Home / Financial Firm (Unknown - Insurer) / Determination 304680

Determination 304680

Delay in claim handling

FirmFinancial Firm (Unknown - Insurer)
Decided2014-01-23
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded$900
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

Stormwater flooded the Applicants' garage and shed in 2011, and mould recurred after the FSP's remediation. AFCA ordered the FSP to remediate mould in the shed and family room and contribute $900 to expert report costs, but found the FSP not liable for the structural cracking to the family room.

Mould that developed after the flood and was never fully eradicated is covered, while the structural cracking was caused by settlement and design defects excluded by the policy.

Issues

Subjects and remedies

home or building damagepay compensationrepair or rectify

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Case No: 304680 Determination Page 1 of 14 Case number: 304680 General Insurance - Domestic Insurance - Home Building - Service - Delay in claim handling 24 December 2013 Summary Description:  The dispute follows a claim under a Home Building Insurance Policy for damage sustained to the property following stormwater inundation of the property in February 2011. The FSP accepted liability for damage to fixtures and fittings and completed various repairs on the Applicants‟ property . The Applicants maintain the FSP failed to eradicate the infestation of the property by mould following the event and claims wide spread cracking occurred to the walls of the family room following the inundation. Basis of Determination:  The FSP has failed to complete adequate remediation works for the mould infestation.  Damage to the walls of the family room according to the two engineering reports, indicate that the damage was most likely due to a combination of the home settling, earth moving and defects in structure and design which are events excluded from cover. Determination:  The FSP is to meet its liability with respect to the remediation work for the removal of the mould.  The FSP is entitled to rely upon the policy exclusion with respect to the structural damage to the family room.  The FSP is to meet the costs of the m ycologist and structural engineer‟s report. Determination Case No: 304680 Determination Page 2 of 14 Background 1. The Applicants insured their home building against loss or damage caused by insured events under a Home Buildings Insurance Policy for $552,000 with a $100 policy excess. The policy was incepted on 6 January 2004 and was renewed annually to 6 January 2013. 2. On or about 4 February 2011, stormwater inundated the Applicants‟ property resulting in water damage to a garage, which had been converted into a family room and shed to a height of approximately 100mm above floor level. 3. On 1 April 2011, the Applicants reported the appearance of mould in the family room and shed and cracking in the walls of the family room. 4. The Financial Services Provider (FSP) accepted liability for the da mage to fixtures and fittings in the family room and arranged to have the mould in the family room treated. 5. However, the Applicants contend that the mould treatment has not been successful and was not carried out in the shed. They also contend that the stormwater inundation caused widespread cracking to the walls of the family room. 6. The Applicants have submitted the following quotations in respect to the family room provided by builder “KSG” on 15 September 2013: To demolish and rebuild $123,800 or To carry out repairs to the building $ 15,750 7. The FSP contends that the mould arising from the storm event was eradicated by its contractor at a cost of $28,456.89. It considers that any subsequent mould is unrelated to the storm event but it is the result of t he location and condition of the site and ongoing moisture conditions. 8. In respect to the damage to the family room, the FSP has denied liability for cost of repairs to the building and contends that the damage was caused due to the building not being constructed to current Australian standards, poor drainage and footing movement due to the footings being founded on sandy loam top soil and the damage has been occurring over a long period of time. Summary of Applicants ’ position 9. The Applicants are represented by their son. For the sake of simplicity, reference to the Applicants will include reference to their representative. 10. The Applicants‟ dispute essentially involves three different issues, the development of mould in the shed, the development of mould in the family room and extensive cracking to the external walls of the family room. Case No: 304680 Determination Page 3 of 14 Mould 11. The Applicants submit that the FSP‟s restoration contractor “PR” has not eradicated the mould from the family room and did not treat the mould in the shed. Shed 12. In its report dated 27 August 2011, PR stated that the contents stored in the shed, showed visible signs of mould and the shed was damp/wet which would warrant some remediation works occurring. 13. The Applicants state that they were led to believe that the shed was to be treated for mould. However, when PR arrived to carry out treatment works , the Applicants were informed that the shed was not to be touched. 