Claim denied as flood; partly covered as flash flood after Brisbane River inundation
Text of the determination
Case No: 306104 Determination Page 1 of 9
Case number: 306104
General Insurance - Domestic Insurance - Home Building - FSP Decision -
Denial of Claim - Inundation
22 May 2013
Background
1. The Applicants insured their home and contents with the Financial Services
Provider (FSP). The relevant period of insurance operated for twelve months
beginning from 25 November 2010. During this period, the building was
insured up to a sum of $196,000 and the contents for $57,000.
2. On or about 12 January 2011, the Applicants‟ home in Graceville was
inundated as a result of severe weather events that affected Queensland at
the time.
3. The FSP denied the claim on the basis the damage was due to “flood”.
4. The Applicants consider that their loss should be covered under the policy.
Summary of Applicants ’ position
5. The Applicants say that the damage to their home was caused as a result of
flash flooding, as defined under the policy. In particular, they claim the
inundation was due to heavy rain that fell on 11 January 2011 which resulted
in the Wivenhoe Dam operators elevating their strategy to W4. This decision
resulted in massive discharges of water into the Brisbane River that
ultimately inundated their property within the 24-hour period stipulated for
flash flooding under the policy.
6. They seek indemnity for damage to their building and contents, estimated at
$50,000 and compensation for the “financial difficulties and mental stress
suffered”, which they value a t $40,000.
Summary of FSP’s position
7. The FSP contends that the cause of the Applicants‟ loss was the flooding of
the Brisbane River, which is excluded from cover under the terms of the
policy.
8. It relies on the following policy provisions to deny the Applic ants‟ claim :
Determination
Case No: 306104 Determination Page 2 of 9
Page 3 of the Certificate of Insurance (COI)
“ What optional covers are included and not included
Home Contents
...
Flood and storm surge not included not included...”
Pages 10-12 of the PDS
“ Words / terms with special meanings
Word / term Meaning
...
Flood Rising water which enters your home as a result of it
running off or overflowing from any origin or cause.
This policy does not cover flood unless we have
agreed and it is shown on your certificate of insurance.
Flash flood and
stormwater run - off
A sudden flood caused by heavy rain that fell no more
than 24 hours prior to the flash flood or stormwater
run - off.
...
Storm A violent disturbance of the atmosphere associated
with strong w inds including a cyclone, light ning, heavy
rain, hail or snow, but not continuous bad weather by
itself.
...”
Pages 17-18 of the PDS
“ Insured events you are covered for
Damage caused by weather...
What is covered What is not covered
Storm Loss or damage:
caused by rain, hail or snow
after it has reached the
ground...
...
Flash flood and stormwater run-off
A sudden flood caused by heavy rain
that fell no more than 24 hours prior to
the flash flood or stormwater run - off
Loss or damage caused:
by flood...
...”
Page 27 of the PDS
Case No: 306104 Determination Page 3 of 9
“ Your home
The most we will pay you for home claims
What is covered What is not covered
Flash flood and stormwater run-off
We will pay up to 50% of your home sum
insured or $25,000, whichever is higher.
...
...”
Page 32 of the PDS
“ Your contents
The most we will pay you for contents claims
What is covered What is not covered
... ...
Flash flood and stormwater run-off
We will pay up to 50% of your contents
sum insured or $25,000, whichever is
higher , but not exceeding your contents
sum insured .
...
...”
Issues
9. Whether the damage caused to the Applicants‟ home was a result of flooding
or flash flooding or some other cause.
10. Whether this cause of the Applicants‟ loss was covered under the policy.
Reasons for decision
11. Due to the nature of the dispute, the parties have been informed that the
matter has been referred to the Panel for Determination in line with the
Operational Guidelines to FOS‟s Terms of Reference. This dispute has not
been the subject of a FOS Recommenda tion and has proceeded directly to
Determination.
12. This decision has been made by a Panel consisting of an Ombudsman, a
representative with extensive experience in the insurance industry and a
representative with extensive experience in consumer claims.
13. Alt hough the Applicants had “Advanced Cover” including Accidental Damage
Cover, it is not in dispute that the Applicants‟ cover with the FSP did not
extend to damage caused by flooding . Flood cover was available as an
Case No: 306104 Determination Page 4 of 9
option under the policy but had not been selected by the Applicants. The
policy differentiated between “flash flood” (which is covered but subject to
limits) and “flood” (which is specifically excluded).
