Amount payable for seaplane damage repairs and float corrosion after insurer-managed recovery and repairs
Text of the determination
Case No: 304502 Determination Page 1 of 21
Case number: 304502
General Insurance - Domestic Insurance - Motor Vehicle- Comprehensive - FSP
Decision - Claim amount
17 June 2014
Summary
Description
A claim under an insurance policy providing coverage for an aircraft.
Basis of Determination
A consideration of the coverage provided by the policy and the repairs
necessitated by the insured event.
Determination
On the basis of the available information, the Panel determines that the
FSP pay the Applicant the amount of $67,829.08, i n full and final
settlement of this claim.
In the event the Applicant accepts this Determination, this amount
should be paid within 21 days of the FSP being notified of its
acceptance unless it requires a binding release to be signed first. In the
event the FSP requires a binding release to be signed, it should:
Ensure a release is sent to the Applicant within 14 days of being
notified of the Applicant’s acceptance of the Determination; and
Pay the above amount within 14 days after it has received an
appropriately signed release.
Background
1. The Applicant is the owner of a Dehavilland Beaver Aircraft VH-IDO, which is
a seaplane (“the aircraft”). On 14 April 2009, the Applicant entered into a
rental agreement with CE. The rental agreement was to commence on 1
June 2009, for a period of 3 months.
2. On 9 August 2009, an employee of CE was in the process of landing the
aircraft on water, however, as the ground landing wheels were deployed this
resulted in the aircraft crashing into the water, sustaining damage.
Determination
Case No: 304502 Determination Page 2 of 21
3. At the time of the incident, the aircraft was insured by the Financial Services
Provider (FSP). The Applicant lodged a claim under this policy following
which, the FSP arranged for the aircraft to be recovered.
4. The aircraft was considered repairable and shipped to Canada where the
damage repairs and other works requested by the Applicant were
undertaken by S. Following this, the aircraft was returned to Australia and
ultimately to the Applicant’s possession on or around 15 June 2011.
5. The Applicant is dissatisf ied with the repairs conducted, the FSP’s actions in
recovering the aircraft , the FSP’s failure to fully indemnify it and the fact the
Applicant had to pay the GST component of the repairs when the aircraft
passed through customs on its return.
6. Both the Applicant and the FSP are represented by solicitors. They have
provided extensive submissions on the issues in dispute. For the sake of
brevity, the Panel will only briefly summarise these submissions given, all of
the material made available has been excha nged with the other party.
Summary of Applicant ’s position
7. The Applicant has raised numerous matters and issues regarding the repairs
and the FSP’s conduct. Based on this, the Applicant is seeking
approximately $215,000 in reimbursement.
Summary of FSP’s position
8. Based on numerous submissions in support, the FSP maintains it is not
liable beyond the amounts it has offered to pay.
9. With respect to the amounts sought by the Applicant and the items it has
particularised, the FSP has responded to this specifica lly in its solicitors’
letter to the Applicant’s solicitor s dated 12 September 2013. In this letter, it
included a Schedule of Costs, setting out the FSP's position for each item.
Issue
10. Whether the Applicant is entitled to the amounts sought.
Reasons for decision
11. As advised to the parties, due to the nature of the dispute, the matter has
been referred to the Panel for Determination in line with the Operational
Guidelines to the Service’s Terms of Reference . This dispute has not been
the subject of a FOS Recommendation and has proceeded directly to
Determination.
Case No: 304502 Determination Page 3 of 21
12. The Panel consists of an Ombudsman and two Panel members with
extensive experience in the insurance industry and consumer claims.
Preliminary Matters
13. The FSP has objected to the Applicant relying on 5 documents obtained by
way of subpoena in District Court Proceedings the Applicant issued against
CE. The Applicant, in a letter addressed to the FSP’s solicitors dated 4
November 2013, noted these were disclosed inadvertently but states FOS
should still consider them as they are relevant to this dispute.
14. The FSP has provided case law ( Psychology Board of Australia & Anor v
Vicary & Ors [2013] FCWA 7) in support of the fact that:
There is an implied undertaking under law that documents obtained by
way of discovery or subpoena cannot be disclosed or used for a
collateral purpose.
This undertaking extends to anyone who comes into possession of
such a document and is aware this document was obtained through
such a process. There is no exception if that third p arty entity had a
legal right or power to obtain the documents through other means .
15. There is no dispute the Applicant has breached its implied undertaking to the
Court in disclosing this information, albeit inadvertently. Despite this, it is
now seeking to have this information included in the material before FOS on
the basis that it is relevant and it would be disingenuous for the FSP to have
them excluded and FOS would have access to them pursuant to its
inquisitorial powers under the Terms of Reference.
16. The Panel does not accept this circuitous argument for numerous reasons.
First and foremost, there is no dispute the documents ought not to have
been included. Second and of similar significance, if the Panel allowed these
documents to be included on the basis such information could have been
obtained through its inquisitorial powers under the Terms of Reference, it
would be in breach of its implied undertaking to the Court having now been
informed of the method these documents were obtained.
17. Third, to allow these documents to be included would, in effect, enable the
Applicant to gain from its failure to comply with its implied undertaking.
18. Therefore, the Panel will not review these documents as part of its
deliberations. To this end, the Panel notes these documents were not
included in the material before it to ensure there was no inadvertent reliance
upon same.
Repairs
19. One of the FSP’s principal arguments is that it did not elect to have the
repairs affected in Canada. Instead, this was an arrangement between the
Case No: 304502 Determination Page 4 of 21
Applicant and S. As such, its obligation under the policy is limited to the
repair work conducted by S.
