Text of the determination
Case No: 305173 Determination Page 1 of 15
Case number: 305173
General Insurance - Domestic Insurance - Home Building and Contents –
Assessment of damage to building - Service - Delay in claim handling
2 October 2013
Background
1. The Applicants held a home and contents insurance policy with the Financial
Services Provider (FSP).
2. The policy, which provided defined events cover, had a sum insured of
$400,000 for their home building and a sum insured of $150,000 for their
contents.
3. While they were overseas on holiday in December 2011, a fire damaged
their home and contents and they lodged a claim with the FSP.
4. The FSP investigated the circumstances of the claim and subsequently
accepted liability for the damage.
5. Although having various difficulties providing proof of ownership and value of
some of their contents, the Applicants provided further information in that
regard to the FSP. However, to date the FSP has not completed its
assessment and the contents claim has not been settled.
6. T he Applicants have rejected the FSP’s proposal to repair their home. They
want the house demolished and rebuilt as they believe this is the only way to
eliminate the hazardous and toxic materials which are now present in their
fire damaged house.
Summary of Applicants ’ position
7. The Applicants are represented by the mother of the female Applicant and
for simplicity and convenience, both the Applicants and their representative
will be hereafter referred to as “the Applicants”.
8. The Applicants say that soot and smoke from the fire has affected every
room in the house and they have evidence which shows that this represents
a health risk to them and their family.
9. In addition, the materials from which the house is constructed include
asbestos and this has been affected by the fire. They have evidence which
Determination
Case No: 305173 Determination Page 2 of 15
indicates that asbestos which has been fire affected becomes friable and
therefore a high risk to people.
10. Further, the fire in December 2011 was extinguished using water and since
that time, mould has been allowed to build up in and around their home and
this is also a serious health risk.
11. For these reasons, they do not accept the FSP’s position regarding the
repair of their home and want the FSP to demolish the existing, damaged
house and rebuild it.
12. With respect to the contents of their home, the Applicants say that they
purchased many items for cash. They say that any receipts and photographs
they may have had to prove their ownership and the value of their contents
did not survive the fire.
13. However, they have obtained some photographs of their possessions and
provided these to the FSP, along with copies of bank statements and quotes
for the replacement of many items.
14. They note that the FSP has accepted liability for the lost or damaged
contents but do not understand why the settlement of this aspect of their
claim has not been effected by the FSP.
Summary of FSP’s position
15. The FSP says it accepted liability for the damage to the Applicants’ home
building and in accordance with the policy, it elected to repair the building
rather than cash settle that part of the claim.
16. It says that it has obtained a report from hygienist “IE” which has identified
the asbestos containing materials at the home, the damage to those
materials, and confirms the extent of the asbestos contamination within the
home.
17. The scope of works and the quotation of the repair of the Applicants’ home
have been amended in line with the conclusions of the report by IE.
18. It says that it has reviewed the reports provided by the Applicants in support
of their contention that the building needs to be demolished and rebuilt but
maintains its view that the house is fit to be repaired and awaits approval
from the Applicants to commence the work.
19. With respect to the contents claim, the FSP says that it is reviewing the
additional information provided by the Applicants and is awaiting the
assessment from its loss adjustor, “C”.
20. The FSP relies on the following policy provisions:
“ Your proof of ownership
Case No: 305173 Determination Page 3 of 15
At the time of making a claim if this policy insures your contents, you will need
to provide evidence of value. We will require evidence of value for high risk
items or valuables whether specified on the policy or not. This evidence can
be a combination of:
Receipts;
A recent valuation provided by an Australian qualified valuer;
Instruction manuals;
Guarantee or warranty certificate;
Catalogues;
Make, model and serial number;
Photographs or video film of the item.
Proof of valuation – Jewellery, gold or silver articles
Jewellery, gold or silver articles, regardless of whether they are specified
contents or specified valuables, must have the valuation as listed in the table
below. If the evidence required by us is not provided, your claim will not be
processed.
Item value Required proof of ownership
Less than $1,499 No valuation required, only proof of
ownership at the time of a claim.
$1,500 up to $14,999 A valuation dated prior to the date of loss
required to be provided at the time of
lodging the claim on the item.
...
...
What you are covered for
Your [FSP] policy insures you up to the amount of the sum insured for loss or
damage to your building and/or contents caused by an insured event listed
below.
Your schedule will indicate if you have insured your building, your contents or
both.
Insured event
Fire We will cover:
Damage to your building and/or contents cause by fire.