14. The central issue for Determination is whether the inundation of the
Applicants‟ home on 12 J anuary 2011 was due to flash flood as defined
within the terms of the policy, that is whether rain that fell no more than 24
hours prior to the inundation of the Applicants‟ property was the proximate
cause of the inundation.
Loss adjuster
15. After the original report of the loss, the FSP appointed MY to attend the
Applicants‟ home and report on the cause of the inundation and damage.
MY‟s report of 29 January 2011 noted that:
The property was inspected on 26 January 2011;
The cause of the loss was overflow of the Brisbane River, situated
about 300m from the Applicants‟ home;
Inundation occurred at approximately 12.00am on 12 January 2011;
All rooms at the home were affected and the house would be
considered a total loss;
The foundations were: „Slab to lower level, storage and recreation area,
stumps to main house.
The water peaked at a total height of 5 metres and the property was
inundated for 2 days.
A hydrologist should be appointed.
16. The FSP subsequently appointed SC to review the general area data and to
consider the Applicants‟ specific circumstances.
Hydrology evidence for the property
17. SC provided a statutory declaration dated 20 December 2012 to evaluate the
cause of the loss in the region surrounding and specifically affecting the
Applicants ‟ home. He found that:
A substantial amount of rain fell in the greater Brisbane area from 9
January 2011 and over the subsequent two days, which caused
significant inflows into the Wivenhoe Dam, which peaked on the evening
of 11 January 2011.
Rain also fell in the area of the Bremer River from 6am on 11 January
2011. This rain travelled along the Bremer River to the junction of the
Brisbane River and ultimately contributed about 15-25% of its peak flow.
A “small proportion” of the overall depth of the Brisbane River “may be
partially attributable to the rain that fell in the Bremer River catchment on
Case No: 306104 Determination Page 5 of 9
11 January 2011”, although the “overwhelming influence” was the rain
that had fallen in the previous days.
The terrain data for the Applicants‟ home shows that the property varies
between 4.9m AHD (Australian Height Datum) and 6.8m AHD. The
“lowest point of the structure of the house on the land”, later identified as
the “benchmark level” is situated at about 5.3m AHD.
The terrain data for the Applicants‟ home sugges ted that it was unlikely
that the Applicants would have experienced significant stormwater or run-
off problems during the period.
Inundation from stormwater run- off requires “intense levels of rain” which
is sufficient to overcome the stormwater drainage s ystem. Any such run-
off generally occurs during or very shortly after such an intense period of
rainfall.
A review of the rainwater gauge at Corinda High Alert, approximately
2.8 km from the Applicants‟ property and representative of its rainfall in
the exp ert‟s opinion, revealed that 85 mm of rain fell over 9 and 10
January 2011, with a further 43mm falling on 11 January 2011. The most
intense rainfall on 11 January 2011 fell between 10am and 11am when
about 15mm was recorded. No rainfall was recorded after 5.00pm on 11
January 2011 and only 2mm was recorded for the next day.
The overall intensity of the rainfall was “very low” and unlikely to result in
run-off or stormwater inundation to the property.
Whilst there might have been some rainfall within 24 hours of the
inundation of the property, in SC‟s opinion this rainfall was not the cause
of the inundation, which he considered to be the rising level of the
Brisbane River.
Contrary to the recollections of the Applicants who testified that the
inundation of the property started from 12.52am on 12 January 2011, SC
relied on the river gauge data to suggest that the Brisbane River had
swollen to 6.3m AHD as at about 12.52am on 12 January and this would
have been sufficient to inundate above the benchmark level by
approximately 1 metre. The Applicants‟ property was inundated by
floodwater from the Brisbane River and not stormwater run-off or other
local run-off.
General hydrology analysis
18. On 21 May 2012 FOS issued a memorandum to all relevant stakeholders
advising that after considerable deliberation of all material available to it, the
Panel formed a view that the heavy rain occurring from approximately
4.00am on 11 January 2011 and in particular the heavy rain between
4.00am and 8.00am on 11 January 2011 was a proximate cause of the W4
strategy being invoked and therefore a proximate cause or trigger that led to
the flooding of many of the properties along the Brisbane River.
