Home / Financial Firm (Unknown - Insurer) / Determination 306519
Determination 306519
Denial of claim (flood)
Summary
The applicants claimed for inundation of their Goodna home during the January 2011 Queensland weather events. AFCA found the loss was river flood, which the policy excludes, and the FSP was entitled to deny the claim.
Water overflowing a stormwater channel, which the policy defines as a water catchment system, falls within the river flood exclusion rather than flash flood cover.
Issues
- Claim denial primary · not upheld“the Panel is not satisfied the circumstances of the loss fall within the policy definition of 'flash flood', or under any insured event contained in the policy.”
Subjects and remedies
home or building damagenatural disasterno remedy
Related
All Financial Firm (Unknown - Insurer) determinations · Find similar determinations
Text of the determination
Case No: 306519 Determination Page 1 of 10
Case number: 306519
General Insurance - Domestic Insurance - Home Building - FSP Decision -
Denial of claim (Flood)
25 March 2013
Background
1. The Applicant and a co-insured held a home insurance policy with the
Financial Services Provider (FSP) for their residential property in Goodna.
The relevant period of insurance operated for 12 months beginning from 21
October 2010.
2. In January 2011, the Applicant lodged a claim following damage sustained to
building and contents that occurred as a result of severe weather events in
Queensland.
3. The FSP denied the claim on the basis it was due to “river flood”. The
Applicant has disputed this.
Summary of Applicant ’s position
4. The Applicant submits the following in support of his position that the
property was inundated by water covered by the policy:
He has provided persuasive evidence to corroborate that his property
experienced approximately 1.2 metres of stormwater inundation.
The rising levels of the Brisbane River prevented the enormous volume
of stormwater from draining. This resulted in flash flooding up to a
depth of 1.8 to 2.0 metres on his property.
At the time he evacuated the property, the water had been on the verge
of reaching his floorboards. There was approximately 4-5 feet of
stormwater pooled. After evacuating the property, he drove through the
main catchment area and parked on higher ground. He had trouble
observing the road though as there was a thunderstorm with significant
rainfall. In addition, the river level had been 6-8 metres from
overtopping its banks.
5. In regards to the site specific hydrology report being relied upon by the FSP,
he submits the following:
a. It refers to a drainage pipe recently installed. However, this pipe was
not installed until sometime after the inundation event.
Determination Determination
Case No: 306519 Determination Page 2 of 10
b. Although the hydrologist has stated there is a relatively small local
catchment affecting his property, he has failed to account for the fact
that the origins of the water that feeds into the small drainage problem
area comes from vast areas of Goodna and Redbank Plains.
c. The reliance on a rainfall station located 3km away is not indicative of
the local rainfall.
d. He refutes the hydrologist’s reliance on a nearby resident’s evidence
given this person is unidentified and s/he did not observe the water
accumulation on his property.
e. He notes another property owner in the catchment area was successful
in claiming against another insurer as it was caused by flash flood.
6. Given all of this, he maintains the property was inundated by flash flood
and/or stormwater runoff. Accordingly, he seeks to be indemnified for his
losses.
Summary of FSP’s position
7. The FSP has relied on a site specific hydrology report, the hydrology reports
obtained by the Insurance Council of Australia (ICA) and the following policy
provisions to deny the Applicant’s claim:
“ Definitions (The Meaning Of Some Words)
…
“ flash flood ” means what occurs when there are heavy, intense bursts of
rainfall, usually during thunderstorms where so much water falls in a very
short time that it cannot get away quickly enough and collects and flows into
your home.
but does not include when rainwater on the site :
cannot run-off into a water catchment system , because it is overflowing
in flood; and
mixes with the flood water coming from the water catchment system and
then flows into your home.
…
“ rain ” means water that has fallen from the sky on to your building and the
site but not water from flash flood .
“ river flood ” means when water that is normally contained in a water
catchment system increases because of rainfall or snow melt (whether in
the immediate region or elsewhere) or is deliberately released by an authority,
and the water overflows onto land that is not normally covered by water into
your home.
For example water may be deliberately released by an authority from
a dam or reservoir.
…
Case No: 306519 Determination Page 3 of 10
“ storm ” means violent weather and high winds, sometimes accompanied by
rain, hail or snow including a cyclone, tornado or willy willy.
…
“ water catchment system ” means:
a river, creek, other natural watercourse or lake, whether they are in their
original state or have been modified, are named or unnamed, or normally
dry land that only run during periods of rain;
a dam, reservoir, storm water channel or canal.
…
1.12 Storm, Rain or Flash Flood
You are insured for damage to your building and/or your contents caused
by storm , rain or flash flood .
