Determination 306190
Denial of claim - section 46 Insurance Contracts Act 1984
Summary
A body corporate for a 102-unit complex claimed for water damage caused by defective shower recess installation. AFCA found the claim excluded for faulty workmanship and for non-rectification of defects the body corporate should have known about, so the FSP is not liable.
Section 46 of the Insurance Contracts Act 1984 applies only to exclusions that refer to the condition of a thing before the contract was entered into, and the exclusions here are not temporal.
Issues
- Claim denial primary · not upheld
“The FSP is not obliged to provide indemnity for faulty workmanship costs or the resultant water damage due to the faulty installation of shower recesses.”
- Product terms interpretation secondary · not upheld
“Section 46 does not assist the Applicant because the exclusion clauses relied upon apply generally and are not temporal in nature.”
Subjects and remedies
no remedy
Text of the determination
Case No: 306190 Determination Page 1 of 10
Case number: 306190
General Insurance - Domestic Insurance - Residential Strata Title - FSP
Decision - Denial of claim – Section 46 Insurance Contracts Act 1984
8 January 2014
Summary
Description:
Claim under a Residential Strata Unit Policy for damage sustained to
the units as a result of defective installation of shower recesses.
Basis for Determination:
The Policy was incepted on 15 December 2010.
Policy is an Accidental Damage Policy with exclusions applying to non
rectification of known defects and faulty workmanship.
The damage was caused by the faulty installation of the shower
recesses. The Applicant was aware of the defects from at least 2010
and the non rectification of the defects caused the damage.
Section 46 of the Insurance Contracts Act 1984 (the Act) does not
apply to the circumstances of the loss.
Determination:
The FSP is not liable to indemnify the Applicant.
Background
1. The Applicant in this matter is a body corporate represented by “JN” . For the
sake of brevity both the body corporate and its representatives will be
referred to as „the Applicant‟ for the purpose of this determination.
2. The Applicant held a Residential Strata Insurance Policy (the policy)
underwritten by the Financial Services Provider (FSP) and arranged through
the Applicant‟s appointed broker and agent “W”.
3. The property is composed of 102 units and of which a majority sustained
water damage due to leaking shower recesses. The Applicant‟s claim was
Determination
Case No: 306190 Determination Page 2 of 10
declined by the FSP on the basis of existing policy exclusions/limitations
specified in the Product Disclosure Statement (PDS).
4. The Applicant remains dissatisfied with the FSP‟s decision to decline the
claim and is seeking indemnity under the policy for the resultant damage
arising from the leaking shower recesses.
Summary of Applicant’s position
5. The insured complex was built in three stages with Stage 1 (Units 1-35) and
Stage 3 (Units 67-102) being constructed first followed by the construction of
units forming part of Stage 2 (Units 36-66). The issues identified with the
installation and sealing of shower recesses in Stage 2 units were covered
under and the builder ‟ s warranty, however, Stage 1 and 3 fell outside the
relevant period the warranty remained in place.
6. The Applicant maintains that evidence has been submitted in respect to why
the loss/ damage claimed should be covered, However the FSP continues to
deny indemnity under the claim relying on technical arguments and legal
loop holes.
7. The Applicant notes that W also believes from an insurance point of view
that at least the resultant water damage to the insured property should be
covered under the claim. The landlords of the various units are not in a
position to seek indemnity under their landlord insurance as their insurers
are of the position that the damage claimed is due to defective workmanship
and/or materials.
8. The Applicant maintains she has only been managing the insured complex
for three years and of which two years have passed in her disputing this
claim. The building is only nine years old and in the previous three years 32
of the total 102 units have been repaired under the Builders Warranty
Insurance held with a separate insurer. The remaining 70 units fall outside
the Builders Warranty insurance as the complex was built in three separate
stages with the first two falling outside the available warranty period.
9. At present several units have serious water problems and it is more than
likely that there will be more. The Applicant maintains that the claimed
damage within the various units occurred at different times and was not
evident straight away as water would first leak under the tiles before
becoming evident.
10. The previous onsite manager had utilised the services of the original builders
to rectify around seven shower recesses prior to the builder being declared
bankrupt. Subsequently another builder “M” had to be appointed to fix other
shower recesses and it was only after its ( M‟s ) inspections that the Applicant
became aware of the magnitude of the issue with the installation of the
shower recesses within the complex. Accordingly, a claim was lodged under
the policy.
Case No: 306190 Determination Page 3 of 10
11. The Applicant maintains it is reasonable to attempt to deal with an issue
privately prior to seeking to make a claim under the policy. Further, some
repairs (as was the case with unit 33) had to be authorised as the damage
became too extensive to ignore. As noted above the Applicant maintains that
it was only subsequent to the appointment of M that it became evident that
the problem faced was of a much wider magnitude than previously believed.
