Summary

After a fire damaged their home and contents, the applicants sought demolition and rebuild and full contents payment. AFCA rejected the rebuild, ordered repair with mould remediation, ordered the contents sum insured and temporary accommodation paid with interest, and awarded $1,500 for delay.

Repair is adequate under the policy where an independent asbestos report proposes appropriate remediation, while the FSP's delay in assessing contents was unreasonable.

Issues

Subjects and remedies

home or building damagepay claimpay interestpay non financial lossrepair or rectify

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Case No: 305173 Determination Page 1 of 15 Case number: 305173 General Insurance - Domestic Insurance - Home Building and Contents – Assessment of damage to building - Service - Delay in claim handling 2 October 2013 Background 1. The Applicants held a home and contents insurance policy with the Financial Services Provider (FSP). 2. The policy, which provided defined events cover, had a sum insured of $400,000 for their home building and a sum insured of $150,000 for their contents. 3. While they were overseas on holiday in December 2011, a fire damaged their home and contents and they lodged a claim with the FSP. 4. The FSP investigated the circumstances of the claim and subsequently accepted liability for the damage. 5. Although having various difficulties providing proof of ownership and value of some of their contents, the Applicants provided further information in that regard to the FSP. However, to date the FSP has not completed its assessment and the contents claim has not been settled. 6. T he Applicants have rejected the FSP’s proposal to repair their home. They want the house demolished and rebuilt as they believe this is the only way to eliminate the hazardous and toxic materials which are now present in their fire damaged house. Summary of Applicants ’ position 7. The Applicants are represented by the mother of the female Applicant and for simplicity and convenience, both the Applicants and their representative will be hereafter referred to as “the Applicants”. 8. The Applicants say that soot and smoke from the fire has affected every room in the house and they have evidence which shows that this represents a health risk to them and their family. 9. In addition, the materials from which the house is constructed include asbestos and this has been affected by the fire. They have evidence which Determination Case No: 305173 Determination Page 2 of 15 indicates that asbestos which has been fire affected becomes friable and therefore a high risk to people. 10. Further, the fire in December 2011 was extinguished using water and since that time, mould has been allowed to build up in and around their home and this is also a serious health risk. 11. For these reasons, they do not accept the FSP’s position regarding the repair of their home and want the FSP to demolish the existing, damaged house and rebuild it. 12. With respect to the contents of their home, the Applicants say that they purchased many items for cash. They say that any receipts and photographs they may have had to prove their ownership and the value of their contents did not survive the fire. 13. However, they have obtained some photographs of their possessions and provided these to the FSP, along with copies of bank statements and quotes for the replacement of many items. 14. They note that the FSP has accepted liability for the lost or damaged contents but do not understand why the settlement of this aspect of their claim has not been effected by the FSP. Summary of FSP’s position 15. The FSP says it accepted liability for the damage to the Applicants’ home building and in accordance with the policy, it elected to repair the building rather than cash settle that part of the claim. 16. It says that it has obtained a report from hygienist “IE” which has identified the asbestos containing materials at the home, the damage to those materials, and confirms the extent of the asbestos contamination within the home. 17. The scope of works and the quotation of the repair of the Applicants’ home have been amended in line with the conclusions of the report by IE. 18. It says that it has reviewed the reports provided by the Applicants in support of their contention that the building needs to be demolished and rebuilt but maintains its view that the house is fit to be repaired and awaits approval from the Applicants to commence the work. 19. With respect to the contents claim, the FSP says that it is reviewing the additional information provided by the Applicants and is awaiting the assessment from its loss adjustor, “C”. 20. The FSP relies on the following policy provisions: “ Your proof of ownership Case No: 305173 Determination Page 3 of 15 At the time of making a claim if this policy insures your contents, you will need to provide evidence of value. We will require evidence of value for high risk items or valuables whether specified on the policy or not. This evidence can be a combination of: Receipts; A recent valuation provided by an Australian qualified valuer; Instruction manuals; Guarantee or warranty certificate; Catalogues; Make, model and serial number; Photographs or video film of the item. Proof of valuation – Jewellery, gold or silver articles Jewellery, gold or silver articles, regardless of whether they are specified contents or specified valuables, must have the valuation as listed in the table below. If the evidence required by us is not provided, your claim will not