Text of the determination
Case No: 304673 Determination Page 1 of 11
Case number: 304673
General Insurance - Small Business/Farm Insurance - Commercial Property -
FSP Decision - Denial of Claims - No Insured Event
29 August 2013
Background
1. The Applicant holds a farm insurance policy with the Financial Services
Provider (FSP) covering his business and property. The policy was current at
the time of the loss.
2. The Applicant submitted 12 claims to the FSP, spanning a period of
approximately three years, for losses incurred due to spoilage of stock in his
coolroom. The FSP declined to cover the claims on the ground that the
losses had not arisen as a result of an insured event.
3. The Applicant is seeking a review of the FSP‟s decision to decline his claims.
Summary of Applicant’s position
4. The Applicant grows bananas in the Northern Territory. After picking them
he stores them in a coolroom until they are transported to market. He says
that stock was damaged while it was stored in the coolroom because of the
malfunction of the coolroom. He says this loss is covered by section 8 of his
policy “Machinery breakdown.”
5. The Applicant also says the FSP accepted two earlier claims in similar
circumstances which led him to believe he would be covered for future
losses of the same nature. He argues that the acceptance of the earlier
claims set a precedent for how these claims should have been resolved.
6. The Applicant says at the time of the two earlier claims lodged in 2010, the
FSP assessed them and determined there was a malfunction in his cool
rooms but did not provide him with a copy of the findings. Had he known
there was a problem with his equipment, he would have taken steps at that
time to fix it and would not have incurred the later losses.
7. The Applicant therefore considers he was prejudic ed by the FSP‟s actions by
not informing him of the problem and preventing him from taking steps to
mitigate his loss. The Applicant says at the least the FSP should therefore
accept all of the losses that occurred before he received a second report
confirming the cause of the problem with his coolroom.
Determination
Case No: 304673 Determination Page 2 of 11
8. The Applicant says the reason for the delay in lodgement of the claims was
because he originally sought recovery from company “C” which had installed
the cool rooms. C was called out on numerous occasions because of
problems with the cool rooms. C has since ceased trading.
9. The Applicant considers the breakdowns in the equipment were sudden and
unforseen and he has therefore demonstrated an entitlement to recover
under the terms of the policy.
Summary of FSP’s position
10. The FSP admits the Applicant is covered for “machinery breakdown” and
“deterioration of refrigerated goods” under his policy. However, in order to
claim for deterioration of refrigerated goods, the loss must have arisen as a
result of a breakdown in machinery and where a claim is admitted under the
section for machinery breakdown.
11. The FSP says the cause of the losses was inadequate equipment being
installed in the cool room, which caused it to malfunction at intermittent
interval s. There was no “breakdown” of machinery, in the sense of
unforeseen and unexpected physical destruction or damage to the
machinery. Therefore the losses do not fall within the cover offered by the
policy.
12. The FSP says the Applicant was aware of the problems with his cool rooms
from as early as 2010 and failed to take any steps to rectify them. The FSP
says that acceptance of any earlier claims did therefore not set a precedent
for how future claims would be resolved.
13. The FSP relies on the following policy provisions:
“ Section 8
Machinery Breakdown
What is insured
The property set out on your schedule is insured if it is destroyed, lost or
damaged. It is insured only if you own, or are liable, for the property.
...
Words that have special meaning in this section
In this section there are words that have a special meaning:
Breakdown means unforseen and unexpected physical destruction or
damage to the machinery or electronic equipment specified on your
schedule, which needs repair or replacement to allow normal working
to continue.
...
Deterioration of refrigerated goods means unforseen and unexpected
decay, contamination and purification of refrigerated goods other than
milk contained in a refrigerated vat, refrigerated room, refrigerator or
Case No: 304673 Determination Page 3 of 11
freezer, which results from a rise or fall in temperature or
contamination by contact with refrigerant gases.
This deterioration must be caused by:
Breakdown of the dairy plant, electrical machinery, electronic
equipment, mechanical machinery or pressure equipment for which a
claim has been admitted under this section or would have been
admitted other than for the application of the excess; or
Non operation of fuses, protective devices or overload devices; or
A change in the concentration of gases in the refrigerated vat,
refrigerated room, refrigerator or freezer, caused by breakdown, or
Contact with refrigerant gas leaking from the insured machinery.
