Case No: 305267 Determination Page 1 of 8
Case number: 305267
General Insurance - Domestic Insurance - Home Building - FSP Decision -
Denial of claim-Exclusion/ condition
22 April 2013
Background
1. The Applicant held a home insurance policy with the Financial Services
Provider (FSP) for his tenanted property, which was a unit. The policy was
arranged through a broker. The relevant period of insurance operated for
twelve months beginning from 31 January 2011.
2. The broker lodged a claim with the FSP on 12 December 2011 due to
damage sustained to the gyprock and internal wall of a bedroom that
occurred on or about 27 November 2011. The tenant had been away when
the damage occurred. The damage was caused by a large rock breaking
away from the embankment and falling against the bedroom wall.
3. The FSP initially declined the claim. However, upon disputing the FSP‟s
decision through its internal dispute resolution (IDR) process, the FSP
accepted liability for the damage sustained to the internal walls but
maintained its denial for the rectification to the excavation face.
4. The Applicant has disputed the FSP‟s decision.
Summary of Applicant ’s position
5. The Applicant is represented by his broker in this dispute. For the sake of
convenience, reference to the Applicant will include his broker.
6. The Applicant has submitted the following in disputing the FSP‟s decision:
The FSP‟s decision to accept liability for the internal damage but not for
the damage to the excavation face is completely contradictory.
There is no dispute that a storm event has occurred which resulted in
the landslide.
There was no faulty workmanship evident, particularly given the
damage occurred following a severe storm event, the building was
constructed by a reputable and competent builder 15 years ago and
passed all required council and building inspections.
Determination
Case No: 305267 Determination Page 2 of 8
Even if faulty workmanship and/or inherent defects were evident,
section 46 of the Insurance Contracts Act 1984 (the Act) would
preclude the FSP from relying upon same.
7. As the Applicant has rectified all of the damage, he is seeking
reimbursement of the sum of $26,265.65. This is comprised of the total
amount spent ($30,826.40) less excess ($250) and payment received from
the FSP for the accepted portion ($4,310.75).
Summary of FSP’s position
8. The FSP notes that section 46 of the Act has no operation as the relevant
policy exclusion contains no temporal reference to the condition pre-existing
entry into the contract of insurance.
9. Accordingly, the FSP submits it can maintain its decision based on two
reports provided by engineer RW as well as the following policy provisions:
“ How we will pay
Home...
(d) If part of a home is damaged by an insured event and we agree to pay
your claim, we pay only for the part or parts of the home that actually
sustained damage. We do not pay to replace any undamaged
materials.
...
Additional exclusions applying to this Policy ...
This Policy does not cover: ...
(b) loss or damage resulting from or caused by:
...
inherent defects, structural defects, faulty workmanship, faulty
design or any gradual process
...
erosion, subsidence, landslide or earth movement other than as
provided in Insured event (n).”
Issue
10. Whether the FSP is entitled to deny liability for the damage sustained to the
excavated face.
Reasons for decision
11. As advised to the parties, FOS has considered it appropriate to expedite the
dispute in accordance with clause 8.6 of the FOS Terms of Reference. This
Case No: 305267 Determination Page 3 of 8
is due to the quantum and complexity of the dispute. This dispute has not
been the subject of a FOS Recommendation and has proceeded directly to
Determination.
12. I am satisfied that a full exchange of information has taken place between
each party and that each party has had the opportunity to address any
issues raised.
13. The onus is on the Applicant to establish, on the balance of probabilities, that
he suffered a loss caused by a risk insured against. Once this has been
established on the face of the facts (i.e. he has established a prima facie
claim), the onus shifts to the FSP to show, on the balance of probabilities,
the claim falls within an exclusion of the contract of insurance
14. The relevant insured event the Applicant is claiming under is as follows:
“You are insured against loss or damage caused directly by the following
insured events ...
(n) Erosion, subsidence, landslide or earth movement but only if it is
directly as a result of one of the following insured events:
- ...
- (b) storm.”