14. The floor of the shed is gravel and a PR manager told them orally what they would have to do to afford remediation of the gravel floor. The Applicants state that this was part of the scope of works quoted by PR. 15. The joists in the lower part of the building are bare timber and porous. The segregated areas of the shed have treated pine posts as supports for wiring and all timbers have been affected by mould. 16. The Applicants believe that these timbers should be treated for mould under their policy. Family Room 17. In August 2011, mould was measured by a mycologist and was deemed to be of high to very high levels. 18. PR was engaged by the FSP to carry out remediation work to clear the mould. However, some time later mould growth developed again and in July 2012 the Applicants engaged mycologist “M” to inspect and report on the mould problem. 19. In its report dated 16 July 2012, M stated that:  the building needs to be remediated and further re-testing should then occur;  the surface mould constitutes a health hazard. 20. The FSP was contacted in regard to the mould and it again organised PR to inspect the family room for mould growth. 21. PR inspected the room in August 2012 and reported that moisture levels were high to very high in the concrete floor and was caused by water flowing onto the ground adjacent to the family room from downpipes. The Applicants do not agree with this assumption. Case No: 304680 Determination Page 4 of 14 22. The Applicants contend the mould growth is residual from the initial mould growth in early 2011 and that it has now spread to the brick walls. They state that the FSP should accept their claim for the remediation of the mould in the family room. Damage to the Family Room 23. There is extensive cracking to the external walls of the family room which the Applicants contend have been caused by stormwater run-off that inundated their property in early 2011. 24. The FSP has denied liability on the ground that the damage to the building had been occurring over a long period of time. 25. The Applicants dispute this contention and submit that the family room had been built before 1991 and that the damage now in existence occurred after the stormwater run-off. 26. The Applicants engaged a builder to inspect the damage and provide a quotation for repairs. Builder KSG provided a quotation dated 15 September 2013 to repair the damage at a cost of $15,750 or to demolish the existing structure and re-build at a cost of $123,800. 27. The Applicant engaged a structural engineer „A‟ to inspect and report on the cause of the damage. In his report dated 16 September 2013, A stated:  the footing design of the family room does not comply with current Australian Standard for the design of residential footings;  a sewer pipe had been installed adjacent to the southwest wall of the building and was founded below the footing at the southern corner;   it is possible the footing has locally settled due to the installation of the sewer;  the backfill material appeared to be a sandy soil which is likely to have consolidated when saturated from the flood event in February 2011 resulting in greater local settlement in the corner;  the general damage is considered cosmetic and easily repaired except for a crack above the door in the southern corner where a section of the wall needs to be replaced;  ‘It is likely the defects have been caused by the southern corner of the building settling greater locally relative to the rest of the building due to a combination of the footings being insufficient by current Australian Standards and the sewer trench undermining the existing footings in the southern corner, potentially exacerbated by consolidation of the backfill from the flood event in February 2011’ . 28. The Applicants contend that the damage to the family room was caused by the stormwater inundation in February 2011. Case No: 304680 Determination Page 5 of 14 Summary of FSP’s position 29. On 4 February 2011, severe stormwater flooding affected parts of Victoria. The Applicants‟ property was affected to the extent that a garage and shed were inundated to an approximate height of 100mm above floor level. 30. On 8 February 2011, the Applicants submitted a claim for water damage to the wall cladding and some fixtures and fittings of the garage. The main house was unaffected and the shed sustained no damage. 31. The FSP accepted liability for a claim in relation to the internal damage to the garage. The FSP also agreed that the Applicants‟ preferred builder, KSG, would provide a repair quotation. 32. On 1 April 2011, a telephone conversation took place between the FSP and the Applicants regarding the water being contaminated, the appearance of mould and cracking to the garage. It was agreed the Applicants would provide a quotation for cleaning and decontamination of the ga rage and the FSP would arrange for an engineer to inspect and report on the cause of the cracking. 33. On 14 April 2011, the Applicants provided a repair quotation from KSG in the amount of $19,270. There was also a quotation from a cleaning contractor “ TC ” for decontamination and cleaning in the amount of $462. 34. On 28 April 2011, assessor “ PW ” attended the property and confirmed the presence of mould in various areas and instructed the Applicants to have the mould treated by TC in accordance with its quotation. 