be processed. Item value Required proof of ownership Less than $1,499 No valuation required, only proof of ownership at the time of a claim. $1,500 up to $14,999 A valuation dated prior to the date of loss required to be provided at the time of lodging the claim on the item. ... ... What you are covered for Your [FSP] policy insures you up to the amount of the sum insured for loss or damage to your building and/or contents caused by an insured event listed below. Your schedule will indicate if you have insured your building, your contents or both. Insured event Fire We will cover:  Damage to your building and/or contents cause by fire. We will not cover:  Damage cause by charring, melting or scorching as a result of a fire without the presence of flames;  Damage to a heat resistant item and any fittings or attachments on or in these items if the fire only caused damage to that item. Case No: 305173 Determination Page 4 of 15 Examples of heat resistant items are a cooking appliance, iron, toaster, microwave oven, heater, clothes dryer, electric kettle, chimney, fireplace, heater, oven, potbelly stove. ... ... Your standard benefits This policy insures you for standard benefits set out in this section. We pay these standard benefits as part of the sums insured for building or contents depending on the type of cover your have chosen unless otherwise stated. Benefit Description ... Accommodation costs If this policy insures your building, we will cover: The reasonable costs you incur for similar accommodation while your building is being rebuilt, repaired or replaced if you live in your building, or ... if we have accepted a claim following damage to your building and we agree that the building is not fit to live in. ... Limit: The maximum we will pay for temporary accommodation or lost rent is the lesser of: The time it would take to repair or replace your building (or home) provided work commences as soon as practicable after the incident, or 12 months from the date of the damage, or 10% of the sum insured, or If this policy insures your building and you elect not to replace your building, the time it would have taken to repair or replace your building had you elected to do so. This benefit is in addition to the sum insured. ... How we settle your claim Your building What we pay Case No: 305173 Determination Page 5 of 15 If this policy insures your building and we accept your claim, at our option we will pay for the reasonable cost of: repairing, rebuilding, or replacing, your home at the site to its condition when last renovated, altered or restored. We will only pay for damaged parts If we accept a claim, we will only pay for the part of the home that has been damaged. We will not pay for undamaged parts of the home in order to achieve a uniform appearance. We will repair up to the nearest archway, doorway or similar entry and exit point. We will not pay for undamaged materials in adjoining rooms. ... We will not pay:  for the portion of these building costs which relate to the undamaged parts of your building;  to upgrade your building if it is over insured;  to modify your building to rectify a fault that is causing loss or damage to your building under the policy. ... You contents and/or valuables What we pay If this policy insures your contents or your valuables and we accept your claim, at our option we will pay for the reasonable cost of: repairing; replacing, or pay you what it would cost to repair or replace, your contents.” Issues 21. Whether the FSP is required to demolish and rebuild the Applicants’ home. 22. Whether the FSP is required to proceed with settlement of the Applicants’ contents claim. 23. Whether the FSP is required to pay the Applicants’ temporary accommodation costs. Case No: 305173 Determination Page 6 of 15 Reasons for decision 24. Due to the nature of the dispute, it has been referred to the Panel for Determination in accordance with the Operational Guidelines to the Financial Ombudsman Service’s Terms of Reference. 25. This decision has been made by a Panel of three decision makers including an Ombudsman and two decision makers with extensive experience in insurance industry matters and in consumer claims. 26. There has been an exchange of information between the parties and the Panel is satisfied that each party has had an opportunity to address the issues raised. 27. It is not in dispute that: fire damaged the Applicants’ home and contents in December 2011; the FSP is liable for the damage to both the home building and to the contents; and the Applicants’ home was not able to be lived in as a result of the damage. Building claim 28. The FSP arranged for loss adjustor “C” to assess the damage to the Applicants’ home and after investigating the circumstances of the claim, decided on 16 July 2012 to accept liability for the damage. 29. Building consultants “E” prepared a scope of works and this was used to obtain quotations from builders for the repairs. The FSP selected the more competitive of the two quotations obtained and engaged builder “CJD” to begin repairs to the building. 