Home / Financial Firm (Unknown - Insurer) / Determination 304502

Determination 304502

Amount payable for seaplane damage repairs and float corrosion after insurer-managed recovery and repairs

FirmFinancial Firm (Unknown - Insurer)
Decided2014-07-17
ProductGeneral Insurance · Other general
OutcomeFor the complainant in part
Amount awarded$67,829
Non-financial loss—
Amount claimed$215,000
SourceAFCA PDF

Summary

The aircraft owner, a business represented by solicitors, claimed about $215,000 for repairs and costs after the insurer recovered and had the aircraft repaired by a contractor. AFCA ordered a full and final payment of $67,829.08, rejecting much of the claim.

The insurer is bound by its conduct in actively managing the repairs, so it is liable for float damage caused by recovery, but the claimant failed to prove causation for most other items.

Issues

Subjects and remedies

small businesspay claim

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Case No: 304502 Determination Page 1 of 21 Case number: 304502 General Insurance - Domestic Insurance - Motor Vehicle- Comprehensive - FSP Decision - Claim amount 17 June 2014 Summary Description  A claim under an insurance policy providing coverage for an aircraft. Basis of Determination  A consideration of the coverage provided by the policy and the repairs necessitated by the insured event. Determination  On the basis of the available information, the Panel determines that the FSP pay the Applicant the amount of $67,829.08, i n full and final settlement of this claim.  In the event the Applicant accepts this Determination, this amount should be paid within 21 days of the FSP being notified of its acceptance unless it requires a binding release to be signed first. In the event the FSP requires a binding release to be signed, it should:  Ensure a release is sent to the Applicant within 14 days of being notified of the Applicant’s acceptance of the Determination; and  Pay the above amount within 14 days after it has received an appropriately signed release. Background 1. The Applicant is the owner of a Dehavilland Beaver Aircraft VH-IDO, which is a seaplane (“the aircraft”). On 14 April 2009, the Applicant entered into a rental agreement with CE. The rental agreement was to commence on 1 June 2009, for a period of 3 months. 2. On 9 August 2009, an employee of CE was in the process of landing the aircraft on water, however, as the ground landing wheels were deployed this resulted in the aircraft crashing into the water, sustaining damage. Determination Case No: 304502 Determination Page 2 of 21 3. At the time of the incident, the aircraft was insured by the Financial Services Provider (FSP). The Applicant lodged a claim under this policy following which, the FSP arranged for the aircraft to be recovered. 4. The aircraft was considered repairable and shipped to Canada where the damage repairs and other works requested by the Applicant were undertaken by S. Following this, the aircraft was returned to Australia and ultimately to the Applicant’s possession on or around 15 June 2011. 5. The Applicant is dissatisf ied with the repairs conducted, the FSP’s actions in recovering the aircraft , the FSP’s failure to fully indemnify it and the fact the Applicant had to pay the GST component of the repairs when the aircraft passed through customs on its return. 6. Both the Applicant and the FSP are represented by solicitors. They have provided extensive submissions on the issues in dispute. For the sake of brevity, the Panel will only briefly summarise these submissions given, all of the material made available has been excha nged with the other party. Summary of Applicant ’s position 7. The Applicant has raised numerous matters and issues regarding the repairs and the FSP’s conduct. Based on this, the Applicant is seeking approximately $215,000 in reimbursement. Summary of FSP’s position 8. Based on numerous submissions in support, the FSP maintains it is not liable beyond the amounts it has offered to pay. 9. With respect to the amounts sought by the Applicant and the items it has particularised, the FSP has responded to this specifica lly in its solicitors’ letter to the Applicant’s solicitor s dated 12 September 2013. In this letter, it included a Schedule of Costs, setting out the FSP's position for each item. Issue 10. Whether the Applicant is entitled to the amounts sought. Reasons for decision 11. As advised to the parties, due to the nature of the dispute, the matter has been referred to the Panel for Determination in line with the Operational Guidelines to the Service’s Terms of Reference . This dispute has not been the subject of a FOS Recommendation and has proceeded directly to Determination. Case No: 304502 Determination Page 3 of 21 12. The Panel consists of an Ombudsman and two Panel members with extensive experience in the insurance industry and consumer claims. Preliminary Matters 13. The FSP has objected to the Applicant relying on 5 documents obtained by way of subpoena in District Court Proceedings the Applicant issued against CE. The Applicant, in a letter addressed to the FSP’s solicitors dated 4 November 2013, noted these were disclosed inadvertently but states FOS should still consider them as they are relevant to this dispute. 14. The FSP has provided case law ( Psychology Board of Australia & Anor v Vicary & Ors [2013] FCWA 7) in support of the fact that:  There is an implied undertaking under law that documents obtained by way of discovery or subpoena cannot be disclosed or used for a collateral purpose.  This undertaking extends to anyone who comes into possession of such a document and is aware this document was obtained through such a process. There is no exception if that third p arty entity had a legal right or power to obtain the documents through other means . 15. There is no dispute the Applicant has breached its implied undertaking to the Court in disclosing this information, albeit inadvertently. Despite this, it is now seeking to have this information included in the material before FOS on the basis that it is relevant and it would be disingenuous for the FSP to have them excluded and FOS would have access to them pursuant to its inquisitorial powers under the Terms of Reference. 16. The Panel does not accept this circuitous argument for numerous reasons. First and foremost, there is no dispute the documents ought not to have been included. Second and of similar significance, if the Panel allowed these documents to be included on the basis such information could have been obtained through its inquisitorial powers under the Terms of Reference, it would be in breach of its implied undertaking to the Court having now been informed of the method these documents were obtained. 17. Third, to allow these documents to be included would, in effect, enable the Applicant to gain from its failure to comply with its implied undertaking. 