35. On 13 May 2011, engineer “ PB ” attended the property and reported he had identified old and new cracking as well as building defects. 36. On 22 July 1011, the assessor informed the FSP that he had advised the Applicants that a 12 month period to allow stabilization of the soil is required before a re-inspection can be carried out to determine what repairs may or may not be required in relation to brickwork distress. 37. On 1 August 2011 the Applicants informed the FSP by way of an email that they remained concerned about sewerage contamination and mould. 38. On 2 August 2011, the FSP instructed the assessor to engage a restoration firm, PR, to urgently attend the site and treat any mould or septic contamination. The Assessor was also instructed to arrange re-inspection by the engineer in order to address all issues with the Applicants. 39. On 9 August 2011, the assessor and builder attended the site to discuss and review all areas of concern with the Applicants. 40. KSG submitted a quotation in the amount of $12,893 to effect repairs. Following discussions between KSG and the assessor, the quotation was reduced to $11,339. Case No: 304680 Determination Page 6 of 14 41. In a report dated 27 August 2011, PR submitted an undated report from Mould lab confirming the presence of mould in the main dwelling, garage and shed. On 5 September 2011, PR was engaged to treat the mould. 42. KSG were instructed to proceed with building repairs once PR had completed their work. PR completed their work in the first week of October 2011 and submitted their invoice for $28,456.89. 43. KSG completed their repairs to fixtures and fittings and submitted their invoice for $11,339. 44. However, on 20 June 2012, the Applicants sent an email to the FSP advising mould had reappeared in a couple of locations and there was one area that had not been treated by PR. 45. PR re-attended that property and in its report dated 21 August 2012 they advised the new mould was due to current conditions at the property and is unrelated to the flood event. 46. On 3 September 2012, the Applicants sent an email to the FSP with queries in respect to PR‟s report. On 6 September 2012, the FSP sent an email to the Applicants advising that the assessor and PR have been asked to respond to their queries and that the engineer had been requested to provide a further report. 47. On 6 October 2012, the engineer attended the property and subsequently submitted his report dated 10 October 2012. The report advised that there is no damage from the February 2011 event, but rather the condition of the building is due to the location, composition of the soil and building design and construction. 48. He confirmed the primary cause of the cracking to the garage relates to the location including soils and the inadequate slab and footing. The engineer also confirmed the cracking has occurred over a lengthy period of time. 49. The FSP provided a copy of the engineer‟s report to the Applicants who responded by email on 10 December 2012 acknowledging receipt of the report and requesting answers to a number of queries. 50. The appointed structural engineer advised the property is poorly drained with water ponding beside the garage and rainwater run-off from the garage downpipes directed to the ground beside the garage. 51. The assessors, contractors and engineer provided advice to the Applicants regarding works required at the site to reduce or eliminate the water/moisture problems. At no time did they direct the Applicants to carry out works. 52. Any earthworks undertaken by the Applicants related to the improvement of drainage at the site, is not covered by the policy. Case No: 304680 Determination Page 7 of 14 53. On 19 December 2012, the FSP wrote to the Applicants denying their claim for additional mould damage as it is not the result of the flood event in February 2011. The claim for cracking to the walls is also denied due to policy exclusions relating to settling, shrinking or expa nding. 54. The FSP relies on the following policy/contract provisions: “ PART 1 LOSS OR DAMAGE TO YOUR HOME The events we insure you for ... 5 Flood or action of the sea What we insure you for We insure you for loss or damage to the home caused by flood, or a tidal wave, or the action of the sea. ... PART 7 GENERAL EXCLUSIONS We do not insure you for loss or damage that is not directly caused by an event that we insure you for, unless we say that we do in this policy. We do not insure you for loss or damage or legal liability that is intentionally caused by you or your family or a person acting with the consent of you or your family . We do not insure you for loss or damage or legal liability caused by:  ...  the home or site settling or shrinking or expanding  hydrostatic pressure, or earth moving (other than from earthquake), erosion  defects in structure, design, work done, or materials used on the home or at the site  ...  rust, corrosion, rot, mildew, seepage, rising damp, any gradual deterioration or process  atmospheric or climatic conditions (other than those we say will in the events section), condensation, evaporation  ...” Issues 55. Whether the recurrence of mould growth is related to the February 2011 stormwater event or whether the growth has been caused by other factors. 