Text of the determination
Case No: 306130 Determination Page 1 of 6
Case Number: 306130
General Insurance – Domestic Insurance – Home Building – Storm damage –
Collapse of retaining wall – Repair rectification
21 November 2012
Background
1. On 16 January 2006, the Applicants lodged a claim for damage to 8 metres of
an 18 metre retaining wall that had collapsed following storms and heavy rain.
The Financial Services provider (FSP) accepted liability and completed repairs
at a cost of $3,118.
2. The FSP did not engage the services of a structural engineer and it was
subsequently found that the original wall was not structurally adequate to
withstand the applied loads.
3. In early January 2011, eight metres of the retaining wall, that had been
replace d in 2006, collapsed due to what the Applicants, and FSP‟s experts
believed, was as a result of poor workmanship and not following BCA
standards.
4. The FSP accepted the claim to rebuild the eight metres of wall previously
replaced due to it having accepted t he 2006 claim. However, the Applicants‟
requested the FSP obtain a quote to replace the entire 18 metres of the wall.
5. The FSP obtained a quote to replace the wall at a cost of $27,060 and made a
cash settlement offer to the Applicants to pay 50% of that amount, that is,
$13,530.
Summary of Applicants’ Position
6. The Applicants seek to have replacement of the entire 18 metre length of the
wall to comply with the Building Act 1993 and an engineer‟s design.
7. The FSP rejected the Applicant‟s request on the grounds that the original
retaining wall had not been constructed according to the Building Code and the
inadequate construction was the cause of the collapse of the wall.
8. The matter was referred to the FOS Ombudsman who found that the FSP„s
offer of $13,530 was fair and reasonable with the proviso that the cost of
Addendum Determination
Case No: 306130 Determination Page 2 of 6
repairs was to include additional costs such as engineer‟s report, Council and
Building permits.
Summary of FSP’s Position
9. The FSP obtained quotes to complete repairs for the amount of $27,060 which
was subsequently increased by $4,070 to include the cost of Engineer‟s design
fee, Building surveyor‟s fee and Soil engineer‟s fee increasing the total amount
to $31,130.
10. The FSP then made a cash payment of 50% of $31,130, that is, $15,565 to the
Applicants.
11. However, the Applicants have rejected the amount of the cash payment on the
grounds that it does not allow for price increases since the date of the original
quotes and does not include possible additional costs that may be incurred in
carrying out the repairs.
12. The Applicants are also claiming payment of $3,000 compensation under
section 9.3 of the Service‟s Terms of Reference due to further delays in settling
their claim and time and effort in reviewing the costs associated in replacing the
wall.
13. The Applicants investigated the increases in material and labour costs and the
possible additional overhead costs and found that the cost of repairs will
possibly be $44,455.75. They submit that the FSP should increase its payment
to 50% of $44,455.75, that is, $22,227.88.
14. The Applicants have referred this matter back to the Ombudsman as the FSP
has maintained its position to pay the amount of $15,565.
Issues
15. Whether the Applicants are entitled to have the cash payment of $15,565
increased.
16. Whether the Applicants are entitled to payment of compensation under the
Terms of Reference.
Reasons for Decision
17. There has been an exchange of material which the parties rely on. Each party
has had access to the material on which the other party bases its case. As a
consequence it is not necessary to go into all of this material other than when
relevant.
Case No: 306130 Determination Page 3 of 6
18. The Applicants have reviewed the costs involved in carrying out the repairs to
the retaining wall with various contractors. A schedule of their increased costs
is as follows:
Item FSP ‟s Quote Applicants‟ Quote
Steel channels $2,134 $2,400.75
Sleepers $3,850 $4,235.00
Concrete $4,400 $4,730.00
Labour $6,270 $6,583.50
Machinery hire
& drilling $2,750 $2,887.50
Demolition $3,080 $3,234.00
Supervision &
Overhead $4,576 $4,804.80
Engineers‟ reports $4,070 $4,070.00
Total $31,130 $32,945.55
50% = $15,565 $16,472.78
19. The Applicants have also included the following costs that may, or may not be,
incurred:
1. Remove & reinstall fencing $300.00
2. Drainage aggregate $787.50
3. Drainage plumbing $375.00
4. Fixings & wedges $450.00
5. Porta-loo hire $165.00
6. Building permit $630.00
7. Lodgement fee $51.00
8. State government levy $85.35
9. Traffic management permit $1,912.50
10. Traffic management plan $404.25
11. Assets protection fee $210.00
12. Power line safety $2,250.00
13. Dogman $618.75
14. Electrical spotter $585.75
Case No: 306130 Determination Page 4 of 6
15. Traffic controller $1,607.10
16. Letter drop $200.00
17. Repair access and egress $500.00
18. Kennel for dog $378.00
Total $11,510.20
20. The Applicants are seeking 50% of $44,455.75 which is the total of $32,945.55
plus $11,510.20; 50% amounts to $22,227.88.
21. The FSP has included in its offer payment of 50% of the cost of an engineer‟s
design fee, building surveyors fee, and soil engineers fee.
22. However, this only goes part of the way in arriving at a fair and reasonable
settlement of the Applicants‟ claim.
