has selected the optional Accidental
Damage extension under the policy. For Buildings the clause reads:
“ Accidental damage
In addition to the cover provided by the insured events detailed on pages 21
to 24, the accidental damage option covers damage to the building that is
caused unintentionally. We will cover the cost of repairing or replacing that
part of the building which suffers physical loss or damage caused by an
accident at the insured address.
The general exclusions on pages 18 and 19 apply. In addition, we will not
cover damage caused by or attributable to:
ii. atmospheric conditions, mould, mildew or rot;
iii. Scratching, chipping or denting; or
iv. any cleaning process using chemicals other than domestic household
chemical.
We do not cover accidental damage that occurs outside the insured address.”
20. The word “accident” is defined within the policy as meaning:
“Something that was not intended, planned or expected and which did not
occur through a malicious act. ”
21. The accidental damage extension is additional to the defined events but the
Panel notes that the defined events are not excluded events under the
extension. If the FSP is successful in its argument that the defined event of
explosion does not apply to this loss, then the accidental damage cover
comes into play as an additional cover.
Case No: 306958 Determination Page 5 of 8
22. The Panel is satisfied that the event causing the damage is consistent with
the definition of accident. The vibrations which the Applicant claims are
responsible for the damage occurred at the insured address notwithstanding
the fact that their origin may have been 1.3 kilometres away.
23. The Panel finds that the Applicant is able to establish that there is damage to
the insured property and that there is a reasonable probability that the cause
of that damage is from an event that will be covered under the accidental
damage extension of the policy.
24. Accordingly, there is no need for the Panel to give further consideration to
the various arguments surrounding the application of the defined event titled
“Fire and Explosion”. The onus of proof shifts to the FSP to prove that, on
balance of probabilities, the event causing the damage was one that is
excluded under the policy.
The claim
25. It is common ground between the parties that the authorities detonated
explosive over about a week. The evidence indicates about 550 kg of
explosive were involved with about 5kgs detonated on each separate
occasion. The Applicant’s home was located about 1.3 kilometres from the
site of the explosions.
26. In support of her claim the Applicant has provided reports obtained from a
building contractor and a plumber. The Applicant also presented statements
from other parties living in the vicinity.
27. The plumber stated following his inspection of the home, he observed down
pipes pulled apart and jack studs and concrete piles had sunk with others at
an angle. The house looked like it had lifted and dropped.
28. The plumber was of the opinion the damage was caused by the supervised
explosions nearby. The following is an extract from his letter dated 7 October
2011:
“having been engaged to do the plumbing work during the 2006 renovation I
can attest to the sound nature of this house under floor and above
construction. The damage that has occurred cannot be put down to wear and
tear or lack of maintenance”.
29. The building contractor acknowledged he was not an engineer although he
had been a builder for 26 years. He stated the house was built in 1972 and
renovated in 2006.
30. The builder identified damage to the house and noted the damage had only
occurred within the last 7weeks or so. He believed the house had lifted and
dropped and the observed damage happened over a short period of time. It
was not due to wear and tear.
31. The builder stated he had experienced similar damage to property caused by
dynamite explosions when he worked above a quarry many years ago. He
Case No: 306958 Determination Page 6 of 8
believed the damage to the Applicant’s home was consistent with a house
he worked on at the quarry which was proved to be from explosions.
32. A resident stated that a recently installed 10,000 gallon water tank on his
property formed a large structural crack through the concrete in the last
week of blasting.
33. Another resident stated on a few occasions the blasts were strong enough to
rattle windows and doors on her properties which were located about 5km
from the blast site.
34. T he Applicant’s next door neighbour stated he felt movement of his home at
each detonation.
35. Based on this evidence the Panel accepts that the shock waves from the
explosion were felt some distance from the site and as far away as about
5km.
36. The engineer commissioned by the FSP acknowledged he had only limited
details of the explosives that were detonated. He also observed an accurate
estimation of ground vibrations was a complex task. He considered based on
a number of assumptions,
“... the estimated groun d vibrations at the subject site, as a direct result of the
blasting operation, were probably well within tolerable limits.
37. The engineer’s site inspection included an assessment of the foundation
soils on which the home was built. The engineer acknowledged geotechnical
laboratory testing was not carried out as they were unable to transport soil to
Sydney because of quarantine reasons. Nevertheless, he observed the
ground was formed with silty clay which was assessed to be high plasticity
and hard strength. He noted residual silty clays of high plasticity generally
have high potential for shrink-swell reactivity with changes in sub soil
moisture content.
38. The engineer concluded:
“In the absence of a dilapidation report of the subject house prior to the
blasting operation, the absence of any vibration monitoring records during the
blasting operation and our assessment that ground vibrations at the subject
site from blasting operations were probably well within tolerable limits, it is
difficult to say with certainty, what the direct cause of damage to the subject
house resulted from. However based on our assessment, it is unlikely that the
damage was caused directly by the blasting operations.
The observed damage could also have been caused by shrink-swell of the
reactive clay foundation, inferior building materials (eg timber shrinkage)
and/or inadequate building methods. Some of the damage, for instance the
vertical separation between the timber stud and floor joist below the central
portion of the house, is most likely attributed to shrink-swell movements of the
underlying silty clays”
39. The Panel is mindful of the Applicant’s criticisms of the engineer’s report and
in particular that a laboratory test was not carried out on the foundation soils
Case No: 306958 Determination Page 7 of 8
and that the precise details of the explosions was not available to him.
Nevertheless, in arriving at his findings, the engineer acknowledged the
limitations imposed on him as a result of these issues.
40. The engineer’s report indicates that the soil conditions at the insured
address are of a type which might generally be subject to shrinking and
swelling but the report falls short of attributing the damage observed at the
insured property to that cause. The report acknowledges the difficulty of
determining a cause for the damage to the property.
41. If the damage was caused by the shrinking and swelling of the subsoil it
would be expected that the resulting damage would occur gradually over an
extended period of time. The engineer’s report is silent on this aspect and
provides no indication as to the age of the damage and whether or not any
attempts have been made, over time, to repair any of the damage.
Summary
42. In the Panels opinion the evidence in relation to the cause for damage is
inconclusive. However, given the scope of cover afforded under the
accidental damage extension, the onus is on the FSP to prove that, on the
balance of probabilities, the damage was caused by an excluded event. The
Applicant has offered a plausible reason for the cause of the damage and is
not obliged to disprove the FSP’s theories about shrinking and swelling of
the sub-soil.
43. The Panel acknowledges that the conditions were present to cause damage
to a building. However, given that there are alternative reasons for damage
to the building, which are equally plausible, the Panel finds that the FSP has
provided insufficient evidence to link the prevailing condition of the sub -soil
to the actual observed damage.
44. The Panel finds that the FSP has been unable to prove that, on the balance
of probabilities, an excluded event is more likely to have caused damage to
the insured property than an event that would have been insured under the
policy.
45. The FSP has not provided any argument to the effect that an insured event
and an excluded event may have operated simultaneously, nor has it
provided any evidence to that effect.
46. Accordingly the FSP is required to indemnify the Applicant for the loss.
Determination
47. On the basis of the available information the Panel determines the FSP is
required to indemnify the Applicant for the loss in accordance with the terms
of the policy.
Case No: 306958 Determination Page 8 of 8
48. In the event any aspect of this claim is resolved by way of a cash settlement ,
the FSP is to pay interest on any sum paid in accordance with section 57 of
the Insurance Contracts Act 1984 from 24 April 2012 (the date it initially
denied the claim) to the date when payment is actually made.