Home / Financial Firm (Unknown - Insurer) / Determination 304522
Determination 304522
Claim amount
Summary
The insured sought cyclone Yasi repairs to the roof, walls and cornice of her home, and the FSP refused most of them. AFCA found the FSP's settlement of $3,603.86 met its liability and limited it to that amount.
The weight of expert evidence showed the disputed damage was not caused by cyclone Yasi, so the FSP's liability was limited to the claim-related repairs it had already quoted.
Issues
- Claim denial primary · not upheld“the Panel is persuaded the FSP's offer to re-sand the floor meets its liability; the building was not structurally damaged by cyclone Yasi”
- Inadequate claim investigation secondary · not upheld“the Panel finds J's comments thorough and persuasive on the roof related issues”
Subjects and remedies
home or building damagenatural disasterpay claim
Related
All Financial Firm (Unknown - Insurer) determinations · Find similar determinations
Text of the determination
Case No: 304522 Determination Page 1 of 15
Case number: 304522
General Insurance - Domestic Insurance - Home Building - FSP Decision -
Claim amount
19 July 2013
Background
1. The Applicant held a home building and contents policy with the Financial
Services Provider (FSP).
2. In February 2011, the Applicant lodged a claim for building and contents
damage to her home in Queensland, following the impact of Cyclone Yasi.
3. The FSP assessed the claim and an engineer was appointed to review
possible building movement as the result of high winds. The FSP eventually
agreed to some building and contents loss, but did not consider all the
damage noted by the Applicant was the result of the cyclone.
4. The Applicant provided her own engineering report indicating the damage in
dispute was cyclone related. The FSP appointed further experts to report on
the issues and maintained the refusal of the damage in dispute.
5. The Applicant seeks a review of the FSP‟s decision.
Summary of Applicant’s position
6. The Applicant is represented. For clarity and convenience, the submissions
of the Applicant and her representative will hereafter be referred to as those
of “the Applicant”.
7. The Applicant says that a number of engineers have inspected the building
and they all have different views on the damage and the cause.
8. The first assessment report states that the building moved, yet the FSP now
says that it did not.
9. All the experts agree there is damage to the cornice from high winds;
however, the FSP‟s experts do not comment on the damage to the roof,
which has warped due to the cyclone.
10. The FSP‟s experts did not lift roof sheets to conduct a proper assessment
and they also disagree on whether the roof screws are fixed properly.
Determination
Case No: 304522 Determination Page 2 of 15
11. Her engineer „M‟ conducted the most thorough inspection of the building. M
took photographs of the roof battens and climbed under the house. M is also
from Cairns and has experience with cyclone-related damage.
12. The FSP‟s experts only walked around and state in their reports that they
only did visual inspections of the readily accessible areas.
13. She has concerns with the FSP putting an estimate on the claim before
assessment and also that line 579 of the FSP‟s claims screen says a diary
has been removed.
14. She provides a number of photographs of the building in support of her
submission.
15. The Applicant says that the roof was damaged and the building moved as
the result of Cyclone Yasi and the FSP is therefore liable for the rectification
of these issues.
Summary of FSP’s position
16. The FSP says that it has sent various experts to the property to investigate
the claim and the opinion of the experts is that the roof and walls were not
damaged by the cyclone.
17. It has accepted contents and building damage deemed to be claim related.
18. The Applicant had another engineer „BC‟ inspect the property but no report
was forthcoming. The FSP has requested BC‟s report several times and
suggests the findings of BC were not beneficial and that is why the report
has not been forthcoming from the Applicant.
19. The report provided by the Applicant‟s engineer (M) does not adequately
explain why the entire roof and external cladding needs to be replaced due
to slight movement. Further, the photographs do not support the comment
that the roof batten has lifted off the rafter.
20. The FSP says that the photographs shows paint joining boards in some of
the gaps.
21. The Applicant bears the onus to establish the damage is the result of an
insured event in the policy and in this case, the weight of evidence indicates
the damage in dispute is not related to the cyclone.