18. Therefore, the Panel will not review these documents as part of its deliberations. To this end, the Panel notes these documents were not included in the material before it to ensure there was no inadvertent reliance upon same. Repairs 19. One of the FSP’s principal arguments is that it did not elect to have the repairs affected in Canada. Instead, this was an arrangement between the Case No: 304502 Determination Page 4 of 21 Applicant and S. As such, its obligation under the policy is limited to the repair work conducted by S. 20. The policy confers upon the FSP a right to elect the manner in which it will settle a claim as set out in the following provision: “The Company will at its option pay for, repair, or pay for the repair of, accidental loss of or damage to the Aircraft …” 21. The doctrine of election is well summarised by Stephen J in the case of Sargent v ASL Developments Ltd (1974) 131 CLR 634 at 646 where he stated the following: “ The words or conduct ordinarily required to constitute an election must be unequivocal in the sense that it is consistent only with the exercise of one of the two sets of rights and inconsistent with the exercise of the other; thus for a lessor to continue to receive rent under a lease will be consistent only with his rights as lessor and inconsistent with the exercise of a right to determine the lease ... However, less unequivocal conduct, only providing some evidence of an election, may suffice if coupled with actual knowledge of the right of election ... There need be no expressed intention to elect, nor will an express disclaimer of such an intention be of any avail in preserving one right if in fact there be an exercise of another inconsistent right ... For an election there need be no actual, subjective intention to elect ... an election is the effect which the law attributes to conduct justifiable only if such an election had been m ade.” 22. This issue is vexed given the parties’ contrasting submissions, the history of events surrounding the engagement of S, the communications between all of the relevant parties and the overall repair process being protracted. This is particularly illustrated by the following factors:  On or about 23 September 2009, two quotes to repair the airplane were obtained from AA and S.  The quote provided by S was sent to the FSP, via its loss adjuster , following some discussion between the two regarding various points (e.g. extra shipping costs).  S was preferred by both the FSP and the Applicant.  The Applicant authorised S to repair the airplane on 15 October 2009.  On or about 24 May 2011 (being one a half years later), the airplane was returned to Australia for reassembly following which, S’s involvement in the repair came at an end.  It is clear based on the material available that an abundant amount of communications between the Applicant, the FSP’s loss adjuster, the FSP and S were entered into during this period of time.  It is also clear that most of these communications have not been included in the available material. For instance, the FSP has not made available any of its loss adjuster reports, claim notes or copies of its communications with S. Case No: 304502 Determination Page 5 of 21 23. The FSP’s position is clear in that it did not engage S, did not have a contract with S and therefore is not liable for any potential poor repair conducted by S. In support of this, it relies on the following arguments:  A repair contract was entered into between S a nd the Applicant. This is supported by the quote (Offer) and the Applicant’s authorisation to repair (Acceptance).  Emails dated 29 October, 18 November and 20 November 2009 confirming its position. 24. The Panel does not accept that the FSP’s submissions dispe nses with the issue. Although its communications in the above emails would support the position that it made an unqualified election “to pay for the repair of … accidental loss of or damage to the Aircraft”, its conduct preceding and following this is inconsistent with such an election. This is supported by the following. 25. First, it is clear the FSP actively engaged with S directly regarding insurance related repairs in numerous instances, such as when S’s quotation was procured (email dated 30 September 2009) and during the course of the repairs (paragraph 32 of the FSP’s submission dated 13 September 2013). 26. The FSP has not provided a copy of the communications between its assessor and S to enable the Panel to determine the extent of its involvement. Although its submission stated its involvement was limited to being kept informed of the progress of insurance related repairs, dealing with issues such as float corrosion, the undocumented modification of the aircraft and payment issues, minimal corroboration has been provided. 27. The Applicant sought to include some of these communications that it procured by way of subpoena, which the Panel has had to exclude to ensure it complies with its implied undertaking to the Court. The FSP, in objecting to this, also assured FOS that it has provided all relevant documents both from the FSP’s file and its assessor s. 28. However, it is clear the FSP has withheld a substantial amount of information related to its involvement in the repairs. This inference is supported by the length of time taken for the repairs, the fact the FSP has acknowledged it was regularly communicating with S and the absence of any loss adjuster reports which normally accompany the engagement of a loss adjuster in a claim. 29. Accordingly, the Panel is not in a position to review this documentation to ensure that it corroborates the FSP’s submission about the extent of its involvement. In particular, given the substantive issue in dispute was whether the FSP was responsible for the repairs, the FSP’s failure to provide this information invites an adverse inference to be drawn that this information would not support the FSP’s position. 30. Although the FSP has stated in its submission that it would produce any information requested by FOS, this is not satisfactory. As stated by the Case No: 304502 Determination Page 6 of 21 Applicant, FOS is not in a position to identify the specific material required given the FSP has not set out what information is available on this issue. In such circumstances, FOS would be required to seek a broad amount of information, review all of it in context of the issue in dispute and identify which documents are actually relevant to the issue. 31. This is clearly an inefficient manner for a dispute to progress. 32. Further, in circumstances when the FSP and its solicitors are experienced participants of FOS’s process, have had ample opportunity to set out their position in detail and the incident that led to the claim occurred more than 4 years ago, it would be unfair in all the circumstances for the FSP to place the onus on FOS to identify and request such information. 