Home / Financial Firm (Unknown - Insurer) / Determination 304522

Determination 304522

Claim amount

FirmFinancial Firm (Unknown - Insurer)
Decided2013-07-23
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded$3,604
Non-financial loss—
Amount claimed$11,532
SourceAFCA PDF

Summary

The insured sought cyclone Yasi repairs to the roof, walls and cornice of her home, and the FSP refused most of them. AFCA found the FSP's settlement of $3,603.86 met its liability and limited it to that amount.

The weight of expert evidence showed the disputed damage was not caused by cyclone Yasi, so the FSP's liability was limited to the claim-related repairs it had already quoted.

Issues

Subjects and remedies

home or building damagenatural disasterpay claim

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Case No: 304522 Determination Page 1 of 15 Case number: 304522 General Insurance - Domestic Insurance - Home Building - FSP Decision - Claim amount 19 July 2013 Background 1. The Applicant held a home building and contents policy with the Financial Services Provider (FSP). 2. In February 2011, the Applicant lodged a claim for building and contents damage to her home in Queensland, following the impact of Cyclone Yasi. 3. The FSP assessed the claim and an engineer was appointed to review possible building movement as the result of high winds. The FSP eventually agreed to some building and contents loss, but did not consider all the damage noted by the Applicant was the result of the cyclone. 4. The Applicant provided her own engineering report indicating the damage in dispute was cyclone related. The FSP appointed further experts to report on the issues and maintained the refusal of the damage in dispute. 5. The Applicant seeks a review of the FSP‟s decision. Summary of Applicant’s position 6. The Applicant is represented. For clarity and convenience, the submissions of the Applicant and her representative will hereafter be referred to as those of “the Applicant”. 7. The Applicant says that a number of engineers have inspected the building and they all have different views on the damage and the cause. 8. The first assessment report states that the building moved, yet the FSP now says that it did not. 9. All the experts agree there is damage to the cornice from high winds; however, the FSP‟s experts do not comment on the damage to the roof, which has warped due to the cyclone. 10. The FSP‟s experts did not lift roof sheets to conduct a proper assessment and they also disagree on whether the roof screws are fixed properly. Determination Case No: 304522 Determination Page 2 of 15 11. Her engineer „M‟ conducted the most thorough inspection of the building. M took photographs of the roof battens and climbed under the house. M is also from Cairns and has experience with cyclone-related damage. 12. The FSP‟s experts only walked around and state in their reports that they only did visual inspections of the readily accessible areas. 13. She has concerns with the FSP putting an estimate on the claim before assessment and also that line 579 of the FSP‟s claims screen says a diary has been removed. 14. She provides a number of photographs of the building in support of her submission. 15. The Applicant says that the roof was damaged and the building moved as the result of Cyclone Yasi and the FSP is therefore liable for the rectification of these issues. Summary of FSP’s position 16. The FSP says that it has sent various experts to the property to investigate the claim and the opinion of the experts is that the roof and walls were not damaged by the cyclone. 17. It has accepted contents and building damage deemed to be claim related. 18. The Applicant had another engineer „BC‟ inspect the property but no report was forthcoming. The FSP has requested BC‟s report several times and suggests the findings of BC were not beneficial and that is why the report has not been forthcoming from the Applicant. 19. The report provided by the Applicant‟s engineer (M) does not adequately explain why the entire roof and external cladding needs to be replaced due to slight movement. Further, the photographs do not support the comment that the roof batten has lifted off the rafter. 20. The FSP says that the photographs shows paint joining boards in some of the gaps. 21. The Applicant bears the onus to establish the damage is the result of an insured event in the policy and in this case, the weight of evidence indicates the damage in dispute is not related to the cyclone. 