Text of the determination
Case No: 304680 Determination Page 1 of 14
Case number: 304680
General Insurance - Domestic Insurance - Home Building - Service - Delay in
claim handling
24 December 2013
Summary
Description:
The dispute follows a claim under a Home Building Insurance Policy for
damage sustained to the property following stormwater inundation of the
property in February 2011. The FSP accepted liability for damage to fixtures
and fittings and completed various repairs on the Applicants‟ property . The
Applicants maintain the FSP failed to eradicate the infestation of the property
by mould following the event and claims wide spread cracking occurred to the
walls of the family room following the inundation.
Basis of Determination:
The FSP has failed to complete adequate remediation works for the mould
infestation.
Damage to the walls of the family room according to the two engineering
reports, indicate that the damage was most likely due to a combination of the
home settling, earth moving and defects in structure and design which are
events excluded from cover.
Determination:
The FSP is to meet its liability with respect to the remediation work for the
removal of the mould.
The FSP is entitled to rely upon the policy exclusion with respect to the
structural damage to the family room.
The FSP is to meet the costs of the m ycologist and structural engineer‟s
report.
Determination
Case No: 304680 Determination Page 2 of 14
Background
1. The Applicants insured their home building against loss or damage caused
by insured events under a Home Buildings Insurance Policy for $552,000
with a $100 policy excess. The policy was incepted on 6 January 2004 and
was renewed annually to 6 January 2013.
2. On or about 4 February 2011, stormwater inundated the Applicants‟ property
resulting in water damage to a garage, which had been converted into a
family room and shed to a height of approximately 100mm above floor level.
3. On 1 April 2011, the Applicants reported the appearance of mould in the
family room and shed and cracking in the walls of the family room.
4. The Financial Services Provider (FSP) accepted liability for the da mage to
fixtures and fittings in the family room and arranged to have the mould in the
family room treated.
5. However, the Applicants contend that the mould treatment has not been
successful and was not carried out in the shed. They also contend that the
stormwater inundation caused widespread cracking to the walls of the family
room.
6. The Applicants have submitted the following quotations in respect to the
family room provided by builder “KSG” on 15 September 2013:
To demolish and rebuild $123,800 or
To carry out repairs to the building $ 15,750
7. The FSP contends that the mould arising from the storm event was
eradicated by its contractor at a cost of $28,456.89. It considers that any
subsequent mould is unrelated to the storm event but it is the result of t he
location and condition of the site and ongoing moisture conditions.
8. In respect to the damage to the family room, the FSP has denied liability for
cost of repairs to the building and contends that the damage was caused
due to the building not being constructed to current Australian standards,
poor drainage and footing movement due to the footings being founded on
sandy loam top soil and the damage has been occurring over a long period
of time.
Summary of Applicants ’ position
9. The Applicants are represented by their son. For the sake of simplicity,
reference to the Applicants will include reference to their representative.
10. The Applicants‟ dispute essentially involves three different issues, the
development of mould in the shed, the development of mould in the family
room and extensive cracking to the external walls of the family room.
Case No: 304680 Determination Page 3 of 14
Mould
11. The Applicants submit that the FSP‟s restoration contractor “PR” has not
eradicated the mould from the family room and did not treat the mould in the
shed.
Shed
12. In its report dated 27 August 2011, PR stated that the contents stored in the
shed, showed visible signs of mould and the shed was damp/wet which
would warrant some remediation works occurring.
13. The Applicants state that they were led to believe that the shed was to be
treated for mould. However, when PR arrived to carry out treatment works ,
the Applicants were informed that the shed was not to be touched.
14. The floor of the shed is gravel and a PR manager told them orally what they
would have to do to afford remediation of the gravel floor. The Applicants
state that this was part of the scope of works quoted by PR.
15. The joists in the lower part of the building are bare timber and porous. The
segregated areas of the shed have treated pine posts as supports for wiring
and all timbers have been affected by mould.
16. The Applicants believe that these timbers should be treated for mould under
their policy.
Family Room
17. In August 2011, mould was measured by a mycologist and was deemed to
be of high to very high levels.
18. PR was engaged by the FSP to carry out remediation work to clear the
mould. However, some time later mould growth developed again and in July
2012 the Applicants engaged mycologist “M” to inspect and report on the
mould problem.