20. The policy confers upon the FSP a right to elect the manner in which it will
settle a claim as set out in the following provision:
“The Company will at its option pay for, repair, or pay for the repair of,
accidental loss of or damage to the Aircraft …”
21. The doctrine of election is well summarised by Stephen J in the case of
Sargent v ASL Developments Ltd (1974) 131 CLR 634 at 646 where he
stated the following:
“ The words or conduct ordinarily required to constitute an election must be
unequivocal in the sense that it is consistent only with the exercise of one of
the two sets of rights and inconsistent with the exercise of the other; thus for a
lessor to continue to receive rent under a lease will be consistent only with his
rights as lessor and inconsistent with the exercise of a right to determine the
lease ... However, less unequivocal conduct, only providing some evidence of
an election, may suffice if coupled with actual knowledge of the right of
election ... There need be no expressed intention to elect, nor will an express
disclaimer of such an intention be of any avail in preserving one right if in fact
there be an exercise of another inconsistent right ... For an election there
need be no actual, subjective intention to elect ... an election is the effect
which the law attributes to conduct justifiable only if such an election had been
m ade.”
22. This issue is vexed given the parties’ contrasting submissions, the history of
events surrounding the engagement of S, the communications between all of
the relevant parties and the overall repair process being protracted. This is
particularly illustrated by the following factors:
On or about 23 September 2009, two quotes to repair the airplane were
obtained from AA and S.
The quote provided by S was sent to the FSP, via its loss adjuster ,
following some discussion between the two regarding various points
(e.g. extra shipping costs).
S was preferred by both the FSP and the Applicant.
The Applicant authorised S to repair the airplane on 15 October 2009.
On or about 24 May 2011 (being one a half years later), the airplane
was returned to Australia for reassembly following which, S’s
involvement in the repair came at an end.
It is clear based on the material available that an abundant amount of
communications between the Applicant, the FSP’s loss adjuster, the
FSP and S were entered into during this period of time.
It is also clear that most of these communications have not been
included in the available material. For instance, the FSP has not made
available any of its loss adjuster reports, claim notes or copies of its
communications with S.
Case No: 304502 Determination Page 5 of 21
23. The FSP’s position is clear in that it did not engage S, did not have a
contract with S and therefore is not liable for any potential poor repair
conducted by S. In support of this, it relies on the following arguments:
A repair contract was entered into between S a nd the Applicant. This is
supported by the quote (Offer) and the Applicant’s authorisation to
repair (Acceptance).
Emails dated 29 October, 18 November and 20 November 2009
confirming its position.
24. The Panel does not accept that the FSP’s submissions dispe nses with the
issue. Although its communications in the above emails would support the
position that it made an unqualified election “to pay for the repair of …
accidental loss of or damage to the Aircraft”, its conduct preceding and
following this is inconsistent with such an election. This is supported by the
following.
25. First, it is clear the FSP actively engaged with S directly regarding insurance
related repairs in numerous instances, such as when S’s quotation was
procured (email dated 30 September 2009) and during the course of the
repairs (paragraph 32 of the FSP’s submission dated 13 September 2013).
26. The FSP has not provided a copy of the communications between its
assessor and S to enable the Panel to determine the extent of its
involvement. Although its submission stated its involvement was limited to
being kept informed of the progress of insurance related repairs, dealing with
issues such as float corrosion, the undocumented modification of the aircraft
and payment issues, minimal corroboration has been provided.
27. The Applicant sought to include some of these communications that it
procured by way of subpoena, which the Panel has had to exclude to ensure
it complies with its implied undertaking to the Court. The FSP, in objecting to
this, also assured FOS that it has provided all relevant documents both from
the FSP’s file and its assessor s.
28. However, it is clear the FSP has withheld a substantial amount of information
related to its involvement in the repairs. This inference is supported by the
length of time taken for the repairs, the fact the FSP has acknowledged it
was regularly communicating with S and the absence of any loss adjuster
reports which normally accompany the engagement of a loss adjuster in a
claim.
29. Accordingly, the Panel is not in a position to review this documentation to
ensure that it corroborates the FSP’s submission about the extent of its
involvement. In particular, given the substantive issue in dispute was
whether the FSP was responsible for the repairs, the FSP’s failure to provide
this information invites an adverse inference to be drawn that this information
would not support the FSP’s position.
30. Although the FSP has stated in its submission that it would produce any
information requested by FOS, this is not satisfactory. As stated by the
Case No: 304502 Determination Page 6 of 21
Applicant, FOS is not in a position to identify the specific material required
given the FSP has not set out what information is available on this issue. In
such circumstances, FOS would be required to seek a broad amount of
information, review all of it in context of the issue in dispute and identify
which documents are actually relevant to the issue.
31. This is clearly an inefficient manner for a dispute to progress.
32. Further, in circumstances when the FSP and its solicitors are experienced
participants of FOS’s process, have had ample opportunity to set out their
position in detail and the incident that led to the claim occurred more than 4
years ago, it would be unfair in all the circumstances for the FSP to place the
onus on FOS to identify and request such information.
33. Further, as noted in its own submission,
“As at 23 September 2009 [FSP] had obtained two quote s for repair.
The second quote obtained…from Canadian repairer [S].”
34. This implies that the FSP (either directly or through its assessor) was
actively involved in sourcing a repairer to undertake the repair work, who
was acceptable to the parties.
35. Given all of the above, there is scope for the Panel to find that the FSP’s
direct communication with S was not consistent with that of an insurer
electing to only pay for the repairs to the aircraft. Instead, there is basis to
find the FSP was actively managing this process, an inference supported to
an extent by the next point.