22. The FSP relies on the following policy provisions contained in the Product Disclosure Statement (PDS): “ If your home suffers loss or damage caused by an event listed below, we will choose to do one of the following:  repair the damaged portion of your home,  replace your home, Case No: 304522 Determination Page 3 of 15  compensate you for the amount we would have paid for repair or replacement. … General exclusions applicable to your policy You are not covered under any section of this policy for damage, loss or liability caused by, arising from or involving any of the following. X Consequential loss of any kind. X Cracking, chipping or scratching. … X Water entering your home:  as a result of your failure to perform adequate maintenance on your home, or a structural defect, or faulty design or workmanship, … X Wear and tear, lack of maintenance or inherent defect. X Rust, corrosion, mildew, wet or dry rot, rising damp or seepage and other signs of failure to keep your home in good order and repair. … X Structural defects or faulty workmanship, settling, shrinkage or expansion. … X Damage caused by water seeping or percolating through walls, roofs or floors. ” Issues 23. Whether the issues with the roof and walls of the home were caused by Cyclone Yasi? 24. Whether the FSP has an obligation under the policy to rectify the issues? Reasons for decision 25. As advised to the parties, the Financial Ombudsman Service has considered it appropriate to elevate the dispute in accordance with the Operational Guidelines to the Terms of Reference. This is because of the issues to be considered. This dispute has not been the subject of a FOS Recommendation and has proceeded directly to Determination. 26. The decision has been made by a Panel of three decision makers, including an Ombudsman and decision makers with experience in the insurance industry and consumer rights. The Policy 27. The Panel has reviewed the FSP‟s PDS containing the terms and conditions of cover and is satisfied the policy covers loss resulting from storms. Case No: 304522 Determination Page 4 of 15 28. The policy excludes loss resulting from wear and tear, maintenance issues, defects and settling and shrinkage. Whether the issues with the roof and walls of the home were caused by Cyclone Yasi? 29. At law, the onus to establish a loss is caused by an event covered under the policy rests with the insured. This is known as establishing a prima facie claim under the policy. 30. If an insured establishes a prima facie claim and the insurer seeks to refuse the claim on the basis of an exclusion in the policy, the onus shifts to the insurer to establish the exclusion it relies upon applies, to the circumstances of the claim. 31. In this dispute, the Applicant says that the roof and walls of the home were damaged by Cyclone Yasi and there is movement that was not previously evident. 32. The FSP says it has covered the building and contents damage reasonably related to the cyclone; however, the issues with the walls, roof and movement are not related to the cyclone. The evidence 33. The Panel has reviewed the submissions of the parties. 34. The claim was lodged on 7 February 2011 and the following claim description was recorded on the FSP‟s claims system: “Cyclone Yasi – broken window and water entered the home through this window and other windows were blown open – bedding & cupboards damaged evaporator & other contents – no carpets.” 35. The next day, the Applicant again contacted the FSP and the following notations were recorded on the FSP‟s claims systems: “[Applicant representa tive] contact call to advise that they have noticed structural damage to the home ,the home has moved appr 2cm & the new addition has come away from the older part of the home”. [sic] 36. The claim was assessed on 15 February 2011, and the report included the following relevant comments: “Home has been moved from high winds, engineers needs to attend no obvious strutural damage, some gaps appearing in walls (sic) Home is liveable Next actions Insured to send in list of contents Engineer to attend and report on damage & SOW” [sic] 37. The first engineer‟s report from „RBG‟ dated 27 May 2011, provides the following relevant information: Case No: 304522 Determination Page 5 of 15 The report was based solely on a visual inspection of exposed and readily accessible areas. No floor or wall coverings were removed. Roof 1. “At the time of inspection, no structural damage was observed to the roof sheeting nor support members that could be attributed to Cyclone Yasi. Inspection was performed by accessing roof cladding via ladder provided by owner. Owner advised that roof was re sheeted in September or October 2010. … 2. Owner noticed that after cyclone Yasi the exposed roof beam in kitchen/dining area had lifted and reseated. Inspector did notice slight gap between beam bearing plate and top of blockwall, but this could not be attributed to by Cyclone Yasi. … Owner also made the inspector aware of a gap between an (sic) the eaves soffit and the house that was not evident before cyclone Yasi. … We believe this damage is not related to Cyclone Yasi. 3. Owner made us aware of gap at corner join in fascia boards at N/E corner of house. Owner