We will not cover:
Damage cause by charring, melting or scorching as a
result of a fire without the presence of flames;
Damage to a heat resistant item and any fittings or
attachments on or in these items if the fire only caused
damage to that item.
Case No: 305173 Determination Page 4 of 15
Examples of heat resistant items are a cooking appliance,
iron, toaster, microwave oven, heater, clothes dryer, electric
kettle, chimney, fireplace, heater, oven, potbelly stove.
...
...
Your standard benefits
This policy insures you for standard benefits set out in this section.
We pay these standard benefits as part of the sums insured for building or
contents depending on the type of cover your have chosen unless otherwise
stated.
Benefit Description
...
Accommodation costs If this policy insures your building, we will
cover:
The reasonable costs you incur for similar
accommodation while your building is being
rebuilt, repaired or replaced if you live in your
building, or
...
if we have accepted a claim following damage to
your building and we agree that the building is not
fit to live in.
...
Limit:
The maximum we will pay for temporary
accommodation or lost rent is the lesser of:
The time it would take to repair or replace your
building (or home) provided work commences
as soon as practicable after the incident, or
12 months from the date of the damage, or
10% of the sum insured, or
If this policy insures your building and you elect
not to replace your building, the time it would
have taken to repair or replace your building
had you elected to do so.
This benefit is in addition to the sum insured.
...
How we settle your claim
Your building
What we pay
Case No: 305173 Determination Page 5 of 15
If this policy insures your building and we accept your claim, at our option we
will pay for the reasonable cost of:
repairing,
rebuilding, or
replacing,
your home at the site to its condition when last renovated, altered or restored.
We will only pay for damaged parts
If we accept a claim, we will only pay for the part of the home that has been
damaged. We will not pay for undamaged parts of the home in order to
achieve a uniform appearance.
We will repair up to the nearest archway, doorway or similar entry and exit
point. We will not pay for undamaged materials in adjoining rooms.
...
We will not pay:
for the portion of these building costs which relate to the undamaged
parts of your building;
to upgrade your building if it is over insured;
to modify your building to rectify a fault that is causing loss or damage
to your building under the policy.
...
You contents and/or valuables
What we pay
If this policy insures your contents or your valuables and we accept your
claim, at our option we will pay for the reasonable cost of:
repairing;
replacing, or
pay you what it would cost to repair or replace, your contents.”
Issues
21. Whether the FSP is required to demolish and rebuild the Applicants’ home.
22. Whether the FSP is required to proceed with settlement of the Applicants’
contents claim.
23. Whether the FSP is required to pay the Applicants’ temporary
accommodation costs.
Case No: 305173 Determination Page 6 of 15
Reasons for decision
24. Due to the nature of the dispute, it has been referred to the Panel for
Determination in accordance with the Operational Guidelines to the Financial
Ombudsman Service’s Terms of Reference.
25. This decision has been made by a Panel of three decision makers including
an Ombudsman and two decision makers with extensive experience in
insurance industry matters and in consumer claims.
26. There has been an exchange of information between the parties and the
Panel is satisfied that each party has had an opportunity to address the
issues raised.
27. It is not in dispute that:
fire damaged the Applicants’ home and contents in December 2011;
the FSP is liable for the damage to both the home building and to the
contents; and
the Applicants’ home was not able to be lived in as a result of the
damage.
Building claim
28. The FSP arranged for loss adjustor “C” to assess the damage to the
Applicants’ home and after investigating the circumstances of the claim,
decided on 16 July 2012 to accept liability for the damage.
29. Building consultants “E” prepared a scope of works and this was used to
obtain quotations from builders for the repairs. The FSP selected the more
competitive of the two quotations obtained and engaged builder “CJD” to
begin repairs to the building.
30. However, the Applicants objected to the decision by the FSP to the proposed
house repair, on the basis that they believed that the fire had caused health
and safety issues which could not be rectified by merely repairing the
building.
Reports provided by Applicants
31. The Applicants have provided several documents with general information
about the risks associated with asbestos. These include:
a research paper titled “Asbestos Contamination of Land – Reporting
Obligations of Building Contractors” produced by Master Builders
Australia Ltd;
a guidance note titled “Asbest os- contaminated soil” produced by
Worksafe, NSW;
Case No: 305173 Determination Page 7 of 15
a document titled “Asbestos Blueprint – A guide to roles and
responsibilities for operational staff of state and local government”
produced by the NSW government;
an information sheet titled “Management of Small Scale, Low Risk Soil
Asbestos Contamination” produced by the Australian Capital Territory
government; and
a document titled “Asbestos – A guide for householders and the
general public” produced by the Commonwealth Department of Health.