36. Second, the existence of a repair contract solely between the Applicant and
S is contradicted by a number of factors, namely:
a. S communicated with the FSP directly, both before the Applicant
authorised the repairs and after. It is unclear what standing the FSP
had to communicate directly with S during the process if the contract for
the whole repairs was meant to be solely between the Applicant and S,
according to the FSP.
b. The communication to the FSP by both S and the Applicant would
indicate that they both appeared to conceive the FSP had some
standing in the transaction.
c. The FSP insisted the Applicant execute a partial release to submit
upfront funds to S. However, it appears the invoice provided by S was
addressed to the FSP (Applicant’s email to the FSP dated 18
November 2009, with no evidence provided by the FSP to refute this).
d. Based on the available material, S’s quote was sent only to the FSP
with minimal involvement by the Applicant (emails exchanged between
the assessor and S dated 10, 13 and 17 September 2009, set out the
parties’ discussion about the settlement of the quote). Given this, it
appears the negotiations for the quote (or the “Offer” as described by
Case No: 304502 Determination Page 7 of 21
the FSP) was procured and sent to the FSP, with minimal involvement
by the Applicant.
e. It appears all invoices for insurance related repairs were issued to the
FSP. In particular, in the Applicant’s solicitors’ letter to the FSP dated
24 December 2010, the Applicant understood that monies were paid to
S without its authorisation or approval. The FSP has not refuted this
fact.
37. Having considered all of the above and in the absence of the FSP’s
preparedness to provide more comprehensive information of its
communications and interact ions with S, the FSP’s position that it was not a
party to the repair contract is substantively contradicted by its conduct and
involvement.
38. Further, any argument that it was transacting with S as agent of the
Applicant would be unfounded. This is based on the Applicant’s
communication with the FSP both before and during the repair process,
where it is clear that the Applicant considered the FSP’s involvement was in
a capacity of being responsible for the repairs. Therefore, any argument as
to agency would fail due to the lack of clear mutual intent between the
Applicant and the FSP that such an agreement was in existence.
39. As a result, the FSP’s conduct before, during and after S’s involvement , is
more consistent with an insurer actively managing the repairs. Had the FSP
provided more comprehensive information, such as copies of its assessor’s
reports and communications, the Panel may have been otherwise
persuaded. In the Panel’s view , the Applicant was entitled to form a belief
that the FSP had elected to repair the aircraft, rather than declare it a total
loss and cash-out the Applicant and decided to engage S for the repairs. In
this context, the FSP cannot now retract from that position.
Applicant’s Claim
40. The Panel is also faced with a lack of clarity as to the amount being sought
by the Applicant. Although the Applicant has set out various amounts it is
seeking, it has also referred to figures such as $215,000, which are not
substantiated by the specific amounts and invoices produced in support.
41. For instance, in its initial submissions to FOS, the Applicant set out the
“Order Sought” which included the following:
$12,278.48, being the costs to complete repairs to the aircraft to enable
the issue of an Australian maintenance release.
$72,060.15, being the costs of repairs to the aircraft to enable it to be
flown within Australia.
$663.76, damages, being reimbursement of interest incurred for loss of
use of funds.
Reasonable costs for inspecting the aircraft, dismantling it, applying a
suitable anti-corrosive treatment and re-assembling the aircraft.
Case No: 304502 Determination Page 8 of 21
42. In its next submission, under paragraph 3.3, the Applicant particularised the
last paragraph by providing six invoices that totalled $124,507.89. However,
when adding all of the amounts provided, the total is $209,510.28. It is
therefore unclear where the amount of $215,000, was arrived at.
43. This confusion is further exacerbated as in paragraph 74 of the Applicant’s
submission dated 15 October 2013, the Applicant was seeking $153,000 as
particularised in paragraph 3.3. As the FSP correctly pointed out, the total
amount of the invoices produced with respect to this paragraph is
$124,507.89.
44. It is also unclear why the Applicant is unable to particularise its claim when
you consider the following.
45. Based on the material available, it appears the aircraft was issued with a
maintenance release on or around 16 June 2011. It is reasonable to infer
that the Applicant therefore took possession of the aircraft at or shortly after
this.
46. Accordingly, the Applicant has had over 2 years since the aircraft's return to
particularise its claim.
47. Further, it is clear based on the material provided by the Applicant that it was
aware on or around this time of the various issues and alleged poor repairs
now being agitated. Other alleged latent issues became evident on or
around October 2012, after the aircraft was leased and used by another
entity (CS).
48. Particularly, given :
The Applicant’s second submission was provided on 15 October 2013,
being almost one year after discovering the alleged latent defects and
over 2 years after the Applicant regained possession of the aircraft.
The Applicant is a business and was represented by solicitors at all
material times.
The FSP has clearly put the issue of quantum on notice in its
submission dated 28 November 2013.
The Applicant omitted to clarify the discrepancies in its figures in its
following two submissions.
49. The Applicant has also referred to an additional amount of $11,000 being
sought for recertification and maintenance release. No invoice was provided
and it is unclear if this is part of the amounts sought previously or in addition
to those earlier amounts.
50. The Panel is not prepared to speculate on items which have not been
particularised and as such will confine its review to the amounts the
Applicant has been able to particularise.
Case No: 304502 Determination Page 9 of 21
51. Pursuant to this, the Panel notes that the amounts sought by the Applicant in
reference to invoices it has provided do not reconcile with the totals claimed.
For instance, the Applicant produced a spreadsheet in its initial submission
that totalled $85,002.39. This figure appears to include the total of the first
three bullet points set out in paragraph 41 above.
