Text of the determination
Case No: 305161 Determination Page 1 of 10
Case number: 305161
General Insurance - Domestic Insurance - Home Building - FSP Decision -
Denial of Claim - Inundation - Flood vs Flash Flood
24 June 2013
Background
1. The Applicant insured his home and contents in Milton with the Financial
Services Provider (FSP). The relevant period of insurance operated for
twelve months beginning from 7 October 2010. During this period, the
building was insured up to a sum of $189,000 and the contents for $67,000.
2. On or about 11 January 2011, the Applicant’s home was inundated as a
result of the severe weather events that affected many homes in
Queensland.
3. The FSP denied the claim on the basis the damage was due to “flood”.
Summary of Applicant ’s position
4. The Applicant submits the following as alternative arguments in response to
the FSP’s decision:
The FSP misrepresented the cover provided under the policy after the
inundation event and left him with the understanding that he would be
covered for up to 50% of his loss.
The damage was due to stormwater runoff which affected the home
prior to the arrival of floodwater. At least part of the later inundation
occurred as a result of the heavy rain that fell from 4.00am on 11
January 2011 which resulted in the Wivenhoe Dam operators elevating
their strategy to W4. This decision resulted in massive discharges of
water into the Brisbane River that ultimately inundated the property
within 24 hours.
Summary of FSP’s position
5. In response to the Applicant ’ s arguments, the FSP submits the following:
There is no dispute that a PDS was sent to the Applicant prior to the
claim and the policy structure and layout of the document confirms that
the policy does not extend cover to flood claims.
Determination
Case No: 305161 Determination Page 2 of 10
It denies any of its telephone consultants misrepresented the level of
cover to be provided after the incident, or that it was ever said that the
claim would be covered.
The cause of the loss was the flooding of the Brisbane River which is
properly classed as a flood and excluded from cover.
6. The FSP relies on a number of hydrology reports authored by “ SC ” and the
following policy provisions to deny the Applicant’s claim :
Page 4 of the Certificate of Insurance (COI)
“ What optional covers are included and not included
Home Contents
...
Flood and storm surge not included not included...”
Pages 10-12 of the PDS
“ Words / terms with special meanings
Word / term Meaning
...
Flood Rising water which enters your home as a result of it
running off or overflowing from any origin or cause.
This policy does not cover flood unless we have
agreed and it is shown on your certificate of insurance.
Flash flood and
stormwater runoff
A sudden flood caused by heavy rain that fell no more
than 24 hours prior to the flash flood or stormwater
runoff .
...
Storm A violent disturbance of the atmosphere associated
with strong w inds including a cyclone, light ning, heavy
rain, hail or snow, but not continuous bad weather by
itself.
...”
Pages 17-18 of the PDS
“ Insured events you are covered for
Damage caused by weather...
What is covered What is not covered
Storm Loss or damage:
caused by rain, hail or snow
after it has reached the
Case No: 305161 Determination Page 3 of 10
ground...
...
Flash flood and stormwater runoff
A sudden flood caused by heavy rain
that fell no more than 24 hours prior to
the flash flood or stormwater runoff
Loss or damage caused:
by flood...
...”
Page 27 of the PDS
“ Your home
The most we will pay you for home claims
What is covered What is not covered
Flash flood and stormwater runoff
We will pay up to 50% of your home sum
insured or $25,000, whichever is higher.
...
...”
Page 32 of the PDS
“ Your contents
The most we will pay you for contents claims
What is covered What is not covered
... ...
Flash flood and stormwater runoff
We will pay up to 50% of your contents
sum insured or $25,000, whichever is
higher , but not exceeding your contents
sum insured .
...
...”
Issues
7. Whether the FSP misrepresented to the Applicant that he was covered for
flood and whether this has any implication for the claim.
8. Whether the cause of the Applicant’s loss was covered under the policy.
Case No: 305161 Determination Page 4 of 10
Reasons for decision
9. Due to the nature of the dispute, the parties have been informed that the
matter has been referred to the Panel for Determination in line with the
Operational Guidelines to FOS’s Terms of Reference. This dispute has not
been the subject of a FOS Recommenda tion and has proceeded directly to
Determination.
10. This decision has been made by a Panel consisting of an Ombudsman, a
representative with extensive experience in the insurance industry and a
representative with extensive experience in consumer claims.
11. The Applicant does not dispute receipt of the PDS at or about the time of the
policy’s inception and on this basis, the Panel is satisfied that the FSP is
entitled to rely upon the wording in this document with respect to this claim.
