Home / Financial Firm (Unknown - Insurer) / Determination 304519

Determination 304519

Hail damage claim - liability denied for wear and tear and dispute over repair method (encapsulation versus re-roof)

FirmFinancial Firm (Unknown - Insurer)
Decided2013-05-01
ProductGeneral Insurance · Landlord
OutcomeFor the complainant in part
Amount awarded—
Non-financial loss—
Amount claimed$30,036
SourceAFCA PDF

Summary

The complainant's roofs were damaged by a hailstorm, and the insurer accepted the claim but disputed liability for wear and tear and the repair method. The Ombudsman found the insurer liable, accepted encapsulation as the appropriate repair rather than re-roofing, and ordered settlement on an encapsulation quote with statutory interest.

Once the insured establishes a prima facie claim, the insurer must prove an exclusion, and encapsulation by a qualified specialist is a viable and cost effective repair for hail damage.

Issues

Subjects and remedies

home or building damagenatural disasterpay claimpay interest

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Case No: 304519 Determination Page 1 of 9 Case number: 304519 General Insurance - Domestic Insurance - Home Building - FSP Decision - Denial of claim 18 April 2013 Background 1. The Applicant held insurance policies with the Financial Services Provider (FSP) providing defined events cover over two homes he owns in Zillmere, Queensland. 2. After a hail storm in October 2011 caused pitting of the asbestos roofs of the homes, the Applicant lodged claims for damage. 3. The FSP accepted the Applicant’s claims and offered to repair the da mage by the encapsulation process. 4. The Applicant disagrees with the FSP’s proposed method of repair, saying that the FSP should pay for the cost to re-roof both homes. Summary of Applicant’s position 5. The Applicant says that the relevant Queensland Code of Practice states that damaged asbestos should only be encapsulated if it cannot be removed. 6. He says he has asked the FSP for a guarantee that there will not be any loose asbestos fibres if encapsulation takes place, but the FSP has not responded. Similarly, the FSP has not answered his questions about how long encapsulation lasts and what happens after any guarantee period ends. 7. Due to the FSP’s delays in resolving this dispute, the Applicant has re -roofed both properties, which he believes was the only solution to eliminate the ongoing risk to his family and tenants. He wants the FSP to pay the $30,035.81 it cost him to re-roof the properties. 8. The Applicant says he does not understand how the FSP can now state that it does not accept any liability for the roof damage, which is a change from their previous position on the matter. 9. He says that the opinions of the two consultants engaged by the FSP are in conflict with one another and he has obtained an opinion which supports his position that the roofs needed replacement. Determination Case No: 304519 Determination Page 2 of 9 Summary of FSP’s position 10. The FSP says building consultant “M” inspected both properties and reported that the surface of roof sheeting of both homes had been marked by small hail stones but that the hail storm caused no structural damage to the roofs. 11. M also reported that the roofs were old and there were some maintenance related issues with both. However, according to M, neither roof requires replacement and encapsulation would ensure asbestos particles are not exposed and airborne. 12. The FSP also engaged an environmental asbestos expert (“P”) to provide a further opinion on the damage to both homes, but in the meantime the Applicant re-roofed one of the properties — which was the Applicant’s residence — and advised he intended to do the same to the other property, which he rented out to tenants. 13. The report by P in relation to the rental property stated that the roof surface had been subject to gradual weathering processes over a number of decades and the hail storm had temporarily accelerated that process. P also confirmed that while encapsulation would prolong the roof’s serviceable life, its application was not essential from an asbestos health risk or a structural integrity perspective. 14. The FSP says that on the basis of the reports by M and P, it has determined that the roofs had suffered long term wear and tear and gradual deterioration and the Applicant has not established that, on the balance of probabilities, the damage present in the roofs falls within the policy coverage. 15. The FSP relies on the following policy provisions: “ General exclusions We do not insure you for any loss or damage that is caused by or arises from: ...  wear and tear, gradual deterioration, or fading  rust, corrosion, oxidisation, mould, mildew or atmospheric conditions ... Residential Home and Contents Insurance Insured events ... Storm We will cover Loss or damage caused by storm, including cyclone, hail, wind, snow or rain. We won’t cover ...  loss or damage caused by or resulting from: Case No: 304519 Determination Page 3 of 9 ... o gradual deterioration from rain ... Landlord Home and Contents Insurance Insured events ... Storm We will cover Loss or damage caused by storm, including cyclone, hail, wind, snow or rain. We won’t cover ...  