Determination 304352

Failure to follow instructions/agreement

FirmFinancial Firm (Unknown - Insurer)
Decided2013-04-30
ProductGeneral Insurance · Business / commercial
OutcomeFor the firm
Amount awarded—
Non-financial loss—
Amount claimed$23,183
SourceAFCA PDF

Summary

The applicant said the FSP failed to arrange building works cover for his cafe renovation and misled him that cover was in place, and sought his storm damage and lost profit losses. AFCA found the FSP not liable because the applicant could not establish that any breach or misrepresentation caused his loss.

The applicant bore the onus of proving a breach caused his loss, and the file notes showed he authorised the works before any assurance of cover was given, so the alleged failure was not causal.

Issues

Subjects and remedies

broker or intermediarysmall businessno remedy

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Case No: 304352 Determination Page 1 of 6 Case number: 304352 General Insurance - Small Business/Farm Insurance - Commercial Property - Instructions - Failure to follow instructions/agreement 29 April 2013 Background 1. The Applicant and his related businesses have been clients of the Financial Services Provider (FSP) since 18 November 2002. During this period, the FSP have handled the placement of the Applicant’s insurances in respect of his home, business and motor vehicle policies. 2. This dispute relates to a business policy for his cafe business in Beaconsfield. This policy was insured with Q. 3. The Applicant undertook renovations and extensions to the cafe which began in December 2008 and was completed in 2009. In early March 2009, severe storm damage was sustained to the property as a result of a roof tarp not being secure. The cost of rectification of the damage was $18,183 plus loss of profits of $5,000. 4. The Applicant initially sought to claim for this loss from Q as he believed the FSP had arranged a policy to cover these works. However, he discovered no such policy was arranged. He then attempted to recover these losses from the contractor he believed was principally responsible. The contractor has since gone into liquidation. 5. The Applicant is now seeking recovery for his losses from the FSP. The FSP has denied liability for same. Summary of Applicant’s p osition 6. The Applicant submits that the FSP failed to arrange the necessary policy or misrepresented that it did so. As a result, he has sustained the losses occurred. In this regard, he relies on the following series of events based on his recollection:  A conversation he had with IH of the FSP in 2007 when he informed IH of his intention to renovate and extend the cafe. IH queried the cost of works. He responded stating the works would cost between $100,000 and $150,000. IH then stated he would arrange the appropriate cover Determination Case No: 304352 Determination Page 2 of 6 to be effected and although he was going to be on holidays soon, he would start the process upon his return.  In June 2008, he contacted IH and advised him that the cafe would be owner occupied to facilitate the renovations. He also provided him with instructions to prepare an appropriate policy. IH replied “I will contact you soon”.  In August 2008, IH contacted him to review his motor trade policies. At the same time, the renovation costs were discussed where he again reiterated the estimate would be between $100,000 and $150,000. IH replied words to the effect “I will work on those figures and get back to you to sign the paperwork”.  Upon realising he had not heard anything further; he attempted to make contact with IH. He was informed IH was on sick leave and was put through to SN. He queried with SN the lack of paperwork with respect to the cover surrounding the building works. SN informed him that it did not appear IH had done anything to affect the necessary cover. SN apologised for the delay and said she would complete the formalities and, if necessary, come and see him.  Some weeks later, he had not heard anything from SN so he phoned her again. She informed him that she was leaving the FSP as she was having marital difficulties with her husband. However, she said “but don’t worry about your building works insurance, everything’s fine, it’s all been looked after”.  In reliance on this, he presumed the requested cover was in place and he authorised commencement of the buildings works. 7. The Applicant therefore maintains he is entitled to the compensation sought. Summary of FSP’ s position 8. The FSP has provided a copy of its file notes and relevant documentation to corroborate the fact that no instructions to arrange the insurance cover were ever forthcoming. 9. Accordingly, the FSP maintains its position that it is not liable for the losses sustained by the Applicant. Issues 10. Whether the Applicant instructed the FSP to arrange a policy to cover the buildings works. 11. Whether the FSP misled the Applicant into believing that a building works policy was in place. Case No: 304352 Determination Page 3 of 6 12. If either of the above issues are established in the Applicant’s favour, whether this has caused him to sustain the loss he is seeking reimbursement for. Reasons for Decision 13. As advised to the parties, FOS has considered it appropriate to expedite the dispute in accordance with clause 8.6 of the FOS Terms of Reference. This is due to the quantum and complexity of the dispute. This dispute has not been the subject of a FOS Recommendation and has proceeded directly to Determination. 