33. Further, as noted in its own submission, “As at 23 September 2009 [FSP] had obtained two quote s for repair. The second quote obtained…from Canadian repairer [S].” 34. This implies that the FSP (either directly or through its assessor) was actively involved in sourcing a repairer to undertake the repair work, who was acceptable to the parties. 35. Given all of the above, there is scope for the Panel to find that the FSP’s direct communication with S was not consistent with that of an insurer electing to only pay for the repairs to the aircraft. Instead, there is basis to find the FSP was actively managing this process, an inference supported to an extent by the next point. 36. Second, the existence of a repair contract solely between the Applicant and S is contradicted by a number of factors, namely: a. S communicated with the FSP directly, both before the Applicant authorised the repairs and after. It is unclear what standing the FSP had to communicate directly with S during the process if the contract for the whole repairs was meant to be solely between the Applicant and S, according to the FSP. b. The communication to the FSP by both S and the Applicant would indicate that they both appeared to conceive the FSP had some standing in the transaction. c. The FSP insisted the Applicant execute a partial release to submit upfront funds to S. However, it appears the invoice provided by S was addressed to the FSP (Applicant’s email to the FSP dated 18 November 2009, with no evidence provided by the FSP to refute this). d. Based on the available material, S’s quote was sent only to the FSP with minimal involvement by the Applicant (emails exchanged between the assessor and S dated 10, 13 and 17 September 2009, set out the parties’ discussion about the settlement of the quote). Given this, it appears the negotiations for the quote (or the “Offer” as described by Case No: 304502 Determination Page 7 of 21 the FSP) was procured and sent to the FSP, with minimal involvement by the Applicant. e. It appears all invoices for insurance related repairs were issued to the FSP. In particular, in the Applicant’s solicitors’ letter to the FSP dated 24 December 2010, the Applicant understood that monies were paid to S without its authorisation or approval. The FSP has not refuted this fact. 37. Having considered all of the above and in the absence of the FSP’s preparedness to provide more comprehensive information of its communications and interact ions with S, the FSP’s position that it was not a party to the repair contract is substantively contradicted by its conduct and involvement. 38. Further, any argument that it was transacting with S as agent of the Applicant would be unfounded. This is based on the Applicant’s communication with the FSP both before and during the repair process, where it is clear that the Applicant considered the FSP’s involvement was in a capacity of being responsible for the repairs. Therefore, any argument as to agency would fail due to the lack of clear mutual intent between the Applicant and the FSP that such an agreement was in existence. 39. As a result, the FSP’s conduct before, during and after S’s involvement , is more consistent with an insurer actively managing the repairs. Had the FSP provided more comprehensive information, such as copies of its assessor’s reports and communications, the Panel may have been otherwise persuaded. In the Panel’s view , the Applicant was entitled to form a belief that the FSP had elected to repair the aircraft, rather than declare it a total loss and cash-out the Applicant and decided to engage S for the repairs. In this context, the FSP cannot now retract from that position. Applicant’s Claim 40. The Panel is also faced with a lack of clarity as to the amount being sought by the Applicant. Although the Applicant has set out various amounts it is seeking, it has also referred to figures such as $215,000, which are not substantiated by the specific amounts and invoices produced in support. 41. For instance, in its initial submissions to FOS, the Applicant set out the “Order Sought” which included the following:  $12,278.48, being the costs to complete repairs to the aircraft to enable the issue of an Australian maintenance release.  $72,060.15, being the costs of repairs to the aircraft to enable it to be flown within Australia.  $663.76, damages, being reimbursement of interest incurred for loss of use of funds.  Reasonable costs for inspecting the aircraft, dismantling it, applying a suitable anti-corrosive treatment and re-assembling the aircraft. Case No: 304502 Determination Page 8 of 21 42. In its next submission, under paragraph 3.3, the Applicant particularised the last paragraph by providing six invoices that totalled $124,507.89. However, when adding all of the amounts provided, the total is $209,510.28. It is therefore unclear where the amount of $215,000, was arrived at. 43. This confusion is further exacerbated as in paragraph 74 of the Applicant’s submission dated 15 October 2013, the Applicant was seeking $153,000 as particularised in paragraph 3.3. As the FSP correctly pointed out, the total amount of the invoices produced with respect to this paragraph is $124,507.89. 44. It is also unclear why the Applicant is unable to particularise its claim when you consider the following. 45. Based on the material available, it appears the aircraft was issued with a maintenance release on or around 16 June 2011. It is reasonable to infer that the Applicant therefore took possession of the aircraft at or shortly after this. 46. Accordingly, the Applicant has had over 2 years since the aircraft's return to particularise its claim. 47. Further, it is clear based on the material provided by the Applicant that it was aware on or around this time of the various issues and alleged poor repairs now being agitated. Other alleged latent issues became evident on or around October 2012, after the aircraft was leased and used by another entity (CS). 48. Particularly, given :  The Applicant’s second submission was provided on 15 October 2013, being almost one year after discovering the alleged latent defects and over 2 years after the Applicant regained possession of the aircraft.  The Applicant is a business and was represented by solicitors at all material times.  The FSP has clearly put the issue of quantum on notice in its submission dated 28 November 2013.  The Applicant omitted to clarify the discrepancies in its figures in its following two submissions. 49. The Applicant has also referred to an additional amount of $11,000 being sought for recertification and maintenance release. No invoice was provided and it is unclear if this is part of the amounts sought previously or in addition to those earlier amounts. 