A claim for sewer pipe damage under a strata building policy was denied by the FSP on the basis of an earth movement exclusion. AFCA found the FSP's investigation reasonable and the exclusion applied, so the denial stands.
The insured established a prima facie claim, but the FSP showed on the balance of probabilities that the damage was caused by excluded ground movement.
Issues
- Claim denial primary · not upheld“the FSP denied the claim on the basis that the damage was caused by earth movement, which was excluded under the policy”
- Inadequate claim investigation secondary · not upheld“the approach taken by the FSP in investigating the Applicant's claim was reasonable”
Subjects and remedies
no remedy
Related
All Financial Firm (Unknown - Insurer) determinations · Find similar determinations
Text of the determination
Case No: 304646 Determination Page 1 of 9
Case number: 304646
General Insurance - Domestic Insurance - Home Building - FSP Decision -
Denial of claim
23 July 2013
Background
1. This Determination follows the review of a Recommendation issued on
behalf of the Service on 28 May 2013. The Recommendation has been
rejected by the Applicant.
2. The Applicant is an employee of a company which held a strata insurance
policy with the Financial Services Provider (FSP), which provided cover for
accidental loss and damage to premises owned b y the company. The policy
was current at the time of the loss.
3. On 8 May 2012, the insured‟s broker lodged a claim under the policy for
damage to a sewer pipe at the insured premises. The FSP requested
confirmation as to what caused the blockage and whether there was any
resulting water damage to the insured property, together with copies of
invoices for repairs.
4. In late May 2012, the insured‟s broker provided further details of the
damage, together with copies of receipts for repairs which had been carried
out between 3 May 2012 and 10 May 2012. Following receipt of this
information, the FSP engaged a loss adjuster to assess the claim.
5. The FSP initially declined the Applicant‟s claim based on the loss adjuster‟s
opinion that the damage to the pipe was caused during construction (and
therefore arose prior to policy inception). When the Applicant disputed the
denial, the FSP engaged a building consultant to investigate the cause of the
damage.
6. On completion of the building consultant‟s investigations, the FSP denied the
claim on the basis that the damage was caused by earth movement, which
was excluded under the policy.
7. The Applicant disputes the FSP‟s decision to deny the claim.
Determination
Case No: 304646 Determination Page 2 of 9
Summary of Applicant’s position
8. The Applicant says that the FSP has put forward several possible causes for
the damage, but these are all unproven and not conclusive.
9. The Applicant says that the most probable cause of the damage is a hairline
crack in the sewer pipe which allowed water to escape over time, causing
the ground to subside. He says that compacted ground cannot move under a
slab in the absence of external factors.
10. The Applicant says that the hairline crack may have been caused by a
recent earthquake or by the impact from rubbish trucks driving over the
concrete slab above the pipe three times a week.
11. The Applicant says that the FSP had sufficient opportunity to inspect the
damage, but failed to send an assessor to do so and instead chose to rely
on photographic evidence and information provided by various parties after
the event. The Applicant also says that the FSP‟s questioning of the various
parties involved was done in an inappropriate manner.
12. The Applicant says that, where a definite cause of damage cannot be
determined, the FSP should accept responsibility and at least share the cost
of the repairs.
13. Accordingly, the Applicant seeks to have the FSP indemnify the insured for
costs incurred as a result of the damage to the sewer pipe.
Summary of FSP’s position
14. The FSP says that it was not able to assess the damage to the pipe as the
Applicant did not provide sufficient information when the claim was lodged to
enable the FSP to determine whether an assessor was required. By the time
this information was provided and an assessor appointed, the repair works
had already been completed. Accordingly, the FSP was forced to rely on
information provided by various parties who had been involved in the
incident.
15. The FSP says that the available evidence excludes the possibility of the
damage to the pipe having been caused by external factors.
16. The FSP says that therefore it is reasonable to conclude, on the balance of
probabilities that the damage arose as a result of earth movement. Any loss
arising directly or indirectly from earth movement is excluded under the
terms of the policy.
17. The FSP relies on the following policy provisions:
Case No: 304646 Determination Page 3 of 9
“ 6 . Exclusions
...
We will not be liable in respect of any physical loss, destruction or damage
directly or indirectly caused by or arising out of or in consequence of or
contributed to by:
...
6.13 erosion, subsidence, earth movement or collapse unless resulting
from Earthquake or tsunami ...
6.14 normal settling, seepage, shrinkage or expansion in Buildings or
foundations, walls, pavements, roads and other structural
improvements, creeping, heaving and vibration;
...