52. However, when adding all the individual amounts in the spreadsheet, they do
not reconcile with the total proposed. Instead, the individual amounts actually
total $134,294.39.
53. In addition, included in this spreadsheet are invoices the Applicant has also
accounted for in paragraph 3.3 of its submission dated 15 October 2013.
That is, there is duplication of some of the amounts being claimed.
54. In the Panel’s view, when these amounts are deducted and reconciled to
the relevant figures, the Applicant’s particularised claim is actually as follows:
a. $12,278.48, being the costs to complete repairs to the aircraft to enable
the issue of an Australian maintenance release – This is still correct.
b. $44,489.03, being the costs of repairs to the aircraft to enable it to be
flown within Australia – This has been amended to exclude the
duplicated invoices.
c. $663.76 damages, being reimbursement of interest incurred for loss of
use of funds – This is still correct.
d. $124,507.78, being the additional costs set out in paragraph 3.3 of its
submission dated 15 October 2013.
55. Accordingly, the total amount that is particularised by the Applicant is
$181,939.05.
56. For the sake of expediency, the Panel will attempt to group the issues and
invoices where possible (e.g. the Applicant is claiming the amount of
$12,278.48, for additional expenses incurred to have the airplane issued with
an Australian Maintenance Release). In some instances though, such as
with the float and birdcage repairs, the Panel will address these separately,
given they form a substantial part of the claim and have been the subject of
much ventilation between the parties.
Birdcage
57. Based on the invoices provided by the Applicant, the amount associated with
this item is approximately $65,285.89 (or 36% of the total amount sought).
58. The only evidence provided by the Applicant in support of its position is a
letter from TR dated 7 October 2012. TR was engaged by CS (the entity
which leased the aircraft after it was re - commissioned); CS was responsible
for on - going maintenance. TR states the following :
“As I have advised you over the phone and via many emails your aircraft has
an enormous amount of problems associated with previous repair carried out
in Canada.
Case No: 304502 Determination Page 10 of 21
During this current 100hrly we have found the Birdcage structure to have
serious internal and external corrosion which could not be repaired without
removal from the airframe.
Upon removal we have found further proof that the previous repairs were not
carried out as were stated in the log books. Some of the tubes still had salt
water in them, some had no inhibitor. With the lower easy access areas
having been painted but the upper or awkward areas never had appropriate
paint.
They also stated in the log books that the SB 2/49 ndt inspection was carried
out, which was not the case as the tubes could not have holes in them if it had
been performed.”
59. As the Applicant is alleging the issues with the birdcage are due to S’s
treatment of it, the onus is on the Applicant to establish its allegation on the
balance of probabilities. The Panel is not satisfied the Applicant is able to do
so for the following reasons.
60. First, TR’s report i s not clear in establishing a clear link that the serious
internal and external corrosion identified is due to the repairs and/or
treatment conducted by S. For instance, its first sentence identifies the
corrosion and the next two paragraphs then discuss t he fact there is “further
proof” of previous repairs not being carried out properly.
61. This report does not clearly link the two. Such a link is instead inferred based
on the fact TR ’s correspondence discusses the issues with the repairs after
the identification of the corrosion. However, the Panel is not prepared to
accept such an inference when TR omits to explain how these alleged poor
repairs connect to all the corrosion identified.
62. In particular, such an explanation fails to encompass the following salie nt
issues:
The pre- existing condition of the birdcage. In particular, AG’s report to
S dated 25 January 2010, would be relevant given it indicates the
birdcage was serviceable, albeit marginal in some instances, prior to
the incident.
The fact the airplane was being used fairly regularly since it was
returned to the Applicant and the possible effect this may have had.
The treatment S stated it provided.
The fact that TR, despite having conducted repairs on the airplane
since 2 August 2011, only identified the issues with the birdcage more
than a year after this.
The fact this issue was not identified by either IA or the Applicant when
inspecting the aircraft upon its return to Australia.
63. The last point set out above is significant. IA was engaged to review the
works conducted by S for the purpose of issuing an Australian Maintenance
Release after the aircraft was returned to Australia. Although numerous
Case No: 304502 Determination Page 11 of 21
issues were raised and identified regarding S's works, which also form part
of the Applicant’s claim, the birdcage was omitted.
64. Similarly, the Applicant raised numerous issues with the aircraft’s condition
upon its return to Australia, but omitted to identify any issue with the
birdcage.
65. Given all of this, the Panel therefore does not accept the Applicant has
established the FSP is liable for any of the costs involving the birdcage.
Costs incurred for issue of Australian Maintenance Release
66. The invoice issued by IA in this regard appears to contain more than the
normal costs involved in obtaining the release. For instance, the invoice
contains costs for the following which the FSP has not agreed to pay :
Wheel assembly and float corrosion – this issue will be addressed
under float repairs
Tyres
Oil cooler
Brake cylinders
Replacement of fire extinguisher
67. The Applicant has not segregated these costs from those incurred in issuing
the maintenance release. Instead, it has stated the costs for obtaining the
release were approximately $11,000. When challenged by the FSP to
particularise this in further detail, the Applicant omitted to do so.
68. The Panel has reviewed IA’s invoice dated 14 June 2011. Based on its
reading, the costs involved in the issuing of an Australian Maintenance
Release are set out in details under the heading “Annual Inspection for Issue
of Maintenanc e Release”.
69. When factoring these amounts as well as the associated costs involved
(such as the Engine Log Book, Propeller Log Book and sub-contracting
fees), the amount totals $7,433.35.
