Home / Financial Firm (Unknown - Insurer) / Determination 306849

Determination 306849

Service - delay in claim handling; claim declined on policy exclusions

FirmFinancial Firm (Unknown - Insurer)
Decided2014-03-26
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant
Amount awarded—
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

Applicants' home was damaged by stormwater from a neighbouring drain and the FSP later declined aspects of the claim as subsidence and maintenance. The Panel found an insured event caused the damage and ordered cash settlement of full repair costs and related items, with the $2,000 ex gratia payment offset against non-financial loss.

On the weight of expert evidence and the absence of earlier movement, the proximate cause was a leaking stormwater drain, which is an insured escape of liquid from a drain.

Issues

Subjects and remedies

health or medicalpay claim

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Case No: 306849 Determination Page 1 of 16 Case number: 306849 General Insurance - Domestic Insurance - Home Building - Service - Delay in claim handling 18 March 2014 Summary Description  Home and Contents policy dispute following a claim for water damage lodged in November 2011. Dispute has arisen as to the extent of liability, the FSP declining aspects of the claim due to policy exclusions. Basis of Determination  The property was water damaged in November 2011.  Numerous expert opinions were obtained by both parties.  The weight of the expert evidence establishes on the balance of probabilities the damage sustained was due to an insured event. Determination  The FSP is to meet its liability in accordance with the terms of the policy and cash settle the Applicants‟ claim based o n the cost of repairs required as per the scope of works 1 and 2, the costs of repair/ replacement of the carpets and either cash settle the cost of the accommodation in advance or as incurred. Background 1. The Applicants hold a home insurance policy with the Financial Services Provider (FSP) that commenced on 9 July 2007 providing complete replacement cover and contents cover of $44,500. An excess of $400 applies to the claim. 2. On 27 November 2011, the Applicants lodged a claim for damage to the substructure of the home, the FSP recording the following description of the damage: “I was under the house and i have noticed a large hollow. I am not sure what has caused this, we may have a leak under the house.” [sic] Determination Case No: 306849 Determination Page 2 of 16 3. The FSP initially considered damage had been occurring due to water runoff coming from a neighbouring property and agreed to indemnify the Applicants for the resultant damage. 4. The FSP subsequently determined the damage was not related to an insured event covered under the policy, however, due to the delays in processing the claim, the FSP agreed to offer limited coverage for the areas of the Applicants‟ home it had previously accepted as covered and provided compensation of $2,000 for delays in finalising the claim. 5. The Applicants seek a review of the FSP‟s decision. Summary of Applicants’ position 6. The Applicants reject the scope of works prepared by “JLG” and relied upon by the FSP in its proposal for part settlement of their claim on the basis that:  The Applicants‟ engineer, “RB” has indicated that the founding depth of all footings is to be a minimum of 2.4 metres.  On 17 September 2013 the FSP accepted RB‟s recommendations in respect of footing depth.  They believe they are entitled to indemnity for replacement of all stumps at the property (at a depth of 2.4 metres). 7. The Applicants reject the FSP‟s proposal to only indemnify them for those works provided in JLG‟s “scope of works 1” on the basis the FSP has classifi ed the matters in “scope of works 2” as being building defects and maintenance related matters. 8. The Applicants say the delays in resolving their claim has resulted in additional damage to the property, with movement continuing to occur as a result of the footings undermined by the storm water runoff. 9. The Applicants seek indemnity for the full extent of the damage to their home (as set out in scopes 1 & 2) on the basis of their engineer‟s assessment that “the movement component caused by the event is somew here in the order of 90% plus of the house’s total area.” 10. The Applicants do not agree to JLG being retained to undertake the works and are prepared to resolve the matter on the following basis: a. Receiving an acknowledgement from the FSP that an insured event has occurred for which they are entitled to indemnity under the policy. b. Cash settlement for the works identified in both scopes 1 & 2 (including allowance for the cost of replacement stumps at a minimum footing of 2.4 metres). c. Reimbursement of $3,030.50 for works associated with the installation of an „Ag drain‟ along the length of their property, carried out as per the FSP‟s expert‟s initial recommendations. Case No: 306849 Determination Page 3 of 16 d. Repair/replacement of their carpet which has lifted and been damaged as a result of the underlying structural damage. e. Indemnity by way of cash settlement in respect of alternative accommodation, garden reinstatement, removal costs and storage. f. Compensation for non-financial loss for delays and failure by the FSP to handle their claim effectively. Summary of FSP’s position 11. The FSP initially accepted that there was resultant damage at the property caused by surface run off from a neighbouring property. 