6.16 wear, tear, fading, gradual corrosion or gradual deterioration, concrete
or b rick „cancer‟, wet or dry rot, rust, oxidation, chipping, scratching or
marring, normal upkeep, making good or any developing flaws;
...
6.18 faulty materials or faulty workmanship ”
Issue
18. Whether the FSP is entitled to deny the Applicant‟s claim in accorda nce with
the terms of the policy.
Reasons for decision
19. I am satisfied that a full exchange of information has taken place between
the parties and that each party has had the opportunity to address any
issues raised therein.
20. There is an onus on an insured to establish on the balance of probabilities
that a claim fits the definition of an insured event. This is known as a prima
facie claim. Should this onus be discharged, it is then the responsibility of the
insurer to establish, on the balance of probabilities, that an exclusion applies.
21. The policy provides cover for accidental loss or damage to the insured
“Building”, which is defined to include “fixtures and other improvements of a
structural nature” and “the supply of services such as electricity, water, gas
or sewerage”.
22. It is not disputed that the insured building suffered damage to the sewer
pipe. Accordingly, the Applicant has established a prima facie claim under
the policy.
23. The issue in dispute between the parties is the cause of the damage to the
sewer pipe and, consequently, whether the damage falls within an exclusion
under the policy.
Case No: 304646 Determination Page 4 of 9
Evidence as to cause of damage
Loss adjuster (“IG”)
24. Following receipt of additional information clarifying the amount of the claim,
the FSP appointed a loss adjuster (“IG”) to determine the cause of the
damage. IG‟s report dated 6 June 2012 provides the following background to
the claim:
one of the tenants of the insured premises (“BB”) had r eported that the
toilets within its tenancy were blocked;
emergency plumbers (“PN”) attended and after extensive investigations
determined that the sewer pipe servicing the tenancy had collapsed
approximately 7 metres from the toilets, resulting in the blockage;
the insured appointed another plumbing firm (“AV”) who carried out
their own inspections, including cutting concrete in the car park area to
access the damaged pipes. Following further investigations using a
camera, it was determined that a second section of the pipe
approximately 5 metres further away had also collapsed; and
the collapsed sections of the pipe were removed and replaced and the
excavated area was reconcreted.
25. In relation to the cause of the damage, IG‟s report states that:
it was most likely that the damage had occurred during the original
construction of the property when heavy equipment travelled over the
sewer pipe work, which was installed prior to the laying of the concrete
slab;
if the pipe work had been installed correctly, then the collapse should
not have occurred;
the damage would not have been apparent at the time as the pipes
would have been backfilled and compacted with the concrete car park
eventually laid over the top;
if the pipe had not already collapsed, then over time the weakness
resulting from the original damage would have caused it to collapse;
the emergency plumbers (PN) had advised that the tenant (BB) had
made numerous reports to the building owners regarding toilet
blockages;
there was no evidence of any ground movement or subsidence from
within the car park prior to the loss; and
the collapse of the pipe work is not consistent with vehicle traffic from
above.
Building consultant (“A”)
26. The Applicant disputed IG‟s findings, following which the FSP engaged a
bu ilding consultant (“A”) to conduct further investigations to determine the
Case No: 304646 Determination Page 5 of 9
cause of the damage. “ A ” conducted interviews with, and obtained
information from, a number of people involved in repairing the damage to the
pipe or otherwise connected to the insured premises.
27. In his report dated 8 August 2012, “ A ” stated that he had spoken with an
employee (“TA”) of the tenant (BB) who advised that, while the emergency
plumber (PN) had previously attended the premises on several occasions,
these attendances related to general plumbing works, not blockages of the
sewer pipe.
28. A‟s report states that he also contacted the emergency plumber (PN) who
advised that:
he had previously cleared sewer blockages at the insured premises by
plunging (but did not have any paperwork in relation to the works
previously undertaken);
plunging was not effective to remove the blockage in May 2012 as this
was a solid blockage in the sewer line;
a CCTV drainage camera was put down the sewer line to explore for
any faults and a section of the pipe was found to have collapsed,
however no fractures or leaking of the sewer line was identified;
the plumber engaged to repair the damage (AV) subsequently identified
that a second area of the pipe had collapsed; and
due to the way in which the pipe had collapsed, PN believed that the
damage occurred during construction.