reported that this was not evident before cyclone Yasi. … Inspector noted that corner join in flashing over fascia board at same point appeared not to have moved. (also note in photos roofing screws penetrating thru soffit of roof sheeting, and not fixed into adjacent batten). We believe this damage is not related to Cyclone Yasi.” Subfloor 1. “At the time of inspection, no structural damage was observed to the sub floor framing that could be attributed to Cyclone Yasi. 2. Inspector noted that all stumps in region inspected had tie down rods installed to bearers, and that condition of timber sub floor framing was sound. … Wall Framing 1. “At the time of inspection, no structural damage was obse rved to the wall framing that could be attributed to Cyclone Yasi.” External Cladding 1. “Owner stated that following cyclone Yasi it had been noticed that the vertical join in the external cladding at the junction of the 2 stages of building had increased. Inspector noticed that the original joint width was of sufficient width to permit a paint brush to coat the flashing in the joint, past the face of the cladding. We believe this damage is not related to Cyclone Yasi. 2. Owner demonstrated binding/jamming of casement windows to the living area of the house which was noticed after cyclone Yasi. Inspector noted that paintwork to the windows was in need of re-coating. Condition of paintwork may permit water to swell the timber frames to the windows. Case No: 304522 Determination Page 6 of 15 Considering the extent of rain post cyclone Yasi, this may also be a contributor to the binding/jamming of the windows. Monitoring is recommended to determine probable cause.” Internal 1. “Section of ceiling cornice in kitchen was noted to be damaged and traces of water entry observed. … We believe that this damage has been caused by high winds during Cyclone Yasi. 2. Owner made us aware of buckling in internal floor boards near the entry door. Floorboards were considered to be of local hardwood species. Inspector considers that buckling to the floorboards is a result of moisture, due to expansion restriction. Whether the buckling is a result of rain water entry or due to under floor moisture could not be determined at time of inspection, and will need to be monitored to determine cause.” Structural Scope of Works 1. “Inspector could not attribute any structural damage/defects as a result of cyclone Yasi. 2. Monitoring of binding windows has been recommended to determine if a dryer whether pattern results in fixing this problem (sic). Owner is recommended to repaint frame to increase protection from rain. Similarly further inspection is recommended of buckling to the floor boards, following a period of dryer weather.” Covered patio roof framing “At the time of inspection, no structural damage was observed to the roof sheeting nor support members that could be attributed to Cyclone Yasi. …” 38. The Applicant provides an engineering report from „M‟, dated 10 November 2011. It stated: “ Summary: The single storey house has been constructed in two stages. The original house is constructed of timber framed floor walls and roof with timber chamfer board cladding. The addition to the house has been constructed in reinforced masonry block walls on a concrete slab with a skillion timber raftered roof. The house is in a rural area west of South Johnstone and has close neighbouring house to provide some partial obstruction. The house has been exposed to wind gusts of over 200km/hr for a 5 hour period. The major issue with the house is the integrity of the roof iron, roof framing, wall framing and wall cladding as some of the roof has leaked. The roof sheeting was renewed approximately 3 years ago. Usually when any roof is renewed the contractors upgrade the roof hold down with batten screws and metal strapping. The owner‟s representative was not sure if any hold down upgrade was done. … Recommended Repairs and or Upgrade Case No: 304522 Determination Page 7 of 15 The high wind speeds have created external forces on the roof and wall sheeting and internal pressure inside the house. The forces and vibrations have caused the timber chamber boards and wall framing of the older house to move slightly and open gaps between boards. Roof sheet laps have permanently lifted. The roof has leaked, most likely at the lifted sheet laps. Debris will be lodged between the sheets and future roof leaking will be an issue. Lifted roof sheet laps will provide the starting point for the whole roof sheet to be ripped off during the next cyclonic event. There are some roof hold down bolts but not enough to comply with current building standards. The BSA has advised that roof hold down bolts only have to be installed if wall cladding is to be removed. The following works are required to secure the roof and ceiling. The block work section of the house has not