30. However, the Applicants objected to the decision by the FSP to the proposed house repair, on the basis that they believed that the fire had caused health and safety issues which could not be rectified by merely repairing the building. Reports provided by Applicants 31. The Applicants have provided several documents with general information about the risks associated with asbestos. These include: a research paper titled “Asbestos Contamination of Land – Reporting Obligations of Building Contractors” produced by Master Builders Australia Ltd; a guidance note titled “Asbest os- contaminated soil” produced by Worksafe, NSW; Case No: 305173 Determination Page 7 of 15 a document titled “Asbestos Blueprint – A guide to roles and responsibilities for operational staff of state and local government” produced by the NSW government; an information sheet titled “Management of Small Scale, Low Risk Soil Asbestos Contamination” produced by the Australian Capital Territory government; and a document titled “Asbestos – A guide for householders and the general public” produced by the Commonwealth Department of Health. 32. The Applicants have also provided a special purpose building report, produced by “CS” after an inspection of their damaged home on 15 February 2013. The report by CS identified several parts of the building which may contain asbestos, however, disclosed that “[CS] are n ot qualified in the detection of asbestos materials...”. 33. The Applicants also provided a scope of works and quotation for the remediation of the home produced by “MR”, a firm specialising in mould inspection, testing and removal. The report by MR noted that there were “severe levels of soot and visible mould” inside the house. With respect to any risk associated with asbestos, MR limited its comments to a note that “there is an obligation to have testing and certification for asbestos”. 34. The Applicants have also provided a report by the building consultancy firm “EB”, produced after an inspection of their home on 14 February 2013. The report by EB noted that the dwelling has been fire damaged and some of the asbestos sheets were broken and exposed, and strongly recommended that these sheets be removed for health safety purposes. 35. Two quotations for the demolition and rebuild of their home have also been provided by the Applicants. Reports by FSP 36. The FSP, in response to the objection by the Applicants to the proposed repair of their home, obtained a report by environmental services firm “S” with respect to a survey of asbestos containing materials at the Applicants’ home. 37. The author of the report from S, Licensed Asbestos Assessor and Occupational Hygienist “IE”, inspected the Applicants’ home on 15 May 2013 with a representative from the FSP’s building consultant, E. 38. The “Conclusions and Recommendations” section of the report by S included the following: “ House interior Asbestos fibre cement walls to kitchen (approximate total of 55 m 2 ) – no evidence of cracks or palling as a result of fire. Soot was observed covering the entire exposed surface. Structural integrity possibly affected by heat as close to fire source. Case No: 305173 Determination Page 8 of 15 Asbestos fibre cement walls to study room (approximate total of 36 m 2 ) – no evidence of cracks or palling as a result of fire. Soot was observed covering the entire exposed surface. Structural integrity unlikely to be affected by heat as location is not close to fire source and other materials not burnt/melted within room. House exterior Flat fibre cement sheets to external walls (cement rendered to front area) assumed to contain asbestos (approximate total of 141 m 2 ) – Cracks were observed throughout. No palling observed in sheets where accessible. Sheets show signs of soot around doors and windows. No signs of soot within wall cavity at rear section but found near kitchen through a hole. Structural integrity and cracks unlikely to be affected by heat at most points. As the fire occurred 18 months ago it cannot be fully confirmed that some cracks on the north side wall (35 m 2 ) did not occur due to thermal expansion by fire. Sheets to east, west and south elevation are likely to be damaged by fire (106m 2 )[sic]. Flat fire cement sheets to eaves (approximate total of 15m 2 ) – No cracks or palling observed in sheets where accessible. Severe paint deterioration observed due to weathering. Light soot layer observed on surfaces. Structural integrity unlikely to be affected by heat as location is not close to fire source. Flat fibre cement sheets to walls of external toilet (approximate total of 14m 2 ) – Localised cracks and severely faded paint were observed throughout. No palling observed in sheets where accessible. No signs of soot on sheets. Damage to sheets identified not fire related. Fragments of fibre cement sheet observed on grounds near wall at south west corner of the dwelling.” [sic] 39. The report also noted the following to be the fire damage work required: “ The following ACM were found to be or likely to be affected by fire damage which cannot be restored by cleaning and require removal and replacement: Internal walls of kitchen (lining of all walls) Damaged section (large hole) of laundry, lining of west wall at entry to laundry External wall to northern elevation (entire wall).” The following ACM were found to be unlikely to be structurally damaged by fire and only covered by soot which require cleaning by an approved surfactant and encapsulation under fully controlled conditions by a competent contractor: Internal walls of study room Internal walls and ceiling lining of laundry (except damaged wall section noted above to be removed) Case No: 305173 Determination Page 9 of 15 Status unconfirmed for majority of ACM external wall for surfaces within wall cavities (eastern, western and southern elevation). These need to be checked and cleaned/encapsulated if required. Note that any level of residual soot within wall cavities if not removed may emit odours in the fut ure.” 40. Further, the report by S included the following specific recommendations for all asbestos containing materials (ACM) found: Remove all identified asbestos considered damaged by cracks and exposed edges and severely deteriorated by weathering including fibre cement fragments at all locations shown on the asbestos register noted with P1 priority action. Encapsulate or paint unsealed asbestos fibre cement materials where found with localised [sic] with exposed surface or edges and where surfaces are unpainted at all locations shown on the asbestos register noted with P1 priority action. 