50. The Panel is not prepared to speculate on items which have not been particularised and as such will confine its review to the amounts the Applicant has been able to particularise. Case No: 304502 Determination Page 9 of 21 51. Pursuant to this, the Panel notes that the amounts sought by the Applicant in reference to invoices it has provided do not reconcile with the totals claimed. For instance, the Applicant produced a spreadsheet in its initial submission that totalled $85,002.39. This figure appears to include the total of the first three bullet points set out in paragraph 41 above. 52. However, when adding all the individual amounts in the spreadsheet, they do not reconcile with the total proposed. Instead, the individual amounts actually total $134,294.39. 53. In addition, included in this spreadsheet are invoices the Applicant has also accounted for in paragraph 3.3 of its submission dated 15 October 2013. That is, there is duplication of some of the amounts being claimed. 54. In the Panel’s view, when these amounts are deducted and reconciled to the relevant figures, the Applicant’s particularised claim is actually as follows: a. $12,278.48, being the costs to complete repairs to the aircraft to enable the issue of an Australian maintenance release – This is still correct. b. $44,489.03, being the costs of repairs to the aircraft to enable it to be flown within Australia – This has been amended to exclude the duplicated invoices. c. $663.76 damages, being reimbursement of interest incurred for loss of use of funds – This is still correct. d. $124,507.78, being the additional costs set out in paragraph 3.3 of its submission dated 15 October 2013. 55. Accordingly, the total amount that is particularised by the Applicant is $181,939.05. 56. For the sake of expediency, the Panel will attempt to group the issues and invoices where possible (e.g. the Applicant is claiming the amount of $12,278.48, for additional expenses incurred to have the airplane issued with an Australian Maintenance Release). In some instances though, such as with the float and birdcage repairs, the Panel will address these separately, given they form a substantial part of the claim and have been the subject of much ventilation between the parties. Birdcage 57. Based on the invoices provided by the Applicant, the amount associated with this item is approximately $65,285.89 (or 36% of the total amount sought). 58. The only evidence provided by the Applicant in support of its position is a letter from TR dated 7 October 2012. TR was engaged by CS (the entity which leased the aircraft after it was re - commissioned); CS was responsible for on - going maintenance. TR states the following : “As I have advised you over the phone and via many emails your aircraft has an enormous amount of problems associated with previous repair carried out in Canada. Case No: 304502 Determination Page 10 of 21 During this current 100hrly we have found the Birdcage structure to have serious internal and external corrosion which could not be repaired without removal from the airframe. Upon removal we have found further proof that the previous repairs were not carried out as were stated in the log books. Some of the tubes still had salt water in them, some had no inhibitor. With the lower easy access areas having been painted but the upper or awkward areas never had appropriate paint. They also stated in the log books that the SB 2/49 ndt inspection was carried out, which was not the case as the tubes could not have holes in them if it had been performed.” 59. As the Applicant is alleging the issues with the birdcage are due to S’s treatment of it, the onus is on the Applicant to establish its allegation on the balance of probabilities. The Panel is not satisfied the Applicant is able to do so for the following reasons. 60. First, TR’s report i s not clear in establishing a clear link that the serious internal and external corrosion identified is due to the repairs and/or treatment conducted by S. For instance, its first sentence identifies the corrosion and the next two paragraphs then discuss t he fact there is “further proof” of previous repairs not being carried out properly. 61. This report does not clearly link the two. Such a link is instead inferred based on the fact TR ’s correspondence discusses the issues with the repairs after the identification of the corrosion. However, the Panel is not prepared to accept such an inference when TR omits to explain how these alleged poor repairs connect to all the corrosion identified. 62. In particular, such an explanation fails to encompass the following salie nt issues:  The pre- existing condition of the birdcage. In particular, AG’s report to S dated 25 January 2010, would be relevant given it indicates the birdcage was serviceable, albeit marginal in some instances, prior to the incident.  The fact the airplane was being used fairly regularly since it was returned to the Applicant and the possible effect this may have had.  The treatment S stated it provided.  The fact that TR, despite having conducted repairs on the airplane since 2 August 2011, only identified the issues with the birdcage more than a year after this.  The fact this issue was not identified by either IA or the Applicant when inspecting the aircraft upon its return to Australia. 63. The last point set out above is significant. IA was engaged to review the works conducted by S for the purpose of issuing an Australian Maintenance Release after the aircraft was returned to Australia. Although numerous Case No: 304502 Determination Page 11 of 21 issues were raised and identified regarding S's works, which also form part of the Applicant’s claim, the birdcage was omitted. 64. Similarly, the Applicant raised numerous issues with the aircraft’s condition upon its return to Australia, but omitted to identify any issue with the birdcage. 65. Given all of this, the Panel therefore does not accept the Applicant has established the FSP is liable for any of the costs involving the birdcage. Costs incurred for issue of Australian Maintenance Release 66. The invoice issued by IA in this regard appears to contain more than the normal costs involved in obtaining the release. For instance, the invoice contains costs for the following which the FSP has not agreed to pay :  Wheel assembly and float corrosion – this issue will be addressed under float repairs  Tyres  Oil cooler  Brake cylinders  Replacement of fire extinguisher 67. The Applicant has not segregated these costs from those incurred in issuing the maintenance release. Instead, it has stated the costs for obtaining the release were approximately $11,000. When challenged by the FSP to particularise this in further detail, the Applicant omitted to do so. 68. The Panel has reviewed IA’s invoice dated 14 June 2011. Based on its reading, the costs involved in the issuing of an Australian Maintenance Release are set out in details under the heading “Annual Inspection for Issue of Maintenanc e Release”. 