suffered any structural damage. Windows do not close properly however this due to the poor state of the window fittings and hinges. • Remove the existing roof sheeting and dispose. • Replace any cracked battens and lifted battens. • Upgrade the positions of roof battens to current standards with first two battens at 600 centres down from the ridge and up from the eave. • Strengthen any cracked rafters by screwing same sized timber to side of rafter. • All battens to be re-screwed with Type 17 No 14 batten screw. • Screw any vertical T and G wall boards to the top and bottom plates. • Fit new insulation and roof sheeting. • All external timber chamfer board cladding to be re-nailed, gaps filled and repainted. • Replace all ceiling cornice which has come loose. • All rooms that have had water entry to be repainted as T and G boards are structurally sound. Note the above list is not a scope of works. ” [sic] 39. M‟s report also includes photographs of cracked paint, a gap between a block wall and timber roof beam that M says existed prior to the cyclone due to evidence of dust. There are also photographs of what M reports are lifted roof sheet laps and a batten lifted off the rafter. 40. The FSP appointed a third engineer, „J‟ to inspect the property. The report, dated 17 January 2012, states: “… PROBLEMS – 1) Gap between the eaves soffit and the house: 2) Possible batten lift or shrinkage: 3) Cnr. join in the flashing over fascia board….where roof screws pe netrate: 4) Floorboards through home: INSPECTION RESULT – 1) Gap Between The Eaves Soffit And The House: Comment: The eaves soffit on the original construction has not been lined on either the front or on both side elevations. (refer photo above) The timber Case No: 304522 Determination Page 8 of 15 weather boards have been extended up to and under the timber rafters and out-rigger beams, and the weather boards have then been cut on an angle to fill the gap on the rake of the roof. There are still small gaps around the out-rigger beams as well as under the bottom of the roof sheeting that can allow cyclonic rain to be driven into the wall framing at this point under extreme conditions. There is evidence inside the house to support the entry of cyclonic rain at this point, however the signs of water damage to the internal timber wall and timber ceiling linings is considered minimal. The owner‟s daughter is also claiming that water damage to the wall frame has caused the weather boards to move and crack along their bottom edge, where they over-lap the next board. The cracking referred to is not, in our professional opinion, the result of water damage to the timber wall frame, but is normal shrinkage and gapping associated with hardwood timber weather boards that have never been filled with a gap-filling product prior to painting these external timber walls. Recommendation: The gap between the eaves soffit and the house is considered to be normal building practice from the time this house was built, and does not constitute any structural or building deficiency. These gaps have not been caused by or resulted from any storm/cyclone event, however they may have allowed some water penetration during the cyclone. This may have been in sufficient volume to track onto the timber ceilings of the rooms on the eastern elevation adjacent the external wall, as well as run down the timber “VJ” wall lining inside the two bedrooms on this side of the house. 2) Possible Batten Lift Or Shrinkage: Comment: The over-hanging timber roof battens on the eastern side of the house (direction facing the full force of the cyclone) were inspected and physically tested for movement or up-lift. It appears new hardwood timber roof battens may have been installed when the old roof sheeting was replaced with a new zincalume corrugated iron roof. The new roof sheeting was also examined from above to identify if there was any evidence of batten shrinkage that would allow the roofing iron to move under pressure. In all instances, the roof screws were found to be well seated onto the surface of the corrugated iron, indicating little if any shrinkage of the hardwood roof battens, and no “batten bounce” could be induced either side of the screw line in any part of the roof. Large diameter cyclone washers have been used under the roof screws in the re-roof operation, and all neoprene washers appear well seated and sealed onto the surface of the roof sheet. Recommendation: The hardwood roof battens do not display any shrinkage or lift as suggested, and all remain in a good serviceable condition. There does not appear to be any damage sustained to the new roof, its mechanical fixings, or the timber battens. Case No: 304522 Determination Page 9 of 15 3) Cnr. Join In The Flashing Over Fascia Board….Where Roof Screws Penetrate: Comment: The “ridge” cap flashing at the top end of the roof has been