14. A broker’s duty to its client is determined principally by the law of contract and the law relating to negligence. In the absence of any specific written agreement, a broker has a general duty to take reasonable care in procuring suitable policies of insurance to protect his or her client against relevant risks. Further the FSP, in the course of providing such services, must ensure it does not engage in misleading and/or deceptive conduct. 15. The standard of care in exercising this duty is that of an ordinary broker exercising the special skill of that profession. Further, a broker is expected to exercise reasonable care and skill in the discharge of all of their services, which is reflected in clause 5.1(b) of the Insurance Broker’s Code of Practice and section 912A of the Corporations Act 2001 16. In establishing whether the FSP has breached any of these duties, the onus is on the Applicant to establish this on the balance of probabilities. Once he has done so, he must then establish he suffered a loss that flowed from the FSP’s breach 17. The dispute involves various factual issues between the alleged conversation the Applicant had with IH in 2007 and when the Applicant authorised commencement of the building works in December 2008. In my opinion, it is essential to consider these factual issues in dispute as they will have an ultimate bearing on the appropriate outcome. 18. If I was to accept the Applicant’s version of his conversations with IH, I note that there was never any positive assertion provided by IH that cover was effected. In this regard, I refer to the Applicant’s submission dated 21 February 2013 whereby he refers to two conversations with IH on June 2008 and August 2008 where he attributes the following statements to him: “I will contact you soon.” “I will work on these figures and get back to you and sign the paperwork .” (my emphasis) 19. I do not accept these statements could be interpreted to mean that a policy had been effected. On the most favourable interpretation, it implied that IH was in the process of undertaking the necessary enquiries and would have him sign paperwork once a suitable option was arranged. Case No: 304352 Determination Page 4 of 6 20. Accordingly, I cannot accept that based on these conversations, it was reasonable for the Applicant to accept that a relevant policy had been effected. Although it is arguable to state the FSP breached its duty of care by failing to act on the Applicant’s instructions given no p olicy was ultimately arranged, this cannot be considered as a causal factor to the Applicant’s loss. I arrive at this conclusion based on the following. 21. The Applicant, in his submissions (particularly his submission dated 30 April 2012), stated he did not authorise the building works until he received an assurance from SN that the policy was in place. Prior to that, he had held off doing so as evident by his follow ups. 22. Given this, I accept that even if I found the Applicant did instruct the FSP to arrange such a policy, it was not the FSP’s failure to follow those instructions that caused his loss. Instead, according to the Applicant, it appears the causal factor was that he was led to believe a policy was in place which then resulted in him authorising the building works. This incorrect state of affairs was triggered by his second conversation he had with SN. Whether the FSP misled the Applicant into believing that a building works policy was in place. 23. In his submission dated 30 April 2012, the Applicant described his second conversation with SN as follows: “Some weeks later I had heard nothing further from Sarah, so I phoned her again. She told me in that conversation that she was leaving [FSP] as she was having some marital difficulties with her husband. However she said to me ‘but don’t worry about your building works insurance’ everything’s fine, it’s all been looked after.’ In reliance on Sarah’s statements to me I assumed that the requested insurance cover was in place and I authorised commencement of the building work in December 2008.” 24. As stipulated previously, I accept the Applicant’s position is that he proceeded with the building works as the FSP, through SN, misled him into believing a policy had been effected . However, the Applicant’s version of his conversations with SN does not appear substantiated by the available corroborating evidence. I base this on the following. 25. According to the FSP, SN did not leave their company until 8 July 2009. It is therefore unlikely that she would have communicated this to the Applicant in a conversation back in 2008. This is a plausible conclusion despite the Applicant maintaining this was said. 26. The FSP also produced a copy of its file notes which contained a number of entries entered by SN. The only one dated prior to December 2008 was dated 15 October 2008. This conversation appeared to be with a female insured regarding a workers’ compensation declaration. 