Home / Financial Firm (Unknown - Insurer) / Determination 305472

Determination 305472

Water inundation damage to home declined as flood; FSP failed to prove exclusion

FirmFinancial Firm (Unknown - Insurer)
Decided2013-05-22
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant
Amount awarded—
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

The FSP declined the water inundation portion of a home claim after a February 2012 storm and flood, citing the flood exclusion. AFCA found the FSP had not proven flood caused the damage and ordered it to liable for the damage, with assessment and settlement to follow and statutory interest on any cash settlement.

Once the insured establishes a prima facie accidental damage claim, the onus shifts to the insurer to prove an exclusion applies, and the insurer's evidence did not discharge that onus.

Issues

Subjects and remedies

home or building damagenatural disasterpay claimpay interest

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Case No: 305472 Determination Page 1 of 8 Case number: 305472 General Insurance - Domestic Insurance - Home Building and Contents - FSP Decision - Denial of claim 6 May 2013 Background 1. The Applicant and his wife held a home building and contents policy with the Financial Services Provider (FSP), which provided accidental damage cover and was current at the time of the loss. 2. After his home in Amby, Queensland was damaged during a storm on or about 3 February 2012, he lodged a claim with the FSP for the damage. 3. The FSP accepted the portion of the claim for damage which was caused by storm. However, it denied the portion of the claim which related to water inundation of the home on the basis that the damage was caused by flood, which is excluded from cover under the policy. 4. The Applicant disagrees with the decision and wants the FSP to pay his claim in its entirety. Summary of Applicant’s position 5. He says although there was a flood event around the time of the inundation, it was not flood water which caused the damage to his home. 6. Water entered the laundry through the gaps in the concrete floor. He believes that the heavy rainfall overnight may have caused water to flow under the house and the amount of water took some time to seep up through the floor. 7. The FSP‟s hydrologist‟s conclusion that flood caused the damage is based on questionable evidence and an assumption that the sewerage treatment ponds were inundated during the event. 8. The Applicant says he has provided evidence which shows that the ponds were not inundated during the event and he contends that the damage should therefore be covered under his policy. Determination Case No: 305472 Determination Page 2 of 8 Summary of FSP’s position 9. The FSP relies on evidence from its hydrologist which indicates that the damage to the Applicant‟s home was caused by water from Amby Creek which back-flowed along the sewerage pipes and up through the shower drain and toilet. 10. It says that the photographs provided by the Applicant do not include a date/time stamp and are therefore of limited use for the purpose of showing that the sewerage treatment ponds were not inundated during the flood event. 11. The FSP also dismisses the value of an email from an officer of the local council who advises that the sewerage treatment ponds were not inundated during the flood. 12. The Applicant offers no credible alternative for the backflow of water from his drains and consequently it has, on the balance of probabilities, proven its case that flood caused the damage. 13. The FSP relies on the following policy provisions: “ Words with special meanings ... “Flood’ means the inundation of normally dry land by water escaping, or being released from, the normal confines of a reservoir, natural watercourse or lake (whether or not they have been altered or modified). Flood also includes water discharge from any sewerage or waste water systems due to pressure induced by flood water. ... SECTION A – HOME COVER Subsections 1 & 2 – Building & Contents Cover What you are insured for We will pay for loss or damage caused by the Occurrences listed under Defined Events Cover or Accidental Damage Cover to your Building or Contents, depending on the cover types you have selected. The Schedule shows if you have insured Building(s) and/or Contents, and the cover type selected by you. ... Accidental Damage Cover We will pay for Accidental Loss or Damage to your Building or Contents at the Address other than the Occurrences or items referred to in “What you are not insured for”. ... All Subsections What you are not insured for Under Section A – Home cover we will not pay for: Case No: 305472 Determination Page 3 of 8 ... 2. Loss of or damage to you property caused by: a . Flood, the action of the sea, high sea water, tidal action or Tsunami; ... ” Issue 14. Whether the inundation of the Applicant‟s home was caused by flood. Reasons for decision 15. Due to the nature of the dispute, it has been referred to the Panel for Determination in accordance with the Operational Guidelines to the Financial Ombudsman Service‟s Terms of Reference. 16. This decision has been made by a Panel consisting of an Ombudsman and two Panel members with extensive experience in insurance industry matters and consumer claims. 17. There has been an exchange of information between the parties and the Panel is satisfied that each party has had an opportunity to address the issues raised. 18. It is an accepted principle of general insurance law that an insured bears the onus to show that they have suffered a loss caused by an event to which the policy responds. This is known as a prima facie claim. Once so established, the onus shifts to the i nsurer to prove that an exclusion applies if it seeks to deny or limit its liability for the loss. 19. There is no dispute that the Applicant‟s home was inundated with water which caused damage. The policy provides cover for accidental damage; it is not in dispute that the damage was unintended and unexpected and as such falls within the definition of accidental damage The Panel therefore accepts that the Applicant has a prima facie claim. 20. The onus now shifts to the FSP to prove the application of an exclusion, in this case “flood”. 