29. A‟s report states that he also contacted the plumber engaged by the
Applicant to repair the damage (AV) who advised as follows:
the PVC bend fitting to the pipe in the vicinity of where it protruded from
the building was fractured and AV believed that there may have been
force applied to the fitting at some stage. The fracture could have
resulted from earth movement or possibly from back filling, but he was
not certain;
there was another section of pipe some metres further down the sewer
line that had also collapsed. The flattened out sections of the pipes
were not broken or cracked;
when asked whether there was any other damage to the sewer line,
AV noted that the sewer line had only been provided with minimal fall
and, when it was excavated, the gradient did not comply with industry
standards. AV considered that this had in all probability resulted from
soil movement that had allowed the pipe to drop; and
AV had not been present when the concrete was first excavated around
the damaged PVC fitting but had arrived on site shortly after.
30. A‟s report states that he also contacted the builder engaged by the Applicant
to undertake the excavation works to allow fo r inspection of the pipe (“WW”),
who advised as follows:
Case No: 304646 Determination Page 6 of 9
the final part of the digging was undertaken by hand so as to keep the
opening small and not cause further damage to the pipes;
when the damaged pipe was exposed, he saw that two sections of the
pipe had “two little humps in it”;
there were no fractures in the exposed section of sewer pipe or the
concrete walkway above the damaged pipe; and
he believed that the weather had resulted in movement in the soil that
caused the damage to the sewer line.
31. A‟s report states that he also contacted the Applicant, who advised as
follows:
he was not aware of any previous blockages to the sewer pipe;
when the sewer line was exposed, he did not see anything which was
cracked, only bent;
in his opinion, the last year or so of rains combined with a very dry
sandy soil had caused the sewer line to shift from where it was
originally laid; and
he believed that the issue with the sewer line related to ground
movement only.
32. A also contacted the plumber (“Z”) who originally i nstalled the underground
sewer line, who confirmed that it satisfied all relevant standards at the time
and that his practice is to use a laser level to install all lines to the correct
gradient. “ A ” obtained a copy of a Compliance Certificate signed by Z at the
time the building was constructed, certifying that the sewer complied with
relevant statutory requirements.
33. “ A ” also reviewed photographs taken by the Applicant when the excavation
and repair works were undertaken. “ A ” noted that:
the photographs showed that the mechanical excavation works
occurred very close to where AV found the cracked fitting;
the broken fitting could be seen in photographs showing the final part of
the soil being excavated by hand;
the photographs supported the view that there was no leaks in the pipe,
as the damaged section of the pipe contained water, paper and waste
material; and
as noted by AV, the gradient of the pipe was shown to be insufficient
when excavated.
34. Based on his investigations, “ A ” concluded that the evidence indicated that:
all relevant parties (other than the repairing plumber, AV) agreed that
no fractures or leakage had occurred to the sewer pipe. Accordingly, in
A‟s opinion, if any fracture to the sewer line fitting had occurred, this
happened during the excavation of the pipe;
Case No: 304646 Determination Page 7 of 9
no damage had occurred to the building and paved concrete surrounds
as a result of the collapse of sections of the pipe;
the PVC sewer line had originally been installed with correct falls and
no leakage, as evidenced by the fact that the blockage on May 2012
was the first and only blockage, and occurred approximately 50 months
after construction had been completed; and
the fact that the damaged sections of the pipe showed inadequate falls
when excavated indicated that the collapse of these sections occurred
due to general ground settlement over a period of time.
Applicant’s evidence
35. The Applicant has raised the following concerns about A‟s report:
the FSP did not attend the premises to inspect the damage but instead
relied on telephone investigations carried out by its building consultant
(A);
A carried out his investigations in an inquisitive and suggestive
manner, which did not give the various parties interviewed the
opportunity to consider their answers. The Applicant says that A‟s
questions were structured so as to produce a predetermined outcome;
and
the Applicant says that it is not appropriate to rely on the evidence of
PN as he may be unfavourably disposed to the Applicant, given that he
quoted unsuccessfully for plumbing work when the building was being
constructed, has never been engaged by the Applicant (who has
appointed other plumbers) and mistakenly issued an invoice to the
Applicant in relation to the current claim, which was subsequently
disputed.
36. The Applicant has provided a copy of an undated, unsigned statement from
AV which provides as follows:
“In my opinion the pipe originally laid some 3 years ago developed a small
leak either on the joint or possibly developed a small crack along the straight
section and leaked sewer water, which over time caused the ground to
subside causing the bend/collapse of the sewer pipe.”
37. The Applicant says that the most probable cause of the damage is a hairline
crack in the sewer pipe which allowed water to escape over time, causing
the ground to subside. He says that this may have been caused by a recent
earthquake or by the impact from rubbish trucks driving over the concrete
slab above the pipe three times a week.