32. The Applicants have also provided a special purpose building report,
produced by “CS” after an inspection of their damaged home on 15 February
2013. The report by CS identified several parts of the building which may
contain asbestos, however, disclosed that “[CS] are n ot qualified in the
detection of asbestos materials...”.
33. The Applicants also provided a scope of works and quotation for the
remediation of the home produced by “MR”, a firm specialising in mould
inspection, testing and removal. The report by MR noted that there were
“severe levels of soot and visible mould” inside the house. With respect to
any risk associated with asbestos, MR limited its comments to a note that
“there is an obligation to have testing and certification for asbestos”.
34. The Applicants have also provided a report by the building consultancy firm
“EB”, produced after an inspection of their home on 14 February 2013. The
report by EB noted that the dwelling has been fire damaged and some of the
asbestos sheets were broken and exposed, and strongly recommended that
these sheets be removed for health safety purposes.
35. Two quotations for the demolition and rebuild of their home have also been
provided by the Applicants.
Reports by FSP
36. The FSP, in response to the objection by the Applicants to the proposed
repair of their home, obtained a report by environmental services firm “S”
with respect to a survey of asbestos containing materials at the Applicants’
home.
37. The author of the report from S, Licensed Asbestos Assessor and
Occupational Hygienist “IE”, inspected the Applicants’ home on 15 May 2013
with a representative from the FSP’s building consultant, E.
38. The “Conclusions and Recommendations” section of the report by S
included the following:
“ House interior
Asbestos fibre cement walls to kitchen (approximate total of 55 m 2 ) –
no evidence of cracks or palling as a result of fire. Soot was observed
covering the entire exposed surface. Structural integrity possibly
affected by heat as close to fire source.
Case No: 305173 Determination Page 8 of 15
Asbestos fibre cement walls to study room (approximate total of 36 m 2 )
– no evidence of cracks or palling as a result of fire. Soot was observed
covering the entire exposed surface. Structural integrity unlikely to be
affected by heat as location is not close to fire source and other
materials not burnt/melted within room.
House exterior
Flat fibre cement sheets to external walls (cement rendered to front
area) assumed to contain asbestos (approximate total of 141 m 2 ) –
Cracks were observed throughout. No palling observed in sheets where
accessible. Sheets show signs of soot around doors and windows. No
signs of soot within wall cavity at rear section but found near kitchen
through a hole.
Structural integrity and cracks unlikely to be affected by heat at most
points. As the fire occurred 18 months ago it cannot be fully confirmed
that some cracks on the north side wall (35 m 2 ) did not occur due to
thermal expansion by fire. Sheets to east, west and south elevation are
likely to be damaged by fire (106m 2 )[sic].
Flat fire cement sheets to eaves (approximate total of 15m 2 ) – No
cracks or palling observed in sheets where accessible. Severe paint
deterioration observed due to weathering. Light soot layer observed on
surfaces. Structural integrity unlikely to be affected by heat as location
is not close to fire source.
Flat fibre cement sheets to walls of external toilet (approximate total of
14m 2 ) – Localised cracks and severely faded paint were observed
throughout. No palling observed in sheets where accessible. No signs
of soot on sheets. Damage to sheets identified not fire related.
Fragments of fibre cement sheet observed on grounds near wall at
south west corner of the dwelling.” [sic]
39. The report also noted the following to be the fire damage work required:
“ The following ACM were found to be or likely to be affected by fire damage
which cannot be restored by cleaning and require removal and replacement:
Internal walls of kitchen (lining of all walls)
Damaged section (large hole) of laundry, lining of west wall at entry to
laundry
External wall to northern elevation (entire wall).”
The following ACM were found to be unlikely to be structurally damaged by
fire and only covered by soot which require cleaning by an approved
surfactant and encapsulation under fully controlled conditions by a
competent contractor:
Internal walls of study room
Internal walls and ceiling lining of laundry (except damaged wall section
noted above to be removed)
Case No: 305173 Determination Page 9 of 15
Status unconfirmed for majority of ACM external wall for surfaces within
wall cavities (eastern, western and southern elevation). These need to
be checked and cleaned/encapsulated if required. Note that any level
of residual soot within wall cavities if not removed may emit odours in
the fut ure.”
