Text of the determination
Case No: 304352 Determination Page 1 of 6
Case number: 304352
General Insurance - Small Business/Farm Insurance - Commercial Property -
Instructions - Failure to follow instructions/agreement
29 April 2013
Background
1. The Applicant and his related businesses have been clients of the Financial
Services Provider (FSP) since 18 November 2002. During this period, the
FSP have handled the placement of the Applicant’s insurances in respect of
his home, business and motor vehicle policies.
2. This dispute relates to a business policy for his cafe business in
Beaconsfield. This policy was insured with Q.
3. The Applicant undertook renovations and extensions to the cafe which
began in December 2008 and was completed in 2009. In early March 2009,
severe storm damage was sustained to the property as a result of a roof tarp
not being secure. The cost of rectification of the damage was $18,183 plus
loss of profits of $5,000.
4. The Applicant initially sought to claim for this loss from Q as he believed the
FSP had arranged a policy to cover these works. However, he discovered no
such policy was arranged. He then attempted to recover these losses from
the contractor he believed was principally responsible. The contractor has
since gone into liquidation.
5. The Applicant is now seeking recovery for his losses from the FSP. The FSP
has denied liability for same.
Summary of Applicant’s p osition
6. The Applicant submits that the FSP failed to arrange the necessary policy or
misrepresented that it did so. As a result, he has sustained the losses
occurred. In this regard, he relies on the following series of events based on
his recollection:
A conversation he had with IH of the FSP in 2007 when he informed IH
of his intention to renovate and extend the cafe. IH queried the cost of
works. He responded stating the works would cost between $100,000
and $150,000. IH then stated he would arrange the appropriate cover
Determination
Case No: 304352 Determination Page 2 of 6
to be effected and although he was going to be on holidays soon, he
would start the process upon his return.
In June 2008, he contacted IH and advised him that the cafe would be
owner occupied to facilitate the renovations. He also provided him with
instructions to prepare an appropriate policy. IH replied “I will contact
you soon”.
In August 2008, IH contacted him to review his motor trade policies. At
the same time, the renovation costs were discussed where he again
reiterated the estimate would be between $100,000 and $150,000. IH
replied words to the effect “I will work on those figures and get back to
you to sign the paperwork”.
Upon realising he had not heard anything further; he attempted to make
contact with IH. He was informed IH was on sick leave and was put
through to SN. He queried with SN the lack of paperwork with respect
to the cover surrounding the building works. SN informed him that it did
not appear IH had done anything to affect the necessary cover. SN
apologised for the delay and said she would complete the formalities
and, if necessary, come and see him.
Some weeks later, he had not heard anything from SN so he phoned
her again. She informed him that she was leaving the FSP as she was
having marital difficulties with her husband. However, she said “but
don’t worry about your building works insurance, everything’s fine, it’s
all been looked after”.
In reliance on this, he presumed the requested cover was in place and
he authorised commencement of the buildings works.
7. The Applicant therefore maintains he is entitled to the compensation sought.
Summary of FSP’ s position
8. The FSP has provided a copy of its file notes and relevant documentation to
corroborate the fact that no instructions to arrange the insurance cover were
ever forthcoming.
9. Accordingly, the FSP maintains its position that it is not liable for the losses
sustained by the Applicant.
Issues
10. Whether the Applicant instructed the FSP to arrange a policy to cover the
buildings works.
11. Whether the FSP misled the Applicant into believing that a building works
policy was in place.
Case No: 304352 Determination Page 3 of 6
12. If either of the above issues are established in the Applicant’s favour,
whether this has caused him to sustain the loss he is seeking reimbursement
for.
Reasons for Decision
13. As advised to the parties, FOS has considered it appropriate to expedite the
dispute in accordance with clause 8.6 of the FOS Terms of Reference. This
is due to the quantum and complexity of the dispute. This dispute has not
been the subject of a FOS Recommendation and has proceeded directly to
Determination.
14. A broker’s duty to its client is determined principally by the law of contract
and the law relating to negligence. In the absence of any specific written
agreement, a broker has a general duty to take reasonable care in procuring
suitable policies of insurance to protect his or her client against relevant
risks. Further the FSP, in the course of providing such services, must ensure
it does not engage in misleading and/or deceptive conduct.