22. The FSP relies on the following policy provisions contained in the Product
Disclosure Statement (PDS):
“ If your home suffers loss or damage caused by an event listed below, we will
choose to do one of the following:
repair the damaged portion of your home,
replace your home,
Case No: 304522 Determination Page 3 of 15
compensate you for the amount we would have paid for repair or
replacement.
…
General exclusions applicable to your policy
You are not covered under any section of this policy for damage, loss or
liability caused by, arising from or involving any of the following.
X Consequential loss of any kind.
X Cracking, chipping or scratching.
…
X Water entering your home:
as a result of your failure to perform adequate maintenance on
your home, or a structural defect, or faulty design or workmanship,
…
X Wear and tear, lack of maintenance or inherent defect.
X Rust, corrosion, mildew, wet or dry rot, rising damp or seepage and
other signs of failure to keep your home in good order and repair.
…
X Structural defects or faulty workmanship, settling, shrinkage or
expansion.
…
X Damage caused by water seeping or percolating through walls, roofs or
floors. ”
Issues
23. Whether the issues with the roof and walls of the home were caused by
Cyclone Yasi?
24. Whether the FSP has an obligation under the policy to rectify the issues?
Reasons for decision
25. As advised to the parties, the Financial Ombudsman Service has considered
it appropriate to elevate the dispute in accordance with the Operational
Guidelines to the Terms of Reference. This is because of the issues to be
considered. This dispute has not been the subject of a FOS
Recommendation and has proceeded directly to Determination.
26. The decision has been made by a Panel of three decision makers, including
an Ombudsman and decision makers with experience in the insurance
industry and consumer rights.
The Policy
27. The Panel has reviewed the FSP‟s PDS containing the terms and conditions
of cover and is satisfied the policy covers loss resulting from storms.
Case No: 304522 Determination Page 4 of 15
28. The policy excludes loss resulting from wear and tear, maintenance issues,
defects and settling and shrinkage.
Whether the issues with the roof and walls of the home were caused by
Cyclone Yasi?
29. At law, the onus to establish a loss is caused by an event covered under the
policy rests with the insured. This is known as establishing a prima facie
claim under the policy.
30. If an insured establishes a prima facie claim and the insurer seeks to refuse
the claim on the basis of an exclusion in the policy, the onus shifts to the
insurer to establish the exclusion it relies upon applies, to the circumstances
of the claim.
31. In this dispute, the Applicant says that the roof and walls of the home were
damaged by Cyclone Yasi and there is movement that was not previously
evident.
32. The FSP says it has covered the building and contents damage reasonably
related to the cyclone; however, the issues with the walls, roof and
movement are not related to the cyclone.
The evidence
33. The Panel has reviewed the submissions of the parties.
34. The claim was lodged on 7 February 2011 and the following claim
description was recorded on the FSP‟s claims system:
“Cyclone Yasi – broken window and water entered the home through this
window and other windows were blown open – bedding & cupboards
damaged evaporator & other contents – no carpets.”
35. The next day, the Applicant again contacted the FSP and the following
notations were recorded on the FSP‟s claims systems:
“[Applicant representa tive] contact call to advise that they have noticed
structural damage to the home ,the home has moved appr 2cm & the new
addition has come away from the older part of the home”. [sic]
36. The claim was assessed on 15 February 2011, and the report included the
following relevant comments:
“Home has been moved from high winds, engineers needs to attend no
obvious strutural damage, some gaps appearing in walls (sic)
Home is liveable
Next actions
Insured to send in list of contents
Engineer to attend and report on damage & SOW” [sic]
37. The first engineer‟s report from „RBG‟ dated 27 May 2011, provides the
following relevant information:
Case No: 304522 Determination Page 5 of 15
The report was based solely on a visual inspection of exposed and
readily accessible areas. No floor or wall coverings were removed.
Roof
1. “At the time of inspection, no structural damage was observed to the roof
sheeting nor support members that could be attributed to Cyclone Yasi.
Inspection was performed by accessing roof cladding via ladder provided
by owner. Owner advised that roof was re sheeted in September or
October 2010. …
2. Owner noticed that after cyclone Yasi the exposed roof beam in
kitchen/dining area had lifted and reseated. Inspector did notice slight gap
between beam bearing plate and top of blockwall, but this could not be
attributed to by Cyclone Yasi. … Owner also made the inspector aware of
a gap between an (sic) the eaves soffit and the house that was not evident
before cyclone Yasi. … We believe this damage is not related to Cyclone
Yasi.