56. Whether the FSP is liable for the structural damage to the family room Case No: 304680 Determination Page 8 of 14 Reasons for decision 57. Due to the nature of the dispute, the FOS has considered it appropriate to expedite the dispute in accordance with the Operational Guidelines to the FOS Terms of Reference. Thus, this dispute has not been subject to a FOS Recommendation and has proceeded directly to Determination. The parties have been previously advised that a Determination will be issued in this case. 58. The onus of proof is on the Applicant to establish, on the balance of probabilities, that he has suffered a loss caused by a risk insured against. Once the Applicant has established that the loss was prima facie caused by a risk insured against, the onus shifts to the FSP to show, on the balance of probabilities, that the loss falls within an exclusion in the contract of insurance. 59. There has been an exchange of material which the parties rely on. Each party has had access to the material on which the other party bases its case. As a consequence it is not necessary to go into all of this material other than when relevant. Mould Shed 60. The Applicants report that mould is present on the internal timbers of the shed and on the contents stored in the shed at the time of the stormwater event. 61. In its report dated 27 August 2011, PR stated: ‘Summary: The visible signs of mould on the content, combined with some of the content and shed being damp/wet, would warrant some reme diation works occurring...’ 62. The Applicants have reported that no remediation work was carried out on the shed. 63. The FSP in its IDR letter noted that the shed was used to store furniture and other items removed from the home. It was never treated for mould because the structure did not require treatment (the shed flooring is not structural). Any treatment of the contents stored within the shed if required, does not come within the ambit of the policy. Based on the information exchanged, the FSP appears to have ignored the Applicants comments with respect to the structural damage to the shed, in particular, the mould on the internal timbers. 64. In view of the report by PR, I accept that there is evidence of mould in the shed and evidence that the shed required remediation work to remove any mould. I consider it appropriate that remediation work to remove any mould be performed by the FSP‟s nominated contractor. Case No: 304680 Determination Page 9 of 14 Family Room 65. On 27 August 2011, PR carried out an inspection of the presence of higher than normal levels of mould and on the presence of Coliform bacteria and E.coli in the Applicants‟ home, family room and shed. 66. PR reported that the family room was in need of mould and Coliform bacteria remediation works. 67. On 8 August 2011, a mycologist, „NSJ‟, took samples to identify and report on mould and bacterial growth within the Applicants premises. NSJ report that airborne mould in the kitchenette of the family room was high and that surface mould and bacteria in sections of the family room were very high. 68. NSJ recommended porous material be removed, remediation works be carried out and that following the remediation retesting to confirm clearance should be performed. This retesting was not carried out. 69. During 2012 there was a recurrence of mould and the Applicants engaged NSJ to carry out additional tests. The Applicants took samples from the family room on 7 July 2012 and submitted them to NSJ for testing. NSJ found that the levels of surface mould and bacteria detected on culture collected were rated as very high and constituted a health hazard. 70. NSJ recommended an assessment of the premises to determine the source of the very high mould contamination within the premises. 71. On 1 August 2012 PR took moisture readings of the family room which indicated there was high to very high levels to the concrete floor. Moving from the centre of the floor in all directions to the perimeter brick wall there was an increase of readings from just above normal levels to extremely high moisture readings. 72. PR stated that the moisture reading indicates that the ingression of water is from the outer perimeter of the concrete floor inwards to the middle of the garage and that water is wicking up the walls to about 600mm high. 73. PR reported that the ground levels in some areas surrounding the family room were higher than the floor level of the room. PR also reported that stormwater down pipes opens directly onto the ground adjacent to the family room walls and floors. Further, the ground around the stormwater down pipes, slope towards the room. 74. Notwithstanding the possibility of the floor of the family room being affected by the water from the down pipes, it is of concern that when PR carried out remediation work in October 2011, only the surfaces of all internal walls and surfaces were treated. 75. The works did not include wall spaces, ceiling and cavities or behind permanently fixed items. It was a surface remediation only. Case No: 304680 Determination Page 10 of 14 76. The down pipes of the family room have been draining directly onto the ground for many years and there has not been any problem with moisture affecting the interior of the family room. 77. The mycologist, NSJ, reported in August 2011 that the kitchenette had a high mould reading and the south brick wall had very high concentrations of mould. 