69. When factoring these amounts as well as the associated costs involved (such as the Engine Log Book, Propeller Log Book and sub-contracting fees), the amount totals $7,433.35. 70. The Panel therefore accepts the minimum cost of obtaining the release would have been of that order given the Applicant’s omission to explain how it arrived at $11,000. 71. The FSP, in its submission dated 28 November 2013, indicated that S paid for the costs of issuing a maintenance release based on an invoice dated 24 May 2011. This is misconceived. The invoice paid by S, which the FSP provided, included:  IA’s transportation costs,  The hiring of a crane to unload the aircraft and attach the floats to it, and Case No: 304502 Determination Page 12 of 21  The assembly of the aircraft. 72. The invoice does not set out any costs involved in issuing the maintenance release. 73. Instead, based on the material provided by the parties, it appears S has not paid this amount and has instead directed the Applicant to pay for this itself. According to the Applicant’s solicitors’ letter dated 24 May 2011 , addressed to the FSP’s solicitors, S did so because of the Applicant's alleged late payment of custom taxes which delayed the aircraft’s return to Australia. 74. In its submission dated 13 September 2013, the FSP also added that the reason the Applicant was required to pay for these costs was due to the delay in furnishing the log books. 75. The Panel is not persuaded by the FSP’s position. First, there is no evidence as to how this conduct entitled S to stop proceeding with works agreed to. Second, there is no clear evidence that there was a delay caused which resulted in additional costs. The FSP's argument on this point omits to set this out. 76. Based on the material available, it was clearly agreed between the parties that the FSP would pay for the costs involved in obtaining a maintenance release when the aircraft was returned to Australia. This is particularly confirmed by the FSP in various correspondence (e.g. letter to the Applicant dated 8 July 2011), where it states it has paid this amount to S and has no further liability in this regard. 77. Despite this, it is clear the Applicant was required to pay $7,433.35 plus GST for a cost the FSP agreed to indemnify. The Panel therefore accepts the FSP is liable to pay this amount to the Applicant. 78. The fact S did not complete the works agreed is a matter between the FSP and S. In this regard, the Panel refers to its findings made with respect to the arrangements between S, the FSP and the Applicant. Other Costs 79. With respect to the balance of IA’s invoice (excluding the float and wheel assembly), the Panel is not satisfied the FSP is liable to pay for the majority of those items. 80. For instance, with respect to the tyres, the Applicant has alleged that these were serviceable prior to the accident. Now they are not due to scores and gouges across the tread, which the Applicant has assumed was caused by dragging the aircraft across rocks sideways. 81. There is no evidence to substantiate this. It is an assumption provided without any expert evidence in support. In particular, IA makes no reference to support such an assumption. According to the FSP’s letter to the Applicant Case No: 304502 Determination Page 13 of 21 dated 8 July 2011, its assessment is that the condition of the tyres was due to wear and tear. 82. Given this, the Panel does not accept that the Applicant has produced sufficient evidence to establish on the balance of probabilities that the requirement to replace the tyres was due to the FSP’s conduct or part of the claim. 83. This reasoning similarly applies to the replacement of the brake cylinders. That is, the Applicant has led little evidence to establish their replacement was due to the conduct of the FSP, S or damaged as part of the claim. 84. In regards to the replacement of the fire extinguisher, the Panel is not satisfied the FSP is liable for this item for two reasons. First, the replacement of the fire extinguisher according to IA was due to the fact it was not an approved BCF unit. It is unclear if this unit was provided by the FSP or the Applicant. If the latter, then the need for replacement was due to the Applicant’s conduct, not the FSP’s. 85. Second and in the alternative, the policy does not appear to extend to items stored on the aircraft, even if mandated by legislation. The policy insures the “Aircraft”. The aircraft is described in the schedule as the airplane itself. Nothing in the policy indicates equipment stored in the aircraft forms part of the aircraft itself, particularly items that are not fixtures. Nor is such a construction consistent with the natural and ordinary description of the term aircraft. 86. Accordingly, items that are stored in the aircraft but are not a fixture or part of the aircraft itself would not fall within the policy coverage. This includes the fire extinguisher. 87. In regards to the oil cooler, the position is confusing. According to the FSP, it stated the following in its submission: “oil cooler was not covered as [FSP] has already paid for the replacement of this item and the oil cooler that came off the Aircraft had many more blocked cores than the overhaul unit that was refitted.” 88. This was supported in its later submission, which stated the oil cooler fitted at the time of the accident was not serviceable and required replacement. 89. The confusion is that, on the one hand, the FSP is stating the item itself was not serviceable at the time of the accident. This would infer it would not be covered given the item was not damaged by the accident. 90. However, it appears the FSP replaced the item regardless of the policy coverage as implied in the above statement. 91. If that is the case and this replacement unit is not fit for purpose, then the Panel does not accept the FSP can reverse its position to seek to enforce contractual rights. The reason is that it has elected to authorise the replacement of this unit despite having been aware that it was not covered Case No: 304502 Determination Page 14 of 21 by the policy. Once it elected to replace the unit, the Panel’s view is that it is liable to ensure the unit it has replaced it with is fit for purpose, particularly in circumstances when it made no representation that it was only replacing the unit on an ex gratia basis. 92. Given this and the Panel’s finding regarding the costs involved in obtaining a maintenance release, the Panel accepts the FSP is liable to pay $9,012.69 (inclusive of GST) towards IA’s invoice. This includes the amounts the FSP has agreed to pay in its solicitors’ letter to the Applicant’s solicitors dated 12 September 2013. 