40. Further, the report by S included the following specific recommendations for
all asbestos containing materials (ACM) found:
Remove all identified asbestos considered damaged by cracks and
exposed edges and severely deteriorated by weathering including fibre
cement fragments at all locations shown on the asbestos register noted
with P1 priority action.
Encapsulate or paint unsealed asbestos fibre cement materials where
found with localised [sic] with exposed surface or edges and where
surfaces are unpainted at all locations shown on the asbestos register
noted with P1 priority action.
41. The FSP also provided an updated scope of works (produced by E) and a
revised quotation (produced by CJD) which take into account the
recommendations included in the report by S.
Consideration of the evidence
42. The Panel has considered the submissions provided by both parties.
Asbestos
43. The evidence provided by the Applicants highlights that under certain
circumstances, the risks to human health associated with asbestos is high.
44. The information from the Applicants indicates that asbestos is present within
their home:
The report by CS indicated that parts of the building may contain
asbestos, however, noted that CS is not qualified in the detection of
asbestos materials.
The report by EB stated that the house was fire damaged and identified
that there were several asbestos sheets which were broken and
exposed and strongly recommended that they be removed for health
and safety purposes. However, the Panel notes that EB has not
indicated whether the fire caused the damage to all the asbestos
sheets at the Applicants’ home.
45. The report by S is an assessment of the condition of all the asbestos at the
home (although it is noted that some areas of the home could not be
accessed or inspected) and includes a risk assessment based on a
methodology which factors in various attributes of the asbestos, including:
friability;
Case No: 305173 Determination Page 10 of 15
extent of damage or deterioration;
surface treatment;
asbestos type;
occupant activity;
likelihood of disturbance;
human exposure potential; and
maintenance activities.
46. Further, the report by S makes an assessment of whether the fire at the
Applicants’ home caused the damage to the asbestos found.
47. The Panel notes that IE, the author of the report by S, is appropriately
qualified to perform such an asbestos assessment and does not accept the
Applicants’ claim that IE is not independent.
48. The Panel accepts that asbestos in the environment presents a risk to the
health of humans. However, it cannot be disputed that the Applicants’ home
(like many homes of the same age) contained asbestos — which the
Applicants were exposed to, with some degree of risk — before the fire
occurred.
49. The central issue for the Panel to consider is the extent to which the
proposed repairs to the fire damage will increase the risk to the Applicants
and whether the remedial action proposed by the FSP will appropriately
control any increase in asbestos risk caused by the fire.
50. After reviewing the submissions, the Panel finds that the report by S is the
most comprehensive and balanced of all those presented. It takes a
relatively conservative approach to the identification of asbestos; where it is
not clear that material includes asbestos, S has assumed that it does.
51. It recommends the removal of asbestos sheeting in the kitchen, the laundry
and the northern external wall of the home. For areas which were assessed
as being unlikely to be structurally damaged by the fire and only covered in
soot, the report by S recommends cleaning by approved surfactant and
encapsulation under fully controlled conditions.
52. Although the Applicants have indicated that they are very concerned about
the asbestos risk to their health which may be caused by the proposed
repairs to the fire damage to their home, the evidence they have provided
does not substantiate their concerns in this regard and fails to convince the
Panel of the need to demolish and rebuild their home.
53. Accordingly, the Panel is of the view that the proposal by S provides an
appropriate solution to manage the risk to the Applicants associated with
asbestos, and as proposed, the repairs include appropriate remediation of
any identifiable issues with damaged asbestos.
Case No: 305173 Determination Page 11 of 15
Soot and mould
54. The Applicants have also expressed concern about the health risks from the
soot from the fire and the mould which has developed in the house since the
fire was extinguished.
55. The report by MR indicates that parts of the house had severe levels of soot
which, in the Panel’s view, is only to be expected when a fire causes
damage within a home.
56. The report by MR also indicates there is “visible mould” in the house but
unlike its description of the level of soot in the house, the mould is not
described as “severe”. The report also does not identify where within the
home this mould is visible.
57. The Panel notes that the report by S specifically addresses the soot
contamination in the house. Further, the scope of works involves the removal
and replacement of many of the affected areas of the home and which, it is
reasonable to assume will deal with any soot present in the home.
58. The report by S indicates that any residual soot within the wall cavities may
emit odours if not removed, and accordingly the Panel requires that during
the course of repairs, any such soot is identified and removed by the
repairers.
59. With respect to the mould within the home, the Panel accepts the Applicants’
argument that since the fire, some mould has developed within the home.