Tekscrewed to the top of the roof sheeting, as well as batten-screwed to the face of the timber fascia at the ends of each of the timber rafters in an effort to prevent the flashing from being dislodged under cyclonic wind conditions. The “barge” cap flashing running down the side edge of the roof has also been batten-screwed through the roof sheeting, as well as through the face of the flashing into the ends of each of the out-rigger roof beams. In all instances, the screw fixings have been well founded and remain tightly secured. One roof screw adjacent the eastern edge of the roof at the top corner was found to be slightly proud of the roof sheeting, but remained solid in its fixing. The screw may need with-drawing and the timber batten/beam pre-drilled, as it is suspected that the timber has “seasoned” and is now extremely hard, thus preventing the self-taping screw from pulling down all the way onto the surface of the roof sheeting. This in itself is not considered to be of any structural significance and will not allow the roof sheeting to lift or become detached. Recommendation: The thread of the screw fixings observed under the roof at the front elevation are not considered to be from poor workmanship, but are purpose-made screws for the joining of metal roofing products in this application. 4) Floorboards Through Home: Comment: The waxed timber floor boards through-out the house were closely inspected for distortion, cupping, or gapping as a result of water penetration during the cyclone event. In all instances, the timber floor boards were in exceptional condition, with the exception of the flooring directly behind the front door. The floor boards directly behind the front door displayed excessive gapping at the sides of each board and appeared to be suffering from long- term “weathering”. The damage to this section of the floor is a result, in our professional opinion, of long-term wetting and drying from water getting in under the bottom of the front door during normal storm activity over the life of the house (60+ yrs). The remainder of the waxed timber floor, especially in the bedrooms where water entered the house during the cyclone event have survived well, with none of the damage signs displayed behind the front door. The m ajority of the timber floor was also noted to be very “flat” over the surface of each board, with only slight “cupping” or “waving” visible across the floor surface when viewed under glancing light. Recommendation: The internal timber floor is considered to be in a very good condition, with little evidence of any water damage from the cyclone event. Slight water staining is just visible in the wax finish of the floor in both bedrooms and could easily be removed with a light sanding and re-waxing. Case No: 304522 Determination Page 10 of 15 SUMMARY The building structure does not display any significant structural or major water damage as a result of the cyclone event. Slight water staining is just visible in the timber wall and ceiling linings in the eastern bedrooms, however the entire house internally is suffering from mould growth as a result of the high humidity in this location. The timber roof framing and roof cover (including side and end flashings) all appear in a good serviceable condition and do not display any structural damage as a result of the cyclone event. The internal timber floor remains in a very good condition and has not been adversely affected by the cyclone event.” 41. After the Applicant provided a number of photographs of the roof showing it had “buckled , J provided further comments to the FSP in an email dated 16 February 2012: “ … When I attended the site, the owners daughter and son were present, and they were looking after their mother‟s affairs. Her son – [name] – accompanied me onto the roof for the final part of our assessment for cyclone damage, and he also agreed that the roof was in a remarkable condition considering the cyclone it had just gone through. All of the screw fixings and battens were pressure tested and found to be in an excellent condition. The roof sheeting is relatively new, as the old roof sheeting had been replaced sometime after the last cyclone (Larry), but I believe the replacement work was triggered more because of the rusted state of the old iron more so than from cyclone damage. The front porch roof still remains in place, and this is part of the old roof sheeting. If you look at my photos in the report you will see just how badly this small roof has rusted. In relation to the photos supplied by the homeowner, the roof is definitely “wavy”, a s it follows the shape of the timber rafters and battens. The timber rafters are spaced at an excessive distance, and the timber battens to which the roofing iron is attached have also sagged over the excessive distance between the rafters. In saying this, the timber