12. The FSP has gone to great lengths to decline the claim however the
Applicant believes the issue to consider is simple i.e. there is no dispute that
there exists water damage at the insured property and this is a loss covered
under the policy. She notes the FSP is essentially seeking to decline the
claim on two issues essentially:
The initial cause for the damage was due to faulty workmanship; and
Failure by the Applicant to minimise the extent of damage and inform
it as soon as possible.
13. The Applicant does not dispute that the cause for the water leaks in the
shower recesses was due to the property builder not sealing the shower
recesses correctly. However, she refutes the second reason the FSP is
seeking to rely upon to decline the claim.
14. The problem with the shower recesses has been ongoing for around two
years with all the showers not leaking at the same time or to the same
degree. The damage was not always visible/apparent with water initially
seeping out under the tiles rather than pouring out. It was only after removal
of tiles that the damage became obvious.
15. The Applicant refutes the FSP position that it had prior knowledge and refers
to a letter provided by the Strata Title management supporting the fact that
this issue had not been raised in previous meetings. Accordingly, the
Applicant believes it to be a fair expectation that the FSP provide indemnity
for the cost to repair the resultant damage only and not inclusive of the cost
to repair the shower recesses i.e. the defective workmanship under the
claim.
16. The Applicant on the advice of the broker has also made reference to
possible advantage arising from the obligations imposed under section 46 of
the Insurance Contracts Act 1984 (the Act).
Summary of FSP’s position
17. The FSP has sought the assistance of legal representat ives “H” in making its
submissions to FOS in respect to this dispute. In the interest of brevity, both
the FSP and H, will be referred to as „the FSP‟ for the purpose of this
Determination.
Case No: 306190 Determination Page 4 of 10
18. The FSP in seeking to decline indemnity to the Applicant under the claim
relies upon a report made available by its commissioned consultant “DC”
dated 24 May 2013.
19. The report confirms the damage to the units at the insured complex is due to
failed and/or inadequate water proofing in the vicinity of the shower recess
and silicon sealant failure to the shower screens. DC is of the opinion that
the damage claimed had been an ongoing problem occurring over
approximately 2-3 years.
20. The leaking showers are due to building and construction defects from the
original construction practices. Such damage was not proximately caused
during the period of insurance but rather at the time of construction.
21. Whilst the defects resulting in the leaks were presumably unintentional, the
FSP does not consider that it happened by chance or unexpectedly. The
policy specifically excludes from cover costs associated with the rectification
of faulty or defective materials and workmanship.
22. Further, the policy expressly excludes from cover damage arising from a lack
of maintenance, rust, oxidation, corrosion, wear and tear, fading, gradual
deterioration, concrete or brick cancer, developing flaws, wet or dry rot, and
a failure to maintain the insured property in reasonably good state of repair.
23. In the alternative, the FSP maintains that the policy excludes cover for
damage „ caused by non-rectification of an insured property defect, error or
omission that you were a ware of, or should reasonably have been aware of .”
24. The evidence indicates that the Body Corporate was notified of the damage
by the Onsite Manager and that no action was taken to rectify the situation
for 18 months. The Applicant cannot claim it was not made aware of issues
relating to water leakage and the shower recesses installed at the property.
25. It is a condition of the policy that requires an insured, in this instance the
Applicant, to advise the FSP as soon as possible of an incident which could
lead to a claim. The Applicant failed to notify the FSP of the issues and/or
seek authorisation to undertake repairs. Therefore, it is entitled to decline
indemnity to the Applicant in line with the policy.
26. In respect to reference to section 46 of the Act, the FSP maintains section 46
is only triggered where an insurer has relied upon a provision which
excludes or limits its liability by reference to the condition at a time before the
contract was entered into. The policy in this instance makes no reference to
the condition of the property prior to entering into the contract of insurance.
Relevant Law
Section 46 of the Insurance Contracts Act 1984 provides that if a claim is made
in respect of a loss that occurred in whole or in part as a result of a defect or
imperfection in a thing and the insured was not aware of the defect or a
Case No: 306190 Determination Page 5 of 10
reasonable person in the circumstances could not be expected to have bee n
aware of the defect or imperfection the insurer may not rely on an exclusion
clause that refers to the condition of the thing before the contract was entered
into.
Issue
27. Whether the FSP was entitled to decline indemnity to the Applicant for the
loss claimed in line with the policy.
Reasons for decision
28. As advised to the parties, FOS has considered it appropriate to expedite the
dispute in accordance with the Operational Guidelines to the FOS Terms of
Reference. This is due to the circumstances of the dispute. This dispute has
not been the subject of a FOS Recommendation and has proceeded directly
to Determination.