38. I note that when the FSP‟s loss adjuster initially indicated that the damage to
the sewer pipe had occurred during construction, the Applicant stated that:
“Our view is that due to construction done during extended period of dry
seasons, now when the rains returned especially in Gippsland region, the
ground under slab subsided bowing the pipe to create flow blockage.”
Case No: 304646 Determination Page 8 of 9
Analysis
39. In the usual course of events, it is reasonable to expect an insurer to inspect
the damage which is the subject of a claim, before seeking to deny the claim
on the basis that the damage has been caused by an event which is
excluded under the policy. In the case of the current claim, the FSP did not
do this but instead relied on a report prepared by its building consultant (A),
which was based on evidence gathered “after the fact”.
40. The FSP says that it took this approach because, at the time that the claim
was initially received, the extent of the damage (and the costs to repair it)
was unclear, and therefore the FSP did not have enough information to
determine whether to appoint a loss adjuster to assess the claim. Once this
information was provided several weeks later, the repairs had already been
completed (and therefore there was little value to be gained from an
inspection at that stage).
41. In the circumstances, I consider that the approach taken by the FSP in
investigating the Applicant‟s claim was reasonable. I note that the
investigations carried out by A were extensive, involving hours of telephone
discussions with at least ten different individuals. In particular, A had the
benefit of discussions with several people who were present when the
excavation and removal of the pipe occurred, as well as photographs taken
at the time. Accordingly, I consider that A had sufficient information on which
to form a view about the cause of the damage to the sewer pipe.
42. I have reviewed A‟s report, together with the photographs taken by the
Applicant. In the absence of expert evidence to the contrary, I consider that
A‟s report is persuasive, and that his conclusions are supported by the
available evidence. In particular, I note that:
while the FSP‟s loss adjuster (IG) initially concluded that the damage to
the sewer pipe was caused during construction, as a building
consultant A was better placed to form a view as to the cause of the
damage;
while IG‟s conclusion that the damage occurred during construction
was consistent with PN‟s statements that he had previously attended
the insured premises to clear blockages in the sewer, it was not
consistent with the additional evidence subsequently obtained from TA
and the Applicant which indicated that the insured premises had not
suffered from blockages prior to May 2012;
the evidence obtained by A from PN, WW and the Applicant himself
(who were all present when the damage was investigated) indicated
that the pipe had become misshapen, but did not indicate that it had
cracked or was leaking. Although AV noted that the pipe fitting had
fractured, he was not present when the excavation occurred. Further,
the initial CCTV investigations carried out by PN had confirmed that
there were no fractures to the pipe. In these circumstances, I consider
that it is reasonable to conclude (as A did) that the damage observed
by A most likely arose during the excavation process;
Case No: 304646 Determination Page 9 of 9
A‟s conclusion that the damage to the pipe was caused by earth
movement is consistent with the nature of the damage to the pipe and
the inadequate gradient observed when the area was excavated. The
weight of the evidence does not supp ort the Applicant‟s contention that
the damage was caused by a hairline crack in the pipe. It is widely
accepted that changes in climatic conditions can result in ground
movement without the application of “external forces”, such as those to
which the Applicant refers;
the Applicant submits that the damage to the pipe may have been
caused by an earthquake or by the movement of heavy vehicles over
the area. However, analysis of publicly available earthquake data does
not support the Applicant‟s argument. Fu rther, the absence of damage
to the concrete surface above the pipe makes it highly unlikely that the
damage was caused by the actions of heavy vehicles. It is worth noting
that IG‟s initial conclusion that the damage was caused by heavy
equipment appears to have been a reference to equipment being used
in the area during construction (i.e. before the concrete slab was
installed), rather than the impact of subsequent vehicle traffic;
even if the evidence provided by PN was considered to be unreliable,
this in itself would not be sufficient to discredit the conclusion that the
damage to the pipe was caused by ground movement, given the other
evidence available; and
the Applicant has not provided any independent evidence (for example,
from other parties inter viewed by A that A‟s investigative methods were
in any way inappropriate.
43. For the reasons outlined above, I am satisfied that the pipe at the insured
premises collapsed due to ground movement. The policy wording clearly and
unambiguously excludes from cover losses arising from ground movement
(see paragraph 17 above).
44. Accordingly, I consider the FSP is entitled to deny the insured‟s claim.
Determination
45. On the basis of the available information I determine that the FSP is entitled
to deny the insured‟s claim.