19. In its report dated 16 July 2012, M stated that:
the building needs to be remediated and further re-testing should then
occur;
the surface mould constitutes a health hazard.
20. The FSP was contacted in regard to the mould and it again organised PR to
inspect the family room for mould growth.
21. PR inspected the room in August 2012 and reported that moisture levels
were high to very high in the concrete floor and was caused by water flowing
onto the ground adjacent to the family room from downpipes. The Applicants
do not agree with this assumption.
Case No: 304680 Determination Page 4 of 14
22. The Applicants contend the mould growth is residual from the initial mould
growth in early 2011 and that it has now spread to the brick walls. They state
that the FSP should accept their claim for the remediation of the mould in the
family room.
Damage to the Family Room
23. There is extensive cracking to the external walls of the family room which the
Applicants contend have been caused by stormwater run-off that inundated
their property in early 2011.
24. The FSP has denied liability on the ground that the damage to the building
had been occurring over a long period of time.
25. The Applicants dispute this contention and submit that the family room had
been built before 1991 and that the damage now in existence occurred after
the stormwater run-off.
26. The Applicants engaged a builder to inspect the damage and provide a
quotation for repairs. Builder KSG provided a quotation dated 15 September
2013 to repair the damage at a cost of $15,750 or to demolish the existing
structure and re-build at a cost of $123,800.
27. The Applicant engaged a structural engineer „A‟ to inspect and report on the
cause of the damage. In his report dated 16 September 2013, A stated:
the footing design of the family room does not comply with current
Australian Standard for the design of residential footings;
a sewer pipe had been installed adjacent to the southwest wall of the
building and was founded below the footing at the southern corner;
it is possible the footing has locally settled due to the installation of the
sewer;
the backfill material appeared to be a sandy soil which is likely to have
consolidated when saturated from the flood event in February 2011
resulting in greater local settlement in the corner;
the general damage is considered cosmetic and easily repaired except
for a crack above the door in the southern corner where a section of the
wall needs to be replaced;
‘It is likely the defects have been caused by the southern corner of the
building settling greater locally relative to the rest of the building due to a
combination of the footings being insufficient by current Australian Standards
and the sewer trench undermining the existing footings in the southern corner,
potentially exacerbated by consolidation of the backfill from the flood event in
February 2011’ .
28. The Applicants contend that the damage to the family room was caused by
the stormwater inundation in February 2011.
Case No: 304680 Determination Page 5 of 14
Summary of FSP’s position
29. On 4 February 2011, severe stormwater flooding affected parts of Victoria.
The Applicants‟ property was affected to the extent that a garage and shed
were inundated to an approximate height of 100mm above floor level.
30. On 8 February 2011, the Applicants submitted a claim for water damage to
the wall cladding and some fixtures and fittings of the garage. The main
house was unaffected and the shed sustained no damage.
31. The FSP accepted liability for a claim in relation to the internal damage to
the garage. The FSP also agreed that the Applicants‟ preferred builder,
KSG, would provide a repair quotation.
32. On 1 April 2011, a telephone conversation took place between the FSP and
the Applicants regarding the water being contaminated, the appearance of
mould and cracking to the garage. It was agreed the Applicants would
provide a quotation for cleaning and decontamination of the ga rage and the
FSP would arrange for an engineer to inspect and report on the cause of the
cracking.
33. On 14 April 2011, the Applicants provided a repair quotation from KSG in the
amount of $19,270. There was also a quotation from a cleaning contractor
“ TC ” for decontamination and cleaning in the amount of $462.
34. On 28 April 2011, assessor “ PW ” attended the property and confirmed the
presence of mould in various areas and instructed the Applicants to have the
mould treated by TC in accordance with its quotation.
35. On 13 May 2011, engineer “ PB ” attended the property and reported he had
identified old and new cracking as well as building defects.
36. On 22 July 1011, the assessor informed the FSP that he had advised the
Applicants that a 12 month period to allow stabilization of the soil is required
before a re-inspection can be carried out to determine what repairs may or
may not be required in relation to brickwork distress.
37. On 1 August 2011 the Applicants informed the FSP by way of an email that
they remained concerned about sewerage contamination and mould.