3. Owner made us aware of gap at corner join in fascia boards at N/E corner
of house. Owner reported that this was not evident before cyclone Yasi. …
Inspector noted that corner join in flashing over fascia board at same point
appeared not to have moved. (also note in photos roofing screws
penetrating thru soffit of roof sheeting, and not fixed into adjacent batten).
We believe this damage is not related to Cyclone Yasi.”
Subfloor
1. “At the time of inspection, no structural damage was observed to the sub
floor framing that could be attributed to Cyclone Yasi.
2. Inspector noted that all stumps in region inspected had tie down rods
installed to bearers, and that condition of timber sub floor framing was
sound.
…
Wall Framing
1. “At the time of inspection, no structural damage was obse rved to the wall
framing that could be attributed to Cyclone Yasi.”
External Cladding
1. “Owner stated that following cyclone Yasi it had been noticed that the
vertical join in the external cladding at the junction of the 2 stages of
building had increased. Inspector noticed that the original joint width was of
sufficient width to permit a paint brush to coat the flashing in the joint, past
the face of the cladding. We believe this damage is not related to Cyclone
Yasi.
2. Owner demonstrated binding/jamming of casement windows to the living
area of the house which was noticed after cyclone Yasi. Inspector noted
that paintwork to the windows was in need of re-coating. Condition of
paintwork may permit water to swell the timber frames to the windows.
Case No: 304522 Determination Page 6 of 15
Considering the extent of rain post cyclone Yasi, this may also be a
contributor to the binding/jamming of the windows. Monitoring is
recommended to determine probable cause.”
Internal
1. “Section of ceiling cornice in kitchen was noted to be damaged and traces
of water entry observed. … We believe that this damage has been caused
by high winds during Cyclone Yasi.
2. Owner made us aware of buckling in internal floor boards near the entry
door. Floorboards were considered to be of local hardwood species.
Inspector considers that buckling to the floorboards is a result of moisture,
due to expansion restriction. Whether the buckling is a result of rain water
entry or due to under floor moisture could not be determined at time of
inspection, and will need to be monitored to determine cause.”
Structural Scope of Works
1. “Inspector could not attribute any structural damage/defects as a result of
cyclone Yasi.
2. Monitoring of binding windows has been recommended to determine if a
dryer whether pattern results in fixing this problem (sic). Owner is
recommended to repaint frame to increase protection from rain. Similarly
further inspection is recommended of buckling to the floor boards, following
a period of dryer weather.”
Covered patio roof framing
“At the time of inspection, no structural damage was observed to the roof
sheeting nor support members that could be attributed to Cyclone Yasi. …”
38. The Applicant provides an engineering report from „M‟, dated 10 November
2011. It stated:
“ Summary:
The single storey house has been constructed in two stages. The original
house is constructed of timber framed floor walls and roof with timber chamfer
board cladding. The addition to the house has been constructed in reinforced
masonry block walls on a concrete slab with a skillion timber raftered roof.
The house is in a rural area west of South Johnstone and has close
neighbouring house to provide some partial obstruction. The house has been
exposed to wind gusts of over 200km/hr for a 5 hour period. The major issue
with the house is the integrity of the roof iron, roof framing, wall framing and
wall cladding as some of the roof has leaked. The roof sheeting was renewed
approximately 3 years ago. Usually when any roof is renewed the contractors
upgrade the roof hold down with batten screws and metal strapping. The
owner‟s representative was not sure if any hold down upgrade was done.
…
Recommended Repairs and or Upgrade
Case No: 304522 Determination Page 7 of 15
The high wind speeds have created external forces on the roof and wall
sheeting and internal pressure inside the house. The forces and vibrations
have caused the timber chamber boards and wall framing of the older house
to move slightly and open gaps between boards. Roof sheet laps have
permanently lifted. The roof has leaked, most likely at the lifted sheet laps.