41. The FSP also provided an updated scope of works (produced by E) and a revised quotation (produced by CJD) which take into account the recommendations included in the report by S. Consideration of the evidence 42. The Panel has considered the submissions provided by both parties. Asbestos 43. The evidence provided by the Applicants highlights that under certain circumstances, the risks to human health associated with asbestos is high. 44. The information from the Applicants indicates that asbestos is present within their home: The report by CS indicated that parts of the building may contain asbestos, however, noted that CS is not qualified in the detection of asbestos materials. The report by EB stated that the house was fire damaged and identified that there were several asbestos sheets which were broken and exposed and strongly recommended that they be removed for health and safety purposes. However, the Panel notes that EB has not indicated whether the fire caused the damage to all the asbestos sheets at the Applicants’ home. 45. The report by S is an assessment of the condition of all the asbestos at the home (although it is noted that some areas of the home could not be accessed or inspected) and includes a risk assessment based on a methodology which factors in various attributes of the asbestos, including: friability; Case No: 305173 Determination Page 10 of 15 extent of damage or deterioration; surface treatment; asbestos type; occupant activity; likelihood of disturbance; human exposure potential; and maintenance activities. 46. Further, the report by S makes an assessment of whether the fire at the Applicants’ home caused the damage to the asbestos found. 47. The Panel notes that IE, the author of the report by S, is appropriately qualified to perform such an asbestos assessment and does not accept the Applicants’ claim that IE is not independent. 48. The Panel accepts that asbestos in the environment presents a risk to the health of humans. However, it cannot be disputed that the Applicants’ home (like many homes of the same age) contained asbestos — which the Applicants were exposed to, with some degree of risk — before the fire occurred. 49. The central issue for the Panel to consider is the extent to which the proposed repairs to the fire damage will increase the risk to the Applicants and whether the remedial action proposed by the FSP will appropriately control any increase in asbestos risk caused by the fire. 50. After reviewing the submissions, the Panel finds that the report by S is the most comprehensive and balanced of all those presented. It takes a relatively conservative approach to the identification of asbestos; where it is not clear that material includes asbestos, S has assumed that it does. 51. It recommends the removal of asbestos sheeting in the kitchen, the laundry and the northern external wall of the home. For areas which were assessed as being unlikely to be structurally damaged by the fire and only covered in soot, the report by S recommends cleaning by approved surfactant and encapsulation under fully controlled conditions. 52. Although the Applicants have indicated that they are very concerned about the asbestos risk to their health which may be caused by the proposed repairs to the fire damage to their home, the evidence they have provided does not substantiate their concerns in this regard and fails to convince the Panel of the need to demolish and rebuild their home. 53. Accordingly, the Panel is of the view that the proposal by S provides an appropriate solution to manage the risk to the Applicants associated with asbestos, and as proposed, the repairs include appropriate remediation of any identifiable issues with damaged asbestos. Case No: 305173 Determination Page 11 of 15 Soot and mould 54. The Applicants have also expressed concern about the health risks from the soot from the fire and the mould which has developed in the house since the fire was extinguished. 55. The report by MR indicates that parts of the house had severe levels of soot which, in the Panel’s view, is only to be expected when a fire causes damage within a home. 56. The report by MR also indicates there is “visible mould” in the house but unlike its description of the level of soot in the house, the mould is not described as “severe”. The report also does not identify where within the home this mould is visible. 57. The Panel notes that the report by S specifically addresses the soot contamination in the house. Further, the scope of works involves the removal and replacement of many of the affected areas of the home and which, it is reasonable to assume will deal with any soot present in the home. 58. The report by S indicates that any residual soot within the wall cavities may emit odours if not removed, and accordingly the Panel requires that during the course of repairs, any such soot is identified and removed by the repairers. 