60. As with the issue of soot in the home, the Panel would expect that the
removal and replacement of many of the affected materials in the home
would reduce or eliminate the mould which has developed.
61. The Panel confirms that repair of the Applicants’ home in line with the scope
of works produced by E is sufficient for the FSP to meet its obligations under
the policy and there is no requirement for the FSP to demolish and rebuild
the Applicants’ home.
62. However, the Panel also requires the FSP to perform an inspection of the
home after the completion of the repairs to identify any mould which remains
within the home and based on that inspection, undertake appropriate
remediation.
Contents claim
63. The FSP arranged for C to perform an initial assessment of the contents
claim, although it has not provided a copy of any report from that
assessment.
64. Subsequently, the FSP investigated the circumstances of the fire and in the
course of this investigation, requested that the Applicants provide, among
Case No: 305173 Determination Page 12 of 15
other things, evidence of ownership and value of the contents items which
were lost or damaged in the fire.
65. The Applicants experienced difficulty in providing the evidence requested by
the FSP. They say that they paid cash for many of the contents items and
that the fire destroyed receipts and other evidence of ownership they may
have had, including photographs.
66. Nevertheless, they have managed to obtain various photographs of some of
their contents items and have also provided to the FSP invoices and copies
of bank statements.
67. In its submission of 24 June 2013, the FSP stated that it had accepted the
Applicant s’ contents claim and was “currently assessing the further
information provided by the Applicants”. It said that C was reviewing this
information and it hoped to receive C’s assessment “in one week”.
68. The Panel notes that the Service’s Case Manager emailed the FSP (through
its solicitors) several times including on 1 August 2013, at which time an
update on the status of the contents claim was requested. A further email
was sent to the FSP on 6 August 2013, stating that as there had been no
response to earlier emails, the matter would be put to the Panel for decision
based on the information available.
69. The Panel finally received a further submission from the FSP’s solicitors on
16 September 2013 with the report from C and two appendices. The FSP
has maintained its position that the Applicants have provided insufficient
proof of ownership in respect of a number of items claimed. No offer has
been made for the balance of the items.
70. The Panel notes that the report from C is dated 13 September 2013. It refers
to its previous report, its 7 th report dated 13 August 2013. None of the earlier
reports have been made available to the Service. The FSP has provided no
reason for this.
71. The report confirms the existence of a large number of items and makes
recommendations with respect to the payment of the claim. Despite the
recommendations, no offers have been communicated in the latest
correspondence from the FSP.
72. The FSP (solicitors) has not provided any reasonable explanation for the
delay or failure to provide the earlier reports.
73. Whilst the Panel accepts the FSP is entitled to perform an assessment of
loss and to satisfy itself of the ownership and value of items claimed, it
needs to do so in a reasonable manner and have regard to the
circumstances of the loss.
74. The Applicants have provided quite detailed explanations as to why they
have difficulty in establishing proof of ownership of some items and
Case No: 305173 Determination Page 13 of 15
difficulties they have had following the fire in terms of destroyed
documentation.
75. It took the FSP until 16 July 2012, more than six months after the fire, to
complete its investigation into the circumstances of the fire and only then did
it seek further information from the Applicants with respect to the ownership
of the contents items claimed. There is no explanation for such a delay.
76. It has then taken until 13 September 2013 for the FSP to complete a
“detailed” review of the Applicants’ contents claimed according to C. This
assessment which the FSP’s solicitors expected to take one week from 24
June 2013 appears to have extended for nearly three months. Just what has
been happening over that time is unknown, but is clearly not a process that
has been either efficient or effective in dealing with this aspect of the
Applicants’ claim.
77. Whilst the Panel accepts the Applicants have been unable to provide proof
of ownership such as purchase receipts etc, the Panel is satisfied given the
circumstances of the loss, that the Applicants have been able to establish
that the majority of the items claimed were destroyed in the fire and it is
reasonable, given the nature of the fire that a lot of the traditional items of
proof such as receipts, manuals, guarantees would have been destroyed in
the fire. The Panel also accepts that given the time taken to conduct “a
detailed review” of the Applicants’ contents claim, it is also reasonable that
some items of proof may have been lost or misplaced or destroyed in the
clean up following the fire.
78. In the circumstances, having considered all of the information exchanged,
the Panel does not accept t he FSP’s response is reasonable. The delay in
assessing the loss is due to the FSP’s approach to this matter and not due to
the Applicants’ conduct. The Panel is satisfied that the (female) Applicant
has done all in her power to identify the items and provide proof of
ownership.