15. The FSP has not disputed that a storm event has occurred. In particular, it
has accepted liability for a portion of the damage claimed as a result of this
event. Accordingly, I am satisfied that the Applicant is able to establish a
prima facie claim.
16. The onus is therefore on the FSP to establish the applicability of an
exclusion clause.
Expert Evidence
17. Both parties have provided two experts from two engineers (DW & RE).
DW‟s first report was dated 22 March 2012 and contained the following
comments of relevance:
“Whilst excavation faces of this nature are common ly found in residential
developments, in our opinion they are unsatisfactory as they are unstable in
the long term and continually „frett‟ and fall away. This in fact is the case in
this instance and a „slip‟ has occurred, allowing the rock boulder to disl odge.
This was likely to be caused by rain effects, with natural ground water flows
causing the „slip‟. In our opinion the original construction method of leaving
this unrestrained near vertical excavation surface is poor building practice,
and a safety concern. The base drainage is also not adequate in our view, as
a deeper spoon drain with adequate falls and a collection pit at one end,
should have been provided to collect natural ground water flows and
discharge these correctly.
...
The excavation face collapse in our opinion is due to inadequate original
construction techniques of some 15 years ago when constructed, resulting in
Case No: 305267 Determination Page 4 of 8
a steep excavation face, unrestrained, and general unsatisfactory base
drainage methods. This construction condition in our opinion is contrary to the
Home Building Act. Whilst we note this is commonplace to some residential
developments, it is considered poor building practice and is unsafe in the
longer term.”
18. The FSP emailed DW on 10 August 2012 seeking further clarification on a
number of points, namely:
“Which specific regulations of the Home Building Act or other legislation have
been breached?
Were these regulations already in place when the house was built some 15
years ago?
Have any Australian Standards (at the time) been breached? If yes, which?
How have these standards been breached?
Why did the Council not discover and address the breach and poor building
practice during the approval process?
19. DW responded to this in a report dated 20 August 2012 that stated the
following:
“1. ... We attach a copy of an extract of Section 18B – Home Building Act 1989
for your reference. In our opinion, the construction techniques used by the
original builder did not comply with paragraphs (a), (c), (e) & (f) of the Act.
2. The regulations that were in place were the Building Code of Australia,
released in 1990 and the Australian Standards referred to in that document.
The specific standard in our opinion was AS2870 – 1996, first released in
1986. We attach an extract from that Standard from Section 6, Clause 6.2 –
Permanent Excavations. This describes how excavations should be treated,
and in our view the builder did not comply with this Australian Standard.
3. The Australian Standard that was breached in our opinion was AS2870 –
1996 for the above stated reasons.
4. At the time of construction, Council Officers carried out mandatory
inspections of footings, raft slabs, wet areas of construction and other critical
components of residential construction. The experience of Council Officers
varied considerably at that time and whilst an experienced inspector may
have had an opinion on the excavation steepness, generally they would not
interfere with that particular aspect of construction. It is more the role of a
structural or geotechnical engineer and on small residential developments
such as this, the role of a structural engineer was limited and the use of a
geotechnical engineer, almost did not occur on small building sites.
Geotechnical engineers sometimes categorised sites, with reference to
AS2870 – 1996 to allow engineers or builders to choose a standard footing
system, which was the original intention of developing this Australian
Standard.”
20. RE‟s first report was dated 13 January 2012 but did not address the issue of
causation. His second report was dated 8 May 2012 and contained the
following comment on this issue:
“I am of the opinion that the preceding long period of rainfall eroded the soil,
weakening the soil layers resulting in the loss of the slops stability.”
Case No: 305267 Determination Page 5 of 8
Consideration of the evidence
21. In my view, when relying on an exclusion clause regarding faulty
workmanship/design or inherent/structural defects, the FSP must be in a
position to establish the following on the balance of probabilities:
There is a defect or evidence of faulty workmanship/design,
The extent of same, and
Whether this was the proximate cause of the loss.