70. The Panel therefore accepts the minimum cost of obtaining the release
would have been of that order given the Applicant’s omission to explain how
it arrived at $11,000.
71. The FSP, in its submission dated 28 November 2013, indicated that S paid
for the costs of issuing a maintenance release based on an invoice dated 24
May 2011. This is misconceived. The invoice paid by S, which the FSP
provided, included:
IA’s transportation costs,
The hiring of a crane to unload the aircraft and attach the floats to it,
and
Case No: 304502 Determination Page 12 of 21
The assembly of the aircraft.
72. The invoice does not set out any costs involved in issuing the maintenance
release.
73. Instead, based on the material provided by the parties, it appears S has not
paid this amount and has instead directed the Applicant to pay for this itself.
According to the Applicant’s solicitors’ letter dated 24 May 2011 , addressed
to the FSP’s solicitors, S did so because of the Applicant's alleged late
payment of custom taxes which delayed the aircraft’s return to Australia.
74. In its submission dated 13 September 2013, the FSP also added that the
reason the Applicant was required to pay for these costs was due to the
delay in furnishing the log books.
75. The Panel is not persuaded by the FSP’s position. First, there is no evidence
as to how this conduct entitled S to stop proceeding with works agreed to.
Second, there is no clear evidence that there was a delay caused which
resulted in additional costs. The FSP's argument on this point omits to set
this out.
76. Based on the material available, it was clearly agreed between the parties
that the FSP would pay for the costs involved in obtaining a maintenance
release when the aircraft was returned to Australia. This is particularly
confirmed by the FSP in various correspondence (e.g. letter to the Applicant
dated 8 July 2011), where it states it has paid this amount to S and has no
further liability in this regard.
77. Despite this, it is clear the Applicant was required to pay $7,433.35 plus GST
for a cost the FSP agreed to indemnify. The Panel therefore accepts the
FSP is liable to pay this amount to the Applicant.
78. The fact S did not complete the works agreed is a matter between the FSP
and S. In this regard, the Panel refers to its findings made with respect to the
arrangements between S, the FSP and the Applicant.
Other Costs
79. With respect to the balance of IA’s invoice (excluding the float and wheel
assembly), the Panel is not satisfied the FSP is liable to pay for the majority
of those items.
80. For instance, with respect to the tyres, the Applicant has alleged that these
were serviceable prior to the accident. Now they are not due to scores and
gouges across the tread, which the Applicant has assumed was caused by
dragging the aircraft across rocks sideways.
81. There is no evidence to substantiate this. It is an assumption provided
without any expert evidence in support. In particular, IA makes no reference
to support such an assumption. According to the FSP’s letter to the Applicant
Case No: 304502 Determination Page 13 of 21
dated 8 July 2011, its assessment is that the condition of the tyres was due
to wear and tear.
82. Given this, the Panel does not accept that the Applicant has produced
sufficient evidence to establish on the balance of probabilities that the
requirement to replace the tyres was due to the FSP’s conduct or part of the
claim.
83. This reasoning similarly applies to the replacement of the brake cylinders.
That is, the Applicant has led little evidence to establish their replacement
was due to the conduct of the FSP, S or damaged as part of the claim.
84. In regards to the replacement of the fire extinguisher, the Panel is not
satisfied the FSP is liable for this item for two reasons. First, the replacement
of the fire extinguisher according to IA was due to the fact it was not an
approved BCF unit. It is unclear if this unit was provided by the FSP or the
Applicant. If the latter, then the need for replacement was due to the
Applicant’s conduct, not the FSP’s.
85. Second and in the alternative, the policy does not appear to extend to items
stored on the aircraft, even if mandated by legislation. The policy insures the
“Aircraft”. The aircraft is described in the schedule as the airplane itself.
Nothing in the policy indicates equipment stored in the aircraft forms part of
the aircraft itself, particularly items that are not fixtures. Nor is such a
construction consistent with the natural and ordinary description of the term
aircraft.
86. Accordingly, items that are stored in the aircraft but are not a fixture or part
of the aircraft itself would not fall within the policy coverage. This includes
the fire extinguisher.
87. In regards to the oil cooler, the position is confusing. According to the FSP, it
stated the following in its submission:
“oil cooler was not covered as [FSP] has already paid for the replacement of
this item and the oil cooler that came off the Aircraft had many more blocked
cores than the overhaul unit that was refitted.”
88. This was supported in its later submission, which stated the oil cooler fitted
at the time of the accident was not serviceable and required replacement.
89. The confusion is that, on the one hand, the FSP is stating the item itself was
not serviceable at the time of the accident. This would infer it would not be
covered given the item was not damaged by the accident.
90. However, it appears the FSP replaced the item regardless of the policy
coverage as implied in the above statement.
91. If that is the case and this replacement unit is not fit for purpose, then the
Panel does not accept the FSP can reverse its position to seek to enforce
contractual rights. The reason is that it has elected to authorise the
replacement of this unit despite having been aware that it was not covered
Case No: 304502 Determination Page 14 of 21
by the policy. Once it elected to replace the unit, the Panel’s view is that it is
liable to ensure the unit it has replaced it with is fit for purpose, particularly in
circumstances when it made no representation that it was only replacing the
unit on an ex gratia basis.
92. Given this and the Panel’s finding regarding the costs involved in obtaining a
maintenance release, the Panel accepts the FSP is liable to pay $9,012.69
(inclusive of GST) towards IA’s invoice. This includes the amounts the FSP
has agreed to pay in its solicitors’ letter to the Applicant’s solicitors dated 12
September 2013.
93. To clarify, this finding does not include the issues with the float and wheel
assembly, which will be addressed later. However, this finding does
dispense with all the other items contained in this invoice.