21. The Panel notes that the FSP has accepted part of the claim which was due to storm damage and this dispute is only in respect of the damage resulting from the overflow of the shower drain and toilet, which the FSP says falls within the flood exclusion. 22. The Panel also notes the Applicant‟s confirmation that he was aware his policy did not provide cover for flood. Case No: 305472 Determination Page 4 of 8 Cause of damage 23. The FSP has provided a report by hydrologist “W” which was produced after an inspection of the Applicant‟s property on 13 July 2012 and a review of the data on rainfall, drainage and local topography. 24. W provided the following report of the Applicant‟s version of events with respect to the inundation of the laundry and bathroom of the home:  He could not recall the exact time that water began to flow out of the shower drain and toilet in the lower area of the house but believes it first occurred at around lunchtime on 3 February 2012.  During the event, water from the creek only reached the clothesline in the yard and there was water at the far (northern) end of C Street and it was flowing in the gutters but did not overflow into his yard.  His home is connected to town water supply and sewerage networks and the wastewater treatment ponds are located to the south of the railway line, approximately 500m south of the house. 25. The report by W included the following about the extent of the damage to the Applicant‟s home:  The laundry and bathroom, which have a floor level similar to the adjoining ground level, were inundated to a shallow depth during the February 2012 event.  The Applicant advised that the main living area of the house, which is elevated by at least 400 mm above the laundry and bathroom, was not inundated.  The Applicant also reported that cracks had appeared in some walls and floors on the house since the event, as well as prolific growth of mould on the ceilings. 26. W examined data from the available rainfall stations closest to the property, including from Richland Hill (7.1 km north-west of the property) and Mitchell TM (21.2 km north-north-west of the property). Only the latter of these stations recorded sub-daily totals. 27. W provided the following analysis of the rainfall in the Mitchell area:  Rainfall intensities during the period 1 to 3 February 2012 for storm durations up to and including 3 hours were not severe and had an Average Recurrence Interval (ARI) of less than 1 year. Rainfall of this intensity would be experienced, on average, every year.  For durations between 6 hours and 12 hours, ARIs were between 1 and 5 years.  For durations between 24 and 72 hours, the ARIs were between 5 and 50 years.  According to W, as the daily rainfall totals recorded at Richland Hill and Mitchell TM rainfall stations over the period 1 to 4 February 2012 were Case No: 305472 Determination Page 5 of 8 similar, it is expected that the rainfall severities in the vicinity of the Applicant‟s property would have been similar to those recorded at Mitchell TM. 28. With respect to the property location and the drainage behaviour in the area, W reported the following:  The property is located on the western floodplain of Amby Creek, which is a tributary of the Maranoa River and flows in a southerly direction along the property‟s eastern boundary approximately 70 m from the east side of the house.  The stormwater catchment draining to the lower area of the house on the property is small and consists of only the yard of the property itself.  Stormwater can flow in kerb and channel along C St towards the property, however, there is a portion of elevated land between the street drainage and the lower area of the house. 29. The report by W provided the following regarding the creek water levels:  There is no water level data available for Amby Creek at Amby outside the period 30 January to 4 February 2012.  Amby Creek levels are manually recorded and the Applicant advised that he is the person responsible for reading the gauge boards and reporting the date to the Bureau of Meteorology (BoM) via the internet.  The Applicant also advised that his landline and internet connection failed during the event which is why there is no official BoM data after 9am on 3 February 2012.  A final water level reading of 8.0 mGH (gauge height) at approximately 6pm on 3 February 2012 was obtained from the local council media release.  The Applicant indicated that he believes that the water level in Amby Creek at Amby peaked at approximately 8.0 mGH between 11.30am and 2pm on 3 February 2012.  Information from BoM indicates that Amby township would begin to be inundated when the Amby Creek water level reaches a trigger level of 7.0 mGH at the Amby gauging station.  Amby Creek reached this major flood event level of 7.0 mGH at approximately 7am on 2 February 2012 and remained above this level for more than 2 days.  The peak water level was converted from mGH to Australian Height Datum — mAHD — using the gauge zero value at the Amby Creek gauging station of 339.54 mAHD. Using this conversion, the peak water level of Amby Creek at Amby was 347.54 mAHD.  An approximation of the extent of flooding in the vicinity of the Appli cant‟s property during the February 2012 event was estimated using available topographic data and the estimated peak water level of Case No: 305472 Determination Page 6 of 8 8.0 mGH. Based on this approximation, the eastern boundary of the property is within the flood extent. However, the house itself is outside the flood extent. 30. In the findings section of the report, W concluded the following:  The lower area of the house at the property was not inundated above floor level by direct overland flow of floodwater from Amby Creek.  Based on available rainfall data and weather radar imagery, it appears that rainfall in the Amby area ceased at around 9am on 3 February 2012.  The Applicant believes that water started surcharging from the shower drain and the toilet in the lower area of the house at around lunchtime on 3 February 2012, which is at least 3 hours after the rainfall in the area had ceased.  Based on the reported timing of the inundation, the low intensity of the rainfall and the size of the catchment, stormwater runoff could not have inundated the lower area of the house above floor level.  