12. However, after receiving additional expert material, the FSP has determined that the damage to the insured property has not been caused by an insured event. Rather the FSP considers the damage to the property to be the result of subsidence and stump failure that has existed for an extended period of time. 13. Whilst the FSP maintains the Applicants are not entitled to indemnity under the policy, it has nonetheless agreed to indemnify them for the damage it initially accepted as being damage caused by stormwater runoff. 14. As the damage to the south western area of the building was predominately caused by subsidence/stump failure (and the FSP has not previously accepted liability for these areas of the property) the FSP says the damage to the two bedrooms, study and north side of the lounge are excluded. It has also identified other areas of cracking and pre-existing damage which it says are not resultant damage of stormwater run-off. 15. The FSP refers to these excluded aspects of the damage as being „maintenance works‟, and they are described accordingly in the second scope of works that has been prepared. 16. On receiving final quotations in respect of the final scope of works for the accepted items, the FSP has offered to cash settle the Applicants in the sum of $56,252.11, based on a quote from its builder, JLG. 17. The FSP believes cash settlement is the only option as the Applicants have indicated they intend to carry out the identified maintenance (or excluded) works at the same time as the accepted works. 18. The FSP accepts liability for any carpet requiring repair or replacement as a result of the claim related building repairs. 19. It also accepts liability for the costs associated with alternative accommodation for the Applicants and their pets during the repairs and has indicated it is willing to work with the Applicants to source suitable accommodation for this period. Case No: 306849 Determination Page 4 of 16 20. In respect of the Applicant s‟ submissions that the FSP‟s delays in processing the claim has resulted in further damage to the property the FSP says the onus is on the Applicants to prove this, and they have not done so. 21. In respect of the Applicants submissions that the compensation provided to date is insufficient, the FSP says its decision to partly indemnify them for the claim although it is specifically excluded from cover is compensation enough for their delays in assessing the claim. 22. In any event, the Applicants have been provided with compensation of $2,000 due to delays in finalising the claim. Further, the engineering expert “FE” has stated that the correct remedy for damage suffered in these circumstances is to allow sufficient time for a drying out period, such that soil moisture levels have returned to pre -event conditions. Therefore, whilst the FSP admits there has been a significant delay in settling the claim, due to the required drying out period, had the claim been settled earlier, repairs would not have been able to commence for a period of 12-18 months, as soil movement was continuing during that time. 23. The FSP has agreed to reimburse the Applicants for the expert report costs. Payment of $3,146.00 has now been issued to them. The FSP has also reimbursed the Applicants for $497 for works associated with their pathway. Issues 24. Whether the damage was caused by an insured event under the policy. 25. Whether the FSP is entitled to deny coverage for the two bedrooms, study and north side of the lounge. 26. Whether the Applicants are entitled to any further compensation pursuant to paragraph 9.3(b)(i) of the Financial Ombudsman Service (FOS) Terms of Reference. Reasons for decision 27. Due to the nature of the dispute, it has been directly referred to the Panel for Determination in accordance with the Operational Guidelines to the Financial Ombudsman Service‟s (FOS) Terms of Reference. 28. The Panel consists of an Ombudsman and two Panel Members with extensive experience in insurance industry matters and consumer claims. 29. Having reviewed the available evidence, the Panel notes:  The Applicants‟ home is estimated to be about 50 years old and the Applicants have lived there since 2007. Case No: 306849 Determination Page 5 of 16  There is no evidence to suggest that the home had prior incidences of movement or cracking since purchased by the Applicants. These issues appear to have first surfaced sometime in November 2011.  The Applicants lodged their claim on 27 November 2011. Initial investigations indicated the cause of the damage was storm water runoff from the neighbouring property. Several months later it was identified that the source of the runoff included a defective stormwater drain at the neighbouring property. It is unknown how long the drain issue had been occurring, however it has now been rectified.  