93. To clarify, this finding does not include the issues with the float and wheel assembly, which will be addressed later. However, this finding does dispense with all the other items contained in this invoice. Cost of Repairs to allow airplane to be flown in Australia 94. Some of these items have already been agreed to by the FSP. For instance, in its schedule, it agreed to contribute 100% towards the invoices issued by FA and AA. These total $8,816.39. 95. A number of the remaining amounts are associated with the float repairs, which will be addressed separately. These total $7,510.14. 96. With respect to the items invoiced by TR that do not involve the floats, the Panel has difficulty accepting many of them could be associated with the claim. For instance, in the spreadsheet set out by the Applicant, it has attempted to claim all of these costs were necessary due to faulty repairs. 97. However, TR, who was the entity that conducted the repairs and maintained the aircraft following its return to Australia, has provided no evidence to support the Applicant’s allegation. The only direct evidence produced from TR, are two letters dated 7 October 2012. Neither of them discusses all of the issues the Applicant has claimed were due to faulty repairs. 98. TR ’s letters contain a number of global statements setting out the fact the aircraft had “an enormous amount of problems associated with the previous repair carried out in Canada”. However, no specific evidence has been provided about the extent of the problems or the reasons these are associated with the previous repair. 99. According to the FSP, it responded to the invoices claimed after direct discussion with TR. However, the FSP again omitted to provide any evidence to support this, such as a statement from the assessor or individual that had this direct discussion, or any other relevant report (such as assessor reports). 100. The level of evidence provided on this key point is unsatisfactory when considering:  both parties are represented by solicitors; Case No: 304502 Determination Page 15 of 21  both have had numerous opportunities to gather and present this information; and  both should be experienced enough in litigation to understand what is required to establish factual matters that are in dispute. 101. Ultimately, the onus is on the Applicant to substantiate its position. In regards to the items being claimed from TR, that are not associated with the float, the Panel does not accept the Applicant has discharged this onus given the minimal evidence provided. 102. In particular, the Panel is not prepared to infer solely on global statements provided by TR, that the remaining invoices issued by TR are payable by the FSP, based on S’s poor repairs. This is predominantl y due to the fact a number of these items were only identified months after a maintenance release was issued and the aircraft was accepted by the Applicant and leased to another party. 103. This therefore dispenses with approximately $26,043.72. 104. The remaining balance of invoices to be considered is $2,118.78. One of these is associated with a hydraulic leak ($616). The Applicant claims this was associated with faulty repairs but there is no evidence to support this. The invoices are silent as to the issue, there is no expert evidence to support same and neither the Applicant nor IA identified any issue with this when the aircraft was returned to Australia. 105. Given this, the Panel does not accept the FSP is liable for this cost. 106. Another invoice relates to the weight and balance of the aircraft ($715). The Applicant, in a letter to the FSP dated 30 June 2011, claims the cost of this was due to the repairs adding 188kg to the aircraft weight. 107. Again, minimal evidence was provided in support. In particular, there is no dispute that the Applicant authorised S to undertake a number of repairs that were not associated with the claim incident. This amounted to approximately $100,000, being almost 20% of the repairs conducted by S. Accordingly, it is possible that the addition to the aircraft weight was due to these repairs, not the ones authorised by the FSP. 108. In addition, IA’s invoice included weighing the aircraft and made no reference to these additional costs being due to inappropriate repairs or conduct by S. 109. Given this, the Panel is not satisfied the Applicant has established these costs were due to the claim or either the FSP’s or S’s conduct associated with the claim related repairs. 110. The last invoice ($787.78), appears to be associated with one electrical part, a relay. The invoice was dated 31 October 2011, more than 2 months after the airplane’s return. Case No: 304502 Determination Page 16 of 21 111. The FSP, albeit agreeing to many of the electrical costs, has disputed this one claiming it is “maintenance related as parts were new after repair”. 112. The Applicant has not explained why this cost was necessary. In the absence of evidence in support of the Applicant’s claim, the Panel is not satisfied this amount should be reimbursed by the FSP. Float Repairs 113. This issue has been the subject of the most ventilation between the parties. A large part of the costs being sought by the Applicant are associated with this issue. 114. Based on the Panel’s calculations, the total amount the Applicant is claiming for the floats, is approximately $67,672.52. This incorporates approximately 37% of the claim. 115. The Applicant’s position is that the float repairs were associated with the poor recovery of the aircraft. This appears to be supported by an email sent by the FSP’s assessor to the Applicant dated 8 April 2010, which included an update of S’s works. In this update, the following was stated of relevance: “8 th Jan 2010 Received email form [BA] advising the aircraft had arrived and was well packed with no transport damage. He queried the spreaders and I advised him they were damaged in the accident and recovery. The wings and floats were full of water and this was not taken into account when uprighting her. ” (Panel emphasis) 116. This was further support by an email from S to the Applicant dated 12 January 2012, which stated the following: “The guys who salvaged this aircraft did absolutely NOTHING in the way of preservation. Makes our job much more difficult and more expensive than it had to be.” 117. The Panel notes the Applicant had communicated to the FSP early in the claim about its concerns regarding the aircraft’s recovery. In particular, the Applicant was concerned that if the aircraft was not washed down thoroughly, this would increase the chance of corrosion to the floats to render them unserviceable. 