Debris will be lodged between the sheets and future roof leaking will be an
issue. Lifted roof sheet laps will provide the starting point for the whole roof
sheet to be ripped off during the next cyclonic event. There are some roof
hold down bolts but not enough to comply with current building standards. The
BSA has advised that roof hold down bolts only have to be installed if wall
cladding is to be removed. The following works are required to secure the roof
and ceiling. The block work section of the house has not suffered any
structural damage. Windows do not close properly however this due to the
poor state of the window fittings and hinges.
• Remove the existing roof sheeting and dispose.
• Replace any cracked battens and lifted battens.
• Upgrade the positions of roof battens to current standards with first two
battens at 600 centres down from the ridge and up from the eave.
• Strengthen any cracked rafters by screwing same sized timber to side of
rafter.
• All battens to be re-screwed with Type 17 No 14 batten screw.
• Screw any vertical T and G wall boards to the top and bottom plates.
• Fit new insulation and roof sheeting.
• All external timber chamfer board cladding to be re-nailed, gaps filled
and repainted.
• Replace all ceiling cornice which has come loose.
• All rooms that have had water entry to be repainted as T and G boards
are structurally sound.
Note the above list is not a scope of works. ” [sic]
39. M‟s report also includes photographs of cracked paint, a gap between a
block wall and timber roof beam that M says existed prior to the cyclone due
to evidence of dust. There are also photographs of what M reports are lifted
roof sheet laps and a batten lifted off the rafter.
40. The FSP appointed a third engineer, „J‟ to inspect the property. The report,
dated 17 January 2012, states:
“…
PROBLEMS –
1) Gap between the eaves soffit and the house:
2) Possible batten lift or shrinkage:
3) Cnr. join in the flashing over fascia board….where roof screws pe netrate:
4) Floorboards through home:
INSPECTION RESULT –
1) Gap Between The Eaves Soffit And The House:
Comment: The eaves soffit on the original construction has not been lined on
either the front or on both side elevations. (refer photo above) The timber
Case No: 304522 Determination Page 8 of 15
weather boards have been extended up to and under the timber rafters and
out-rigger beams, and the weather boards have then been cut on an angle to
fill the gap on the rake of the roof.
There are still small gaps around the out-rigger beams as well as under the
bottom of the roof sheeting that can allow cyclonic rain to be driven into the
wall framing at this point under extreme conditions.
There is evidence inside the house to support the entry of cyclonic rain at this
point, however the signs of water damage to the internal timber wall and
timber ceiling linings is considered minimal.
The owner‟s daughter is also claiming that water damage to the wall frame
has caused the weather boards to move and crack along their bottom edge,
where they over-lap the next board.
The cracking referred to is not, in our professional opinion, the result of water
damage to the timber wall frame, but is normal shrinkage and gapping
associated with hardwood timber weather boards that have never been filled
with a gap-filling product prior to painting these external timber walls.
Recommendation: The gap between the eaves soffit and the house is
considered to be normal building practice from the time this house was built,
and does not constitute any structural or building deficiency. These gaps have
not been caused by or resulted from any storm/cyclone event, however they
may have allowed some water penetration during the cyclone. This may have
been in sufficient volume to track onto the timber ceilings of the rooms on the
eastern elevation adjacent the external wall, as well as run down the timber
“VJ” wall lining inside the two bedrooms on this side of the house.
2) Possible Batten Lift Or Shrinkage:
Comment: The over-hanging timber roof battens on the eastern side of the
house (direction facing the full force of the cyclone) were inspected and
physically tested for movement or up-lift.
It appears new hardwood timber roof battens may have been installed when
the old roof sheeting was replaced with a new zincalume corrugated iron roof.
The new roof sheeting was also examined from above to identify if there was
any evidence of batten shrinkage that would allow the roofing iron to move
under pressure.
In all instances, the roof screws were found to be well seated onto the
surface of the corrugated iron, indicating little if any shrinkage of the
hardwood roof battens, and no “batten bounce” could be induced either side
of the screw line in any part of the roof.
Large diameter cyclone washers have been used under the roof screws in the
re-roof operation, and all neoprene washers appear well seated and sealed
onto the surface of the roof sheet.