The Applicants were first advised by the FSP that its expert had now determined that the damage to their property did not arise from an insured event on 28 December 2012, 13 months after claim lodgement.  Ongoing movement of the structure has occurred since lodgement of the claim. This has been verified by various experts who have inspected the property at various stages throughout the dispute.  The Applicants have continued to keep the FSP informed of the additional issues that have arisen as a consequence of the continued movement, including the inability to close external doors and properly secure the property. 30. The first issue for the Panel to consider is whether the proximate cause of the damage to the Applicants‟ home is the stormwater runoff, and therefore whether an insured event has occurred. If so, the next consideration for the Panel is the extent of damage that has been caused by that insured event. Expert Evidence 31. The parties have each provided expert evidence in respect of the cause of the damage and appropriate scope of works. The key points of these reports are set out below. FSP’s Expert Evidence 32. The FSP‟s initial assessment report, dated 3 January 2012 provides the following opinion: “Water has caused soi l under the sub-floor to erode away around some of the perimeter stumps on the LHS & under the concrete side paving. ... Io‟s home is showings signs of movement between the kitchen/laundry areas with obvious slops to the tile kitchen floor between the island bench and laundry door. ... Standing at the front of the decking one can see the decking also slopping back towards the back wall & leaning towards the laundry. The laundry door can no longer be opened due to the movement and the back double doors have had to be planed so that they can be closed/opened. There are a few concrete stumps under the decking which have cracked. Mr Io stated that he has had the stumps looked at by a re-stumper who stated that the home is shifting and requires re- stumping. ...” (sic) Case No: 306849 Determination Page 6 of 16 33. The FSP‟s engineer “HCE” prepared a report dated 22 February 2012 which states:  Cracking and movement is occurring of the kitchen and laundry area at the rear south-west corner of the house and it was indicated by the owner that these problems have recently occurred.  The kitchen and laundry floor appear out of level. Doors in this area are out of square, cracks are evident in the door architraves, and the kitchen bench is out of level.  The built in cupboard doors in the north-east corner bedroom are out of square, wall tiles and wall lining of the south side wall of the bathroom are cracked, and the floor of the family room at the rear north-west corner of the house is out of level.  Collapse and washing away has occurred of the foundation material around a few stumps below the south-west corner of the house, and also of the soil below the concrete paving adjacent to the south side of the house at the south-west corner.  Collapse and washing away has occurred of the foundation material around the old gully trap and an adjacent stump below the kitchen floor.  The timber stumps are generally in a good condition with only minor decay occurring of the stumps immediately below the surface. A concrete stump is evident below the family room which was installed after the house was built to repair previous movement of the floor of the family room.  According to the geological map the soil in the area is a Quaternary Basaltic Clay which is a classified as a highly reactive clay site (class H). Seasonal changes in moisture content of the foundation material can cause up to 65mm movement at the surface of the soil.  The cracking and movement evidence of the residence is typical of problems that can occur due to differential movement of the stumps due to seasonal changes in the moisture content of the foundation material.  A considerable amount of rain has fallen in late 2010 and early 2011 which have resulted in changes in the moisture content of the foundation material from a long period of drought to normal rains .  Therefore the general cracking and movement evidence in the house has resulted due to changes in the moisture content of the foundation material. The cracking and movement of the laundry and kitchen area is a result of collapse and washing away of the foundation materials which has resulted in the stumps losing support and subsequent cracking and movement has occurred.  The saturation of the foundation material has resulted from surface runoff during recent heavy rainfall draining to below the south-west corner of the house. The surface run off is from a combination of the adjacent southern property and of the subject property. Case No: 306849 Determination Page 7 of 16 34. The above expert carried out a further site inspection on 4 June 2012. This inspection was subsequent to the Applicants becoming aware of the stormwater drain issue at the adjoining property. In their further report dated 12 July 2012, HCE states:  A recent plumbing investigation has revealed that issues with the neighbour‟s stormwater drain had resulted in stormwater backing up and flowing into the sub-floor space below the insured premises over an unknown period of time. The stormwater drain has since been removed and replaced.  