Home / Financial Firm (Unknown - Insurer) / Determination 305564
Determination 305564
Settlement Amount - Policy exclusions/Limitations
Summary
The Applicants claimed storm and flood damage to tiles and paving and disputed the FSP's exclusion of part of the claim and its payment of invoices. AFCA required the FSP to indemnify the storm-damaged tiles on an agreed scope of works and found the paving damage excluded.
A storm-caused tile damage was established on the evidence, while the paving damage was attributed to gradual soil movement that the policy excludes.
Issues
- Claim denial primary · upheld
“I am not persuaded by the evidence presented by the FSP that any relevant exclusion applies with respect to that damage (kitchen, laundry and veranda tiles).”
- Claim amount dispute secondary · unclear
“The FSP has agreed to reconsider those invoices associated with that part of the claim that has been accepted.”
- Poor claim handling secondary · not upheld
“The Applicants have not established that they were prejudiced by the FSP altering its position on the Scope of Works.”
- Inadequate claim investigation secondary · upheld
“the initial report provided by M does not in my view adequately address the issues in this dispute.”
- Delay secondary · not upheld
“To the extent there has been any delay, it was largely due to the Applicants' conduct rather than that of the FSP.”
Subjects and remedies
home or building damagenatural disasterpay claimreassess claim
Text of the determination
Case No: 305564 Determination Page 1 of 9
Case number: 305564
General Insurance - Domestic Insurance - Home Building - Service - Delay in
claim handling – Settlement Amount – Policy exclusions/Limitations
9 May 2013
Background
1. The Applicants (P & T) held a Home Building and Contents Insurance policy
(the policy) with the Financial Services Provider (FSP).
2. The Applicants have sought indemnity under the policy for water damage
arising from the events ‘storm and flood’ on 28 September 2011 and 25
December 2011. The damage is being dealt with under the single claim.
3. The FSP having assessed the damage accepted a majority of the building
and contents loss however it excluded from cover damage to external paving
and internal floor tiling on the basis it is not claim related.
4. The Ap plicants remain dissatisfied with the FSP’s decision to decline certain
components of the claim and are seeking complete indemnity for their loss.
Summary of Applicants ’ position
5. In September 2011, the Applicants’ home suffered damage due to a storm
after which a claim was lodged under the policy. Before an assessor was
appointed there occurred another flood event in December 2011.
6. An assessor from the FSP attended their home in March 2012 and at the
request of the FSP they proceeded to obtain quotes for the repairs. These
were accepted by the FSP and a Scope of Works (SOW) also approved
under the claim.
7. However, having approved the SOW the FSP subsequently changed its
position in the middle of the repair works leaving the Applicants without any
money and unfinished repairs at the insured property.
8. The Applicants are of the opinion that the consultant “M” (engineers)
appointed by the FSP failed to support its position that the excluded damage
was due to poor building practices and movement, with sufficient evidence.
In the alternative, the Applicants believe the evidence submitted by their
appointed consultants “IR” is the more accurate and reliable.
Determination
Case No: 305564 Determination Page 2 of 9
9. The Applicants have spent $33,191.14 in invoices that they maintain were
part of the approved SOW which the FSP has failed to reimburse them for
under the claim. There is a further requirement of around $51,754.50 worth
of works to complete the repairs under the claim. The Applicants note that
the FSP’s Internal Dispute Resolution (IDR) process recommended that the
Applicants pay for the repairs and seek compensation later, which they do
not believe to be a reasonable expectation.
10. The Applicants are seeking for the FSP to honour the scheduled SOW
approved under the claim and accepted prior to commencement of the
repairs.
Summary of FSP’s position
11. At lodgement of the claim the Applicant (P) informed the FSP that he was
employed in the building industry and would prefer to provide his own quote
and also arrange the repairs.
12. The FSP formed the opinion that the damage was extensive and therefore
appointment of one of its preferred builders was necessary. There was a
delay in the assessment of the damage arising from the Applicants’ personal
circumstance and subsequently they refused to allow any of the FSP’s
preferred builders on site.
13. Therefore, the FSP proceeded to appoint an in house assessor to visit the
insured property and undertake an assessment of the damage claimed.
Based on the recommendations of its assessor, the FSP accepted a majority
of the claim and issued a cash settlement payment to the Applicants based
on their (Applicants) quotes and invoices.
14. In issuing the payments to the Applicants the FSP informed them that it
would be appointing an engineer to the claim to assess and determine the
cause for the damage to the internal tile flooring and paving to the front and
rear of the property, for which settlement under the claim had not been
approved.
15. Based on the evidence made available by the engineers (M), the FSP
excluded from cover the damage to the internal tiles and external paving.