...
When we will pay
We will pay for destruction, loss or damage to the following property
shown in the schedule, and while at the situation:
The costs of repair following the breakdown of electrical
machinery, electronic equipment, mechanical machinery and
specified items listed in the schedule under machinery breakdown.
This also includes the cost to dismantle and reassemble.
Where blanket cover has been selected we will pay the repair
costs following, the breakdown of electrical machinery and
mechanical machinery. This does not apply to electrical machinery
or mechanical machinery used only for domestic purposes.
...
When we will not pay
Repair or replacement necessitated by:
Wasting or wearing out of parts, caused by or resulting from
ordinary use or working or gradual deterioration.
...
Additional things you can insure for under machinery breakdown
Deterioration of refrigerated goods
If you have selected cover for refrigerated goods, we will either replace
the goods, or pay the value of the goods immediately prior to the loss. If
produced by you this will be based on the production cost. We will decide
which we will do.
The most we will pay for any one occurrence is the amount specified in
the schedule. ”
Issues
14. Whether the damage to the Applicant‟s stock was caused by unforeseen and
unexpected physical destruction or damage to machinery requiring repair.
Case No: 304673 Determination Page 4 of 11
Reasons for decision
15. I am satisfied there has been a complete exchange of information between
the parties and each party has had the opportunity to address issues raised.
16. As the Applicant has brought the claims against the FSP, he bears the onus
of proving that the loss for which he is claiming resulted from an event
covered by the policy.
17. It is not disputed that the Applicant suffered losses when his stocks of
bananas deteriorated. However it is disputed whether the events are
covered by the policy, or should be covered by the FSP due to the prior
history of dealing with these claims.
18. At the outset, I note the losses span over four years and are subject to two
different product disclosure statements (PDS), although the wording in each
for this section of cover has only minor differences. In my view, the minor
variations in wording do no materially affect any of these claims.
19. As there are numerous claims included in this dispute, for the sake of clarity I
have set out a brief table summarising the losses incurred, from the
information provided by the Applicant:
Claim Date of loss Lodgement
date
Cause of loss Amount claimed
($)
1 November
2009
12 June 2012 Compressor circuit breaker
tripped out, causing the air
temperature in the cool room
to rise to 35°C and spoil the
bananas.
$15,104
2 December
2009
12 June 2012 Compressor failed to turn off at
its programmed temperature.
The temperature dropped to
1°C causing chill damage to
the bananas.
$15,104
3 December
2009
12 June 2012 The compressor failed to turn
off at its programmed
temperature. The temperature
rose to 34°C causing the
bananas to become „cooked‟.
$11,328
Claim Date of loss Lodgement
date
Cause of loss Amount claimed
($)
4 February
2010
12 June 2012 Inconsistent temperatures
within the cool room, causing
the bananas to have a mix of
$11,328
Case No: 304673 Determination Page 5 of 11
Claim Date of loss Lodgement
date
Cause of loss Amount claimed
($)
ripe and unripe bananas in the
same box and they had to be
discarded.
5 February
2010
12 June 2012 Compressor circuit breaker
tripped out, causing the air
temperature in the cool room
to rise to 38°C and spoiling the
bananas.
$7,552
6 March
2010
12 June 2012 Inconsistent temperatures
within the cool room, causing a
mix of ripe and unripe bananas
in the same box and they had
to be discarded.
$7,552
7 April
2010
12 June 2012 Compressor failed to turn on
resulting in the temperature
rising to 28°C and the bananas
becoming heat stressed.
$4,130
8 November
2011
17 July 2012 Thermostat read 12.5°C,
whereas it was actually 22°C,
causing premature and
uneven ripening.
$7,552
9 15 May
2012
17 July 2012 Uneven pulp temperatures
being found upon delivery to
buyer. It was considered
uneven or poor cooling was
the cause. Bananas sold at a
loss.
$1,824
10 29 May
2012
17 July 2012 Uneven pulp temperatures
being found upon delivery to
buyer. It was considered
uneven or poor cooling was
the cause. Bananas sold at a
loss.
$2,268
11 25 June
2012
17 July 2012 For works completed to the
cooling rooms after refrigerant
gas had leaked.