This was the main stormwater drain which collected all of the roof stormwater so the amount of water escaping from the drain would have been considerable.  Cracking and movement of the kitchen and laundry area has worsened since the initial inspection with cracks occurring of the floor tiles. The powder room which adjoins the east end of the kitchen showed a noticeable fall of the floor and gaps occurring between the top of the vanity unit and the tiled splashback.  The family room showed the doorway is out of square and cracks evident around chimney mantel. The chimney is out of plumb with rotation of the chimney occurring in a northerly direction, away from the area where washing away of foundation material has occurred.  Noticeable fall of hallway floor towards the south. Evidence of bowing of the wall lining and skirting of the south side wall near the kitchen doorway and hairline cracks in this area is also evident.  The bathroom door is binding and cracks are occurring in the tile grout of the shower recess and floor tiles in this room.  The study shows a fall of the floor towards the centre of the room.  The main bedroom has hairline cracks occurring of the ceiling cornice above the window and cracks between the door jam and architraves.  Bedroom two showed a horizontal crack in the wall lining above the window and the sliding doors of the built in cupboard are out of square.  The timber deck at the rear of the laundry showed a noticeable fall towards the laundry.  Inspection of the sub-floor space showed additional washing away and collapse of the foundation material below the kitchen and laundry area.  The extent and severity of the cracking movement had worsened due to the additional washing away and collapse of the foundation material.  The movement which has occurred due to the collapse of foundation material has now extended to include the powder room, bathroom, timber decking, hallway and south end of the family room.  However, the cracking and movement that has occurred of the two front bedrooms, study, and north end of the family room (including chimney) have not been attributed to the washing away of foundation material as Case No: 306849 Determination Page 8 of 16 these areas are well away from the area where the collapse has occurred. 35. The FSP retained an alternative engineering firm, “FE”, due to delays by HCE in providing additional reports requested of them. In their report dated 17 December 2012, FE state:  Inspections of the property were carried out on 6 November 2012 and 8 December 2012.  The site elevation drops approximately three (3) metres from the drive entry at the street to the rear northwest corner of the property. The site also has a slight cross slope from north to south of approximately 500 mm.  The Applicants had not undertaken any significant work on the structure other than painting of the internal finishes in 2010. They had added the rear deck shortly after purchase of the property.  The additional damage to the upper level section of the structure, the damage to the powder room, and damage to the north and east faces of the Applicants‟ home are not a res ult of the drainage event.  FE concluded: - The settlement of the upper level flooring is a direct result of poor construction and long term lack of maintenance and was present prior to the drainage event. - The settlement of the powder room near the shower is the result of long term water infiltration due to the lack of maintenance of the shower waterproofing system and was present prior to the drainage event. - The settlement of the southwest corner of the structure is the result of poor construction practice, failure to properly dispose of the clay pipe and overflow relief gully beneath the structure and general lack of maintenance to properly drain stormwater. - The settlement of the southwest corner of the structure was for the most part present prior to the drainage event as a result of long term drainage problems and general lack of maintenance at this area though it may have worsened as a result of the 2011 drainage event. - There is a general lack of cracking present in the brittle plasterboard linings and movement-sensitive architrave framings, indicating long term, slowly developing structure movement that was present prior to the drainage event. 