Cost of Repairs to allow airplane to be flown in Australia
94. Some of these items have already been agreed to by the FSP. For instance,
in its schedule, it agreed to contribute 100% towards the invoices issued by
FA and AA. These total $8,816.39.
95. A number of the remaining amounts are associated with the float repairs,
which will be addressed separately. These total $7,510.14.
96. With respect to the items invoiced by TR that do not involve the floats, the
Panel has difficulty accepting many of them could be associated with the
claim. For instance, in the spreadsheet set out by the Applicant, it has
attempted to claim all of these costs were necessary due to faulty repairs.
97. However, TR, who was the entity that conducted the repairs and maintained
the aircraft following its return to Australia, has provided no evidence to
support the Applicant’s allegation. The only direct evidence produced from
TR, are two letters dated 7 October 2012. Neither of them discusses all of
the issues the Applicant has claimed were due to faulty repairs.
98. TR ’s letters contain a number of global statements setting out the fact the
aircraft had “an enormous amount of problems associated with the previous
repair carried out in Canada”. However, no specific evidence has been
provided about the extent of the problems or the reasons these are
associated with the previous repair.
99. According to the FSP, it responded to the invoices claimed after direct
discussion with TR. However, the FSP again omitted to provide any
evidence to support this, such as a statement from the assessor or individual
that had this direct discussion, or any other relevant report (such as
assessor reports).
100. The level of evidence provided on this key point is unsatisfactory when
considering:
both parties are represented by solicitors;
Case No: 304502 Determination Page 15 of 21
both have had numerous opportunities to gather and present this
information; and
both should be experienced enough in litigation to understand what is
required to establish factual matters that are in dispute.
101. Ultimately, the onus is on the Applicant to substantiate its position. In
regards to the items being claimed from TR, that are not associated with the
float, the Panel does not accept the Applicant has discharged this onus
given the minimal evidence provided.
102. In particular, the Panel is not prepared to infer solely on global statements
provided by TR, that the remaining invoices issued by TR are payable by the
FSP, based on S’s poor repairs. This is predominantl y due to the fact a
number of these items were only identified months after a maintenance
release was issued and the aircraft was accepted by the Applicant and
leased to another party.
103. This therefore dispenses with approximately $26,043.72.
104. The remaining balance of invoices to be considered is $2,118.78. One of
these is associated with a hydraulic leak ($616). The Applicant claims this
was associated with faulty repairs but there is no evidence to support this.
The invoices are silent as to the issue, there is no expert evidence to support
same and neither the Applicant nor IA identified any issue with this when the
aircraft was returned to Australia.
105. Given this, the Panel does not accept the FSP is liable for this cost.
106. Another invoice relates to the weight and balance of the aircraft ($715). The
Applicant, in a letter to the FSP dated 30 June 2011, claims the cost of this
was due to the repairs adding 188kg to the aircraft weight.
107. Again, minimal evidence was provided in support. In particular, there is no
dispute that the Applicant authorised S to undertake a number of repairs that
were not associated with the claim incident. This amounted to approximately
$100,000, being almost 20% of the repairs conducted by S. Accordingly, it is
possible that the addition to the aircraft weight was due to these repairs, not
the ones authorised by the FSP.
108. In addition, IA’s invoice included weighing the aircraft and made no
reference to these additional costs being due to inappropriate repairs or
conduct by S.
109. Given this, the Panel is not satisfied the Applicant has established these
costs were due to the claim or either the FSP’s or S’s conduct associated
with the claim related repairs.
110. The last invoice ($787.78), appears to be associated with one electrical part,
a relay. The invoice was dated 31 October 2011, more than 2 months after
the airplane’s return.
Case No: 304502 Determination Page 16 of 21
111. The FSP, albeit agreeing to many of the electrical costs, has disputed this
one claiming it is “maintenance related as parts were new after repair”.
112. The Applicant has not explained why this cost was necessary. In the
absence of evidence in support of the Applicant’s claim, the Panel is not
satisfied this amount should be reimbursed by the FSP.
Float Repairs
113. This issue has been the subject of the most ventilation between the parties.
A large part of the costs being sought by the Applicant are associated with
this issue.
114. Based on the Panel’s calculations, the total amount the Applicant is claiming
for the floats, is approximately $67,672.52. This incorporates approximately
37% of the claim.
115. The Applicant’s position is that the float repairs were associated with the
poor recovery of the aircraft. This appears to be supported by an email sent
by the FSP’s assessor to the Applicant dated 8 April 2010, which included an
update of S’s works. In this update, the following was stated of relevance:
“8 th Jan 2010
Received email form [BA] advising the aircraft had arrived and was well
packed with no transport damage. He queried the spreaders and I advised
him they were damaged in the accident and recovery. The wings and floats
were full of water and this was not taken into account when uprighting
her. ” (Panel emphasis)
116. This was further support by an email from S to the Applicant dated 12
January 2012, which stated the following:
“The guys who salvaged this aircraft did absolutely NOTHING in the way of
preservation. Makes our job much more difficult and more expensive than it
had to be.”
117. The Panel notes the Applicant had communicated to the FSP early in the
claim about its concerns regarding the aircraft’s recovery. In particular, the
Applicant was concerned that if the aircraft was not washed down
thoroughly, this would increase the chance of corrosion to the floats to
render them unserviceable.
118. Although the FSP indicates this was done, the email from the FSP’s
assessor to the Applicant, as well as S’s email to the Applicant , contradicts
this.