Recommendation: The hardwood roof battens do not display any shrinkage or
lift as suggested, and all remain in a good serviceable condition. There does
not appear to be any damage sustained to the new roof, its mechanical
fixings, or the timber battens.
Case No: 304522 Determination Page 9 of 15
3) Cnr. Join In The Flashing Over Fascia Board….Where Roof Screws
Penetrate:
Comment: The “ridge” cap flashing at the top end of the roof has been
Tekscrewed to the top of the roof sheeting, as well as batten-screwed to the
face of the timber fascia at the ends of each of the timber rafters in an effort to
prevent the flashing from being dislodged under cyclonic wind conditions.
The “barge” cap flashing running down the side edge of the roof has also
been batten-screwed through the roof sheeting, as well as through the face
of the flashing into the ends of each of the out-rigger roof beams.
In all instances, the screw fixings have been well founded and remain tightly
secured. One roof screw adjacent the eastern edge of the roof at the top
corner was found to be slightly proud of the roof sheeting, but remained solid
in its fixing.
The screw may need with-drawing and the timber batten/beam pre-drilled, as
it is suspected that the timber has “seasoned” and is now extremely hard,
thus preventing the self-taping screw from pulling down all the way onto the
surface of the roof sheeting. This in itself is not considered to be of any
structural significance and will not allow the roof sheeting to lift or become
detached.
Recommendation: The thread of the screw fixings observed under the roof at
the front elevation are not considered to be from poor workmanship, but are
purpose-made screws for the joining of metal roofing products in this
application.
4) Floorboards Through Home:
Comment: The waxed timber floor boards through-out the house were closely
inspected for distortion, cupping, or gapping as a result of water penetration
during the cyclone event.
In all instances, the timber floor boards were in exceptional condition, with
the exception of the flooring directly behind the front door. The floor boards
directly behind the front door displayed excessive gapping at the sides of
each board and appeared to be suffering from long- term “weathering”.
The damage to this section of the floor is a result, in our professional opinion,
of long-term wetting and drying from water getting in under the bottom of
the front door during normal storm activity over the life of the house (60+
yrs).
The remainder of the waxed timber floor, especially in the bedrooms where
water entered the house during the cyclone event have survived well, with
none of the damage signs displayed behind the front door.
The m ajority of the timber floor was also noted to be very “flat” over the
surface of each board, with only slight “cupping” or “waving” visible across
the floor surface when viewed under glancing light.
Recommendation: The internal timber floor is considered to be in a very good
condition, with little evidence of any water damage from the cyclone event.
Slight water staining is just visible in the wax finish of the floor in both
bedrooms and could easily be removed with a light sanding and re-waxing.
Case No: 304522 Determination Page 10 of 15
SUMMARY
The building structure does not display any significant structural or major
water damage as a result of the cyclone event. Slight water staining is just
visible in the timber wall and ceiling linings in the eastern bedrooms, however
the entire house internally is suffering from mould growth as a result of the
high humidity in this location.
The timber roof framing and roof cover (including side and end flashings) all
appear in a good serviceable condition and do not display any structural
damage as a result of the cyclone event. The internal timber floor remains in a
very good condition and has not been adversely affected by the cyclone
event.”
41. After the Applicant provided a number of photographs of the roof showing it
had “buckled , J provided further comments to the FSP in an email dated 16
February 2012:
“ … When I attended the site, the owners daughter and son were present, and
they were looking after their mother‟s affairs. Her son – [name] –
accompanied me onto the roof for the final part of our assessment for cyclone
damage, and he also agreed that the roof was in a remarkable condition
considering the cyclone it had just gone through.
All of the screw fixings and battens were pressure tested and found to be in
an excellent condition. The roof sheeting is relatively new, as the old roof
sheeting had been replaced sometime after the last cyclone (Larry), but I
believe the replacement work was triggered more because of the rusted state
of the old iron more so than from cyclone damage. The front porch roof still
remains in place, and this is part of the old roof sheeting. If you look at my
photos in the report you will see just how badly this small roof has rusted.