36. The FSP engaged a firm of building consultants “SBC” to provide a further causation report. Their report, dated 24 December 2012 concludes: - The damage to the south western area of the building is predominately the result of subsidence and stump failure that has Case No: 306849 Determination Page 9 of 16 existed and been ongoing for an extended period of time. On the balance of probabilities this subsidence and stump failure has been exacerbated by the drainage issue in the neighbouring property over the same period. - The decline in the levels and the resultant damage throughout the remainder of the residence is not the result of the drainage issue, it is the result of the combination of the normal settlement of the foundation material over an extended period of time, the normal decay of the Red Gum timber stumps over a period of time and defective building practices. - Taking into consideration the degree of movement and subsidence to the building, it is not practical at this stage to accurately quantify or predict the extent of the repairs that will be required following restumping and re-levelling works. 37. A further report obtained from FE dated 9 August 2013 provides:  The ground has continued to move, especially due to the hot dry period between the surveys undertaken by them.  Deformations of the building existed prior to the drainage event.  The building movement is mostly long term. This is based on evidence of previous remedial works including re-stumping and re-levelling. Lack of internal defects and wall cracking indicates previous internal repairs suggesting the building has been affected by long term movement and distress.  This expert agrees with the suggestion by RIB that a stump rotation mechanism exists however this can also be attributed to poor workmanship/construction.  It is reasonable to assume that the stumps were originally installed verti cal and plumb and that the “out of plumbness” would most likely have been caused by foundation soil movement.  The differences in floor levels taken by FE and the Applicants‟ expert RIB were carried out 7 months apart with an extremely hot and dry summer in between. These differences suggest that drying effects of reactive soils have resulted in footing settlement.  Rotting of timber stumps is a prolonged process, resulting from a long term lack of adequate drainage and a lack of maintenance. 38. Finally, FE have provided a supplementary report in response to the Applicants‟ expert evidence, dated 5 September 2013, which states: “In response to the request for further comment on the depth of reconstructed stumps, as discussed by [RIB], we offer the following comments; [FE] agrees with [RIB] that a founding depth of the order of 2.4m is required for any new stump/footing construction for this site, based on the current geotechnical and other information. (2.4m is measured from the soil surface to the underside of the pad footing) Case No: 306849 Determination Page 10 of 16 This depth of 2.4m is considered to be the required depth based on a “first tier” engineering approach. [FE] notes that a more rigorous engineering and geotechnical investigation and analysis may result in a lesser founding depth than 2.4m being required, but it is not expected that the founding depth would be significantly reduced in any case. The comments made in item 7 of our response letter, dated 9/8/13, still apply.” Applicants’ Expert Evidence 39. The Applicants retained a civil e ngineer, “RIB” to inspect and report on the damage to their property. In their first report dated 11 July 2013, RIB stated:  An inspection by the FSP‟s expert ALD has confirmed there was no failure of the Applicants‟ plumbing system.  The property does not have a large amount of trees or foliage that would cause an ongoing draining problem. Basic upkeep of the property was above average.  The damage was caused by the stormwater system from the adjoining property which followed the slope of the land down and went underneath the Applicants‟ property. Water leaking from this system scoured out and/or dissolved the softish clays underneath the insured premises.  The bore log carried out by RIB indicated there was an overall dryness at 3.15 depth indicating loss of moisture during the drought. The high moisture on the upper level is strictly attributable to a leak and/or an overflow as is noted from the adjoining property.  The soil is quaternary basaltic in origin and loses strength quite rapidly when its moisture regime gets to around 45-50%. At 20-40% it swells quite strongly and has good strength and is capable of lifting.  Relative levels of the flooring at the property were undertaken twice as they did not correlate with those taken by the FSP‟s expert, FE. On this basis, RIB have concluded that either the building has continued to move since the FE report, or there is an error in FE‟s measurements.  As the leak has been corrected and the Applicant‟s have installed an AG drain, the difference in levels could be attributed to drying out of the soil.  The stumping system has failed quite dramatically as a consequence of excess moisture and the further movement is a result of “ follow through of the stumps continuing to drop as the soil gets drier and shrinks.”  There is ample evidence to suggest that the ground is drying out and the stumps are dropping and will continue to do so. When they do this, they rotate which gives the illusion that the stumps were not put in correctly in the first place. This is not necessarily true. The ground does not dry out uniformly and stumps as they drop away from the bearer can rotate and distort. Case No: 306849 Determination Page 11 of 16  HCE in their report have underestimated the extent to which the ground had wetted up and the extent to which it was going to dry out and continue to initiate movement.  