119. Further, it is unclear if the water found in the wings and floats when the
aircraft was received by S, was saltwater or freshwater. However, the Panel
would assume that a proper wash down would not result in the wings and
floats being “full of water” upon the aircraft being received by S.
Case No: 304502 Determination Page 17 of 21
120. In addition, no evidence has been led about the ai rcraft’s recovery and wash
down. The details of the recovery are set out in the FSP’s solicitors’
submission dated 28 November 2013, which it states is based on the
assessor's evidence. However, nothing was provided from either the
assessor or the contract or involved in the aircraft’s wash down to
corroborate the process and tasks undertaken.
121. A number of photographs were provided in support by the FSP. In these
photographs, the FSP notes:
The hatches on the floats had been opened, thus draining any residual
water.
On 7 January 2010, the aircraft had been returned to S who confirmed
it was completely dry.
122. In regards to the latter, this is contradicted by the FSP’s assessor’s email to
the Applicant where S stated the wings and floats were “full of water”. In
addition, none of the photographs provided any evidence of the aircraft
actually being washed down.
123. Given this, the Panel considers the state of the FSP’s evidence regarding
the aircraft’s recovery to be unsatisfactory. In particular, the presence of the
f loats being “full of water” and S’s email to the Applicant stating nothing was
done by way of preservation, invites a conclusion to be drawn that the water
found by S was saltwater.
124. The implication of such an inference is obvious, namely that the floats were
exposed to the corrosive effect of saltwater for almost 5 months.
125. In contesting the Applicant’s position regarding the floats, the FSP states
they were at a point of serious exfoliation which suggests they had been in a
poor state for a long time and the corrosion was pre-existing. In support of
this, the FSP relies on its assessor, S, photos of the aircraft before and after
the accident, an expert report by A and evidence from NWA (the entity that
completed maintenance works prior to the accident).
126. Ag ain, with respect to the assessor’s view, minimal direct evidence has been
provided. There is the email from the assessor to the Applicant dated 8 April
2010 which included the following:
“5 th April,…
3 The corrosion in the floats was at a point of serious exfoliation, which
suggests they have been in a poor state for a considerable time. Makes you
wonder about prior maintenance and operator house keeping. [B] said that in
his opinion the corrosion needed this level of repair prior to the accident.”
127. However , this email only conveys S’s view of the situation, not the
assessor’s own opinion. Further, it is hearsay and no direct evidence has
been sought from S on this salient issue.
128. A’s report was dated 3 August 2010 and addressed to S. It stated the
following of relevance:
Case No: 304502 Determination Page 18 of 21
The floats have seen extensive service and contain evidence of rework
and sealing around the main wheel openings.
There were typical examples of mild corrosion found on the float skins.
This was due to coating failure that leads to crevice corrosion whilst the
coating is partially intact. Corrosion of this type would be expected to
occur as the coating deteriorates over time.
Samples were taken of obvious corrosion on the longeron extrusions as
well as the white sealant.
129. Following this, A concluded the following:
“The observed exfoliation corrosion on structural extrusions has occurred over
a relatively long period of time (likely years). The roll-over incident likely had
little or no effect on the corrosion rates experienced by the floats. The 2024
alloy is susceptible to pitting and exfoliation in both salt water and fresh water
environments. Exfoliation can initiate on exposed extrusion surfaces as soon
as the protective coating is lost, either by mechanical or chemical means.”
130. Although A’s conclusions support the FSP, the Applicant’s solicitors does
provide a number of valid points to refute the conclusions. Namely, it does
not appear A took into account the following:
The aircraft had been unwashed for approximately 7 days.
Saltwater possibly remained in the floats for approximately 5 months.
131. The latter is particularly significant. Given the common knowledge of
saltwater having a corrosive effect, A’s report would have contained more
probative value if it could have accounted for this possible scenario. It does
not. Instead, its instructions on this issue was limited to a roll-over incident
which infers they were not appraised of the more extensive exposure to
saltwater than anticipated and the potential effect this may have had.
132. In addition, the Applicant provides the valid point that the aircraft passed a
100 hourly inspection prior to the incident which would not have occurred if
the floats were not in a serviceable condition. Given this, it is reasonable to
infer the floats were serviceable at the time of the incident.
133. Upon considering the whole of the available evidence, the Panel is more
persuaded by the Applicant’s position. That is, it appears the requirement to
repair the floats arose due to its treatment post-recovery as opposed to their
pre-existing condition.
134. Despite the FSP’s evidence on this , the Panel has not given much weight to
it due to the fact the factual background provided to S , omitted salient
matters. Namely, the expert was not privy to the possibility the floats were
exposed to saltwater for almost 5 months as a result of not being washed
down properly and the possible detrimental effect this would have.
135. This is further supported by the fact the FSP was invited to provide a copy of
the instructions given to S to clarify what background was made available. It
omitted to do so. In the absence of this and the fact the only comment A
Case No: 304502 Determination Page 19 of 21
provided in this regard was the “roll - over incident” , the Panel concludes A
was not privy to the possible factual background that the aircraft was
exposed to saltwater for almost 5 months.
136. Given this, the fact the floats were considered serviceable approximately one
month prior to the incident and the lack of any other direct expert evidence to
the contrary, the Panel accepts that the corrosion on the floats was
proximately due to the FSP’s recovery of the aircraft.
137. In regards to the amount being sought by the Applicant, the Panel notes the
state of the evidence is unsatisfactory. For instance, it is unclear to what
extent the float repairs S undert ook were proximately due to the FSP’s
recovery. Further, it is unclear to what extent the repairs done to the floats
subsequent to this were either associated with the FSP’s recovery, S’s poor
repairs, or the floats' pre-existing condition.