38. On 2 August 2011, the FSP instructed the assessor to engage a restoration
firm, PR, to urgently attend the site and treat any mould or septic
contamination. The Assessor was also instructed to arrange re-inspection by
the engineer in order to address all issues with the Applicants.
39. On 9 August 2011, the assessor and builder attended the site to discuss and
review all areas of concern with the Applicants.
40. KSG submitted a quotation in the amount of $12,893 to effect repairs.
Following discussions between KSG and the assessor, the quotation was
reduced to $11,339.
Case No: 304680 Determination Page 6 of 14
41. In a report dated 27 August 2011, PR submitted an undated report from
Mould lab confirming the presence of mould in the main dwelling, garage
and shed. On 5 September 2011, PR was engaged to treat the mould.
42. KSG were instructed to proceed with building repairs once PR had
completed their work. PR completed their work in the first week of October
2011 and submitted their invoice for $28,456.89.
43. KSG completed their repairs to fixtures and fittings and submitted their
invoice for $11,339.
44. However, on 20 June 2012, the Applicants sent an email to the FSP advising
mould had reappeared in a couple of locations and there was one area that
had not been treated by PR.
45. PR re-attended that property and in its report dated 21 August 2012 they
advised the new mould was due to current conditions at the property and is
unrelated to the flood event.
46. On 3 September 2012, the Applicants sent an email to the FSP with queries
in respect to PR‟s report. On 6 September 2012, the FSP sent an email to
the Applicants advising that the assessor and PR have been asked to
respond to their queries and that the engineer had been requested to
provide a further report.
47. On 6 October 2012, the engineer attended the property and subsequently
submitted his report dated 10 October 2012. The report advised that there is
no damage from the February 2011 event, but rather the condition of the
building is due to the location, composition of the soil and building design
and construction.
48. He confirmed the primary cause of the cracking to the garage relates to the
location including soils and the inadequate slab and footing. The engineer
also confirmed the cracking has occurred over a lengthy period of time.
49. The FSP provided a copy of the engineer‟s report to the Applicants who
responded by email on 10 December 2012 acknowledging receipt of the
report and requesting answers to a number of queries.
50. The appointed structural engineer advised the property is poorly drained with
water ponding beside the garage and rainwater run-off from the garage
downpipes directed to the ground beside the garage.
51. The assessors, contractors and engineer provided advice to the Applicants
regarding works required at the site to reduce or eliminate the
water/moisture problems. At no time did they direct the Applicants to carry
out works.
52. Any earthworks undertaken by the Applicants related to the improvement of
drainage at the site, is not covered by the policy.
Case No: 304680 Determination Page 7 of 14
53. On 19 December 2012, the FSP wrote to the Applicants denying their claim
for additional mould damage as it is not the result of the flood event in
February 2011. The claim for cracking to the walls is also denied due to
policy exclusions relating to settling, shrinking or expa nding.
54. The FSP relies on the following policy/contract provisions:
“ PART 1 LOSS OR DAMAGE TO YOUR HOME
The events we insure you for
...
5 Flood or action of the sea
What we insure you for
We insure you for loss or damage to the home caused by flood, or a tidal wave, or
the action of the sea.
...
PART 7 GENERAL EXCLUSIONS
We do not insure you for loss or damage that is not directly caused by an event that
we insure you for, unless we say that we do in this policy.
We do not insure you for loss or damage or legal liability that is intentionally caused
by you or your family or a person acting with the consent of you or your family .
We do not insure you for loss or damage or legal liability caused by:
...
the home or site settling or shrinking or expanding
hydrostatic pressure, or earth moving (other than from earthquake), erosion
defects in structure, design, work done, or materials used on the home or at
the site
...
rust, corrosion, rot, mildew, seepage, rising damp, any gradual deterioration
or process
atmospheric or climatic conditions (other than those we say will in the events
section), condensation, evaporation
...”
Issues
55. Whether the recurrence of mould growth is related to the February 2011
stormwater event or whether the growth has been caused by other factors.