12. The PDS has an index on the inside cover which highlights the areas of the
policy to which the policyholder might find information. Included in this are
“Words/terms with special meanings” on page 9, for which definitions of
relevant terms in the policy are provided. Flood is included in this, together
with the qualification that:
“... This policy does not cover flood unless we have agreed and it is shown on
your certificate of insurance. ”
13. In addition to this, page 53 directs the reader to “Flood and storm surge”,
which is explain ed under the broader definition of “Optional covers for extra
peace of mind”. This section explains that:
“... This policy does not cover flood unless we have agreed and it is shown on
your certificate of insurance. ”
14. The COI clarifies that no cover was opt ioned by the Applicant for “Flood and
storm surge” cover and therefore , he was not covered for it under the policy.
15. The policy does differentiate between “flood” (which is not covered) and
“flash flood and stormwater runoff ” (which is covered) under the po licy. To
the extent that the Applicant suffered a loss which may be attributable to
flash flooding and/or stormwater runoff (as defined in the policy), the Panel is
satisfied that the Applicant will be covered.
Alleged misrepresentation
16. The Applicant alleges that he was informed during conversations with the
FSP’s representatives after the loss that he would be covered for 50% of his
loss.
17. The FSP has provided transcripts of two telephone discussions with the
Applicant, both occurring on 13 January 2011 when the claim was reported.
18. In broad terms, the doctrine of estoppel seeks to ensure that a person who
leads another to act to his or her detriment, by relying on a statement made
Case No: 305161 Determination Page 5 of 10
by this person should be held responsible for those statement(s) insofar as
the representations made were relied upon. Statements or representations
may be in the form of an express promise or they may be inferred from the
conduct of a person.
19. There is no evidence in the conversations of any promise for cover. There is
also no evidence that the Applicant acted to his detriment as a result of any
poor advice provided.
20. In the first conversation, the FSP’s operator does confirm that the policy:
“... does not provide cover for flood but it does provide cover for flash flooding
and stormwater runoff ...”
21. The representative went on to explain the limits that apply to this cover under
the policy. The Panel is satisfied that this explanation was satisfactory.
22. The second conversation, which involved a different representative for the
FSP, is less clear and the Panel accepts that the Applicant may have been
confused as to whether he was covered or not after this discussion. The
representative does clarify that the Applicant would be entitled to up to 50%
of his building and contents cover if “the claim goes through successfully”,
although it is clear that the operator was less certain or clear about the limits
of the policy.
23. Notwithstanding this, the Panel is satisfied that no representation was made
by the FSP that led the Applicant to act to his detriment. As such, the Panel
is satisfied that the claim should be evaluated solely on its merits.
Water inundation
The Evidence
24. The Panel accepts that the FSP’s policy does not extend cover to
circumstances where a loss is caused by a flood. The policy distinguishes
between flood, flash flood and stormwater runoff (the latter two of which are
covered). It extends cover to damage from sudden flood events “caused by
heavy rain that fell no more than 24 hours prior” to the flash flood.
25. The Applicant noted that water entered the property on the morning of 11
January 2011. He believes that this water was stormwater runoff which had
previously affected the property and had been the subject of two separate
claims in 2008 and 2010. He concedes that the home was ultimately
inundated with floodwater but is of the view that it was first inundated by
stormwater runoff and/or flash flooding within 24 hours of the heavy rainfall
from the morning of 11 January 2011.
26. The Applicant notes that the water on the property was about 450mm deep
at approximately 10.00am on 11 January 2011. This is before any alleged
impact from the floodwater from the Brisbane River relied upon by the FSP.
The home was situated in fairly close proximity to the Brisbane River.
Case No: 305161 Determination Page 6 of 10
27. After the lodgement of the claim, the FSP appointed a loss adjuster “ MY ”, to
investigate and report on the damage caused to the Applicant’s property.
The report estimated that the damage would equal or exceed the total policy
cover of $256,000 for home and contents. MY attributed the loss to
“Rainwater” but said that it was caused by “Flood - River”. The date of the loss
was suggested as 12 January 2011. MY noted that a hydrologist would be
required to properly assess the cause of the damage.
28. The FSP subsequently engaged a hydrologist, SC, to provide a report as to
the damage.
29. SC provided a statutory declaration dated 14 January 2013 to evaluate the
cause of the loss in the region surrounding and specifically affecting the
Applicant ’ s home. He found that:
The terrain data for the Applicant’s home shows that the property varies
between 2.1m AHD (Australian Height Datum) and 2.4m AHD. He
understood that underneath the home had been “dug out” by about two
feet and he estimated the “benchmark level” for inundation to be at thi s
point (1.7m AHD). The benchmark level was SC’s estimate of the lowest
point of the home.