Another consequence of water underneath timber stumped houses is it accelerates the rotting out of the sole plates and can terminate the functionality of a stump over a very short period.  RIB disagrees with the assertion by FMG that the plasterboard is brittle.  The event is recent as had the leak been occurring for a long period of time the trees at the property would have been bigger and/or the moisture regimes at depth would have been higher.  To rectify the property, a large part of the building needs to be re- stumped, re-levelled and then repaired. The Building Commission „Guide to Standards and Tolerances‟ require that floor levels be taken back to a reasonable degree of trueness and level. Therefore it all has to be re-levelled.  The stumps are to be put in at a greater level of depth and compliance with Australian standards requires replacement of all stumps to the new level of 2.0-2.4 metres. 40. A second report provided by RIB dated 28 August 2013, further provides:  It is possible that rapid drying out has occurred over the time period between FE‟s level surveys and RIB‟s being undertaken as there has been a hot dry summer in the interim and the source of water has been repaired.  Further, the ground has a good slope and there is ample ventilation under the floor. Nonetheless, the expert is surprised by the depth of dry out over the short period that appears to have occurred.  Damage and movement has been caused by the drainage event and re-levelling will be needed. It is inevitable that re-levelling will cause further damage, the extent of which will be unknown until the works are completed.  RIB accepts that the „excluded‟ area of the property has some evidence of long term movement, however, the difference in levels taken only seven months apart demonstrates vigorous and extensive movement during that time.  Further, if it is accepted that the differences in levels indicate drying out since the leak has occurred over a dry summer, then nearly 90% of the house has been affected, not the 60% previously referred to.  As FE have asserted their levels are correct and RIB are confident theirs are also correct it therefore means there is a major amount of movement affecting the house which can only be caused by a consequence of an abnormality such as drainage/ingress into the ground. Case No: 306849 Determination Page 12 of 16  Further, it would be necessary for the ingress to be “ massive” to account for the amount of movement between the two relative levels taken by FE and RIB.  The FSP ‟s offer to restump approximately 60% of the house is inadequate as the failure has gone to at least 90% of the house, and possibly the whole house based upon the relative levels and the extent of change over a seven month period.  Correcting the building with shallow stumps or readjusting the existing stumps will not lead to a satisfactory resolution as re-levelling will be required if the building continues to move. Proximate cause of damage 41. Having considered the expert evidence above, the Panel finds the weight of the available evidence to be consistent with a view that the proximate cause of the home‟s structural damage as well as its continued issues with movement was the damaged storm water drain at the neighbouring property as:  The damage to the home occurred initially at the south-western end being the area, by virtue of the gradient/contour of the property, to which the runoff from the neighbouring property flowed.  HCE concluded the extent and severity of the cracking movement had worsened due to the additional washing away and collapse of the foundation material between their two inspections in February and June 2012.  The rectification of the source of moisture, ie replacement of the damaged pipe, and installation of the „Ag drain‟ along the len gth of the Applicants‟ property have resulted in the rapid drying out of the previously water affected sub-floor, evidenced by the dropping and movement of the stumps in the usual course of drying out.  Early investigations ruled out any other source of moisture including failure of plumbing or sewerage systems at the subject property. This would presumably have included any leak from beneath the shower as suggested by the FSP‟s experts. This is further supported by RIB‟s investigations confirming there are no plumbing issues at the property.  The date of the stormwater pipe failure first occurring is unknown, however the identification of damage to the Applicants‟ home and lodgement of the claim shortly after a period of heavy rains is consistent with and a persuasive explanation that the dominant cause of the stump movement and loss of foundation soils, was the leaking stormwater runoff drain.  