29. Prior to coming to a Determination I have read and considered all the
evidence made available by the parties to this dispute.
30. The parties do not dispute the following:
The Applicant held an active Residential Strata Insurance policy with
the FSP. The policy was arranged by the Applicant‟s broker W and not
a representative acting under a binder with the FSP.
The policy provides cover for loss arising from Accidental Damage
subject to exclusions provided within the policy.
The insured property consists of 102 units constructed in three
separate stages. There are a total of 70 units which were initially
constructed during Stage 1 and Stage 3 which and fall within the scope
of this dispute before FOS.
The remaining units constructed during Stage 2 , although subject to the
same workmanship issues in respect to the construction and sealing of
the shower recesses, have been covered under a builders warranty
cover held with a different insurer.
The Onsite Manager at the insured property (prior to the appointment of
the current Onsite Manager) was aware of the arising pattern of failing
shower recesses waterproofing and resultant water damage.
Further, the original builder was appointed by the previous Onsite
Manager to undertake rectification works to several bathrooms before
the builder declared bankruptcy.
The reason for the water damage claimed is due to defective
workmanship and/or use of defective materials by the builder
Case No: 306190 Determination Page 6 of 10
responsible for the original construction of the shower recesses within
the units.
The policy excludes from cover loss or damage arising from defective
workmanship and/or use of defective materials.
DC (Building Consultant) Report dated 24 May 2013
DC inspected all the units, except for units 33-66, as these had
previously been inspected and repaired under a home owner‟s
warranty insurance contract held with a different insurer.
Arrangements were made to inspect the units 1-22 on 13 May 2013,
units 23-33 and units 67-77 on 16 May 2013 and units 78-102
(excluding 101) on 16 May 2013.
The majority of units displayed water damage consistent with failed
and/or inadequate water proofing in the vicinity of the shower recesses.
Further, there was evidence of silicone sealant failure to shower
screens.
DC concluded that in his opinion:
The water proofing of wet areas to the complex is defective with
a majority of units having problems in the direct vicinity of the
shower recesses.
The repair of water related damage can be carried out from
outside the wet areas without having to remove tiles.
Rectification of the defective water proofing membranes should
be undertaken prior to repairing the resultant water damage.
The water leaks have been ongoing for approximately 2-3 years
in most badly damaged units to more recently in others.
31. The report from DC includes a separate report and Scope of Works for each
unit. Without reciting the individual unit findings, I am satisfied the report
identifies the resultant damage in the majority of bathrooms as follows:
Carpet damage.
Damage to timber architraves.
Damage to timber doorframes and jambs.
Damage to vanity.
Damage to wall and floor tiles in the vicinity of the shower recesses.
Damage to the walls and linings.
Rusted fixings.
Case No: 306190 Determination Page 7 of 10
‘MB’ Lawyers letter dated 18 September 2012
The units at the insured complex were constructed in three stages:
Stage 1 Units 1-35 Built 9 years ago.
Stage 2 Units 36-66 Built 6 years ago.
Stage 3 Units 67-102 Built 7.5 years ago.
Units 36-66 were covered under a Home Owners Warranty insurance
contract held with a different insurer to that which insured Stages 1 and
3.
It appears clear the leaking shower recesses are the result of building
and construction defects from the original construction of the premises.
The solicitors consider it is clear that „Accidental Damage‟ cover is not
intended to cover building and construction defects.
MB considered a Court would likely find that any resultant damage to
the walls and other structures of the Strata premises caused by the
leaking shower recesses would constitute Accidental damage.
However, pursuant to the exclusions, the damage largely consists of
timber rot would be excluded from cover.
Based on the history it could be argued that appropriate actions were
not taken by the Owner‟s Corporation to mitigate the loss/damage,
which is also cause to decline indemnity under the policy.
C’s Report dated 23 April 2012
Date of inspection 18 April 2012.
There was no doubt that the damage sustained to the units inspected
was caused by the leaking shower recesses.
The construction under Stages 1 and 3 was outside the six years
warranty period against the builder who was also later declared
bankrupt.
In saying that, had the Body Corporate acted when the then Onsite
Manager allegedly informed it of the problem (approx. 1.5 years ago)
then more of the units may also have fallen within the available
warranty insurance period.
The Onsite Manager was aware of 15 units with evidence of water
damage. Further, that she had managed the complex for 18 months
and to her knowledge the Body Corporate was aware of the problems
with the shower recesses when she was appointed as the Onsite
Manager.
32. The policy provides cover for accidental loss or damage. It is accepted that
accidental loss or damage is damage which is considered to be unintentional
and unexpected.
Case No: 306190 Determination Page 8 of 10
33. Although there is evidence that the cause of the damage was defective
workmanship, there is no evidence that the damage itself was not
unintentional or unforeseen.