118. Although the FSP indicates this was done, the email from the FSP’s assessor to the Applicant, as well as S’s email to the Applicant , contradicts this. 119. Further, it is unclear if the water found in the wings and floats when the aircraft was received by S, was saltwater or freshwater. However, the Panel would assume that a proper wash down would not result in the wings and floats being “full of water” upon the aircraft being received by S. Case No: 304502 Determination Page 17 of 21 120. In addition, no evidence has been led about the ai rcraft’s recovery and wash down. The details of the recovery are set out in the FSP’s solicitors’ submission dated 28 November 2013, which it states is based on the assessor's evidence. However, nothing was provided from either the assessor or the contract or involved in the aircraft’s wash down to corroborate the process and tasks undertaken. 121. A number of photographs were provided in support by the FSP. In these photographs, the FSP notes:  The hatches on the floats had been opened, thus draining any residual water.  On 7 January 2010, the aircraft had been returned to S who confirmed it was completely dry. 122. In regards to the latter, this is contradicted by the FSP’s assessor’s email to the Applicant where S stated the wings and floats were “full of water”. In addition, none of the photographs provided any evidence of the aircraft actually being washed down. 123. Given this, the Panel considers the state of the FSP’s evidence regarding the aircraft’s recovery to be unsatisfactory. In particular, the presence of the f loats being “full of water” and S’s email to the Applicant stating nothing was done by way of preservation, invites a conclusion to be drawn that the water found by S was saltwater. 124. The implication of such an inference is obvious, namely that the floats were exposed to the corrosive effect of saltwater for almost 5 months. 125. In contesting the Applicant’s position regarding the floats, the FSP states they were at a point of serious exfoliation which suggests they had been in a poor state for a long time and the corrosion was pre-existing. In support of this, the FSP relies on its assessor, S, photos of the aircraft before and after the accident, an expert report by A and evidence from NWA (the entity that completed maintenance works prior to the accident). 126. Ag ain, with respect to the assessor’s view, minimal direct evidence has been provided. There is the email from the assessor to the Applicant dated 8 April 2010 which included the following: “5 th April,… 3 The corrosion in the floats was at a point of serious exfoliation, which suggests they have been in a poor state for a considerable time. Makes you wonder about prior maintenance and operator house keeping. [B] said that in his opinion the corrosion needed this level of repair prior to the accident.” 127. However , this email only conveys S’s view of the situation, not the assessor’s own opinion. Further, it is hearsay and no direct evidence has been sought from S on this salient issue. 128. A’s report was dated 3 August 2010 and addressed to S. It stated the following of relevance: Case No: 304502 Determination Page 18 of 21  The floats have seen extensive service and contain evidence of rework and sealing around the main wheel openings.  There were typical examples of mild corrosion found on the float skins. This was due to coating failure that leads to crevice corrosion whilst the coating is partially intact. Corrosion of this type would be expected to occur as the coating deteriorates over time.  Samples were taken of obvious corrosion on the longeron extrusions as well as the white sealant. 129. Following this, A concluded the following: “The observed exfoliation corrosion on structural extrusions has occurred over a relatively long period of time (likely years). The roll-over incident likely had little or no effect on the corrosion rates experienced by the floats. The 2024 alloy is susceptible to pitting and exfoliation in both salt water and fresh water environments. Exfoliation can initiate on exposed extrusion surfaces as soon as the protective coating is lost, either by mechanical or chemical means.” 130. Although A’s conclusions support the FSP, the Applicant’s solicitors does provide a number of valid points to refute the conclusions. Namely, it does not appear A took into account the following:  The aircraft had been unwashed for approximately 7 days.  Saltwater possibly remained in the floats for approximately 5 months. 131. The latter is particularly significant. Given the common knowledge of saltwater having a corrosive effect, A’s report would have contained more probative value if it could have accounted for this possible scenario. It does not. Instead, its instructions on this issue was limited to a roll-over incident which infers they were not appraised of the more extensive exposure to saltwater than anticipated and the potential effect this may have had. 132. In addition, the Applicant provides the valid point that the aircraft passed a 100 hourly inspection prior to the incident which would not have occurred if the floats were not in a serviceable condition. Given this, it is reasonable to infer the floats were serviceable at the time of the incident. 133. Upon considering the whole of the available evidence, the Panel is more persuaded by the Applicant’s position. That is, it appears the requirement to repair the floats arose due to its treatment post-recovery as opposed to their pre-existing condition. 134. Despite the FSP’s evidence on this , the Panel has not given much weight to it due to the fact the factual background provided to S , omitted salient matters. Namely, the expert was not privy to the possibility the floats were exposed to saltwater for almost 5 months as a result of not being washed down properly and the possible detrimental effect this would have. 135. This is further supported by the fact the FSP was invited to provide a copy of the instructions given to S to clarify what background was made available. It omitted to do so. In the absence of this and the fact the only comment A Case No: 304502 Determination Page 19 of 21 provided in this regard was the “roll - over incident” , the Panel concludes A was not privy to the possible factual background that the aircraft was exposed to saltwater for almost 5 months. 136. Given this, the fact the floats were considered serviceable approximately one month prior to the incident and the lack of any other direct expert evidence to the contrary, the Panel accepts that the corrosion on the floats was proximately due to the FSP’s recovery of the aircraft. 137. In regards to the amount being sought by the Applicant, the Panel notes the state of the evidence is unsatisfactory. For instance, it is unclear to what extent the float repairs S undert ook were proximately due to the FSP’s recovery. Further, it is unclear to what extent the repairs done to the floats subsequent to this were either associated with the FSP’s recovery, S’s poor repairs, or the floats' pre-existing condition. 