There is limited evidence that the home previously had any issues with movement, or cracking since purchased by the Applicants, who had completed internal repainting in 2010. It would have been reasonably expected that any pre-existing damage would have been identified during these works. Case No: 306849 Determination Page 13 of 16  As the home did not present with significant similar issues in the past, a re asonable inference is that the home‟s alleged issues with improper installation of the stumps or a failure to comply with building regulations cannot reasonably be regarded as dominant (or proximate) causes of the home‟s movement and cracking.  If such issues do in fact exist, they would already have been in existence before the Applicants first began experiencing problems with their home. Yet, notwithstanding the home being more than 50 years old, it did not begin to develop significant problems until 2011, after the stormwater issue is believed to have arisen.  Further, the extension to the decking added to the property shortly after purchase by the Applicants was also affected by the loss of foundation soils and found to be sloping towards the laundry. There has been no indication that the footings of this structure are non-compliant with the building regulations.  Evidence of replacement of some stumps and the existence of concrete stumps in some areas are contrary evidence, as to any lack of maintenance at the property, as asserted by the FSP. 42. The FSP relies on the alleged existence of „long term‟ rot to the subfloor structure but its experts have not provided any explanation of the period required for this to occur. The Panel notes however that the HCE report of 22 February 2012, states “( t)he timber stumps are generally in a good condition with only minor decay occurring of the stumps immediately below the surface.” This is in stark contrast to the findings of FE in their report of 17 December 2012, ten months later, that “(t)he timber stumps in the south west corner of the subject structure have suffered long term exposure to water which has caused the base of the stumps to rot.” 43. Accordingly, a reasonable explanation for this disparity in the findings of the FSP‟s two experts could be that time period between the two inspections (or the commencement and subsequent rectification of the leak) was of a sufficient period for this damage to occur. 44. The Panel finds the evidence of the Applica nts‟ expert RIB, inclusive of soil testing and confirmation of „drying out‟ occurring to be thorough and persuasive. The persuasive nature of this evidence is reinforced by the readiness of the FSP‟s expert FE to concede RIB‟s explanation for the ongoing movement as being reasonable, including with respect to rotations and “out of plumbness”, as set out in their further report dated 9 August 2013. 45. As the weight of evidence establishes that the home did not begin to develop problems until after the stormwater leak developed and in the absence of persuasive evidence to the effect that the property had been experiencing these problems prior to this time, the Panel is satisfied that on balance, the damage to the Applicants‟ premises was most likely caused by th e insured event of: Case No: 306849 Determination Page 14 of 16 “ Liquid escaping suddenly and unexpectedly from a: water main, drain, fixed pipe, gutter, guttering, fixed tank or drain, sink, basin, bath, shower, toilet or spa bath, ...” 46. As set out in RIB‟s evidence, further resultant damage is a n inevitable consequence of the restumping works. 47. The materials indicate the FSP advised the Applicants against carrying out any repair works, which may have prevented or at the very least limited the extent of the ongoing movement/damage and in doing so, it has prevented the Applicants from mitigating the extent of the ensuing loss. 48. On this basis, the Panel accepts that the FSP should be responsible for the cost of rectifying any such damage on the basis that the FSP‟s delays in dealing with the matter have resulted in additional movement (thus ongoing internal damage). 49. Accordingly, the Applicants are entitled to indemnity for the full cost of the required works to their property (including 90% of the cost of restumping works based on RIB‟s evidence), as set out in both scopes of work 1 & 2, and any additional movement related issues that have been identified since the preparation of the most recent scope. 50. The Panel notes that the Applicants do not agree with JLG being retained to undertake the works and seeks to cash settle the dispute. The FSP has also indicated in its submissions that it believes the only option is for the matter to be cash settled. 51. In the circumstances, the FSP should obtain a full quotation from JLG as to the costs of conducting the full repairs as per the scope of works 1 and 2 and likely costs of any resultant damage from the restumping process 52. The Panel accepts that in order to quote on the possible resultant damage from the restumping process requires speculation, however, in view of the desire of the parties that this matter be cash settled, the Panel believes it is an appropriate process, in the circumstances 53. JLG should prepare the relevant quotations as if it were to be contracted by the Applicants to conduct the repairs. 54. Once these quotations are available, the Panel determines the FSP is entitled to cash settle the Applicants based on the quotation. 