78. The samples were collected by PR and submitted to NSJ for laboratory testing. Therefore, they would not have covered all areas of the family room as the samples were taken from exposed internal walls and surfaces. Further, the family room was not tested to confirm clearance after the remediation work as recommended by NSJ . 79. There is no evidence that the property had suffered from mould infestation prior to the inundation of the property in February 2011. The evidence suggests that the mould developed after that time and had not been completely eradicated. 80. Based on the information exchanged, I am satisfied that it is unlikely that the mould was eradicated by October 2011 and the continuing presence was a cause or factor in the recurrence of the mould growth. 81. Accordingly, I find that the FSP is to engage a qualified contractor to remediate the mould and bacteria in the family room, including all exposed surfaces, wall spaces, ceiling, cavities, and behind permanently fixed items. 82. I further find that the FSP is to arrange for follow up testing of the remediation treatment to determine the success or otherwise of the treatment. If it is found that the treatment was not successful, the onus shifts to the Applicants to determine the cause of the mould and bacteria. Damage to Family Room 83. The Applicants submit that the damage to the external walls of the family room was caused by the stormwater run-off in February 2011. The FSP has denied liability on the grounds that the damage has been occurring over a long period of time, settlement of footings founded in the sandy loam topsoil and inadequate stormwater drainage. The family room was originally a garage and is approximately 37 years old. 84. The Applicants have submitted quotations for repair of the building in the amount of $15,750 or to demolish and rebuild in the amount of $123,800. 85. The Applicant engaged a structural engineer, „A‟, to inspe ct and report on the external damage to the building. In his report dated 16 September 2013, A stated, in part:  based on a visual inspection it was evident the building had undergone differential settlement with the southern corner settling further than the rest of the building; Case No: 304680 Determination Page 11 of 14   assessment of the structural drawings provided by the Applicants indicates that the footing design does not comply with the current Australian Standard for the design of residential footings;  it was noted that a sewer pipe had been installed adjacent to the southwest wall of the building and was founded below the footing at the southern corner; it is possible the footing has locally settled due to the installation of the sewer;  the backfill material appeared to be a sandy soil which is likely to have consolidated when saturated from the flood event in February 2011 resulting in greater local settlement in the corner;  the general damage is considered cosmetic and easily repaired except for a crack above the door in the southern corner where a section of the wall need to be replaced;  ‘It is likely the defects have been caused by the southern corner of the building settling greater locally relative to the rest of the building due to a combination of the footings being insufficient by current Australian Standards and the sewer trench undermining the existing footings in the southern corner, potentially exacerbated by consolidation of the backfill from the flood event in February 2011’; 86. A stated that the limited scope of its brief, including the limited scope of investigation requested by the Applicants meant that the report necessarily concentrated on readily apparent major items. No detailed testing or inspection was carried out. 87. The FSP engaged structural engineer, „PB‟ to inspect and report on the damage to the family room. In his report dated 20 May 2011, PB stated, in part: ‘Cracking of the walls in the converted garage, accompanied by increased cracking in the floor slab, is considered to be due to settlement caused by overly wet founding soil and inadequate footing )stiffened raft) construction. Of full masonry construction, the building also has no articulation joints in walls, thus any footing movement results in increased cracking. Drying out of founding soils is unlikely to result in any reduction of crack sizes or improvement in appearance.’ 88. PB provided an additional report dated 10 October 2012. In his summarised findings, PB stated:  the converted garage construction does not meet Building Code of Australia requirements for a habitable building;  stiffened raft footing system does not conform to AS 2870, Residential slabs & footings, for the soil type and the full masonry walls;  site landscaping does not divert surface run-off away from the building;  floor levels are lower than required for a habitable building, but are permissible for a garage;  the walls are constructed of porous brickwork and have not been water or weatherproofed, not has a damp course been fitted; Case No: 304680 Determination Page 12 of 14  ventilators have not been provided;  stormwater disposal piping does not take roof run-off away from the building. 