138. For instance, IA, to an extent, identified the floats required additional work. However, the extent of repairs provided by TR, subsequent to this, appears to have been much more substantive. 139. Further, the Applicant’s claim is limited to post -S repairs, which total $67,672.52. The repairs charged by S for the float repairs, according to annexure 21 of the FSP’s submissions, were $25,095.79. It is unclear why this has been omitted. 140. The Panel is conscious of the age of the matter and the adversarial positions undertaken by both sides. In light of this, allowing further inspections and expert involvement at this late stage to enable the FSP to particularise its liability, particularly in circumstances when it had numerous opportunities to do so, would be unfair and likely to result in further delays and agitation. 141. Instead, the Panel considers it is fair in all the circumstances that a cash amount be provided in this regard. Having regard to all of the above, the Panel considers an amount of $50,000 in all the circumstances to be fair. 142. The amount is less than that sought by the Applicant. This is to reflect the Applicant’s omission to provide persuasive evidence that all of the costs are reasonably incurred or associated with the FSP’s recovery of the aircraft . However, the substantive amount allowed acknowledges the fact the Applicant established the FSP’s liability towards this contentious issue, the FSP’s unsatisfactory evidence in rebuttal and the fact the Applicant has produced invoices in support for extensive works being undertaken to the floats. Customs Charges 143. This issue arose when the aircraft was due to be returned to Australia from Canada and there was a liability to pay GST on the cost of repairs incurred. The parties disputed who was required to pay this amount with the Applicant ultimately having to pay for same. Case No: 304502 Determination Page 20 of 21 144. Although the Applicant received an input tax credit for the full amount, it is seeking loss of use of the funds incurred. It appears the amount arrived at ($663.76), is based on an interest charge of 6% for the period the funds were unavailable. 145. The FSP has stated it had no liability as the GST component was associated with the repair costs which it states was a matter between the Applicant and S. For reasons already set out, the Panel has not accepted this reflects the arrangement between the parties. 146. The policy states the following with respect to GST: “Conditions applicable to this Section only … GST (b) If the Company exercises its option to repair or pay the repair of the Aircraft the Company will pay the amount of any Goods and Services Tax (“GST”), where applicable, included in the cost of the repairs … less any Input Tax Credit to which the Insured is entitled in respect of the GST payable on the cost of repairs.” 147. The policy is unclear regarding circumstances when the FSP is invoiced the costs. The Panel presumes in those cases, GST is payable by the FSP given the Applicant cannot claim an input tax credit for a service he did not receive. 148. Given the relevant policy provision, the Panel accepts tha t the parties’ common intention is that in circumstances where an Applicant is entitled to an input tax credit, the FSP is not liable to pay GST. With respect to the import charges, the GST component was payable by the Applicant under the terms of the policy given it received an input tax credit. 149. Although the Applicant has raised a number of submissions stating the FSP was liable to pay for the GST, the Panel prefers to rely on the terms of the policy. Particularly in the absence of any evidence to substantiate that the FSP provided an unequivocal representation that it would pay GST in these circumstances and in contradiction of its policy terms. Concluding Remarks 150. After taking into account the amounts awarded in this Determination, as well as the amounts acknowledged by the FSP in the Schedule of Costs that accompanied the FSP’s solicitors’ letter to the Applicant’s solicitors dated 12 September 2013, the total amount to be allowed is $67,829.08. This is made up of the amounts: $9,012.69; $8,816.39 and $50,000.00. 151. The Panel does not consider interest should be payable pursuant to the Insurance Contracts Act 1984 (the Act). This is mainly due to the fact that a substantive amount of the figure awarded by the Panel is based on a proportion of a broad estimate (float repairs), rather than the Applicant strictly proving its entitlement in this regard. Case No: 304502 Determination Page 21 of 21 152. Given this, the Panel does not consider it is fair in all the circumstances or consistent with section 57 of the Act, for interest to be awarded. 153. In regards to the amounts acknowledged as payable by the FSP, it is unclear if these were actually paid. For the sake of clarity, the Panel will presume that these amounts have not been paid and shall award a final figure based on that. 154. If the FSP has paid an amount towards the costs it acknowledged liability for, then it is clearly entitled to deduct those amounts from the final figure awarded in this Determination. 155. In addition and by way of clarification, the figure awarded by the Panel is based on a full and final settlement. Although the Applicant was unable to fully particularise the amount sought, despite being given sufficient opportunities to do so, the Panel does not propose to award an interim amount with scope for the parties to return with additional items in dispute. 156. Instead, any outcome accepted in this Determination is to be in full and final settlement of this dispute. Such a condition is in line with FOS’s overarching principle to attempt to resolve disputes efficiently and fairly. Further, given the age of the matter, the sophistication of the parties involved and the fact both parties have been legally represented at all material times, the Panel considers such an outcome offered is fair in all the circumstances. Determination 157. On the basis of the available i nformation, the Panel determines that the FSP pay the Applicant the amount of $67,829.08, in full and final settlement of this claim. 158. In the event the Applicant accepts this Determination, this amount should be paid within 21 days of the FSP being notified of its acceptance unless it requires a binding release to be signed first. In the event the FSP requires a binding release to be signed, it should:  Ensure a release is sent to the Applicant within 14 days of being notified of the Applicant’s acceptance of the Determination; and  Pay the above amount within 14 days after it has received an appropriately signed release.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.