23. The FSP submits that a report it received from a consulting engineer confirmed
that the contractor‟s quote of $27,060 was fair and reasonable and complies
with the Ombudsman‟s determination.
24. However, the FSP has ignored provisos to the quotes from the contractor in
which he states:
“Quote No: 40560 – „Total estimated cost to complete these works $27,060
including GST.
NB: these costs are subject to change, depending upon specifications by an
engineer‟
Quote No: 40658 – „This quote would be subject to an engineer‟s report and
approval of the method [my emphasis] we have quoted for.”
25. Further, the consulting engineer in con firming the contractor‟s quote was fair
and reasonable also added a proviso when he stated:
“In our opinion, the Scope of Works detailed in the quotation appears fair and
reasonable and the proposal put forward appears [my emphasis] to be
adequate, however geotechnical investigation and engineers computations
would need to be carried out to confirm this.” [my emphasis]
26. Therefore, because of these provisos I find that the FSP has not met the terms
of the determination dated 22 March 2012.
27. The Applicants have stated that they contacted the landscape contractor, who
was to perform the repair work and submitted the quote for $27,060 to the
FSP‟s managing contractor and who confirmed that his quote was for only 30
days after 21 September 2011.
28. However, the FSP submits that the landscape contractor has confirmed that he
will honour the quote of $27,060.
29. Neither the FSP nor the Applicants have submitted any evidence in support of
their position in regard to the status of the quote.
Case No: 306130 Determination Page 5 of 6
Compensation
30. The Applicants have submitted a request for FOS to determine whether
compensation should be awarded under the FOS Terms of Reference.
31. 9.3(b)(i) of the Services terms of Reference state:
“ 9.3 Other compensation
...
b) Subject to paragraph 9.3 c) and paragraph 9.7, FOS may decide that the
Financial Services provider compensate the Applicant for non-financial loss
but only where:
(i) an unusual degree or extent of physical inconvenience, time taken to
resolve the situation or interference with the Applicant‟s expectation of
enjoyment or peace of mind has occurred; or FOS Terms of Reference – 1
January 2010 (as amended 1 January 2012) page 19 to 43.
...
The maximum amount of compensation for non-financial loss will be $3,000
per claim made in the Dispute.”
32. During the course of the dispute, the FSP has not explored what possible costs
would be incurred following any investigation by structural and/or soil
engineers.
33. In the contractor‟s original quote under the heading “Scope of works‟ is the
statement:
“Approval of engineer specifica tions & permits will be required before work
can be carried out.‟
Notwithstanding this advice the FSP did not appoint an engineer to prepare
the recommended specifications.”
34. In September 2011, the FSP engaged a consulting engineer to „...determine the
cau se of partial collapse of a retaining wall.‟ However, the FSP did not engage
a structural engineer to prepare specifications to repair the wall as
recommended by the contractor.
35. At the request of FOS, the Applicants did have the cost of repairs reviewed and
investigated other additional costs that may be incurred during the repair works.
The Applicants submitted a schedule of these costs to FOS which were copied
to the FSP.
36. The FSP did not offer any comment. I would have expected a detailed
response. I do consider that the FSP‟s handling of the matter has been
unsatisfactory and has caused unnecessary inconvenience as referred to in
paragraph 9.3(b)(i) of the Terms of Reference.
37. Therefore, in view of the inconvenience and time taken to prepare the costings
schedule, I consider that the Applicants should receive $1,000 as
compensation under clause 9.3 (b)(i) of the Terms of Reference.
Case No: 306130 Determination Page 6 of 6
Determination
38. In respect to the quote of $27,060, that is eleven months old, I determine the
Applicants‟ increased quote of $32,945.55 to be fair and reasonable and
supersedes the amount of $27,060. The FSP is to pay 50% of the $32,945.55,
that is, $16,472.55 less the amount of $15,565 already paid to the Applicants.
39. If the amount of $32,945.55 has to be reviewed depending on the results of
engineers‟ reports, any increase in the cost of repairs is to be shared on a
50:50 basis between the FSP and Applicants.
40. In respect to expense items numbered 1 to18 I determine that item 1 „remove
and reinstall fencing $300‟ is to be included . I therefore add the additional sum
of $300 or 50% equalling to $150.
41. In respect to item 18 „Kennel for dog $378‟ I determine that this item is not
relevant in respect to the repairs and is not to be included in the total cost.
42. Items 2 to 17 inclusive are items which may, or may not, be costs that will be
incurred as repairs to the wall proceed. However, I determine that as any of
these expenses are incurred the FSP is to pay 50% of the cost incurred at that
time.
43. Alternatively, I determine that the FSP ca n make a full and final settlement of
the Applicants‟ claim by payment of the amount of $21,849.88 (being
$22,227.88 less the $378 for the dog kennel) less the amount of $15,565, as
requested by the Applicants. In addition, the FSP is to cash settle 50% of any
additional construction costs that may be incurred following the repair
specifications recommended by the relevant engineers‟.
44. I also determine that the FSP must pay to the Applicants the sum of $1,000
pursuant to paragraph 9.3(b)(i) of the Terms of Reference of this Service.