The FSP has considered the evidence made available by IR (appointed by
the Applicants) however is of the opinion that M’s reports are more accurate
and conclusive in respect to the cause of the loss.
16. It acknowledges the Applic ants’ allegation of being short paid on the
settlement. With exception to one quote from plumber “R”, the FSP
maintains that it has settled all other accounts in line with the documentation.
The FSP has issued a further payment of $239.36 to the Applicants, this
being the difference between what it had actually paid and the amount noted
on R’s quote.
Case No: 305564 Determination Page 3 of 9
17. The FSP is satisfied that the available evidence establishes, on the balance
of probabilities, that the outstanding damage in dispute between the parties
(internal tiles and external concrete paving etc) was due to gradual
deterioration and subsidence, circumstances clearly excluded under the
policy.
18. The FSP relies on the following policy provisions:
“ What we cover – insured events
You are covered for damage or loss to your home building occurring during
the period of cover and caused by the following events:
Animals and birds – the actions of animals and birds
Earthquake
Explosion
Fire
Impact - sudden and unexpected impact
Liquid escaping suddenly and unexpectedly
Malicious acts and vandalism
Riot, civil commotion or labour disturbances
Storm and rainwater
Theft Thunderbolt and lightning
….
What we do not cover – general exclusions
You are not covered under any section of the policy for damage, loss, cost or
liability caused by or arising from or involving:
wear and tear, rust, deterioration or corrosion,
mechanical, structural, electrical, electronic or other failure or breakdown,
other than as provided for under ‘Damage to electric motors’ on page 22,
subsidence or landslide unless caused by the insured event of earthquake” .
Issues
19. Whether the Applicants have established an entitlement to indemnity for
those aspects of the damage declined by the FSP.
20. Whether the Applicants have established any prejudice arising from the FSP
allegedly altering its position in respect to the Scope of Works approved
under the claim.
Reasons for decision
21. As advised to the parties, FOS has considered it appropriate to expedite the
dispute in accordance with the Operational Guidelines to the FOS Terms of
Case No: 305564 Determination Page 4 of 9
Reference. This is due to the circumstances of the dispute. This dispute has
not been the subject of a FOS Recommendation and has proceeded directly
to Determination.
22. There has been an exchange of material upon which the disputing parties
rely. I am satisfied that each party has had full access to the material on
which the other party bases its case, and also an opportunity to reply to
matters raised by each party.
23. The parties do not dispute the following:
The Applicants held an active home building and contents insurance policy
with the FSP at the time of loss.
The FSP provided and the Applicants received the relevant policy
documentation including the Product Disclosure Statement (PDS) prior to
the loss.
The insured property was damaged due to two separate insured events in
2011 with the parties agreeable for the damage to be dealt with under the
one claim.
The FSP has accepted to provide indemnity to the Applicants for much of
the building and contents damage under the claim.
The remaining damage in contention is in respect to cracked tiles in the
kitchen, laundry and front entry areas as well as cracking of concrete
paving at the front and rear of the insured home.
The policy excludes from cover (under any part of the policy) loss or
damage, caused by or arising from or involving soil movement or
settlement.
24. I note the parties have sought to rely upon opinions made available by the
various consultants’ app ointed to the claim. These reports have been
exchanged between the parties and therefore I will only reiterate information
from these reports I find relevant in providing this Determination.
Assessor’s Report dated 3 September 2012
25. The assessor concluded:
the Applicants had obtained quotes which were considered fair and
reasonable;
he recommended a cash settlement of the items as invoiced and also
support for the whole claim to be cash settled.
if the claim was to be cash settled the settlement was to also include
eight weeks of temporary accommodation; and
an engineer would be required to report on the damaged concrete and
floor tiles as noted in SOW. Further, a specialist report would also be
necessary for a number of contents noted on the SOW.
Case No: 305564 Determination Page 5 of 9
M’s Engineer Report dated 3 October 2011
26. The consultant observed:
the front area including the driveway area had some cracks that were
relatively fine. There was no engineering evidence available to
attribute damage to the storm event.
there was cracking in the stamped concrete paving at the rear of the
residence and garage that opens through the rear. There was no
engineering evidence available to attribute the cracking to the storm
event.
cracking in the stamped concrete at two locations where an internal
corner was formed showed direct evidence the cause of the cracks
were due to lack of engineer design and insufficient jointing.
cracking across three tiles in the laundry showed no engineering
evidence to attribute cracking to storm event.
inspected cracking to one or two tiles located at the inner side of the
kitchen servery bench, the far side of the servery bench and neat
truncated corner close to entry to the kitchen/dining area. Determined
there was no direct engineering evidence to attribute tile cracking to
storm event.
the lifting damage to terracotta tiles at the front entry to the patio again
showed no sign that this was due to storm damage.
there was a change in level at various points at joins of paving to
front, which could be due to being poured that way when slabs were
laid, however unlikely this would occur with a good tradesman on site.