59. With respect to the mould within the home, the Panel accepts the Applicants’ argument that since the fire, some mould has developed within the home. 60. As with the issue of soot in the home, the Panel would expect that the removal and replacement of many of the affected materials in the home would reduce or eliminate the mould which has developed. 61. The Panel confirms that repair of the Applicants’ home in line with the scope of works produced by E is sufficient for the FSP to meet its obligations under the policy and there is no requirement for the FSP to demolish and rebuild the Applicants’ home. 62. However, the Panel also requires the FSP to perform an inspection of the home after the completion of the repairs to identify any mould which remains within the home and based on that inspection, undertake appropriate remediation. Contents claim 63. The FSP arranged for C to perform an initial assessment of the contents claim, although it has not provided a copy of any report from that assessment. 64. Subsequently, the FSP investigated the circumstances of the fire and in the course of this investigation, requested that the Applicants provide, among Case No: 305173 Determination Page 12 of 15 other things, evidence of ownership and value of the contents items which were lost or damaged in the fire. 65. The Applicants experienced difficulty in providing the evidence requested by the FSP. They say that they paid cash for many of the contents items and that the fire destroyed receipts and other evidence of ownership they may have had, including photographs. 66. Nevertheless, they have managed to obtain various photographs of some of their contents items and have also provided to the FSP invoices and copies of bank statements. 67. In its submission of 24 June 2013, the FSP stated that it had accepted the Applicant s’ contents claim and was “currently assessing the further information provided by the Applicants”. It said that C was reviewing this information and it hoped to receive C’s assessment “in one week”. 68. The Panel notes that the Service’s Case Manager emailed the FSP (through its solicitors) several times including on 1 August 2013, at which time an update on the status of the contents claim was requested. A further email was sent to the FSP on 6 August 2013, stating that as there had been no response to earlier emails, the matter would be put to the Panel for decision based on the information available. 69. The Panel finally received a further submission from the FSP’s solicitors on 16 September 2013 with the report from C and two appendices. The FSP has maintained its position that the Applicants have provided insufficient proof of ownership in respect of a number of items claimed. No offer has been made for the balance of the items. 70. The Panel notes that the report from C is dated 13 September 2013. It refers to its previous report, its 7 th report dated 13 August 2013. None of the earlier reports have been made available to the Service. The FSP has provided no reason for this. 71. The report confirms the existence of a large number of items and makes recommendations with respect to the payment of the claim. Despite the recommendations, no offers have been communicated in the latest correspondence from the FSP. 72. The FSP (solicitors) has not provided any reasonable explanation for the delay or failure to provide the earlier reports. 73. Whilst the Panel accepts the FSP is entitled to perform an assessment of loss and to satisfy itself of the ownership and value of items claimed, it needs to do so in a reasonable manner and have regard to the circumstances of the loss. 74. The Applicants have provided quite detailed explanations as to why they have difficulty in establishing proof of ownership of some items and Case No: 305173 Determination Page 13 of 15 difficulties they have had following the fire in terms of destroyed documentation. 75. It took the FSP until 16 July 2012, more than six months after the fire, to complete its investigation into the circumstances of the fire and only then did it seek further information from the Applicants with respect to the ownership of the contents items claimed. There is no explanation for such a delay. 76. It has then taken until 13 September 2013 for the FSP to complete a “detailed” review of the Applicants’ contents claimed according to C. This assessment which the FSP’s solicitors expected to take one week from 24 June 2013 appears to have extended for nearly three months. Just what has been happening over that time is unknown, but is clearly not a process that has been either efficient or effective in dealing with this aspect of the Applicants’ claim. 77. Whilst the Panel accepts the Applicants have been unable to provide proof of ownership such as purchase receipts etc, the Panel is satisfied given the circumstances of the loss, that the Applicants have been able to establish that the majority of the items claimed were destroyed in the fire and it is reasonable, given the nature of the fire that a lot of the traditional items of proof such as receipts, manuals, guarantees would have been destroyed in the fire. The Panel also accepts that given the time taken to conduct “a detailed review” of the Applicants’ contents claim, it is also reasonable that some items of proof may have been lost or misplaced or destroyed in the clean up following the fire. 78. In the circumstances, having considered all of the information exchanged, the Panel does not accept t he FSP’s response is reasonable. The delay in assessing the loss is due to the FSP’s approach to this matter and not due to the Applicants’ conduct. The Panel is satisfied that the (female) Applicant has done all in her power to identify the items and provide proof of ownership. 