The property is identified as an elevated property with possible storage
areas underneath. Whilst the benchmark, being the lowest point of the
structure of the house on the land is at 1.7m, the hydrologist in the key
conclusion statement refers to the benchmark level as elevated.
During an inspection of the site, a WT technician observed that rainfall
and stormwater would drain to and pool in the “dug out” area under the
home, although SC considered that rainfall in the “wider vicinity”
surrounding the property would generally head towards the rear of the
property and into the large open area located south of it.
The water levels of the Brisbane River reached 2.1m AHD at about
10.50am on 11 January 2011 and would have been sufficient to inundate
the minimum level of the subject property. By 11.43am, the river was at
2.3m AHD, which would have been sufficient to inundate the property
itself. By 1.06am on 12 January 2011, the Brisbane River was at 3.9m
AHD and this would have been sufficient to begin inundation of the floor
level of the home. The water level peaked at 6.1m AHD at about 2.57am
on 13 January 2011.
Whilst the Applicant noted that the water was 450mm deep from around
10.00am on 11 January 2011, SC notes that the initial inundation of the
property was likely through backflow inundation of the stormwater system
from the Brisbane River.
30. As a result of the report from SC, the FSP denied the claim on the basis that
it considered the cause of the loss to be flooding from the Brisbane River.
Case No: 305161 Determination Page 7 of 10
31. In an attachment filed to the Notice of Response, SC refers to the approach
taken to determine the cause of the inundation. The report refers to the
benchmark level at 1.7m AHD being the dugout area underneath the house,
the general property level being at 2.3m AHD excluding the dugout area,
whilst the floor level of the living area of the house was considered to be at
3.9m AHD.
32. Although there is reference to a site inspection conducted by DC, no
statement from DC has been provided.
Releases from Wivenhoe Dam & Proximate Cause
33. Leaving aside the possibility of minor stormwater inundation, the central
issue for Determination in this dispute is whether the inundation of the
Applicant’s home on 11 January 2011 was due to flash flood as defined
within the terms of the policy, that is, whether rain that fell no more than 24
hours prior to the inundation of the Applicant’s property was the proximate
cause of the inundation.
34. On 21 May 2012 FOS issued a memorandum to all relevant stakeholders
advising that after considerable deliberation of all material available to it, the
Panel formed a view that the heavy rain occurring from approximately
4.00am on 11 January 2011 and in particular the hea vy rain between
4.00am and 8.00am on 11 January 2011 was a proximate cause of the W4
strategy being invoked and therefore, a proximate cause or trigger that led to
the flooding of many of the properties along the Brisbane River.
35. At that time, the Panel noted that in relation to the approach that each
dispute would depend upon the individual and unique factors relevant to the
dispute and in that regard the parties were invited to make further
submissions in relation to disputes before FOS.
36. In view of this, the FSP provided detailed submissions in relation to this
dispute addressing the general background information relevant to the loss
and site specific factors for the Applicant’s inundation. Included with the
submission were the following documents:
A Reference document for disputes relating to Queensland Floods (this
is a general reference document) relating to the various submissions
the FSP makes in relation to a number of issues. Not all issues raised
in the reference document appear in the current dispute;
Letter dated 14 January 2013 from the FSP’s hydrologist attaching a
key information sheet for the Applicant’s property;
Hydrologist report “Investigations of January 2011 inundation event –
Brisbane” dated March 2011;
Statements dated 14/1/13 and 1/3/13 from SC relevant to the
Applicant’s circumstances.
37. As established in paragraph 35 above, having considered the submissions,
the Panel is of the view having regard to the information exchanged and the
Case No: 305161 Determination Page 8 of 10
relevant legal principles, that the heavy rain that commenced falling on or
about 4.00am on 11 January 2011 over the Wivenhoe Dam was the
proximate or affective cause of the adoption of the W4 strategy and that this,
combined with the heavy rain that continued to fall over the Brisbane River
from 4.00am on 11 January 2011 together with the heavy rain that
commenced falling over the Bremer River at approximately 6.00am on the
same date, was the proximate cause of inundation of many properties
downstream of the Wivenhoe Dam.
The Applicant’s Inundation
38. SC’s stat ement indicates the effect of the W4 releases first reached the
vicinity of the Applicant’s property at 3.14pm on 11 January 2011. SC
estimated that the property was first inundated by the Brisbane River at
10.50am on 11 January 2011 and by 11.43am the property was inundated
up to the relevant benchmark level of 1.7m AHD. SC estimated that the
inundation of the living area of the home did not occur until 1.06am on 12
January 2011.