Another and more likely cause would be moisture changes under the
slab. No engineering evidence available to establish difference in slab
level was due to storm event. M was of the opinion it was more likely
to have occurred over a lengthy period of time with rain after a long
dry season.
The consultant concluded that it was more likely that the damage
subject to the dispute occurred over a period of time from rainfall after
a long dry season.
IR’s Report dated 16 October 2011
27. Synopsis
“ Cracking to tiling at the kitchen and laundry cannot be diagnosed with
certainty but is consistent with the flood affects sustained elsewhere. The
Pavement at the rear has heaved due to moisture infiltration under, this will be
occurring as a result of the site profile and recent climatic changes but may
have been triggered or exacerbated by the 2011 flood. The pavement remains
serviceable subject to tripping point concerns. The pavement at the front has
suffered minor differential movement due to pumping or heaving, floor
influence cannot be ruled out. Tenting of the front veranda tiles at the entry is
Case No: 305564 Determination Page 6 of 9
consist with moisture infiltration. None of our findings are conclusive. There
ar e a range of possible remedial works discussed in the report.”
Geological maps show the site of newer volcanic, olivine clay foundation
material. This is highly reactive, usually classified ‘Class H’. This means
shrinkage and swelling due to changes in foundation moisture content is
typical behaviour.
During the recent drought IR had seen many structures built on such
foundations suffer from settlement and now notes heave as well.
This was a restricted investigation and it was advised to the Applicants
that there was a risk of an inconclusive result.
There were numerous cracks, mainly along intended crack lines, these are
part of usual slab performance. The ‘peaking’ or ‘tenting’ along the joint
lines suggests pumping or heaving.
The step down into the garage has increased by about 5mm, apparently
quite recently as shown by the failure of the silicone seal.
The two infill patches adjacent to the garage are irregular around their
edges and do appear to have moved. This movement is consistent with
heave or pumping but the pavement was unusually susceptible to such
actions.
IR confirmed the existence of hairline cracks in the kitchen and laundry tile
floors. The tiles were found to be drummy on either side of the cracks
indicating de-bonding, and seemed to be recent.
3mm peak or tent suggests with expansion or some activity such as
moisture under the tiles, this is only one case/cause.
Checked spot floor levels about the kitchen and dining rooms and the slab
was flat with reasonable tolerance, this suggests the tile cracking is not a
response to slab irregularities.
It is not possible to tell with any certainty what has caused the differential
movement of the pavement, but it is consistent with either heave or
pumping from moisture beneath.
A one off event of flood may have contributed significantly to this by
inundating the sub-grade. Given the description of the floodwater and
timing of that event, there is reasonable probability that the pavement
irregularities were partly the result of flood.
It is not possible to determine with certainty what has caused the tile
cracking in the kitchen and laundry, however it does not appear to match a
structural mechanism to be impact damage and it does appear to be
associated with de-bonding. It is consistent with moisture infiltration, thus
the cracking is consistent with flood damage.
Case No: 305564 Determination Page 7 of 9
M’s Engineer Report dated 30 October 201 1
28. On being provided with IR’s findings M provided a second report in relation
to the outstanding damage in dispute between the parties. The report
provides:
M noted that although IR advised the damage was due to flood, at the
beginning of the report it provides that “ None of our findings are
conclusive ”.
IR’s findings conclude with uncertainty regarding the proximate cause and
does not contradict or den y M’s findings provided in report dated 3
October 2011.
M remains of the view that the slab had moved and settled over time and
that this had occurred due to the manner in which the slabs were
laid/constructed upon reactive soils.
The differential movement between the more recently poured slab area to
the left on exiting the rear of the garage was indicative of poor
engineering/building practice.
M concluded that having received IR’s report there is no information and/or
findings that would cause it to alter its original findings i.e. the damage
claimed is due to ongoing differential soil movement which has occurred
over a period of time and is not the result of the storm/flood events.
29. I note from the screen print provided by the FSP of the actions on the policy
that following lodgement of the claim on or about 29 September 2009, the
Applicant informed the FSP that he was a builder and would arrange his own
repairs and prepare a quote. He informed the FSP that he had arranged for
the roof to be secured and for a water extraction company to attend.
30. An assessment of the property was arranged but was cancelled due to the
Applicants ’ unavailability. There were further delays in the assessment
processes when the Applicants did not wish to allow two of the builders
appointed by the FSP to assess the damages on the property. Eventually,
the FSP appointed SO to conduct the assessment. This did not occur until 3
September 2012 nearly 12 months after the initial incident.