22. DW‟s second report provided references to section 18B of the Home
Building Act 1989 and, in particular, section 6.2 of Australian Standards
2870-1996. This latter stated the following:
“Any vertical or near -vertical permanent excavation within 2m of the building
and deeper than 0.6m in material other than rock shall be adequately retained
or battered. The effects of excavations on drainage or foundation drying shall
be considered.”
23. The provisions quoted in the Home Building Act 1989 do not greatly assist in
identifying the extent of the breach. For instance, these provisions mainly
refer to the fact that the work should be performed in a proper and
workmanlike manner and reasonably fit for the purpose. They do not
specifically address what is required to be done with respect to the
excavation face. It would appear that in attempting to identify whether the
relevant defect exists and to what extent, the only document applicable is
section 6.2 of the Australian Standards 2870-1996.
24. It is not clear based on the available evidence whether this standard was in
place at the time of the property‟s construction or if it was, whether it was
breached. I base this on the following.
25. The property was constructed approximately 15 years prior to DW‟s initial
inspection, which was conducted on 22 March 2012. This would mean that
the property was constructed in 1997. Although that is one year after the
relevant year quoted by the Australian Standards (i.e. 1996), it is unclear
whether they were in effect that year. Further, it is unclear whether the
property was approved for construction in 1997. It may have begun
construction in 1996 and have been completed in early 1997.
26. DW did state the specific standard was released in 1986. Although he has
not provided any evidence to substantiate this, it has neither been refuted by
the Applicant. Accordingly, it is open for me to accept that this standard was
applicable at the time of the property ‟s construction although the evidence is
not overly persuasive in this regard.
27. However, even if I accept the standard was in place, it only states that the
excavation face should be adequately retained or battered. It does not
discuss drainage except to state that the effects of excavation on drainage
should be considered. Accordingly, despite DW stating there was
“unsatisfactory base drainage methods”, there was clearly drainage in place
Case No: 305267 Determination Page 6 of 8
and there is no evidence, beyond his opinion, that the drainage was
inadequate.
28. Although I accept DW has the appropriate qualification to comment about
the drainage methods utilised, I do not accept his view that they were
“unsatisfactory” leads to the outcome that they were faulty or defective. I
base this on the fact the Applicant constructed the home utilising a
professional builder and satisfying all the necessary council and building
inspections. Given this, and the fact that by DW‟s own admission, this type of
excavation face was common, I cannot accept that his comment that the
drainage was “unsatisfactory” can be considered a defect or faulty
design/workmanship.
29. Instead, his opinion appears to be more based towards best practice.
Although this is encouraged, it does not imply that a failure to follow best
practice results in the work being faulty or defective.
30. Given this, I do not accept that the drainage methods undertaken to the
property can be considered a defect or faulty workmanship/design and
therefore should not be considered in determining whether the exclusion
clause has been triggered.
31. This therefore leaves the sole remaining issue of the omission to restrain the
excavation face and whether:
This falls within the relevant exclusion, and
If it does, what type of restraint should have been in place, and
Whether the absence of this restraint was the proximate cause of the
Applicant‟s loss.
32. I note the relevant Australian Standard states that a vertical or near vertical
excavation should be “adequately” retained or battered if it is:
“within 2m of the building and deeper than 0.6m in material other than rock”
(my emphasis)
33. It is the latter part that has not been satisfactorily established in my opinion.
For instance, DW‟s report does not provide any analysis as to whether the
excavation face has material that is deeper than 0.6m which is not rock. In
particular, given the damage was caused by a “large rock boulder” and the
photographs contained in DW‟s report makes numerous references to rock,
it is reasonable to accept that rock forms a major part of this excavation face.
34. Accordingly, I do not accept the FSP has established that the excavation
face contained material deeper than 0.6m that was not rock. Given this, I
therefore cannot be satisfied that the omission to undertake any retaining or
battering methods breaches the relevant Australian Standard.
35. I am therefore not satisfied the FSP has established there was an inherent or
structural defect or that there was evidence of faulty workmanship/design.
This is particularly corroborated by the fact that such excavation faces are
Case No: 305267 Determination Page 7 of 8
common and the building was constructed by a professional builder which
passed all relevant council inspections.