39. The Panel accepts the possibility that these assessments may not be
entirely accurate, particularly noting that the estimate of the lower floor level
is only that and has not been properly measured.
40. In essence, SC suggests that the Applicant’s home was inundated by the
W3 event (which is properly classed as a flood) and not the W4 event (which
was directly influenced by the heavy rain that fell from 4.00am on 11 January
2011).
41. Although the FSP suggested the Applicant’s home was inundated by waters
from the Brisbane River prior to the impact of the W4 event and was
therefore inundated by floodwater rather than flash flood, the Panel is not
satisfied that the information as provided is sufficient to establish this. While
the inundation of the property may have occurred prior to the arrival of the
impact of the W4 releases, the Panel is not satisfied that the evidence
establishes the inundation of the home above floor level before the arrival of
the W4 releases.
42. The Panel accepts that it is possible in fact probable that the impact of the
W4 releases are likely to have impacted on the level of the Brisbane River
prior to the property being inundated above floor level. The hydrology
indicates that the floor level height of the property is 3.9m AHD. The
hydrology indicated that the effect of the W4 releases first reached the
vicinity of the property at 3.14pm on 11 January 2011. As indicated, the
Panel accepts that this is not necessarily accurate given the events that
occurred on that day. The Panel accepts however, that as the inundation of
the living area of the home did not occur until approximately 1.06am on 12
January 2011, that the inundation of the living area of the home as identified
by SC occurred as a result of the impact of the W4 releases.
43. The Panel notes that SC has determined that by 4.00am on 12 January
2011, the river level would have been approximately 2.7m above the
Case No: 305161 Determination Page 9 of 10
benchmark level. With the benchmark level set at 1.7m and the living area
set at 3.9m, then as a result of the W4 releases, the property would have
been inundated to a height of approximately 0.5m AHD above the living area
on the elevated level of the property.
44. Having considered the evidence as a whole and having regard to the
relevant legal principles, good industry practice, the terms of the policy and
prior determination the Panel is satisfied on the balance of probabilities and
in the circumstances that such inundation would be properly classified as
flash flood.
Quantum
45. The Renewal Certificate of Insurance for the relevant period provides a sum
insured of $189,000 for the home with contents of $67,000. Pursuant to the
policy cap for the insured event of “Flash flood and stormwater runoff”, the
FSP is liable up to an amount of $94,500 for the damage to the building and
$33,500 for the contents.
46. Given the time since the loss was sustained, the Panel accepts that the
parties may be unable to provide an exact estimate of the total loss
sustained, or a breakdown of that loss.
47. The Applicant has also sought cover for rental costs incurred since the
event, totalling $23,435. This was inclusive of seven weeks rent at $565 per
week and a further 41 weeks rent at $470 per week. The FSP has not
challenged the legitimacy of these figures.
48. The policy provides for emergency and alternative accommodation, which is
limited to no more than 10% of the “home sum insured”. This e ntitles the
Applicant to cover for this loss but would appear to place a cap of $18,900
for any claim for rental expenses.
49. The Applicant and the FSP are asked to work cooperatively together to
establish the extent of the loss sustained to the first level of the property and
to reach an agreement as to the relevant scope of works necessary to effect
those repairs; the cost of replacing contents will also require the co-operation
of the parties.
50. Insofar as the FSP may have made payment of a compassionate sum to the
Applicant, FOS does not have jurisdiction to deal with this payment but
acknowledges that the FSP, given the terms on which the compassionate
payment was made, may be entitled to deduct this payment from any
settlement sum.
Determination
51. The FSP is to meet the cost of repairs incurred by the Applicant and the cost
of the replacement of items damaged as a result of the inundation of the
Applicant’s property to a height of 4.4m above benchmark level that is,
Case No: 305161 Determination Page 10 of 10
equivalent to 500mm above the living area o f the elevated part of the home,
subject to the limitations provided within the policy with respect to flash flood
and stormwater runoff cover.
52. As the scope of works is to be completed with respect to the building
damage based on current prices, the Panel accepts that it is not appropriate
in these circumstances to require interest to be paid.
53. However, with respect to contents, the Panel believes that it is appropriate
that interest be paid to any cash settlement figure.
54. Insofar as the FSP is to cash settle the contents claim, the FSP is to pay
interest from 10 March 2011 (being the date of rejection of the claim) to date
of payment of the claim, in accordance with Section 57 of the Act.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.