loss or damage caused by or resulting from: ... o gradual deterioration from rain How we settle your claim . ... We will not pay for an event when:  the claim is excluded by specific policy exclusions or by any of the general exclusions listed on page 13. ... ” Issues 16. Whether the Applicant has established that his homes were damaged by an insured event under the policy and if so, whether the FSP is liable for that damage. 17. What is the appropriate repair method for any damage sustained to the Applicant’s roofs. Reasons for decision 18. There has been an exchange of information and I am satisfied that both parties have had the opportunity to respond to the issues raised. 19. It is an accepted principle of general insurance law that an insured bears the onus to establish, on the face of the facts, that they have suffered a loss caused by an event to which their policy responds. This is known as a prima facie claim. Once so established, the onus shifts to the insurer to prove that an exclusion applies if it wishes to limit or deny liability for the loss. Case No: 304519 Determination Page 4 of 9 20. The FSP arranged for M to inspect the Applicant’s properties and this occurred on 21 December 2011. M’s report for each home in cluded the following: “ Cause and Extent of Loss On the 14 th of October 2011, hail storm activity was in the South-East Queensland Region including the suburb of Zillmere and your insured’s property sustained damage as a direct result. Inspection of the ... asbestos cement corrugated roofing to your insured’s dwelling revealed slight impact marks to the surface of the roof sheeting resulting from small hail stones. Hail stone impact has pitted the surface of the asbestos roofing sheets ... ” 21. In a Final Decision Letter (FDL) to the Applicant dated 18 June 2012, the FSP stated the following: “By phone conversation and letter dated 31 January 2012 you were advised that your claims had been accepted...” 22. Accordingly, I am satisfied that the Applicant has established a prima facie claim under the policy. It follows that if the FSP seeks to deny or limit its liability for the damage, it must prove that a policy exclusion applies. 23. The report by M, for the Applicant’s residential home, noted that the roof had some cracking to the ridge capping and roofing sheets which were not caused by hail stone impact. One crack appeared consistent with pedestrian traffic, while another was around the screw fixing and was consistent with movement. 24. M also noted that previous repairs to the roof were evidence where tar had been placed over the roofing screws and along the sheeting to prevent water entry. M stated that the cracking to the roof sheets was maintenance related and needed to be rectified at the Applicant’s expense. 25. With re spect to the Applicant’s rental home, M noted that the pointing to the ridge and hip capping had deteriorated and become loose due to movement between the capping and roof sheets. The report by M also noted that the screw fixings across the roof sheets had corroded. The issues identified were regarded as maintenance related and the Applicant was expected to rectify these at his own expense. 26. I accept that the Applicant’s residential home and rental home were approximately 41 and 51 years old, respectively. 27. Based on the reports by M, I also accept that the roofs had damage which was caused by wear and tear and gradual deterioration and that as this is excluded under the policy, the FSP is not liable for the damage so identified. 28. The Applicant indicated to M that he believed that the impact marks to the asbestos roofs could not be repaired and that the entire roofs needed replacing. Case No: 304519 Determination Page 5 of 9 29. In response to the Applicant’s contention, M stated in his reports for both homes, that the roofing sheets and fasteners to the Ap plicant’s roofs had not sustained any structural damage, whatsoever as a result of the storm and that only the surface of the roof sheeting had been marked by small hail stones. 30. M also stated in his report that encapsulation of the entire roof(s), with an approved system, would ensure that asbestos particles would not be exposed and airborne by exposure to ultraviolet rays and general weathering provided it was carried out by a licensed specialist. 31. Further, M opined that encapsulating the roof(s) with an approved system would meet legislative requirements and allow at least a further 10 years service. M said there was no reason to recommend the replacement of the roofs on health of legal grounds. 32. In a letter dated 8 March 2012 to the FSP, the Applicant stated that he had a number of concerns about the resolution of the claims as proposed by M. 33. The Applicant stated that at both his properties, hail stones had pitted the asbestos roof sheeting, leaving exposed and loose asbestos particles. He asked the FSP to answer the following questions:  Could the FSP guarantee that there would not be any loose asbestos fibres after the proposed encapsulation process?  