rafters and battens have not been damaged or compromised by the cyclonic winds, nor have they suffered any “lift” as is normally the case with timber roof construction subjected to the full force of cyclonic winds. This is a “skillion” roof a nd has a continuous fall from the front wall of the house to the back wall where the kitchen has been extended out past the old back wall of the original house. The “wavy” roof depicted in the owners photos is not a result of the cyclone buckling the roof. The timber battens and rafter shapes, along with their positions, are also clearly reflected in the “wavy” nature of the roof. Even if this existing roof sheeting was removed and new roofing iron installed, the new roof would also look exactly the same as this does, as it too will be following the shape of the existing timber battens and timber rafters. In closing, the present appearance of the roof has nothing to do with any cyclone damage, but is a reflection of the shape of the old timber roof structure that the roof sheeting is fitted to. Case No: 304522 Determination Page 11 of 15 I hope this helps explain the cause of the “wavy” roof and if I can be of any further assistance, please feel free to contact me again. [sic] 42. The Applicant responded to the above email, saying that her son did not say the roof was in excellent condition. She also said that J only had a clipboard and pen and no equipment was taken onto the roof to conduct pressure testing. The Applicant said that jumping up and down on the roof can hardly be considered pressure testing. She also questioned how the kitchen cornice could have suffered damage due to wind with the roof not being damaged. 43. J responded to the Applicant‟s concerns in another email, dated 7 March 2012, which states: “In relation to the latest from the insured‟ s daughter I offer the following response to her statements; 1) Kitchen Cornice – I agree that the timber cornice on the back wall of the kitchen in the R/H corner (when standing inside the kitchen) has come away from the ceiling and is drooping slightly. The timber cornice is on the side wall of the house, and on the wall not facing the direction of the cyclone to start with. The other inconsistency is that only the small corner section of the side wall cornice has come away from its nail fixing, where-as the piece of timber cornice on the back wall of the kitchen in this same corner has not moved at all. The other thing to remember is that this part of the kitchen is an addition to the original building, and the external walls have been constructed from masonry concrete blocks. The fiber cement ceiling sheets have not dropped as a result of any roof movement, and the block walls are also crack-free, especially on the side wall where the end of the timber cornice has come away slightly. There is a tapered in-fill panel on top of the concrete blocks to cover the angle of the roof against the horizontal top course of concrete blocks, and once again there is no evidence of any “down - ward” pressure in this area either. Using the insured logic, if the cornice has been forced down by wind pressure on the roof, the timber roof rafters would have to be squashed or flattened, and this is an impossibility as the wall supporting them is a solid concrete block wall. I will attach photos of the cornice in the corner of the kitchen in a separate E-mail for better clarity. In summary, it would be impossible to accredit the slight dislodgement of the end of one small piece of timber cornice in the corner of the back wall as being a result of the cyclone event. If the wind pressure from the cyclone was that great that it dislodged the end of the cornice, it should have dislodged the entire length of cornice, as well as the timber cornice along the back wall of the kitchen at the same time. Cyclonic wind does not discriminate…..i t will dislodge a large area and not just one small piece of timber in a single corner. I believe the end of this piece of timber cornice has been dislodged for a considerable length of time and was like this well before the cyclone event. The nail fixing is probably to blame and has not found any back-block timber to attach to. Finally, cyclonic wind pressure on a roof structure affects the attachment of the roofing iron to the timber batten, and then the connection of the timber batten to the roof rafter. In this particular case, the timber rafters have not become detached from the top of the concrete block walls and therefore the ceiling lining of the kitchen, which is affixed to the bottom of the rafters, has not moved or stressed either. If the cyclonic wind had entered the soffits or under the roof iron as suggested by the insured daughter, it would have destroyed this entire corner of the ceiling, and not just pushed the end of one small piece of timber cornice down. Case No: 304522 