31. Whilst I accept the Applicants had provided a number of quotations to the
FSP prior to this, by delaying the ability of the FSP to assess the claim, the
Applicants delayed the ability of the FSP to assess the extent of the loss
suffered. To the extent that there has been any delay, I am satisfied that the
delay through to 3 September 2012 was largely due to the Applicants’
conduct rather than that of the FSP.
32. Based on the information exchanged, I am not satisfied that the Applicants
have established that they were advised that the complete statement of
works would be covered under the claim. The Applicants may have
understood the discussion with the assessor to mean that they would agree
to pay based on his quotations. However, it is clear from the assessor’s
report that he informed the Applicants that an engineer would be appointed
Case No: 305564 Determination Page 8 of 9
to determine issues with respect to the cracked concrete and cracked floor
tiles. In the circumstances, I am not satisfied that the Applicants have
established that they have been prejudiced by any misrepresentation on
behalf of the FSP or its assessor.
33. Insofar as the engineering reports are concerned, the initial report provided
by M does not in my view adequately address the issues in this dispute.
Whilst the consultant has referred to the lack of engineering evidence, the
consultant has not explained how that opinion has been reached. It is
unclear from that report how or what caused the damage to the tiles in the
laundry and kitchen or to the terracotta tiles. The conclusion reached by M
that damage most likely occurred over a lengthy period of time with rain and
after a long dry season appears to relate to the movement of the slab rather
than the tile damage.
34. On review of IR’s report, M maintains that the dama ge to the kitchen and
laundry tiles was due to expansion and contraction, but otherwise does not
expand on this.
35. Insofar as the damage to the tiling at the kitchen and laundry is concerned, I
am more persuaded by the report of IR of 16 October 2011 that the cracking
was consistent with the effects of the storms, and further that the damage to
the front veranda tiles at the entrance was consistent with moisture
infiltration.
36. Having considered the evidence as a whole with respect to the damage to
the kitchen and laundry tiles and damage to the terracotta tiles on the front
veranda, I accept the evidence presented by the Applicants establish on the
balance of probabilities that that damage was caused as a result of a storm
related event which is an insured event under the terms of the policy. I am
not persuaded by the evidence presented by the FSP that any relevant
exclusion applies with respect to that damage.
37. Insofar as the damage to the paving to the front and rear of the property is
concerned, I note IR’s r eport is less persuasive. Although he believes the
pavement at the rear heaved due to moisture infiltration, he considered this
was a result of site profile and recent climatic change, although it may have
been triggered or exacerbated by the events of 2011. With respect to the
pavement at the front, he indicated that this was due to pumping or heaving
but that flood could not be ruled out. M on the other hand remains of the
view that the slab had moved or settled over time with differential movement
between the more recently poured slab area at the rear of the garage,
indicative of poor engineering standards. M considered the movement and
subsidence had occurred over a long period of time most likely before the
flood events and that the event merely continued the ongoing process.
38. Again, I have considered reports with respect to the pavement damage in
detail. I am not persuaded that either report has clearly identified the cause
of the damage, although I am satisfied that most likely the damage would not
have been due solely to the storm events of 28 September 2011 and 25
December 2011. I am not persuaded that the Applicants have been able to
Case No: 305564 Determination Page 9 of 9
establish on the balance of probabilities that the damage to the paving at the
front and rear of the property was caused by an insured event under the
terms of the policy. I accept that more likely the damage has been sustained
over a period of time due to ongoing soil movement.
39. There is dispute with respect to a number of invoices and whether these
invoices have been paid or not. The FSP has agreed to reconsider those
invoices associated with that part of the claim that has been accepted. Given
this undertaking, I encourage the parties to work cooperatively in reviewing
the available quotes and invoices to determine those parts of the invoice that
are covered under the terms of the policy.
40. Insofar as the damage to the tiles of the kitchen and laundry and the
terracotta tiles of the veranda, I determine that the FSP is to obtain a Scope
of Works as to the cost of repairs and/or rectification of the damage
sustained to those areas as a result of the insured events and upon
agreement as to the Scope of Works to cash settle that aspect of the
Applicants’ claim.
Determination
41. Based on the available information I determine that the FSP indemnify the
Applicants with respect to the loss and damage sustained as a result of the
insured events to the laundry and kitchen tiles and to the terracotta tiles of
the front veranda of the Ap plicants’ property. With respect to the damage
sustained to the concrete paving at the front and rear of the property, I
determine the FSP is entitled to deny liability in accordance with the terms of
the policy.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.