79. The Panel is satisfied the (female) Applicant has provided proof of ownership
of the majority of items and as the Applicants have claimed in excess of
$196,000 for the loss of contents including all of the specified jewellery
items, as against a total sum insured of $150,000, it is fair and reasonable in
the circumstances that the FSP meet its liability to pay for the total loss of
contents of $150,000.
80. Accordingly, the Panel determines the FSP is required to pay the contents
sum insured of $150,000 to the Applicants in settlement of the contents
claim less any excess applicable and less any amount already paid to the
Applicants with respect to the contents claim.
Temporary accommodation
81. The Applicants have indicated that they are paying approximately $1,050 per
fortnight in rent while waiting for their claim to be settled. They have also
indicated that this additional expense is burdensome for them.
Case No: 305173 Determination Page 14 of 15
82. The policy covers the reasonable costs incurred for similar accommodation
while the Applicants’ building is being repaired, in situations where the FSP
has accepted a claim following damage to building and it agrees that the
building is not fit to live in. The policy limits in respect of the coverage of
temporary accommodation is the lesser of 12 months from the damage
occurrence, 10% of the sum insured, or the time it would take to complete
the repairs.
83. The Panel accepts that the Applicants’ damaged home is not fit to be lived
in.
84. As outlined earlier, the FSP took until July 2012 to complete its investigation
and to accept the claim. The Panel notes that CJD indicated in its 12 June
2012 revised quotation that the repair work would take 10 weeks to complete
and it would be available (to commence the repair work) two weeks after the
signing of the contract.
85. Given the various processes to be completed prior to and subsequent to
undertaking the repairs, it would be reasonable to assume that the
Applicants would have been unable to resume living in their home until at
least November/December 2012, which would be approximately 12 months
after the loss occurred.
86. After carefully considering the matter, the Panel finds that subject to the
Applicants producing a suitable rental agreement or other evidence of rental
expenses incurred, the FSP is required to pay the Applicants the equivalent
of 12 months temporary accommodation. The FSP is entitled to deduct any
temporary accommodation costs it may already have paid.
Compensation
87. Pursuant to paragraph 9.3 of the Terms of Reference, FOS is able to award
compensation for non-financial loss up to a maximum of $3,000 where there
has been an unusual degree of inconvenience, time taken to resolve a
dispute or interference with the Applicants’ expectations or enjoyment or
peace of mind.
88. Compensation is not paid merely because an Applicant suffers
inconvenience that is a normal part of the process.
89. In this dispute, however, whilst the Panel is satisfied the process with
respect to the building dispute has been reasonable, the delay on the part of
the FSP in dealing with the contents claim and in particular, the continued
delay and misinformation provided by the FSP with respect to the process of
reviewing the contents claim and the assessment being undertaken, has in
the Panel’s view caused a considerable degree o f inconvenience and
interference with the expectation of enjoyment and peace of mind of the
Applicants.
90. No explanation has been provided for this delay. It has taken nearly two
years for the FSP to complete its “detailed assessment”. This in the Panel’s
Case No: 305173 Determination Page 15 of 15
view is unacceptable and in the circumstances, the Panel considers it is
appropriate to award an amount of $1,500 by way of compensation for non-
financial loss due to the delays in the dealing with the assessment of the
Applicants’ contents claim.
Determination
91. On the basis of the available information the Panel determines that:
The repairs to the Applicants’ home building proposed by the FSP, as
recommended by S and outlined in the amended scope of works by E
and revised quotation by CJD, is appropriate in the circumstances.
There is no requirement for the FSP to demolish the home and rebuild
it.
After the completion of the repairs, the FSP is required to arrange for
an inspection of the home for residual mould and based on the
outcome of that inspection, to perform remediation of any mould
indentified.
The FSP is required to pay the Applicants $150,000 as settlement of
their contents claim, less any excess applicable and less any amount
already paid to the Applicants with respect to the claim.
The FSP is required to pay the Applicants the equivalent of 12 months
temporary accommodation, subject to the Applicants providing a
suitable rental agreement or evidence of rental expenses incurred, less
any amount already paid with respect to this aspect of the claim.
The FSP is to pay interest on any cash settlement of the Applicants’
entitlement from 16 July 2012 being the date of the FSP’s claim
completion of its investigations to the Applicants’ claim to date of
payment of the claim.
Further, the FSP is to pay the Applicants the sum of $1,500 by way of
non-financial compensation pursuant to paragraph 9.3 of the Terms of
Reference.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.