$8,956.42
12 31 July
2012
29 August
2012
Cool room failed to draw heat
out of the produce leading to
premature and uneven
ripening.
$2,745
20. The Applicant says the FSP accepted two prior claims from him in 2010 and,
as a result, he formed a reasonable expectation that future loss of the same
nature would be met. He further contends the FSP failed to advise him at
that time the cool room equipment was inadequate. Had it done so, he would
Case No: 304673 Determination Page 6 of 11
have taken steps to remedy the defective equipment and would therefore not
have incurred the subsequent losses.
21. I have been provided with details regarding two claims lodged in 2010, both
of which were accepted by the FSP. The dates of loss were 24 December
2009 and 14 April 2010 respectively. I note on both occasions, the FSP
accepted both the loss of stock and costs incurred for machinery breakdown.
Accordingly, it would seem to me the FSP‟s decision to accept those claims
was correct pursuant to the terms of the policy.
22. However, I note acceptance of those, or any other claims does not set a
precedent for how future claims should be handled. Each claim should be
assessed on its own merits and in each case the Applicant must establish
that the claim comes within the terms of the policy.
23. The policy wording states that in order to claim for deterioration of stock,
there must be a corresponding breakdown in machinery, for which a claim is
admitted by the FSP. Therefore, in order for the Applicant to demonstrate an
entitlement to claim for lost stock he is required to demonstrate that the
machinery suffered a breakdown consistent with the policy definition, and
furthermore that the costs incurred to repair the machinery are covered
under the FSP‟s policy.
24. The policy defines machinery breakdown as unforseen and unexpected
physical destruction or damage requiring repair.
25. The claims accepted by the FSP resulted from a random power failure
(December 2009) and part of a solenoid breaking off and causing a gas leak
(April 2010). The Applicant says that these machinery breakdowns were
also responsible for the other losses claimed by him up to April 2010.
However, as the following analysis shows, and the report to the FSP from
C&L dated 19 April 2010 makes clear, this is not so. These losses were
caused by design and installation deficiencies in the coolroom equipment.
26. C installed the cool rooms for the Applicant in or around December 2009. I
have been provided with a number of reports and invoices from various
technicians who have attended the cool rooms since that time and set out a
brief summary of these documents below:
Company Attendance Date Reason for Attendance
C 15 January 2010 Call out, circuit breaker off. R eset circuit
breaker and tested system.
C 20 February 2010 Call out, air flow problems in cool room. Found
isolator in off position. Switched on and
monitored operation.
Company Attendance Date Reason for Attendance
C 21 April 2010 Air flow problem. Adjusted force fan speed.
C 21 April 2010 Cool room 3 breakdown. Found liquid line
Case No: 304673 Determination Page 7 of 11
solenoid valve jammed, causing cool room to
cease functioning. Replaced and monitored
function for a few hours.
C 22 April 2010 Change location of temperature sensor to tr y
to stop bananas getting chill damage.
H 24 May 2010 Appointed by FSP to determine cause of
ongoing problem. Determined cool room set up
deficiently and required modifications to
function properly.
T 14 June 2010 Appointed by Applicant to determine cause of
ongoing problem. Determined cool room set up
deficiently and required modifications to
function properly.
C 12 August 2010 Call out, cool room 3 not starting. Unable to
locate fault as systems running at time of
attendance.
C 4 January 2011 Modifications to pull down room to enable it to
be used as a holding room.
E 24 April 2012 Appointed by Applicant to determine cause of
ongoing problem. Determined cool room set up
deficiently and required modifications to
function properly.
E 28 June 2012 Loss of entire gas charge due to leak in liquid
line.
E 12 August 2012 Compressor circuit breaker tripped due to
inadequate function controllers.
27. I note there have been detailed reports provided by H, T and E as to the
cause of the problems with the cool rooms. H was appointed by the FSP to
inspect the cool rooms and provide an opinion as to the cause of these
problems. Whilst identifying a number of concerns with the size, set up and
temperature controls of the rooms, H concluded the problem with the
compressor function was due to incorrect electrical systems. H‟s report
dated 24 May 2010 provided:
“In our opinion the electrical cascade of the property electrical system from
the main utility fuses is incorrect. The 63 Amp circuit breaker for the
refrigeration systems is marginal, but is not tripping because the fault levels
and electrical cascades are not correct. A 100amp main on/off switch has
been used for the refrigeration board. To overcome the main utility fuses
blowing (and based on the correct upgrade to the power being carried out) we
recommend a higher rated circuit breaker with the correct fault rating replaces
the on/off refrigeration supply switch.”