In relation to the photos supplied by the homeowner, the roof is definitely
“wavy”, a s it follows the shape of the timber rafters and battens. The timber
rafters are spaced at an excessive distance, and the timber battens to which
the roofing iron is attached have also sagged over the excessive distance
between the rafters. In saying this, the timber rafters and battens have not
been damaged or compromised by the cyclonic winds, nor have they suffered
any “lift” as is normally the case with timber roof construction subjected to the
full force of cyclonic winds.
This is a “skillion” roof a nd has a continuous fall from the front wall of the
house to the back wall where the kitchen has been extended out past the old
back wall of the original house.
The “wavy” roof depicted in the owners photos is not a result of the cyclone
buckling the roof. The timber battens and rafter shapes, along with their
positions, are also clearly reflected in the “wavy” nature of the roof. Even if
this existing roof sheeting was removed and new roofing iron installed, the
new roof would also look exactly the same as this does, as it too will be
following the shape of the existing timber battens and timber rafters.
In closing, the present appearance of the roof has nothing to do with any
cyclone damage, but is a reflection of the shape of the old timber roof
structure that the roof sheeting is fitted to.
Case No: 304522 Determination Page 11 of 15
I hope this helps explain the cause of the “wavy” roof and if I can be of any
further assistance, please feel free to contact me again. [sic]
42. The Applicant responded to the above email, saying that her son did not say
the roof was in excellent condition. She also said that J only had a clipboard
and pen and no equipment was taken onto the roof to conduct pressure
testing. The Applicant said that jumping up and down on the roof can hardly
be considered pressure testing. She also questioned how the kitchen cornice
could have suffered damage due to wind with the roof not being damaged.
43. J responded to the Applicant‟s concerns in another email, dated 7 March
2012, which states:
“In relation to the latest from the insured‟ s daughter I offer the following
response to her statements;
1) Kitchen Cornice – I agree that the timber cornice on the back wall of the
kitchen in the R/H corner (when standing inside the kitchen) has come away
from the ceiling and is drooping slightly. The timber cornice is on the side wall
of the house, and on the wall not facing the direction of the cyclone to start
with. The other inconsistency is that only the small corner section of the side
wall cornice has come away from its nail fixing, where-as the piece of timber
cornice on the back wall of the kitchen in this same corner has not moved at
all. The other thing to remember is that this part of the kitchen is an addition to
the original building, and the external walls have been constructed from
masonry concrete blocks. The fiber cement ceiling sheets have not dropped
as a result of any roof movement, and the block walls are also crack-free,
especially on the side wall where the end of the timber cornice has come
away slightly. There is a tapered in-fill panel on top of the concrete blocks to
cover the angle of the roof against the horizontal top course of concrete
blocks, and once again there is no evidence of any “down - ward” pressure in
this area either. Using the insured logic, if the cornice has been forced down
by wind pressure on the roof, the timber roof rafters would have to be
squashed or flattened, and this is an impossibility as the wall supporting them
is a solid concrete block wall. I will attach photos of the cornice in the
corner of the kitchen in a separate E-mail for better clarity. In summary, it
would be impossible to accredit the slight dislodgement of the end of one
small piece of timber cornice in the corner of the back wall as being a result of
the cyclone event. If the wind pressure from the cyclone was that great that it
dislodged the end of the cornice, it should have dislodged the entire length of
cornice, as well as the timber cornice along the back wall of the kitchen at the
same time. Cyclonic wind does not discriminate…..i t will dislodge a large area
and not just one small piece of timber in a single corner. I believe the end of
this piece of timber cornice has been dislodged for a considerable length of
time and was like this well before the cyclone event. The nail fixing is probably
to blame and has not found any back-block timber to attach to. Finally,
cyclonic wind pressure on a roof structure affects the attachment of the
roofing iron to the timber batten, and then the connection of the timber batten
to the roof rafter. In this particular case, the timber rafters have not become
detached from the top of the concrete block walls and therefore the ceiling
lining of the kitchen, which is affixed to the bottom of the rafters, has not
moved or stressed either. If the cyclonic wind had entered the soffits or under
the roof iron as suggested by the insured daughter, it would have destroyed
this entire corner of the ceiling, and not just pushed the end of one small piece
of timber cornice down.