56. Whether the FSP is liable for the structural damage to the family room
Case No: 304680 Determination Page 8 of 14
Reasons for decision
57. Due to the nature of the dispute, the FOS has considered it appropriate to
expedite the dispute in accordance with the Operational Guidelines to the
FOS Terms of Reference. Thus, this dispute has not been subject to a FOS
Recommendation and has proceeded directly to Determination. The parties
have been previously advised that a Determination will be issued in this
case.
58. The onus of proof is on the Applicant to establish, on the balance of
probabilities, that he has suffered a loss caused by a risk insured against.
Once the Applicant has established that the loss was prima facie caused by
a risk insured against, the onus shifts to the FSP to show, on the balance of
probabilities, that the loss falls within an exclusion in the contract of
insurance.
59. There has been an exchange of material which the parties rely on. Each
party has had access to the material on which the other party bases its case.
As a consequence it is not necessary to go into all of this material other than
when relevant.
Mould
Shed
60. The Applicants report that mould is present on the internal timbers of the
shed and on the contents stored in the shed at the time of the stormwater
event.
61. In its report dated 27 August 2011, PR stated:
‘Summary: The visible signs of mould on the content, combined with
some of the content and shed being damp/wet, would warrant some
reme diation works occurring...’
62. The Applicants have reported that no remediation work was carried out on
the shed.
63. The FSP in its IDR letter noted that the shed was used to store furniture and
other items removed from the home. It was never treated for mould because
the structure did not require treatment (the shed flooring is not structural).
Any treatment of the contents stored within the shed if required, does not
come within the ambit of the policy. Based on the information exchanged,
the FSP appears to have ignored the Applicants comments with respect to
the structural damage to the shed, in particular, the mould on the internal
timbers.
64. In view of the report by PR, I accept that there is evidence of mould in the
shed and evidence that the shed required remediation work to remove any
mould. I consider it appropriate that remediation work to remove any mould
be performed by the FSP‟s nominated contractor.
Case No: 304680 Determination Page 9 of 14
Family Room
65. On 27 August 2011, PR carried out an inspection of the presence of higher
than normal levels of mould and on the presence of Coliform bacteria and
E.coli in the Applicants‟ home, family room and shed.
66. PR reported that the family room was in need of mould and Coliform bacteria
remediation works.
67. On 8 August 2011, a mycologist, „NSJ‟, took samples to identify and report
on mould and bacterial growth within the Applicants premises. NSJ report
that airborne mould in the kitchenette of the family room was high and that
surface mould and bacteria in sections of the family room were very high.
68. NSJ recommended porous material be removed, remediation works be
carried out and that following the remediation retesting to confirm clearance
should be performed. This retesting was not carried out.
69. During 2012 there was a recurrence of mould and the Applicants engaged
NSJ to carry out additional tests. The Applicants took samples from the
family room on 7 July 2012 and submitted them to NSJ for testing. NSJ
found that the levels of surface mould and bacteria detected on culture
collected were rated as very high and constituted a health hazard.
70. NSJ recommended an assessment of the premises to determine the source
of the very high mould contamination within the premises.
71. On 1 August 2012 PR took moisture readings of the family room which
indicated there was high to very high levels to the concrete floor. Moving
from the centre of the floor in all directions to the perimeter brick wall there
was an increase of readings from just above normal levels to extremely high
moisture readings.
72. PR stated that the moisture reading indicates that the ingression of water is
from the outer perimeter of the concrete floor inwards to the middle of the
garage and that water is wicking up the walls to about 600mm high.
73. PR reported that the ground levels in some areas surrounding the family
room were higher than the floor level of the room. PR also reported that
stormwater down pipes opens directly onto the ground adjacent to the family
room walls and floors. Further, the ground around the stormwater down
pipes, slope towards the room.
74. Notwithstanding the possibility of the floor of the family room being affected
by the water from the down pipes, it is of concern that when PR carried out
remediation work in October 2011, only the surfaces of all internal walls and
surfaces were treated.
75. The works did not include wall spaces, ceiling and cavities or behind
permanently fixed items. It was a surface remediation only.
Case No: 304680 Determination Page 10 of 14
76. The down pipes of the family room have been draining directly onto the
ground for many years and there has not been any problem with moisture
affecting the interior of the family room.
77. The mycologist, NSJ, reported in August 2011 that the kitchenette had a
high mould reading and the south brick wall had very high concentrations of
mould.