19. At that time, the Panel noted that in relation to the approach that each
dispute would depend upon the individual and unique factors relevant to the
Case No: 306104 Determination Page 6 of 9
dispute and in that regard the parties were invited to make further
submissions in relation to disputes before FOS.
20. To address these issues, the FSP relies upon a standard “reference
document” to address its position in relation to the W4 release strategy and
its relevance and impact in terms of its policy. Included with its submission
was:
A Reference document for disputes relating to Queensland Floods (this
is a general reference document) relating to the various submissions
the FSP makes in relation to a number of issues. Not all issues raised
in the reference document appear in the current dispute;
Letter dated 19 December 2012 from hydrologist SC attaching a key
information sheet for the Appl icants‟ property;
Hydrologist report “Investigation of January 2011 Inundation Event –
Brisbane” dated March 2011;
Statement from hydrologist SC dated 20 December 2012.
21. The Panel has reviewed the reference document. Insofar as the reference
document relates to the current issues in dispute, those matters have been
considered.
22. In summary the FSP argues that the proximate cause of the inundation of
the properties, that is the real or effective cause of the damage caused to the
properties downstream of the dam, is not simply the rain that occurred from
4.00am on 11 January 2011. The FSP maintains that on any reasonable
view, the damage sustained to the downstream properties was the combined
effect of all of the rainfall and not just the rain that had fallen from 4.00am on
11 January 2011 leading to the implementation of the W4 strategy from
8.00am that day.
23. The Panel has considered the information exchanged and with due respect
to the FSP‟s argument the Panel disagrees. Whilst the Panel accepts there
has been a significant impact on the levels of the Wivenhoe Dam by the
rainfall that commenced falling on or about 9 January 2011 or earlier, the
Panel is satisfied having regard to the information that has been exchanged
and the relevant legal principles, that the heavy rain that commenced falling
on or about 4.00am on 11 January 2011 was the proximate or effective
cause of the adoption of the W4 strategy.
24. The Panel is also satisfied that whilst the level of the Brisbane River may
have been increasing under the W3 strategy, it was the heavy rainfall from
approximately 4.00am on 11 January 2011 that caused the need to adopt
the W4 strategy at 8.00am on the same day.
The Applicants’ Inundation
25. SC‟s „Key Conclusions‟ attachment of 19 December 2012 indicates the effect
of the W4 releases first reached the vicinity of the Applicants‟ property at
2.38pm on 11 January 2011. He estimated that the property was first
Case No: 306104 Determination Page 7 of 9
inundated by the Brisbane River at 8.35pm on 11 January 2011 and by
4.00am the next morning the property was inundated approximately 1.7m
above the relevant benchmark level which the attachment notes is „Elevated
(possible storage areas)‟.
26. This evidence differs from the recollections of the Applicants, who suggested
that the initial inundation occurred at 12.52am the next morning. To clarify
this, the Panel Chair Ombudsman conducted a site inspection on 16 May
2013 with the Applicants and the FSP. The inundation observed by the
Applicants was at the front of the house whilst the key conclusion statement
indicates the initial inundation was at the benchmark level at the rear of the
house. This is lower than the front of the house and explains the difference
in the timing of the inundation. The benchmark level highlighted by SC was
his estimate of the lowest point of the house, approximately located at the
south western edge of the rear of the home by reference to the annotated
aerial photograph provided with the Key Conclusion‟s attachment. Based on
the information exchanged the Panel is satisfied that by 4.00am 12 January
2011 the property was inundated to a height of 1.7m above benchmark. At
this level the inundation would have inundated the lower level of the property
but not the upper level.
27. The inundation of the property after 4.00am would be due to rain that fell
more than 24 hours beforehand and under the terms of the policy excluded
from cover as flood. The Panel notes that the ultimate inundation of the
property was identified by SC as 3.9m above the benchmark level. SC
suggested that this peak inundation occurred at approximately 11.41pm on
12 January 2011. Whilst the Panel acknowledges the assessments as to the
timing of the inundation may not be entirely accurate the Panel is satisfied
that it is reasonable to rely on the key conclusion statement and, the Panel is
satisfied that the inundation of the Applicants‟ property to the level of 1.7m
above the benchmark level was caused by flood that occurred within 24
hours of the heavy rainfall.