Generally, if water and wastewater treatment plants (including treatment ponds) are inundated by floodwaters overflowing from a watercourse, it is possible for the floodwater to back up along the water and sewerage pipe networks and surcharge through the manholes, street drains and internal house drains and toilets.  An aerial photograph of Amby Creek shows an area south of the railway line (including the water treatment ponds) was inundated at the time the photo was taken. The local council which supplied the photograph, has (according to W) confirmed that it was taken on 3 February 2012 and from the water level shown at the Applicant‟s property, it is considered likely that it was taken prior to the peak flood level.  It is likely that the water seen surcharging from the shower drain and toilet in the lower area of the house was floodwater from Amby Creek that had backed up along the sewer pipe network. 31. The Applicant has disputed the conclusions from W, particularly with respect to the inundation of the wastewater treatment ponds. He has questioned the date and time at which the photograph — upon which the FSP relies to establish that the ponds were inundated — was taken and he has provided alternative photographs of the area showing the ponds free of inundation. 32. The FSP in turn has questioned the timing of the photographs provided by the Applicant. 33. The Panel is of the opinion that due to the uncertainty of the timing of the photographs provided by both parties, it would be inappropriate to rely on either set of photographs to establish whether and if so, when the wastewater treatment ponds were inundated during the February 2012 floods. Case No: 305472 Determination Page 7 of 8 34. The Applicant has provided a copy of an email from „TP”, the Manager, Utilities at the local council who states the following: “We did not receive any calls regarding the Amby sewerage system during the floods of 2012. Also in regards to the Amby separation ponds, these ponds were not inundated by flood water during the floods.” 35. The FSP says that the email from TP does not, by itself, displace the evidence it has provided. It says that the Applicant should obtain a statutory declaration from TP in which he sets out the basis for asserting that the ponds were not inundated. 36. The FSP a lso says that the Applicant should obtain a statement from TP‟s managing officer which confirms that his statement is true and accurate and that the Council is prepared to stand behind it. 37. In addition, the FSP states that the Applicant has provided no credible alternative explanation for the backflow of sewerage/water from the drain and toilet in his home, so concludes that it has proven its case. 38. The Applicant has also provided a copy of a draft Flood Hazard Mapping report for Amby, dated October 2012 and sourced from the Queensland Reconstruction Authority, in support of his position that the wastewater treatment ponds were not inundated during the February 2012 floods. 39. As outlined earlier in this Determination, the Applicant‟s policy provides accidental damage to his home and contents and the Panel has accepted that he has a prima facie claim under the policy. 40. Accordingly, the onus is not on the Applicant to provide a credible alternative for the cause of the damage; the onus is instead on the FSP to pro ve that flood was the cause and in these circumstances, that onus is absolute. 41. The Panel recognises that the email document provided by the Applicant from TP is not a sworn statement. However, the Panel does not agree with the FSP‟s implication that because of this and without a document from TP‟s manager to confirm TP‟s statement, the email document carries little or no weight. 42. At the very least, the email from TP creates some doubt on the conclusion reached by W regarding the inundation of the Amby waste water treatment ponds. 43. The Panel has reviewed the Flood Hazard Mapping report provided by the Applicant. The report has used the February 2012 flood event as a baseline and designated this event to have a 2.8% Annual Exceedance Probability (AEP). The report includes a map of the area with overlays showing events with AEPs of 2%, 1% or 0.5%; these are effectively 1-in-50 year, 1-in100- year and 1-in-200 years events. The Panel notes that the Amby wastewater treatment ponds would not be inundated in any of these modelled events. Case No: 305472 Determination Page 8 of 8 44. The Panel notes that the Flood Hazard Mapping report is a draft and is based on modelling and as has been disclosed in the report itself, has a level of uncertainty associated with it. Nevertheless, this document serves to cast further doubt on the conclusion regarding the inundation of the ponds. 45. There is no dispute that the Applicant‟s home was not inundated by direct overland flow of floodwater from the creek . 46. After carefully reviewing material provided by both parties, the Panel is of the view that neither party has established with any degree of certainty the cause of the water inundation from the shower drain and toilet. 47. As noted earlier, although the Applicant has failed to establish the cause of the loss claimed, the onus is not on him to do so. 48. The FSP has relied on W‟s conclusion that the overflow was caused by the inundation of the wastewater treatment ponds, however, the Panel is not persuaded that the FSP‟s evidence is sufficiently sound to establish on the balance of probabilities, that this was the cause. 49. Given there is a prima facie claim on foot, in the absence of such evidence, the FSP has failed to establish that the damage was caused by the excluded event, flood. 50. Accordingly, the Panel finds that the FSP is liable for the damage as a result of water inundation to the lower area of the Applicant‟s home. Determination 51. On the basis of the available information the Panel determines that:  The FSP has failed to discharge its onus to prove that floodwater was the cause of the inundation damage to the Applicant‟s home; and  The FSP is liable for this damage. 52. The FSP is required to work cooperatively with the Applicant to arrange for an assessment of the damage and arrive at a settlement. 53. Pursuant to Section 57 of the Insurance Contracts Act 1984, where the FSP cash settles any part of the claim, it is required to pay statutory interest from 30 August 2012, being the date of the FSP‟s initial decline letter with respect to this portion of the claim.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.