Case No: 304522 Determination Page 12 of 15
2) Roof Condition – My report reflects that the insured son was present on top
of the roof when I did my inspection, and he agreed with me that the roof was
in a “ remarkable condition” after going through the cyclone , not that it was
in “ excellent condition” as now claimed by his sister. In relation to the
insured daughters claim that “ we do not call jumping up and down on the
roof pressure testing” I must state that we do not jump up and down on
anyone‟s roof. If access into the ceiling space is not available to visually
inspect the timber batten connection to the roof rafter, then our inspection
must be carried out from on top of the roof. This involves walking along the
batten line defined by the roofing screws and placing pressure on the roof
sheeting beside the screw heads, especially at the side lap locations, the
ridge line and the end of the roof near the gutter line. This method of pressure
testing quickly and positively determines if the roof sheeting and screw are
moving up and down, which indicates that the timber batten is also moving up
and down on top of the rafter. If there is no screw head movement, we are
satisfied that the roof batten remains well anchored to the rafter top. This was
the case when testing the screw fixings on this particular roof.
Summary: The allegations of the insured‟s daughter are ill -founded and are in
stark contradiction of what is to be expected when the roof and ceiling frame
of a house is subjected to cyclonic wind forces that exceed the tie-down
requirements of the roof. It was my impression during the initial inspection that
the insured‟s daughter is endeavoring to have normal house maintenance and
a full re-paint of the house undertaken as a claim for cyclone damage, when
the evidence suggests otherwise. ” [sic]
44. The FSP appointed an expert to report on the roof issues and provide a
quotation. The report from „T‟, dated 9 May 2012, states:
“ Client discussions: [Applicant] stated;
“The roof was replaced November 2010, about three months before cyclone
Yasi. It has since developed a downward bow in the middle. The timber
beams have lifted and the roof now leaks. The barge board is no longer hard
against the timber battens. There is water damage/mould forming all over the
ceiling and down some walls from the leaking roof. The timber internal wall
boards have begun to split from the exposure to the water leaks.”
Observations:
The dwelling is an old lowset with a relatively new roof in very good condition.
There is a depression in the middle upper section of the roof, above the
lounge area with timber ceiling joists spanning 6500x4100 wide. This
depression is most likely caused by undersized timber during construction.
The timber beams claimed to have lifted were the windward outriggers
supporting the roof batten overhang. These are of adequate size however
there is a gap to the weatherboards apparently left during construction. The
paint on the underside of the outrigger beyond the edge of the weatherboard
indicates there has been a gap for quite some time. The barge board on the
leeward side of the building is not hard against the outrigger although not
likely the result of cyclone Yasi. The timber internal wall boards have small
cracks associated with age and no signs of water damage. The ceiling shows
extensive mould not due to water leaks from the roof as there is no sign of
water damage in this area. There is one small area with evidence of a roof
leak in the form of several water stain drops. Most likely cause is a leaking
roof screw.
Case No: 304522 Determination Page 13 of 15
Conclusion:
My inspection of the property found the resultant roof damage is not
consistent to the claimed event.
Maintenance /Defect issues related to claim:
The maintenance/defect issues are the undersized ceiling joists used during
construction. The ceilings and house haven‟t been cleaned or painted for a
very long time.
Several roof screws are not making good seal to roof sheets, potential cause
of a roof leak. Not caused by cyclone. We trust this report is to your
satisfaction... ” [sic]
45. During the course of the claim, the Applicant and FSP communicated via
email. The Panel has reviewed these communications and reviewed the
various photographs provided.
46. The Case Manager at the Financial Ombudsman Service contacted the
Applicant on 3 July 2013 to enquire about the engineering report from the
first engineer engaged by the Applicant (BC). The Applicant said she was
not sure if a report was ever written as she did not receive one.
47. The Applicant subsequently contacted BC and was advised that while BC
did attend to inspect the home, no report was ever written.
Discussion
48. The Applicant says the home moved as the result of Cyclone Yasi, resulting
in damage to the roof and walls.