79. The Panel is satisfied the (female) Applicant has provided proof of ownership of the majority of items and as the Applicants have claimed in excess of $196,000 for the loss of contents including all of the specified jewellery items, as against a total sum insured of $150,000, it is fair and reasonable in the circumstances that the FSP meet its liability to pay for the total loss of contents of $150,000. 80. Accordingly, the Panel determines the FSP is required to pay the contents sum insured of $150,000 to the Applicants in settlement of the contents claim less any excess applicable and less any amount already paid to the Applicants with respect to the contents claim. Temporary accommodation 81. The Applicants have indicated that they are paying approximately $1,050 per fortnight in rent while waiting for their claim to be settled. They have also indicated that this additional expense is burdensome for them. Case No: 305173 Determination Page 14 of 15 82. The policy covers the reasonable costs incurred for similar accommodation while the Applicants’ building is being repaired, in situations where the FSP has accepted a claim following damage to building and it agrees that the building is not fit to live in. The policy limits in respect of the coverage of temporary accommodation is the lesser of 12 months from the damage occurrence, 10% of the sum insured, or the time it would take to complete the repairs. 83. The Panel accepts that the Applicants’ damaged home is not fit to be lived in. 84. As outlined earlier, the FSP took until July 2012 to complete its investigation and to accept the claim. The Panel notes that CJD indicated in its 12 June 2012 revised quotation that the repair work would take 10 weeks to complete and it would be available (to commence the repair work) two weeks after the signing of the contract. 85. Given the various processes to be completed prior to and subsequent to undertaking the repairs, it would be reasonable to assume that the Applicants would have been unable to resume living in their home until at least November/December 2012, which would be approximately 12 months after the loss occurred. 86. After carefully considering the matter, the Panel finds that subject to the Applicants producing a suitable rental agreement or other evidence of rental expenses incurred, the FSP is required to pay the Applicants the equivalent of 12 months temporary accommodation. The FSP is entitled to deduct any temporary accommodation costs it may already have paid. Compensation 87. Pursuant to paragraph 9.3 of the Terms of Reference, FOS is able to award compensation for non-financial loss up to a maximum of $3,000 where there has been an unusual degree of inconvenience, time taken to resolve a dispute or interference with the Applicants’ expectations or enjoyment or peace of mind. 88. Compensation is not paid merely because an Applicant suffers inconvenience that is a normal part of the process. 89. In this dispute, however, whilst the Panel is satisfied the process with respect to the building dispute has been reasonable, the delay on the part of the FSP in dealing with the contents claim and in particular, the continued delay and misinformation provided by the FSP with respect to the process of reviewing the contents claim and the assessment being undertaken, has in the Panel’s view caused a considerable degree o f inconvenience and interference with the expectation of enjoyment and peace of mind of the Applicants. 90. No explanation has been provided for this delay. It has taken nearly two years for the FSP to complete its “detailed assessment”. This in the Panel’s Case No: 305173 Determination Page 15 of 15 view is unacceptable and in the circumstances, the Panel considers it is appropriate to award an amount of $1,500 by way of compensation for non- financial loss due to the delays in the dealing with the assessment of the Applicants’ contents claim. Determination 91. On the basis of the available information the Panel determines that: The repairs to the Applicants’ home building proposed by the FSP, as recommended by S and outlined in the amended scope of works by E and revised quotation by CJD, is appropriate in the circumstances. There is no requirement for the FSP to demolish the home and rebuild it. After the completion of the repairs, the FSP is required to arrange for an inspection of the home for residual mould and based on the outcome of that inspection, to perform remediation of any mould indentified. The FSP is required to pay the Applicants $150,000 as settlement of their contents claim, less any excess applicable and less any amount already paid to the Applicants with respect to the claim. The FSP is required to pay the Applicants the equivalent of 12 months temporary accommodation, subject to the Applicants providing a suitable rental agreement or evidence of rental expenses incurred, less any amount already paid with respect to this aspect of the claim. The FSP is to pay interest on any cash settlement of the Applicants’ entitlement from 16 July 2012 being the date of the FSP’s claim completion of its investigations to the Applicants’ claim to date of payment of the claim. Further, the FSP is to pay the Applicants the sum of $1,500 by way of non-financial compensation pursuant to paragraph 9.3 of the Terms of Reference.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.