…
We will not pay for damage caused by:
…
river flood ;”
Issue
8. Whether the FSP is entitled to deny the Applicant’s claim.
Reasons for decision
9. Due to the nature of the dispute, the parties have been informed that the
matter has been referred to the Panel for Determination in line with the
Operational Guidelines to the Service’s Terms of Reference. This dispute
has not been the subject of a FOS Recommendation and has proceeded
directly to Determination.
10. This decision has been made by a Panel consisting of an Ombudsman, a
representative with extensive experience in the insurance industry and a
representative with extensive experience in consumer claims.
Site Specific Hydrology Evidence
11. The FSP has substantively relied on a site specific hydrology report to deny
the Applicant’s claim. This report contains the following relevant information:
The property is situated approximately 60m south-west from the
Brisbane River. The house is located on land sloping downwards from
the front to the rear and has a floor level between approximately 0.4m
and 1.2m above the surrounding ground level at the fro nt and rear
respectively. During the January 2011 event, the house was inundated
to an estimated depth of approximately 1.7m above ground level.
Case No: 306519 Determination Page 4 of 10
The Applicant provided him with the following version of events:
There was very heavy rain on 9 January. The yard of the property
had previously been inundated on numerous occasions and he
observed water starting to enter the backyard late that day.
On 10 January, he observed water had inundated the area
underneath the house and the grassed area at the rear of the
property was full of water. He left the property shortly after this.
He provided photographs of the inundation of the yard following
other rainfall events, which indicates the inundation of the
property is an ongoing issue due to poor drainage.
The hydrologist also relied on the eyewitness evidence of a resident in a
nearby property located approximately 200m south- east of the Applicant’s
property. This resident provided the following version of events:
It was raining heavily on 11 January. Between 1430 and 1500
hours, the resident drove his work truck to the property but was
unable to do so as a low-level crossing on B Terrace was
inundated. He then drove to the south and was able to observe
his property. It was not inundated at this time.
At 2230 hours, he returned to his property and identified that it
had not been inundated. In the moonlight, he could observe the
area on the northern side of the Brisbane River across his
property being inundated. He went to the bank of the Brisbane
River and saw the level was low but rising. It was not raining at
this time.
He entered the yard of his property and observed water
inundating the area behind the fence on the rear boundary. This
level was increasing steadily so he removed items from the
house. Within 2 hours, water had inundated the back corner of the
yard.
He left the house between 0230 and 0300 hours on 12 January.
The property had not been inundated but the water in the back
yard had increased considerably. He had to wade through knee
deep water in B Terrace at this time.
When returning to the property at midday on 12 January via an
SES boat, he observed the house was inundated above floor
level.
An open drainage channel is located at the rear of the property and flows
in a north-easterly direction. It eventually drains into Woogaroo Creek,
which is 0.7km to the south-east of the property. The channel conveys
stormwater from the catchment area to the north-west of the property as
well as a large area to the south. During periods of rainfall, local
stormwater runoff would flow into this open channel and be conveyed into
Woogaroo Creek.
The open channel has defined bed and banks and would be considered a
watercourse.
Case No: 306519 Determination Page 5 of 10
The topography in the vicinity of the property indicates that the banks of
the Brisbane River are slightly higher than the ground levels adjacent to
the house. The rear yard of the property slopes towards the open
drainage channel. The local catchment draining to the property is very
small.
Recorded hourly rainfall data was obtained from Wacol Alert, which is
located approximately 2.7km north-east of the property. A total of 143mm
was recorded between 0000 hours on 9 January 2011 and 1700 hours on
11 January 2011. No significant rainfall was recorded after 1700 hours.
The peak hourly rainfall intensity of 22.4mm was recorded in the hour to
1100 hours on 11 January 2011. Peak stormwater runoff to the property
would have occurred within 30 minutes of this peak rainfall. Rainfall
intensities for durations up to 48 hours had an Average Recurrence
Interval (ARI) of less than 1 year.
Recorded levels of the Brisbane River were obtained from Jindalee Alert
(located approximately 11.8km downstream of the property) and Moggill
Alert (located approximately 8.4km upstream of the property). The peak
water level of the property based on observed topography, water level
marks and information obtained by the Ipswich City Council, was
approximately 16.5m AHD. In addition, the floor levels of the property are
estimated to be approximately 14.8m AHD.
Applying an interpolated hydrography, the peak level is estimated to have
occurred at approximately 1600 hours on 12 January. The initial above
floor inundation by floodwaters from the Brisbane River was
approximately 0500 hours on 12 January.