89. PB also reported: “ ...The reasons for it being considered unsuitable for habitation are the loe floor levels relative to surrounding soil levels, the non-waterproofed finish to the exterior walls, lack of a damp course, and inadequate ventilation. The combination of factors would contribute to damp conditions inside the building during normal wet weather, resulting in possible mildew growth and unhealthy conditions. ... ...Based on footing and wall movement which has occurred since being built, estimated at 30 to 35 years ago, the structural condition of the building is unlikely to change markedly as seasonal conditions change, as much potential movement will already have occurred as a result of the extended drought, and the very wet conditions which followed. Note that footing movement and related wall cracking is believed to have occurred due to settlement of footings founded in the sandy loam topsoil and is considered to have occurred over a very long time period. It is probable that some acceleration of movement occurred due to the very wet conditions which occurred during 2011... ” 90. Based upon the two engineers‟ reports, in particular the FSP engineer‟s report, I find that the cracking to the wall of the family room has been caused by:  the home or site settling or shrinking or expanding;   ... earth moving, erosion;  defects in structure, design, work done, or materials used on the home or site;  seepage, rising damp, any gradual deterioration or process. which are events excluded from the cover provided by the policy. 91. Notwithstanding engineer PB‟s opinion as to the acceleration of movement due to the very wet conditions from the stormwater run-off, I consider that that was not a proximate cause of the damage to the family room. Other Issues 92. Replacement of soil excavation surrounding the garage/family room. 93. The Applicants advise that they were advised to carry out earth works but at their own cost. However, the FSP states that any advice given was to reduce or eliminate the water drainage problem. Case No: 304680 Determination Page 13 of 14 94. The Applicants have not submitted any compelling evidence as to what earth works should be performed and at whose cost. Therefore, I find that the FSP is not liable to pay any compensation for this matter. 95. So far as the Applicants claim the FSP‟s loss assessor had also lodged a contents claim with another FSP, I note the loss assessor is an independent contractor. He was not acting on behalf of the FSP with respect to the Applicants ‟ contents claim. There are no details of any dispute with respect to the contents claim as against the other insurer and therefore this is not a matter that I am able to deal with. 96. Insofar as the Applicants have made allegations with respect to breaches of the General Insurance Code of Practice, such allegations will be referred to the Code Manager for investigation. 97. Insofar as the Applicants have alleged the FSP breached its duty of utmost good faith towards the Applicants and was therefore in breach of Section 13 of the Insurance Contracts Act, I am satisfied that the FSP has acted based on the information before it to deal with the Applicants‟ claim. The FSP attended to the eradication of the mould in 2011 and upon the Applicants further claims being lodged in 2012. Although I have determined that the FSP is responsible for further remediation works with respect to the mould infestation, I do not consider its action with respect to its handling of the claim to be in breach of Section 13 of the Insurance Contracts Act . 98. The Applicants have incurred a cost of $350 in obtaining a mycologist report and $550 in obtaining a structural engineer‟s report. The Applicants have sought reimbursement of these costs. 99. Paragraph 9.4 of the Terms of Reference provides that FOS may determine that an FSP contribute to the legal or other professional costs incurred by an Applicant in the course of the dispute. In this dispute, the FSP obtained a mycologist and structural engineer‟s report. It was reasonable in those circumstances that the Applicants sought to obtain such professional advice in support of their position, in particular, given the potential extent of the claim. The mycologist report was $350 and the structural engineer‟s report was $550. I am satisfied it was reasonable for the Applicants to have incurred these costs to respond to the arguments raised by the FSP and to assist in resolving their dispute. Determination 100. Accordingly I determine:  The FSP is to carry out remediation work for the removal of mould and bacteria in the shed and family room. This initial work is to be reviewed within two months of the completion of the remediation work.  The FSP is entitled to rely on the policy exclusions to deny liability for the structural damage to the family room. Case No: 304680 Determination Page 14 of 14  Pursuant to paragraph 9.4 of the Terms of Reference, I determine that the FSP contribute to the Applicants‟ cost incurred in presenting the expert information and that the FSP pay the Applicants the amount of $900 towards those costs. The Applicants have submitted invoices to support their claim.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.