27. There are, however, a number of conversations recorded by SN that appear to reflect the Applicant’s recoll ections to a degree. On 9 March 2009, SN Case No: 304352 Determination Page 5 of 6 recorded two files notes of two conversations she had with him. The first occurred at approximately 11.44am and contained the following: “The Insured [C] rang and advised that there has been storm damage as the contractors forgot to put the tarp back on the roof. The insured wanted to claim under the contract works policy (had a quick look at the system but there was no policy). I advised the Insured that I would have to check the file and call him back. Advised GD.” 28. The second occurred at approximately 1.28pm and stated the following: “Rang the Insured [C] back and advised that there has been no records on our file that he has requested any contract works policy. The insured advised that he asked IH to put it on cover prior to IH leave (August). I asked if he had anything in writing, the insured advised that he told IH when he was out doing the renewal for the motor business. I advised the insured that there has been nothing confirmed with the insurance company. The insured advised that he normally gets his invoices from IH months later and didn’t think anything of it and probably should have chased it up. Decided to put in a claim anyway ...” 29. SN also recorded another conversation she had with the Applicant on 11 June 2009 at 10.04am that stated the following: “I advised that [Q] has recently done a risk survey on the property. Requests that the fire ext to be serviced every 6 months, the insured advised that he will arrange that. The carpark has damage and someone should fall, the insured advised that this has been repaired as the damage was while the construction on the building however it has all been fixed. Confirmed with the insured that he gets COC for the contractors when they are at the property.” 30. The contents of these conversations appear to reflect, to a degree, the Applicant’s recollection of his two conversations with SN. For instance, the two conversations on 9 March 2009 reflect the Applicant’s version of his first conversation with SN whereby he had presumed IH had arranged the cover but was informed by SN that this was not the case. 31. In the conversation on 11 June 2009, this reflects his recollection of the second conversation. For instance, as this conversation occurred less than 4 weeks prior to SN leaving the FSP, it is likely her impending departure would have been discussed. Further, in this conversation, she made the following comment: “Confirmed with the insured that he gets COC for the contractors when they are at the property.” 32. COC is presumably “Certificate of Currency”. This note would appear to indicate that SN provided some form of assurance to the Applicant regarding insurance cover in place for contractors at the property in the form of COC. This is relatively consistent with the Applicant’s re collection that she told him that the buildings work insurance is fine. 33. It would therefore appear that based on the file notes recorded and the Applicant’s own recollection, the conversations he referred to having with SN did occur but after he authorised the contractors to begin work and the damage occurring. Although I acknowledge that his position is that these Case No: 304352 Determination Page 6 of 6 conversations occurred before December 2008, I note his evidence is set out in a submission dated 30 April 2012, being more than 3 years after the fact. 34. Given this substantive timeframe, it is open for me to presume that the Applicant may have been mistaken about the timeframe when attempting to reconstruct what occurred. Instead, given the file notes recorded and the Applicant’s reference to SN in forming him of her impending departure in the second conversation, I accept it is more probable than not that his conversations with SN did occur but after he authorised the contractors to begin renovations and after he sustained a loss. 35. I acknowledge the Applicant has consistently stated he operated under the genuine belief that cover was in place. However, I do not accept that the Applicant is able to establish this belief was based on a representation or conversation he had with the FSP prior to the loss. 36. It is possible he presumed this cover was in place after his conversations with IH although, when reconstructing the series of events a number of years later, he attributed the belief based on the conversations he had with SN having omitted to recall their exact timing. However, given the statements he attributed to IH, I have found that it would not have been reasonable to interpret IH’s comments as representing that cover was affected. 37. Accordingly, after consideration of all of the available evidence, I therefore cannot accept that the Applicant is able to establish, on the balance of probabilities, that the FSP misled him into believing that a policy had been affected. 38. As such, I am not satisfied the Applicant is able to establish the loss he has sustained was caused by the FSP breaching an obligation owed to him. Determination 39. On the basis of the available information I determine that the FSP is not liable to pay any compensation to the Applicant.