28. T was commissioned by the Applicant to report on the deficiencies in the
coolroom. Its report dated 14 June 2010 identified deficiencies in the
temperature controls located in the three cooling rooms, the sizing of the
rooms and the set up of the liquid lines. T‟s report provided:
Case No: 304673 Determination Page 8 of 11
“Room #3 has several issues, first being that the room temperature controller
is not suitable for this type of room/system having only one control temp probe
which is currently situated in the incorrect position in room. Room has no
product pulp temperature probe for better control of temperatures.
The room control is also set up with a pump down cut out, meaning that when
room temperature is ok the system continues to operate until compressor
pumps down on suction pressure, during this time the room temperature
overshoots set point cut out by up to 2C. The system has been installed with
hot gas bypass which is not connected into controls. This usually is to
decrease the temperature difference across the evaporator coil to ensure that
correct room temps are maintained above 13+C at all times during pull down
and storage situations.
The liquid line has two solenoids in series, one on condensing set and one
above evaporator. The solenoid on condensing set is installed in vertical
position (incorrect) meaning it could jam closed or open. The system has
been installed using R22 refrigerant without any labelling except for on the TX
valve power element. The TX valve bulbs are mounted using cable ties,
meaning poor heat transfer to bulb and incorrect super heat control.
Pipe work not bracketed correctly and vibration eliminators installed, where
not required. Door seal damaged, due either to poor adjustment or damage
from forklift loading the room. This room has very poor air flow quality,
meaning there would be temperature variances throughout the room ie.
hot/cold spots.”
29. E‟s report on 24 April 2012 also set out the deficiencies in the temperature
control equipment, the cycle of the compressors, the size of the rooms and
the electrical system installed. It provided:
“Whilst this report points out a lot of issues with your existing set up, some
major changes such as relocation of condensing unit to a better serviceable
position, controls suitable to carry out multiple temperature control, removal of
air restrictions and installation of lighter weight tarps to distribute air more
evenly are just some of our recommendations.
This system is not what [E] would have installed for this application, due to our
experience with Banana rooms we would have given you a larger room area,
with higher ceilings, better controls and extra probes, as well as a lighter
canvas set up and better air distribution chambers.”
30. I accept, on the basis of these reports, that the root cause of the
malfunctioning of the coolroom was inadequate design and installation of
equipment. The FSP says, as a result, that the losses are not covered
because there was no “unforeseen and unexpected physical destruction or
damage to the machinery ... which needs repair or replacement to allow
normal working to continue,” as required by the policy.
31. There are three elements to this definition:
(i) Was there “physical destruction or damage to the machinery”?
(ii) Was the destruction or damage “unforeseen and unexpected”?
Case No: 304673 Determination Page 9 of 11
(iii) Did the machinery “need repair or replacement to allow normal working
to continue” ?
An affirmative answer is required to all three questions if the loss is to be
covered.
32. It seems clear to me that the third question should be answered “yes”. The
reports of H, T and E, referred to above, demonstrated that repairs to the
coolroom equipment could result in it operating properly.
33. The critical question is the first. Can it be said that there was physical
destruction or damage to the machinery when its malfunctioning was caused
by faulty design and installation? Undoubtedly there was no physical
destruction of the machinery but was there “damage” to it? In an email
dated 29 October 2012 to the Applicant‟s solicitor, the FSP answered this
question in the negative, relying on a dictionary definition of damage being
“injury or harm that impairs value or usefulness”.
34. Other dictionary definitions of “damage” from the OED include:
“Loss or detriment caused by hurt or injury affecting estate, condition
or circumstances.”
“A loss, an injury.”
“A disadvantage, inconvenience, trouble.”