Determination Page 12 of 15 2) Roof Condition – My report reflects that the insured son was present on top of the roof when I did my inspection, and he agreed with me that the roof was in a “ remarkable condition” after going through the cyclone , not that it was in “ excellent condition” as now claimed by his sister. In relation to the insured daughters claim that “ we do not call jumping up and down on the roof pressure testing” I must state that we do not jump up and down on anyone‟s roof. If access into the ceiling space is not available to visually inspect the timber batten connection to the roof rafter, then our inspection must be carried out from on top of the roof. This involves walking along the batten line defined by the roofing screws and placing pressure on the roof sheeting beside the screw heads, especially at the side lap locations, the ridge line and the end of the roof near the gutter line. This method of pressure testing quickly and positively determines if the roof sheeting and screw are moving up and down, which indicates that the timber batten is also moving up and down on top of the rafter. If there is no screw head movement, we are satisfied that the roof batten remains well anchored to the rafter top. This was the case when testing the screw fixings on this particular roof. Summary: The allegations of the insured‟s daughter are ill -founded and are in stark contradiction of what is to be expected when the roof and ceiling frame of a house is subjected to cyclonic wind forces that exceed the tie-down requirements of the roof. It was my impression during the initial inspection that the insured‟s daughter is endeavoring to have normal house maintenance and a full re-paint of the house undertaken as a claim for cyclone damage, when the evidence suggests otherwise. ” [sic] 44. The FSP appointed an expert to report on the roof issues and provide a quotation. The report from „T‟, dated 9 May 2012, states: “ Client discussions: [Applicant] stated; “The roof was replaced November 2010, about three months before cyclone Yasi. It has since developed a downward bow in the middle. The timber beams have lifted and the roof now leaks. The barge board is no longer hard against the timber battens. There is water damage/mould forming all over the ceiling and down some walls from the leaking roof. The timber internal wall boards have begun to split from the exposure to the water leaks.” Observations: The dwelling is an old lowset with a relatively new roof in very good condition. There is a depression in the middle upper section of the roof, above the lounge area with timber ceiling joists spanning 6500x4100 wide. This depression is most likely caused by undersized timber during construction. The timber beams claimed to have lifted were the windward outriggers supporting the roof batten overhang. These are of adequate size however there is a gap to the weatherboards apparently left during construction. The paint on the underside of the outrigger beyond the edge of the weatherboard indicates there has been a gap for quite some time. The barge board on the leeward side of the building is not hard against the outrigger although not likely the result of cyclone Yasi. The timber internal wall boards have small cracks associated with age and no signs of water damage. The ceiling shows extensive mould not due to water leaks from the roof as there is no sign of water damage in this area. There is one small area with evidence of a roof leak in the form of several water stain drops. Most likely cause is a leaking roof screw. Case No: 304522 Determination Page 13 of 15 Conclusion: My inspection of the property found the resultant roof damage is not consistent to the claimed event. Maintenance /Defect issues related to claim: The maintenance/defect issues are the undersized ceiling joists used during construction. The ceilings and house haven‟t been cleaned or painted for a very long time. Several roof screws are not making good seal to roof sheets, potential cause of a roof leak. Not caused by cyclone. We trust this report is to your satisfaction... ” [sic] 45. During the course of the claim, the Applicant and FSP communicated via email. The Panel has reviewed these communications and reviewed the various photographs provided. 46. The Case Manager at the Financial Ombudsman Service contacted the Applicant on 3 July 2013 to enquire about the engineering report from the first engineer engaged by the Applicant (BC). The Applicant said she was not sure if a report was ever written as she did not receive one. 47. The Applicant subsequently contacted BC and was advised that while BC did attend to inspect the home, no report was ever written. Discussion 48. The Applicant says the home moved as the result of Cyclone Yasi, resulting in damage to the roof and walls. 