For how many years would the FSP guarantee the encapsulation process and what happens after the guarantee period ends? 34. The FSP engaged P to perform an asbestos risk assessment of the properties. An inspection of the Applicant’s rental property was undertaken on 4 May 2012. I note that an inspection of the residential home was not possible because by that stage, the Applicant had already replaced the roof to that home. 35. In its report dated 15 May 2012, P included the following with respect to the visual inspection of the roof of the Applicant’s rental property:  The roof was moderately pitched and clad with unpainted corrugated asbestos cement (AC) sheets. An estimated 120m 2 of cladding was installed.  It was understood that the house was a circa 1960 construction and it is assumed the roof was the originally installed roof cladding.  The roof cladding showed typical signs of weathering for that type of roof (i.e.: dark in colour with potential lichen growth and soft, friable upper layer with visible asbestos fibre bundles on the surface.)  The soft, friable layer extends to a depth of approximately 1 mm and then the solid unexposed/unweathered AC sheeting is apparent.  Light to moderate dust and debris accumulations were identified along many sections of the sheet metal roof guttering. Case No: 304519 Determination Page 6 of 9  Numerous lighter coloured marks were identified consistently across the roof cladding, consistent with a relatively recent hail stone event. These lighter coloured pitting marks represent mechanical abrasion of the uppermost soft and friable dark (weathered) layer, exposing the unweathered light coloured surface beneath.  There was also evidence of marks which were consistent with animal (eg: possum) scratchings.  Inspection of the garden bed/mulched/lawn areas around the house did not reveal any macroscopic (visible) signs of asbestos debris that could be associated with the migration of AC containing material off the roof. 36. P also took a series of twelve bulk material samples from various areas around the property for analysis, with a view to characterise the nature of any potential migration of asbestos debris off the roof cladding. P noted t hat this did not constitute an assessment of the risk but could provide some guidance as to the level of cleanliness of an area and was included to supplement the visual inspection. 37. The results of the analysis of the bulk material samples revealed that asbestos was identified in 4 of the twelves samples collected, however, no asbestos was identified on any of the eight samples collected from the ground surface around the base of the perimeter walls. 38. In its report, P stated that it generally concurred with the findings of the report by M, that hail stones had pitted the upper roof surface, but the AC roof sheets and fasteners had not sustained any structural damage as a direct result of the storm. According to P, from a health risk or structural integrity perspective, there was no requirement to replace the roof. 39. P also stated that the unsealed, weathered and pitted roof surface and asbestos contaminated roof gutter deposits, present a negligible asbestos related health risk to persons at the property during normal occupancy. P noted that an increased risk may occur where persons access or work in close proximity to the exposed roof surface and/or gutter deposits and where such actions result in physical disturbance of the asbestos related material. 40. According to P, encapsulation of the entire roof could be a cost effective way to prolong the life of an AC roof, if it is done under appropriately controlled conditions and a suitably binding and resilient product is applied. 41. However, P pointed out that the upper ro of surface of the Applicant’s home was already weathered and friable with loose or loosened asbestos fibres apparent on the surface. Like any other unpainted AC roof, under similar circumstances, it has been subject to gradual weathering processes over a number of decades and the October 2011 hail storm would have temporarily accelerated the weathering process, creating more loss fibre at the surface and washing loose material into the gutters to add to the pre -existing gutter deposits. P stated that the October 2011 storm has contributed to the overall weathering profile of the roof. Case No: 304519 Determination Page 7 of 9 42. While P stated encapsulation (or roof replacement) were both viable options to negate the on-going weathering of the unpainted roof, it did not consider encapsulation as being a mandatory remedial action following the October 2011 hail storm. 43. The Applicant says that the opinions of the FSP’s consultants — M and P — conflict one another, with one supporting encapsulation and the other advocating a “do nothing” approach. He has p rovided an undated quotation from “NR” for the replacement of the roof which stated the following about his rental property: “After inspection of the property we found it had sustained damage consistent with hail impact. ... The surface of the asbestos cement sheeting has been disturbed and therefore poses a health risk. ... The roof is made from super six asbestos and is un- repairable. ...” 