36. Although I acknowledge DW‟s comments regarding why such a construction
method passed council inspections even though he considered it is poor
building practice, it does not override the fact that these construction
methods are commonly accepted. This appears to be contrary to the FSP‟s
position. That is, if I was to accept that the failure to restrain the excavation
face would be considered a defect and/or unsafe, it is a significant concern
that councils would generally approve such methods of construction without
requiring the owners to ensure the construction methods are approved by an
appropriately qualified structural or geotechnical engineer.
37. This would also imply that the council and builders who have all followed and
approved this common practice have done so in consistent breach of safety
and building standards. This is somewhat difficult to accept on the face of it.
38. Accordin gly, despite DW‟s comments that the lack of restraint constitutes
“poor” building practice, I am not satisfied this constitutes a defect or faulty
workmanship. “Poor” is not synonymous with “faulty” and in circumstances
when such a practice is common, is followed by a qualified builder and
approved by council; I cannot accept that it should be considered “faulty”.
39. I am therefore not satisfied the FSP is able to establish the existence of a
defect (inherent or structural) or evidence of faulty workmanship/design with
respect to the excavation face. Given this, and the fact I am satisfied that the
evidence establishes rain was a causal factor in its collapse, I therefore
accept the FSP is liable for all of the damage.
40. Further and in the alternati ve, even if I was to accept that the failure to
restrain the wall constituted a defect, I am not satisfied that the evidence is
sufficient to establish the engagement of the exclusion clause. In particular,
the relevant standards state that the excavation face should be “adequately
retained or battered”. DW does not stipulate the extent of such.
41. Although DW concluded the damage was due to the fact the construction
was poor and inadequate, this is not the relevant test. Instead, the exclusion
clause requires there to be a proximate causal link between the defect or the
faulty workmanship/design to the loss.
42. In order to satisfy this burden, the FSP was required to establish, through its
expert, the extent of the defect or faulty workmanship/design. Once this was
done, the expert should then have been asked to determine the minimum
construction method that should have been undertaken to avoid breaching
these provisions and from there, determine whether the loss would have
avoided if these were in place.
43. The available evidence does not do this. Instead, DW concluded that the
collapse was due to “inadequate original construction techniques … and
general unsatisfactory base drainage methods”. As stipulated previously,
there is no evidence to suggest that the drainage methods were either defect
Case No: 305267 Determination Page 8 of 8
or faulty. Accordingly, his reference to this aspect of the construction is
irrelevant to the issue of whether the exclusion is engaged.
44. With respect to DW‟s comment of there being “inadequate original
construction”, again thi s is insufficient. The exclusion does not discuss
“inadequate” but rather defects or faulty workmanship/design. Inadequacy, in
the opinion of one expert, does not automatically infer faultiness and
defectiveness for the purposes of the exclusion clause.
45. The onus was on the FSP to establish the applicability of the exclusion
clause. However, given DW has not conclusively established that the loss
was caused by a factor excluded by the policy, I am not satisfied the FSP is
able to do so.
46. The Applicant has provided invoices and quotations to substantiate the
amount of money he spent repairing and rectifying the damage. There is
nothing to refute that the amount spent was fair and reasonable. Given this, I
accept the Applicant is entitled to the amount sought, being $26,265.65, in
addition to interest pursuant to Section 57 of the Act.
47. One other matter should be mentioned in considering whether this damage
arose as a result of “inadequate original construction techniques”. The house
had been erected fifteen years earlier, yet it was not until the extreme
weather events culminating on 27/11/11 that the boulder broke away and
caused the damage. In these circumstances, it is harder for the FSP to rely
upon the exclusion.
Determination
48. On the basis of the available information I determine that the FSP pay to the
Applicant the following amounts in full and final settlement of this dispute:
The sum of $26,265.65.
Interest on the above amount in accordance with the Section 57 of the
Act from 20 January 2011 (being the date the FSP initially denied
liability) to the date when payment is affected.
49. In the event the Applicant accepts this Determination, the FSP should pay
the appropriate sum within 14 days of being notified of the Applicant‟s
acceptance.