78. The samples were collected by PR and submitted to NSJ for laboratory
testing. Therefore, they would not have covered all areas of the family room
as the samples were taken from exposed internal walls and surfaces.
Further, the family room was not tested to confirm clearance after the
remediation work as recommended by NSJ .
79. There is no evidence that the property had suffered from mould infestation
prior to the inundation of the property in February 2011. The evidence
suggests that the mould developed after that time and had not been
completely eradicated.
80. Based on the information exchanged, I am satisfied that it is unlikely that the
mould was eradicated by October 2011 and the continuing presence was a
cause or factor in the recurrence of the mould growth.
81. Accordingly, I find that the FSP is to engage a qualified contractor to
remediate the mould and bacteria in the family room, including all exposed
surfaces, wall spaces, ceiling, cavities, and behind permanently fixed items.
82. I further find that the FSP is to arrange for follow up testing of the
remediation treatment to determine the success or otherwise of the
treatment. If it is found that the treatment was not successful, the onus shifts
to the Applicants to determine the cause of the mould and bacteria.
Damage to Family Room
83. The Applicants submit that the damage to the external walls of the family
room was caused by the stormwater run-off in February 2011. The FSP has
denied liability on the grounds that the damage has been occurring over a
long period of time, settlement of footings founded in the sandy loam topsoil
and inadequate stormwater drainage. The family room was originally a
garage and is approximately 37 years old.
84. The Applicants have submitted quotations for repair of the building in the
amount of $15,750 or to demolish and rebuild in the amount of $123,800.
85. The Applicant engaged a structural engineer, „A‟, to inspe ct and report on
the external damage to the building. In his report dated 16 September 2013,
A stated, in part:
based on a visual inspection it was evident the building had undergone
differential settlement with the southern corner settling further than the
rest of the building;
Case No: 304680 Determination Page 11 of 14
assessment of the structural drawings provided by the Applicants
indicates that the footing design does not comply with the current
Australian Standard for the design of residential footings;
it was noted that a sewer pipe had been installed adjacent to the
southwest wall of the building and was founded below the footing at the
southern corner; it is possible the footing has locally settled due to the
installation of the sewer;
the backfill material appeared to be a sandy soil which is likely to have
consolidated when saturated from the flood event in February 2011
resulting in greater local settlement in the corner;
the general damage is considered cosmetic and easily repaired except
for a crack above the door in the southern corner where a section of the
wall need to be replaced;
‘It is likely the defects have been caused by the southern corner of the
building settling greater locally relative to the rest of the building due to a
combination of the footings being insufficient by current Australian Standards
and the sewer trench undermining the existing footings in the southern corner,
potentially exacerbated by consolidation of the backfill from the flood event in
February 2011’;
86. A stated that the limited scope of its brief, including the limited scope of
investigation requested by the Applicants meant that the report necessarily
concentrated on readily apparent major items. No detailed testing or
inspection was carried out.
87. The FSP engaged structural engineer, „PB‟ to inspect and report on the
damage to the family room. In his report dated 20 May 2011, PB stated, in
part:
‘Cracking of the walls in the converted garage, accompanied by increased
cracking in the floor slab, is considered to be due to settlement caused by
overly wet founding soil and inadequate footing )stiffened raft) construction. Of
full masonry construction, the building also has no articulation joints in walls,
thus any footing movement results in increased cracking. Drying out of
founding soils is unlikely to result in any reduction of crack sizes or
improvement in appearance.’
88. PB provided an additional report dated 10 October 2012. In his summarised
findings, PB stated:
the converted garage construction does not meet Building Code of
Australia requirements for a habitable building;
stiffened raft footing system does not conform to AS 2870, Residential
slabs & footings, for the soil type and the full masonry walls;
site landscaping does not divert surface run-off away from the building;
floor levels are lower than required for a habitable building, but are
permissible for a garage;
the walls are constructed of porous brickwork and have not been water
or weatherproofed, not has a damp course been fitted;
Case No: 304680 Determination Page 12 of 14
ventilators have not been provided;
stormwater disposal piping does not take roof run-off away from the
building.