44. The Applicant has also pointed to the 2011 Queensland Code of Practice titled “How to manage and control asbestos in the workplace”, saying that this document states that asbestos should only be encapsulated or sealed if it cannot be removed. 45. I have considered all the material provided by both parties. 46. Although the quotation by NR indicates that the roof to the Applicant ’s rental home was unrepairable, it contains no information about the merits or drawbacks of the encapsulation process. 47. By contrast, the reports provided by M and by P, address the encapsulation process and I find them more persuasive than the quotation b y NR. 48. Furthermore, the reports by M and P both indicate that the roof hail storm damage did not present a health risk to occupants. 49. I note the reports by M indicated that the homes are at least 40 years old (for the Applicant’s residential home) and 50 y ears old (for his rental home) and the Applicant has not disputed this. I therefore accept M’s estimate of the ages of the roofs. 50. The Applicant has also not disputed the assumption stated by P, in its report, that the roof (of the rental home), is the originally installed roof cladding. While noting that the roof to the Applicant’s residential home was not able to be inspected by P, in the absence of evidence to the contrary, I accept that P’s assumption is correct and applies to both homes. 51. I have conside red the Applicant’s submission on encapsulation, with respect to the opinions of M and P. M has indicated that encapsulation is a suitable method of repair to the roof and P concurred, however, P has pointed out that encapsulation is not mandatory from a health risk or structural integrity perspective. I do not agree with the Applicant’s contention that the opinions of these two consultants are in conflict on the matter. Case No: 304519 Determination Page 8 of 9 52. I accept that the removal of asbestos from the environment is ultimately the best way in which to reduce the risk posed by this hazardous substance and this is clearly a theme which is reflected in the Queensland 2011 Code of Practice, to which the Applicant has referred. 53. However, based on the information exchanged, I am not convinced that the damage to the roofs from the October 2011 hailstorm event was such that the roofs needed to be replaced. 54. As outlined earlier, the Applicant has established a prima facie claim and I found that FSP was liable for the damage. This is so regardless of whet her or not the damage was structural or superficial. 55. I accept that encapsulation — providing it is performed under controlled conditions by an appropriately qualified and skilled specialist and using a suitably binding and resilient material — is a viable and cost effective alternative for the repair of hail storm damage to the roofs. 56. Accordingly, I find that the FSP is only required to pay for the encapsulation of the roofs. 57. I note that because of the delays to the processing of the claims and out of concern for the health of his family and his tenants, the Applicant was not prepared to wait for the dispute with the FSP to be resolved and decided to replace both of the roofs, thus removing any risk posed by the asbestos roofs at his homes. 58. I appreciate that the Applicant had unresolved concerns about the health risk posed by the asbestos and under the circumstances, his decision to replace the roofs before the claim dispute was finalised, is understandable. 59. The Applicant was entitled to perform the replacement work but because it was performed before an authorisation from the FSP for this work was obtained, any costs incurred by the Applicant (in excess of the claim settlement amount provided by the FSP), have to be at his own expense. 60. For removal of doubt, I do not accept the FSP’s contention that its offer to pay for the cost of encapsulation of the Applicant’s roofs was on a “good faith” basis, as they have a liability under the policy. Determination 61. On the basis of the available information I determine that:  The Applicant’s homes’ roofs were damaged by the hail storm in October 2011 and this damage is covered by the insured event of “storm”, under the policies.  The FSP is li able for this damage to the Applicant’s roofs. Case No: 304519 Determination Page 9 of 9  Encapsulation, performed under controlled conditions by an appropriately qualified and skilled specialist, was an appropriate method of repair to the damage to the roofs.  The FSP is required to obtain a quote for the encapsulation of the Applicant’s roofs from a suitably qualified and skilled specialist and use this as the basis for the settlement of the claims.  Pursuant to Section 57 of the Insurance Contracts Act 1984 , the FSP is required to pay statutory interest on the amount of the settlement from 18 June 2012, being the date of its FDL, until the date upon which the settlement is paid.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.