Quantum
28. The Renewal Certificate of Insurance for the relevant period provides a sum
insured of $196,000 for the home with contents of $57,000. Pursuant to the
policy cap for the insured event of “Flash flood and stormwater runoff”, the
FSP is liable up to an amount of $98,000 for the damage to the building and
$28,500 for the contents.
29. During the site inspection the Applicants noted that various items were
located on the lower level , including 2 Air conditioners, Hot water System,
Refrigerator, Washing machine/laundry, numerous tools, the electrical sub
board, and electrical controls for the house, a children‟s retreat housing toys,
electronic games etc. The Panel accepts that these items would have been
damaged within the relevant 24 hour period although those items in
particular the tools stored above 1.7m above benchmark would not have
been damaged with the relevant time.
Case No: 306104 Determination Page 8 of 9
30. Given the time since the loss was sustained, the Panel accepts that the
parties may be unable to provide an exact estimate of the total loss
sustained, or a breakdown of that loss.
31. The Applicants and the FSP are asked to work cooperatively together to
establish the extent of the loss sustained to the property up to a height of
1.7m and to reach an agreement as to cost of repairs and replacement of the
various contents lost. Any inundation damage that occurred above 1.7m is
properly classed as a flood and not a flash flood and is not covered under
the policy.
32. To the extent that the Applicants may have already replaced the various
items lost or incurred costs in repairing the property as a result of the
inundation to 1.7m above benchmark level the Panel determi nes the FSP
cash settle the loss. Items not yet replaced or repairs not yet completed can
be cash settled subject to agreement between the parties. Insofar as the
FSP may have made payment of a compassionate sum to the Applicants,
FOS does not have jurisdiction to deal with this payment but acknowledges
that the FSP, given the terms on which the compassionate payment was
made, may be entitled to deduct this payment from any settlement sum.
Compensation and interest
33. The Applicants sought a compensatory payme nt of $40,000 from the FSP for
the “financial difficulties and mental stress suffered” as a result of the loss
and subsequent the denial of the claim by the FSP. The FSP has not
specifically addressed the issue of compensation in its submissions,
although it has suggested that interest should not apply as the Applicants
waited around 20 months to report the matter to the Service after the denial
of the claim.
34. The Terms of Reference for the Service allows provision for the award of a
compensatory payment of up to $3,000 in certain circumstances, generally
where the Applicants were subject to an “unusual degree or extent of
physical inconvenience, time taken to resolve the situation or interference
with the Applicants ‟ expectation of enjoyment or peace of mind .”
35. The Panel accepts that the Applicants have suffered a terrible loss and that
(potentially) not all of this loss will be covered within the ambit of the policy.
Whilst this claim has been successful, the total amount of cover offered to
the Applicants does not fully compensate them for their loss.
36. Whilst the FSP denied the claim, the Panel is satisfied that it promptly
responded to it, arranged the inspection of the property and thoroughly
investigated the cause of the loss. Although the Panel disagrees with the
FSP‟s conclusions as to the evidence obtained about the cause of
inundation and whether the policy should respond (and therefore has
reached the decision that the claim should be partially covered as per the
policy limits applicable to „flash flood‟) the Panel is not satisfied that the
denial of the claim itself warrants an award of compensation.
Case No: 306104 Determination Page 9 of 9
37. Notwithstanding the FSP‟s objection to allowing interest, due to the
Applicants‟ 20 month delay in lodging a dispute with the Service, consistent
with relevant law interest is payable from when the FSP unreasonably
withheld payment. The FSP must be entitled to a reasonable period to
determine a claim, but thereafter interest should be paid in accordance with
Section 57 of the Act.
Determination
38. The Panel determines that the FSP is to meet the cost of repairs, incurred by
the Applicants and the cost of the replacement of items damaged as a result
of the inundation of the property to a level of 1.7m above benchmark. Any
payment is subject to the limitations expressed in this Determination.
39. Insofar as the FSP is to cash settle the claim, the FSP is to pay interest in
accordance with Section 57 of the Act from 18 March 2011 (being the date of
rejection of the claim) to date of payment of the claim, on those items that
have been replaced or repairs conducted by the Applicants subject to
satisfactory proof of loss. Insofar as the balance is calculated under a
currently costed scope of works no interest is payable.