34. The damage as identified by DC in the Scope of Works identifies carpet
damage, damage to timber architraves, timber door frames, vanities, wall
and floor tiles, walls and fixings. This damage was caused by the water
leaks. This damage was clearly unintentional, and unexpected.
35. Accordingly I am satisfied that the Applicants have established a prima facie
claim under the terms of the policy with respect to accidental damage.
36. The policy however is subject to specific limitations and exclusions provided
within the PDS including:
“Exclusions – what we do not insure
1. We will not pay for loss or damage
…
c caused by lack of maintenance, rust, oxidation, corrosion, Wear,
Tear, fading, gradual corrosion or gradual deterioration, concrete
or brick cancer, developing flaws, wet or dry rot, or failure to
maintain Your Insured Property in a reasonably good state of
repair.
d caused by non-rectification of an Insured Property defect, error
or omission that You were aware of, or should reasonably have
been aware of
…
2. We will not pay for:
…
b the cost of rectifying faulty or defective materials or faulty or
defective workmanship; ”
37. Dealing firstly with the question of costs associated with the rectification of
the defective workmanship, I note that the Applicant accepts that the
individual unit holders would be responsible for the cost of the rectification of
the defective workmanship. Insofar as exclusion 2(b) applies, I accept that
the FSP is not obliged to cover the Applicant for the cost associated with the
actual rectification of the defective workmanship in the installation of the
numerous shower recesses.
38. The Applicant is seeking indemnity for the costs of repairing the damage
caused by the defective workmanship.
39. I acknowledge the Applicant‟s position that it is reasonable to first attempt
rectification of any issue arising at the property prior to deciding to lodge a
claim under the policy. I also acknowledge the Applicant was unaware of the
scope of the problem in respect to leaking shower recesses until such time
M submitted a report outlining the significance of the problem.
Case No: 306190 Determination Page 9 of 10
40. The evidence is that the Body Corporate and Onsite Manager were aware as
early as 2010 of the defects in the property. They had the original
tradesperson back to fix the problems. It was only after he went bankrupt
and an independent tradesperson inspected the showers after a few more
showers started to leak that they became aware of the extent of the damage.
41. I am satisfied that the available information, on the balance of probabilities,
establishes that the Body Corporate was or should reasonably have been
aware of the arising issues with the shower recesses and resultant water
damage for some time before the claim was lodged. It is evident that the
previous Onsite Manager was made aware of numerous units experiencing
the problems with the shower recesses and for which the original builder was
appointed to undertake rectification works.
42. It is a reasonable expectation that, arising from the clear pattern of the
similar events of water damage due to the defective installation of shower
recesses within the units, quicker and more detailed investigations would
have been authorised by the Body Corporate.
43. I am satisfied that the resultant damage to the units has occurred gradually
over an extended period of time arising from the failure of the shower
recesses waterproofing due to their faulty installation. The resultant water
damage to the insured units occurred as a result of conditions clearly
excluded from cover e.g. wear and tear, dry or wet rot, gradual deterioration
and non-rectification of a property defect of which the Applicant should
reasonably have been aware.
Section 46 of the Act
44. The Applicant refers to Section 46 of the Act and maintains that in line with
this section and the fact they were not aware of the building defects
identified by the consultants, protection should be afforded under section 46
of the Act.
45. Section 46 prevents an insurer from relying on an exclusion clause that
refers to the condition of a thing before the contract was entered into , if the
Applicant (or a reasonable person) was not aware of the defect or condition
which wholly or partly caused the damage claimed for.
46. The case of Nelson v The Hollard Insurance Company Pty Ltd [2010]
NSWSC 199 states that Section 46 of the Act does not apply to an exclusion
of an event which makes no reference to when the event occurs. It is only
exclusions which refer to a condition existing before entry into the contract of
insurance which are affected by Section 46 of the Act.
47. In this dispute, the exclusion clauses relied upon by the FSP apply generally
and are not temporal in nature. The exclusion clauses are not directed to
defects which pre-existed the commencement of the Policy. Accordingly, I
am not satisfied that Section 46 of the Act assists the Applicant in this
dispute.
Case No: 306190 Determination Page 10 of 10
48. In the circumstances, I am satisfied that FSP has established on the balance
of probabilities the exclusion clauses relating to faulty workmanship and non
rectification of known defects applies to defeat the Applicant‟s claim.
Determination
49. On the basis of the available information I determine the FSP is not obliged
to provide indemnity to the Applicant under the claim for:
The cost to rectify the faulty workmanship and/or use of materials in the
installation of the shower recesses within the insured units.
The cost to repair the resultant water damage discovered due to the
faulty installation of the shower recesses within the units.