138. For instance, IA, to an extent, identified the floats required additional work.
However, the extent of repairs provided by TR, subsequent to this, appears
to have been much more substantive.
139. Further, the Applicant’s claim is limited to post -S repairs, which total
$67,672.52. The repairs charged by S for the float repairs, according to
annexure 21 of the FSP’s submissions, were $25,095.79. It is unclear why
this has been omitted.
140. The Panel is conscious of the age of the matter and the adversarial positions
undertaken by both sides. In light of this, allowing further inspections and
expert involvement at this late stage to enable the FSP to particularise its
liability, particularly in circumstances when it had numerous opportunities to
do so, would be unfair and likely to result in further delays and agitation.
141. Instead, the Panel considers it is fair in all the circumstances that a cash
amount be provided in this regard. Having regard to all of the above, the
Panel considers an amount of $50,000 in all the circumstances to be fair.
142. The amount is less than that sought by the Applicant. This is to reflect the
Applicant’s omission to provide persuasive evidence that all of the costs are
reasonably incurred or associated with the FSP’s recovery of the aircraft .
However, the substantive amount allowed acknowledges the fact the
Applicant established the FSP’s liability towards this contentious issue, the
FSP’s unsatisfactory evidence in rebuttal and the fact the Applicant has
produced invoices in support for extensive works being undertaken to the
floats.
Customs Charges
143. This issue arose when the aircraft was due to be returned to Australia from
Canada and there was a liability to pay GST on the cost of repairs incurred.
The parties disputed who was required to pay this amount with the Applicant
ultimately having to pay for same.
Case No: 304502 Determination Page 20 of 21
144. Although the Applicant received an input tax credit for the full amount, it is
seeking loss of use of the funds incurred. It appears the amount arrived at
($663.76), is based on an interest charge of 6% for the period the funds
were unavailable.
145. The FSP has stated it had no liability as the GST component was associated
with the repair costs which it states was a matter between the Applicant and
S. For reasons already set out, the Panel has not accepted this reflects the
arrangement between the parties.
146. The policy states the following with respect to GST:
“Conditions applicable to this Section only …
GST
(b) If the Company exercises its option to repair or pay the repair of the
Aircraft the Company will pay the amount of any Goods and Services
Tax (“GST”), where applicable, included in the cost of the repairs …
less any Input Tax Credit to which the Insured is entitled in respect of
the GST payable on the cost of repairs.”
147. The policy is unclear regarding circumstances when the FSP is invoiced the
costs. The Panel presumes in those cases, GST is payable by the FSP
given the Applicant cannot claim an input tax credit for a service he did not
receive.
148. Given the relevant policy provision, the Panel accepts tha t the parties’
common intention is that in circumstances where an Applicant is entitled to
an input tax credit, the FSP is not liable to pay GST. With respect to the
import charges, the GST component was payable by the Applicant under the
terms of the policy given it received an input tax credit.
149. Although the Applicant has raised a number of submissions stating the FSP
was liable to pay for the GST, the Panel prefers to rely on the terms of the
policy. Particularly in the absence of any evidence to substantiate that the
FSP provided an unequivocal representation that it would pay GST in these
circumstances and in contradiction of its policy terms.
Concluding Remarks
150. After taking into account the amounts awarded in this Determination, as well
as the amounts acknowledged by the FSP in the Schedule of Costs that
accompanied the FSP’s solicitors’ letter to the Applicant’s solicitors dated 12
September 2013, the total amount to be allowed is $67,829.08. This is made
up of the amounts: $9,012.69; $8,816.39 and $50,000.00.
151. The Panel does not consider interest should be payable pursuant to the
Insurance Contracts Act 1984 (the Act). This is mainly due to the fact that a
substantive amount of the figure awarded by the Panel is based on a
proportion of a broad estimate (float repairs), rather than the Applicant
strictly proving its entitlement in this regard.
Case No: 304502 Determination Page 21 of 21
152. Given this, the Panel does not consider it is fair in all the circumstances or
consistent with section 57 of the Act, for interest to be awarded.
153. In regards to the amounts acknowledged as payable by the FSP, it is unclear
if these were actually paid. For the sake of clarity, the Panel will presume
that these amounts have not been paid and shall award a final figure based
on that.
154. If the FSP has paid an amount towards the costs it acknowledged liability for,
then it is clearly entitled to deduct those amounts from the final figure
awarded in this Determination.
155. In addition and by way of clarification, the figure awarded by the Panel is
based on a full and final settlement. Although the Applicant was unable to
fully particularise the amount sought, despite being given sufficient
opportunities to do so, the Panel does not propose to award an interim
amount with scope for the parties to return with additional items in dispute.
156. Instead, any outcome accepted in this Determination is to be in full and final
settlement of this dispute. Such a condition is in line with FOS’s overarching
principle to attempt to resolve disputes efficiently and fairly. Further, given
the age of the matter, the sophistication of the parties involved and the fact
both parties have been legally represented at all material times, the Panel
considers such an outcome offered is fair in all the circumstances.
Determination
157. On the basis of the available i nformation, the Panel determines that the FSP
pay the Applicant the amount of $67,829.08, in full and final settlement of
this claim.
158. In the event the Applicant accepts this Determination, this amount should be
paid within 21 days of the FSP being notified of its acceptance unless it
requires a binding release to be signed first. In the event the FSP requires a
binding release to be signed, it should:
Ensure a release is sent to the Applicant within 14 days of being
notified of the Applicant’s acceptance of the Determination; and
Pay the above amount within 14 days after it has received an
appropriately signed release.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.