35. In Morrison v Peacock (2002) 210 CLR 274 the High Court considered
whether there had been “damage ... to the ship or its equipment” within
certain statutory provisions where abrading and chafing over a period of time
of the ship‟s hose resulted in the hose rupturing and discharging oil into the
sea. The Court held that this was not “damage” within the meaning of the
statutory provisions, although it did adopt a wide meaning of “damage”.
36. At [21] the Court said:
“ In its ordinary and natural meaning, the expression „damag e ... to the ship or
its equipment‟ is wide enough to include any detriment or harm or impairment
of the use or function of a ship. The expression is wide enough to include a
detriment or harm or an impaired use or function that is the product of a
repetitive process as well as a detriment, harm or impairment that results from
the application of an external force. In [the statutory provisions] „damage to‟
describes a condition or attribute of the ship or its equipment. The preposition
„to‟ has no causal connotation. It has nothing to say as to the cause of the
condition or attribute. If a ship or its equipment breaks apart, there is damage
to the ship or the equipment, irrespective of the cause.”
37. However, the Court went on in [24] and [25] to hold that damage in this
instance should be confined to harm or impairment of use or function which
resulted from a sudden event. This was because the statute referred to the
“occurrence” of the damage and al so because it imposed a requirement to
take all reasonable precautions to avoid the damage. The Court reasoned
Case No: 304673 Determination Page 10 of 11
that these criteria were inconsistent with damage caused by a gradual
process.
38. In my view, the malfunctioning of the coolroom equipment in the p resent
case can be described as a “detriment or harm or impairment of the use or
function” of the equipment. Thus it could be described as “damage” to the
coolroom equipment, notwithstanding that it resulted from faulty design and
installation.
39. Unlike the case of Morrison v Peacock , I do not think there is any reason
why a narrower interpretation should be adopted. I do not discern anything
in the policy which would result in the exclusion of harm or impairment of use
or function caused by faulty design a nd installation. Under the heading
“When we will not pay” in particular under the sub - heading “Electrical and
mechanical machinery” the policy contains a number of broad exclusions. In
my opinion none of them applies to harm or impairment of use or function
caused by faulty design and installation.
40. In my opinion, therefore, the answer to the first question is affirmative: there
was physical destruction or damage to the machinery within the terms of the
policy.
41. The remaining question (the second) is whether the damage was unforeseen
or unexpected. The answer depends on when the Applicant did – or should
have – become aware of the defects in the coolroom equipment. The FSP
says he should have become aware of the defects by early 2010. However,
I do not think the attendances in the early part of 2010 by C, who had
installed the coolroom, either did alert or should have alerted the Applicant to
the underlying problems of the coolroom. The report by H dated 24 May
2010 did raise those problems but it has no t been established that the
Applicant received that report.
42. I do, however, accept that the Applicant received the report of T dated 14
June 2010 on or shortly after that date. By then he was – or should have
been – aware of the underlying problems of the coolroom. It therefore
cannot be said that, after that date, the breakdown in the machinery was
“unforeseen and unexpected.”
43. The result is therefore that claims 1-7 (inclusive) should be allowed. I also
allow claim 11 as it was for a discreet problem of leaking gas which is
expressly covered by the policy.
44. The amount of claim 11 is substantiated by a repairer‟s invoice. The
amounts of the other claims are not substantiated. I assume the amounts
claimed represent the prices which the Applicant would have received from
the spoilt bananas, had they not been spoilt. The FSP in its written material
does not challenge the amount of these claims. I am prepared to accept the
amounts claimed by the Applicant. The total of the claims allowed is
therefore $81,054.42.
Case No: 304673 Determination Page 11 of 11
45. Under section 57 of the Insurance Contracts Act 1984 (Cth) the FSP is liable
to pay interest on the claim from the date when it became unreasonable for
the FSP to withhold payment. In this case, the Applicant did not make his
claims until 12 June 2012. I accept that it was reasonable for the FSP to take
some time to consider them, bearing in mind that it already had the report
from H. In my opinion, the FSP should have paid by the claims by 31 July
2012 therefore interest should accrue on the sum of $81,054.42 from 1
August 2012.
Determination
46. I determine that the FSP is obliged to accept claims 1-7 and 11 in the total
amount of $81,054.42. I further determine that the FSP pay interest on that
sum from 1 August 2012 until paid, calculated in accordance with section 57
of the Insurance Contracts Act.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.