89. PB also reported:
“ ...The reasons for it being considered unsuitable for habitation are the loe
floor levels relative to surrounding soil levels, the non-waterproofed finish to
the exterior walls, lack of a damp course, and inadequate ventilation. The
combination of factors would contribute to damp conditions inside the building
during normal wet weather, resulting in possible mildew growth and unhealthy
conditions.
...
...Based on footing and wall movement which has occurred since being built,
estimated at 30 to 35 years ago, the structural condition of the building is
unlikely to change markedly as seasonal conditions change, as much
potential movement will already have occurred as a result of the extended
drought, and the very wet conditions which followed. Note that footing
movement and related wall cracking is believed to have occurred due to
settlement of footings founded in the sandy loam topsoil and is considered to
have occurred over a very long time period. It is probable that some
acceleration of movement occurred due to the very wet conditions which
occurred during 2011... ”
90. Based upon the two engineers‟ reports, in particular the FSP engineer‟s
report, I find that the cracking to the wall of the family room has been caused
by:
the home or site settling or shrinking or expanding;
... earth moving, erosion;
defects in structure, design, work done, or materials used on the home
or site;
seepage, rising damp, any gradual deterioration or process.
which are events excluded from the cover provided by the policy.
91. Notwithstanding engineer PB‟s opinion as to the acceleration of movement
due to the very wet conditions from the stormwater run-off, I consider that
that was not a proximate cause of the damage to the family room.
Other Issues
92. Replacement of soil excavation surrounding the garage/family room.
93. The Applicants advise that they were advised to carry out earth works but at
their own cost. However, the FSP states that any advice given was to reduce
or eliminate the water drainage problem.
Case No: 304680 Determination Page 13 of 14
94. The Applicants have not submitted any compelling evidence as to what earth
works should be performed and at whose cost. Therefore, I find that the FSP
is not liable to pay any compensation for this matter.
95. So far as the Applicants claim the FSP‟s loss assessor had also lodged a
contents claim with another FSP, I note the loss assessor is an independent
contractor. He was not acting on behalf of the FSP with respect to the
Applicants ‟ contents claim. There are no details of any dispute with respect
to the contents claim as against the other insurer and therefore this is not a
matter that I am able to deal with.
96. Insofar as the Applicants have made allegations with respect to breaches of
the General Insurance Code of Practice, such allegations will be referred to
the Code Manager for investigation.
97. Insofar as the Applicants have alleged the FSP breached its duty of utmost
good faith towards the Applicants and was therefore in breach of Section 13
of the Insurance Contracts Act, I am satisfied that the FSP has acted based
on the information before it to deal with the Applicants‟ claim. The FSP
attended to the eradication of the mould in 2011 and upon the Applicants
further claims being lodged in 2012. Although I have determined that the
FSP is responsible for further remediation works with respect to the mould
infestation, I do not consider its action with respect to its handling of the
claim to be in breach of Section 13 of the Insurance Contracts Act .
98. The Applicants have incurred a cost of $350 in obtaining a mycologist report
and $550 in obtaining a structural engineer‟s report. The Applicants have
sought reimbursement of these costs.
99. Paragraph 9.4 of the Terms of Reference provides that FOS may determine
that an FSP contribute to the legal or other professional costs incurred by an
Applicant in the course of the dispute. In this dispute, the FSP obtained a
mycologist and structural engineer‟s report. It was reasonable in those
circumstances that the Applicants sought to obtain such professional advice
in support of their position, in particular, given the potential extent of the
claim. The mycologist report was $350 and the structural engineer‟s report
was $550. I am satisfied it was reasonable for the Applicants to have
incurred these costs to respond to the arguments raised by the FSP and to
assist in resolving their dispute.
Determination
100. Accordingly I determine:
The FSP is to carry out remediation work for the removal of mould and
bacteria in the shed and family room. This initial work is to be reviewed
within two months of the completion of the remediation work.
The FSP is entitled to rely on the policy exclusions to deny liability for
the structural damage to the family room.
Case No: 304680 Determination Page 14 of 14
Pursuant to paragraph 9.4 of the Terms of Reference, I determine that
the FSP contribute to the Applicants‟ cost incurred in presenting the
expert information and that the FSP pay the Applicants the amount of
$900 towards those costs. The Applicants have submitted invoices to
support their claim.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.