49. The Panel has reviewed the evidence from the experts. The experts appointed by the FSP (RBG, J & T) all report there is no cyclone related damage to the roof. However, M (commissioned by the Applicant) reports that “Roof sheet laps have permanently lifted” . M provides photographs of the lifted lap sheets; however, the Panel is unable to identify the issues in the photograph. 50. With respect to the roof, the Applicant also provides a number of photographs showing a wave effect across the roof sheets which she says is the result of the cyclone. The FSP‟s expert J says the wave effect is caused by the distance between the rafters and is not related to the cyclone. J says that even if the roof sheeting was replaced, the same effect would be evident due to the spacing of the rafters. 51. In reviewing the issues with the roof, the Panel can clearly see the „wave‟ effect referred to by the parties. However, the Panel is not satisfied the Applicant has established that there is any damage that can be attributed to the cyclone. In particular, the Panel finds J‟s comments thorough and persuasive on the roof related issues. Case No: 304522 Determination Page 14 of 15 52. T‟s comments also support J‟s findings , albeit that T identified some maintenance issues. 53. With regards to the exterior weatherboards, the Panel is not persuaded that the Applicant has established the noted gaps were caused by the cyclone. While M‟s report has not been disrega rded, the Panel is persuaded by the comments from RBG and J. 54. Further while some photographs show cracked paint, others show what appears to be excess paint drips in the gaps, indicating there was movement at the property well before the Cyclone Yasi. It is noted the home is a number of decades old and movement of this kind is not uncommon. 55. The photographs also reveal some areas of general wear and tear. 56. The Panel is persuaded the FSP‟s offer to re -sand the floor in bedroom 2 meets its liability under the policy. J reports the floor is generally in good condition other than the water mark and some long -term weathering behind the front door. 57. The FSP has offered a settlement of $3,603.86 for the claim related repairs, including the cornice in the kitchen. The quotation from T also includes other damage at a quoted cost of $7,927.92, which the FSP says in its claims screen notations, is not claim related. 58. In conclusion, the Panel finds that the available evidence indicates the building was not structurally damaged by cyclone Yasi. The Panel is therefore satisfied that the settlement offer made by the FSP meets its liability under the policy. Other 59. The Panel has had regard to a number of issues raised by the Applicant, such as minor inconsistencies in reports, the comment about stairs when there are ramps, the issue the Applicant has with the estimate being put on the claim prior to assessment and the notation in the FSP‟s claim system that a diary was deleted. 60. The Panel notes that insurers will usually put an es timate on a claim depending on the nature of the event. An estimate is only that and there is no evidence the FSP‟s initial claim estimates are related to its decision. 61. There are some inconsistencies in the reports, although this is not uncommon in dealing with complex and ongoing building damage issues. In the Panel‟s view none of the issues noted are of such significance as to cause it to completely disregard any of the experts or the FSP‟s case. 62. On this point, it is noted that in M‟s report it is state d that the roof is three years old, while the Applicant reports it was replaced only six months before Cyclone Yasi which occurred in February 2011. Case No: 304522 Determination Page 15 of 15 63. However, the Panel has not disregarded M‟s findings because of this minor issue. Rather, it finds all of the reports have some merit; however, the weight of expert opinion, which the Panel finds is well reasoned, leads to the conclusion that the damage in dispute is not cyclone related. 64. In relation to the deleted diary at line 579 of the FSP‟s claims notation s, the Panel understands that this refers to the FSP ‟s electronic diary system which is used to track the progress of claims and prompt actions by the FSP. Accordingly, that such a diary is removed is not an issue of significance and does not relate to the removal of claim related comments or evidence. 65. The Panel acknowledges that the Applicant has provided a detailed and competent submission in relation to this dispute. However, based on the available evidence and particularly that of expert J, the Panel has not been persuaded on the balance of probabilities that the damage in dispute was caused by Cyclone Yasi. Determination 66. On the basis of the available information the Panel determines that the FSP is entitled to limit its liability to the $3,603.86 quoted.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.