55. The Panel notes the FSP accepts liability for any carpet requiring repair or replacement as a result of the claim related building repairs. Again, given the desire of the parties to cash settle this dispute, the Panel determines that the FSP obtain an assessment as to the likely costs of repair/replacement of the carpets and upon obtaining a quotation with respect to same, cash settle the Applicants on that basis. Case No: 306849 Determination Page 15 of 16 56. The Panel notes the FSP accepts liability to cover the accommodation costs for the Applicants and their pets whilst the repairs are being completed. The Panel determines that in the alternative, the FSP may choose to either cash settle the accommodation amount in advance or may determine, subject to notification from the Applicants that the repairs had commenced, to arrange alternative accommodation for the Applicants and their pets for the duration of the repairs and to indemnify the Applicants for the associated removal and storage costs that may be incurred. 57. Should the FSP choose to cash settle the accommodation costs in advance, the FSP should obtain from JLG, an estimation as to the likely duration of the repairs and an appropriate estimation as to the costs of accommodation and cash settle on this basis. Compensation for non-financial loss 58. The Applicants claim that as a result of the FSP‟s delays in assessing their claim and the late denial of indemnity, they suffered stress, illness, and inconvenience. Medical evidence was supplied to support this. 59. The FSP has conceded that some of the delays were unreasonable. In doing so, the FSP has paid the Applicants an ex gratia payment of $2,000 which it says is fair and reasonable compensation in the circumstances. 60. This dispute has been ongoing for over two years. It took the FSP some time before reaching a decision to decline the claim and in fact, they did not decline the claim until 13 months after lodgement. Whilst the Panel can appreciate that this may occur in some circumstances, in this instance, the Applicants were subjected to considerable inconvenience in facilitating access to the property for the FSP‟s numerous experts who initially supported their claim and subsequently revised their position, notwithstanding the Applicants having been previously advised that the policy would respond. 61. The maximum compensation available under paragraph 9.3 of the Terms of Reference is $3,000. The ex-gratia payment of $2,000 by the FSP should in the Panel‟s view, be offset against any such amount. 62. The Panel also considers despite the inconvenience suffered by the Applicants, consideration needs to be given to the actual outcome of the dispute. In this case, the Panel has determined the matter in favour of the Applicants with cash settlement to be made based on the current scope of works. The Panel also notes some delays were inevitable to allow for the necessary drying out and settling of the property. 63. In these circumstances, the Panel is of the view that the ex-gratia payment of $2,000 made by the FSP represents adequate compensation under paragraph 9.3 of the Terms of Reference. Case No: 306849 Determination Page 16 of 16 Determination 64. On the basis of the available information the Panel determines that: a. The FSP is to meet its liability under the terms of the policy with respect to the full costs of repairs set out in the scope of works 1 and 2 as prepared by JLG, including the costs of restumping of the home to a minimum footing of 2.4 metres. The FSP is entitled to cash settle the claim on the basis of the quotation provided by JLG in accordance with the above. b. The FSP is to further obtain a quotation from JLG as to the likely costs of additional damage that may occur during the restumping undertaken pursuant to the scope of works 1 and 2. The FSP is entitled to cash settle the Applicants‟ claim based on the quotation obtained or, should the Parties agree, delay obtaining this quotation until the repairs pursuant to scope of works 1 and 2 have been completed and then cash settle this aspect of the claim. c. The FSP accepts liability with respect to the costs of repairing or replacing carpet damaged as a result of the building repairs and is to obtain a quotation as to the likely costs of the repair and replacement of the carpet. Upon receipt of the quotation, the FSP is entitled to cash settle the Applicants for those costs. d. Insofar as the Applicants are required to obtain alternative accommodation for themselves and their pets during the duration of the repairs, the FSP may either cash settle the accommodation costs in advance subject to obtaining an appropriate estimation as to the likely duration for repairs or in the alternative, attend to payment of these costs subject to notification by the Applicants of the commencement of the repairs and the repair duration being reasonable. e. As the cash settlement amounts in this dispute are to be based on a current scope of works and quotations, the Panel determines that interest is not applicable in this case.