12. Based on all of this, the hydrologist made the following findings:
a. The yard of the property is prone to inundation due to poor local
drainage and the area underneath the house has been inundated on
numerous occasions. The house on the property had not been
inundated above floor level before the January 2011 event.
b. The water observed underneath the house when the Applicant
evacuated the property on 10 January was floodwater from the open
channel. This was substantively based on the fact the ARI recorded
was not severe.
c. In addition, given the low intensity rainfall for 11 January, there was
insufficient stormwater runoff to have inundated the property.
d. Based on topographical data, the ground levels along the bank of the
Brisbane River adjacent to the property are higher than the floor level of
the house. A low point (14.7m AHD) is located about 110m north-east
of the intersection of B Terrace and LA Street. Once the water level of
the Brisbane River reaches 14.7m AHD, direct overland flow occurs
and B Terrace becomes directly inundated.
e. Topographical data indicates water flowing back up along Woogaroo
Creek would also flow back up the open drainage channel. The ground
level at the rear of the property is approximately 13.0m AHD. Based on
Case No: 306519 Determination Page 6 of 10
the interpolated water level, floodwater flowing back up along the
channel would have reached the property at approximately 0000 hours
on 12 January.
f. It is unlikely, given the low intensity rainfall during the January 2011
event, the property would have been initially inundated above floor level
by overflowing water which could not discharge freely into the open
channel. More severe rainfall events have previously occurred and
although the yard of the property becomes inundated, the house has
never been inundated above floor level.
g. Given the ground levels, the property would have been initially
inundated by water overflowing from the direction of the open drainage
channel rather than directly from the Brisbane River located to the
north. Once the water level of the Brisbane River reached the height of
the bank adjacent to B Terrace, direct overland flow would have
occurred and the two bodies of water would have mixed.
h. The initial inundation would have occurred at approximately 0500 hours
on 12 January (2011). This was approximately 18 hours after the peak
rainfall.
Consideration of the Evidence
Flash Flood definition
13. In a number of submissions, the Applicant has referred to the term “flash
flood” as substantiating his position. In addition, he has referred to the
successful outcome of a nearby resident when lodging a dispute with FOS
where the outcome hinged on the term “flash flood”. The insurer identified
was not the FSP.
14. It should be made clear at the outset that based on the Panel’s experience in
dealing with these types of disputes, the te rm “flash flood” is defined
differently by different insurers. In regard to the insurer referred to by the
Applicant, the definition contained in that policy is significantly different to the
FSP’s policy.
15. For instance, this other insurer has essentially defined flash flood as
inundation occurring within 24 hours of heavy rain, regardless of where the
water came from. In contrast, this policy defines flash flood to mean:
“... there are heavy, intense bursts of rainfall, usually during thunderstorms
where so much water falls in a very short time that it cannot get away quickly
enough and collects and flows into your home.
But does not include when rainwater on the site :
cannot run-off into a water catchment system , because it is overflowing
in flood; and
mixes with the flood water coming from the water catchment system and
then flows into your home.”
Case No: 306519 Determination Page 7 of 10
16. In effect, if the water that enters the property does so because it either
cannot drain into a nearby watercourse that is full or mixes with water
overflowing fr om that watercourse, then it does not satisfy the FSP’s
definition of flash flood. In contrast, the other insurer provides no such
limitation. It is solely reliant on identifying that the inundation occurred
because of heavy rainfall that fell within 24 ho urs of the inundation.
17. It is therefore important that this distinction be kept in mind when reviewing
the available evidence.
Initial & peak inundation
18. The Applicant has disputed the hydrologist’s evidence in a number of
aspects. In particular and what the Panel considers is most significant, is his
evidence that upon evacuating the property on 10 January 2011, the water
level that had accumulated in his back yard was on the verge of reaching the
floorboards.
19. In addition, shortly after evacuating the property, he observed a
thunderstorm dropping a significant amount of rain.
20. The hydrologist, in his report, considers it was unlikely that the house was
inundated at this time given the low intensity rainfall experienced in the area
and the fact the house has not been inundated previously.
21. However, it is unclear whether the Applicant expressed to the hydrologist
what was, in his opinion, the imminent nature of the property’s inundation.
For instance, the hydrologist’s report acknowledged the Applicant’s evidenc e
that the backyard was full of water when he evacuated the property on 10
January 2011, but not that the level was such that it was on the verge of
inundating the property.
22. Further, the heavy rainfall observed by the Applicant shortly after evacuating
the property appears to be corroborated to a certain extent by the rainfall
recorded at Wacol Alert. For instance, these records indicated that there was
rainfall totalling 20mm between 8.00am and 11.00am on 10 January 2011.
Although this total, on the face of it, may not appear severe, it is unclear if
the majority of this fell within a short burst.
23. Accordingly, the hydrologist accepted that the property was initially
inundated at the time of the Applicant’s evacuation, although not to the floor
level of the home, given the ARI of the rainfall event recorded in Wacol Alert
was not significant. However, he did not appear to account for the
Applicant’s report that at the time of his evacuation, the property was on the
verge of being inundated.