49. The Panel has reviewed the evidence from the experts. The experts
appointed by the FSP (RBG, J & T) all report there is no cyclone related
damage to the roof. However, M (commissioned by the Applicant) reports
that “Roof sheet laps have permanently lifted” . M provides photographs of
the lifted lap sheets; however, the Panel is unable to identify the issues in
the photograph.
50. With respect to the roof, the Applicant also provides a number of
photographs showing a wave effect across the roof sheets which she says is
the result of the cyclone. The FSP‟s expert J says the wave effect is caused
by the distance between the rafters and is not related to the cyclone. J says
that even if the roof sheeting was replaced, the same effect would be evident
due to the spacing of the rafters.
51. In reviewing the issues with the roof, the Panel can clearly see the „wave‟
effect referred to by the parties. However, the Panel is not satisfied the
Applicant has established that there is any damage that can be attributed to
the cyclone. In particular, the Panel finds J‟s comments thorough and
persuasive on the roof related issues.
Case No: 304522 Determination Page 14 of 15
52. T‟s comments also support J‟s findings , albeit that T identified some
maintenance issues.
53. With regards to the exterior weatherboards, the Panel is not persuaded that
the Applicant has established the noted gaps were caused by the cyclone.
While M‟s report has not been disrega rded, the Panel is persuaded by the
comments from RBG and J.
54. Further while some photographs show cracked paint, others show what
appears to be excess paint drips in the gaps, indicating there was movement
at the property well before the Cyclone Yasi. It is noted the home is a
number of decades old and movement of this kind is not uncommon.
55. The photographs also reveal some areas of general wear and tear.
56. The Panel is persuaded the FSP‟s offer to re -sand the floor in bedroom 2
meets its liability under the policy. J reports the floor is generally in good
condition other than the water mark and some long -term weathering behind
the front door.
57. The FSP has offered a settlement of $3,603.86 for the claim related repairs,
including the cornice in the kitchen. The quotation from T also includes other
damage at a quoted cost of $7,927.92, which the FSP says in its claims
screen notations, is not claim related.
58. In conclusion, the Panel finds that the available evidence indicates the
building was not structurally damaged by cyclone Yasi. The Panel is
therefore satisfied that the settlement offer made by the FSP meets its
liability under the policy.
Other
59. The Panel has had regard to a number of issues raised by the Applicant,
such as minor inconsistencies in reports, the comment about stairs when
there are ramps, the issue the Applicant has with the estimate being put on
the claim prior to assessment and the notation in the FSP‟s claim system
that a diary was deleted.
60. The Panel notes that insurers will usually put an es timate on a claim
depending on the nature of the event. An estimate is only that and there is
no evidence the FSP‟s initial claim estimates are related to its decision.
61. There are some inconsistencies in the reports, although this is not
uncommon in dealing with complex and ongoing building damage issues. In
the Panel‟s view none of the issues noted are of such significance as to
cause it to completely disregard any of the experts or the FSP‟s case.
62. On this point, it is noted that in M‟s report it is state d that the roof is three
years old, while the Applicant reports it was replaced only six months before
Cyclone Yasi which occurred in February 2011.
Case No: 304522 Determination Page 15 of 15
63. However, the Panel has not disregarded M‟s findings because of this minor
issue. Rather, it finds all of the reports have some merit; however, the weight
of expert opinion, which the Panel finds is well reasoned, leads to the
conclusion that the damage in dispute is not cyclone related.
64. In relation to the deleted diary at line 579 of the FSP‟s claims notation s, the
Panel understands that this refers to the FSP ‟s electronic diary system which
is used to track the progress of claims and prompt actions by the FSP.
Accordingly, that such a diary is removed is not an issue of significance and
does not relate to the removal of claim related comments or evidence.
65. The Panel acknowledges that the Applicant has provided a detailed and
competent submission in relation to this dispute. However, based on the
available evidence and particularly that of expert J, the Panel has not been
persuaded on the balance of probabilities that the damage in dispute was
caused by Cyclone Yasi.
Determination
66. On the basis of the available information the Panel determines that the FSP
is entitled to limit its liability to the $3,603.86 quoted.