24. Nevertheless, although the hydrologist accepted that the property was
inundated under the house on 10 and 11 January 2011, he considered it was
unlikely the home was inundated at floor level, which, he estimated was first
inundated at about 5.00am on 12 January 2011.
Case No: 306519 Determination Page 8 of 10
25. Despite the Applicant’s report of imminent inundation at floor level on 10
January 2011, the Panel is not satisfied that the cause of the inundation was
due to an event covered by the policy. This is based on the following
reasons:
Water which had accumula ted to the rear of the Applicant’s property
appeared to be from the open stormwater channel that runs through the
property. According to the hydrologist, this channel conveyed
stormwater from the catchment area to the north-west of the property
as well as a large area to the south of the property.
This catchment area appears to be relatively consistent with the
Applicant’s presumption that the property attracts a significant amount
of stormwater from a large catchment area.
It is therefore reasonable to accept that the water which pooled at the
rear of the Applicant’s property was likely due to water normally being
conveyed by the stormwater channel overflowing its banks and pooling
there as a result of the property’s poor drainage.
This is consistent with both the Applicant’s submission that this water
could not escape into the Brisbane River and was therefore backing up
the stormwater channel, as well as his diagram of how the water was
accumulating in the backyard.
The Panel notes that, a stormwater channel is specifically included in
the definition of a “water catchment system”. As a result, any water
which overflowed from this “water catchment system” to inundate the
property would fall within the definition of “river flood”.
Accordingly, even if the Panel was to accept that the property was
initially inundated shortly after the Applicant evacuated, it is more
probable than not this was due to the water in the stormwater channel
continually overflowing its boundaries and conveying runoff into the
Applica nt’s backyard. This in turn contributed to the water which had
already accumulated there, causing it to inundate the property.
This falls within the definition of “river flood”.
26. Although the Applicant has referred to the accumulation of water as flash
flooding, such a concept is inconsistent with the policy definition. As stated
previously, a “flash flood” occurs when heavy, intense periods of rainfall
results in a significant amount of water collecting and flowing into your home
because it cannot get away quickly enough.
27. This did not occur in this instance because the water which flowed into the
Applicant’s home was most likely due to water overflowing from the channel
at the rear or stormwater runoff attempting to drain into the channel but
being unable to do so because it is overflowing. Either concept falls outside
of the definition of “flash flood”.
Case No: 306519 Determination Page 9 of 10
28. Given this, even if the Panel was to accept that the property was initially
inundated shortly after the Applicant’s evacuation, this falls within the
defin ition of “river flood” which is an event specifically excluded under the
insured event of “Storm, Rain or Flash Flood”.
29. Further and in the alternative, even if the Panel was to accept the Applicant’s
evidence as to when and in what manner the property was initially
inundated, this also falls within the definition of “river flood” for similar
reasons (i.e. water which overflowed from the channel and/or Brisbane River
would be “river flood”).
30. In regards to the peak inundation, there is little doubt that this falls within the
“river flood” definition as well; as it is clear that this water either came from
the Brisbane River breaking its banks or backing up the stormwater channel
or a combination of both. All of these concepts fall within the definition of
“river flood”.
Clarification of basis for outcome
31. It appears one of the substantive bases for the Applicant’s dispute is the fact
that the property may have been inundated well before the river broke its
banks. Although the Panel accepts the Applicant’s ratio nale, this does not
assist the Applicant.
32. The nature of the “river flood” exclusion is such that it operates in any
circumstances when water escapes from any “water catchment system”. A
“water catchment system” is not limited to a river or creek, but speci fically
includes a stormwater channel.
33. As a result, water which overflows from the stormwater channel at the rear of
the Applicant’s property and causes damage to his home will almost
inevitably fall within the policy definition of “river flood”.
34. Further and as explained previously, there is often confusion regarding the
different definitions used by insurance policies regarding terms that have
attracted a different meaning in the ordinary public. For instance, flash
flooding has been used by the media to describe a certain phenomenon that
is often inconsistent with how an insurance policy describes the concept.
35. This is apparent when comparing the FSP’s definition with that of the other
insurer that the Applicant referred to.
36. In circumstances when a term is specifically defined by the policy, general
legal principles will apply to the definition set out in the policy after having
due consideration to its words and context. Accordingly, when considering
the Applicant’s argument about flash flooding, it is th e policy definition the
Panel must have regard to, as opposed to its ordinary usage.
37. As a result, despite the Applicant’s submissions to the contrary, the Panel is
not satisfied the circumstances of the loss fall within the policy definition of
“flash flood”, or under any insured event contained in the policy.
Case No: 306519 Determination Page 10 of 10
Determination
38. On the basis of the available information the Panel determines the FSP is
entitled to deny the Applicant’s claim.