15. The standard of care in exercising this duty is that of an ordinary broker
exercising the special skill of that profession. Further, a broker is expected to
exercise reasonable care and skill in the discharge of all of their services,
which is reflected in clause 5.1(b) of the Insurance Broker’s Code of Practice
and section 912A of the Corporations Act 2001
16. In establishing whether the FSP has breached any of these duties, the onus
is on the Applicant to establish this on the balance of probabilities. Once he
has done so, he must then establish he suffered a loss that flowed from the
FSP’s breach
17. The dispute involves various factual issues between the alleged
conversation the Applicant had with IH in 2007 and when the Applicant
authorised commencement of the building works in December 2008. In my
opinion, it is essential to consider these factual issues in dispute as they will
have an ultimate bearing on the appropriate outcome.
18. If I was to accept the Applicant’s version of his conversations with IH, I note
that there was never any positive assertion provided by IH that cover was
effected. In this regard, I refer to the Applicant’s submission dated 21
February 2013 whereby he refers to two conversations with IH on June 2008
and August 2008 where he attributes the following statements to him:
“I will contact you soon.”
“I will work on these figures and get back to you and sign the paperwork .”
(my emphasis)
19. I do not accept these statements could be interpreted to mean that a policy
had been effected. On the most favourable interpretation, it implied that IH
was in the process of undertaking the necessary enquiries and would have
him sign paperwork once a suitable option was arranged.
Case No: 304352 Determination Page 4 of 6
20. Accordingly, I cannot accept that based on these conversations, it was
reasonable for the Applicant to accept that a relevant policy had been
effected. Although it is arguable to state the FSP breached its duty of care by
failing to act on the Applicant’s instructions given no p olicy was ultimately
arranged, this cannot be considered as a causal factor to the Applicant’s
loss. I arrive at this conclusion based on the following.
21. The Applicant, in his submissions (particularly his submission dated 30 April
2012), stated he did not authorise the building works until he received an
assurance from SN that the policy was in place. Prior to that, he had held off
doing so as evident by his follow ups.
22. Given this, I accept that even if I found the Applicant did instruct the FSP to
arrange such a policy, it was not the FSP’s failure to follow those instructions
that caused his loss. Instead, according to the Applicant, it appears the
causal factor was that he was led to believe a policy was in place which then
resulted in him authorising the building works. This incorrect state of affairs
was triggered by his second conversation he had with SN.
Whether the FSP misled the Applicant into believing that a building works
policy was in place.
23. In his submission dated 30 April 2012, the Applicant described his second
conversation with SN as follows:
“Some weeks later I had heard nothing further from Sarah, so I phoned her
again. She told me in that conversation that she was leaving [FSP] as she
was having some marital difficulties with her husband. However she said to
me ‘but don’t worry about your building works insurance’ everything’s fine, it’s
all been looked after.’ In reliance on Sarah’s statements to me I assumed that
the requested insurance cover was in place and I authorised commencement
of the building work in December 2008.”
24. As stipulated previously, I accept the Applicant’s position is that he
proceeded with the building works as the FSP, through SN, misled him into
believing a policy had been effected . However, the Applicant’s version of his
conversations with SN does not appear substantiated by the available
corroborating evidence. I base this on the following.
25. According to the FSP, SN did not leave their company until 8 July 2009. It is
therefore unlikely that she would have communicated this to the Applicant in
a conversation back in 2008. This is a plausible conclusion despite the
Applicant maintaining this was said.
26. The FSP also produced a copy of its file notes which contained a number of
entries entered by SN. The only one dated prior to December 2008 was
dated 15 October 2008. This conversation appeared to be with a female
insured regarding a workers’ compensation declaration.
27. There are, however, a number of conversations recorded by SN that appear
to reflect the Applicant’s recoll ections to a degree. On 9 March 2009, SN
Case No: 304352 Determination Page 5 of 6
recorded two files notes of two conversations she had with him. The first
occurred at approximately 11.44am and contained the following:
“The Insured [C] rang and advised that there has been storm damage as the
contractors forgot to put the tarp back on the roof. The insured wanted to
claim under the contract works policy (had a quick look at the system but
there was no policy). I advised the Insured that I would have to check the file
and call him back. Advised GD.”
28. The second occurred at approximately 1.28pm and stated the following:
“Rang the Insured [C] back and advised that there has been no records on
our file that he has requested any contract works policy. The insured advised
that he asked IH to put it on cover prior to IH leave (August). I asked if he had
anything in writing, the insured advised that he told IH when he was out doing
the renewal for the motor business. I advised the insured that there has been
nothing confirmed with the insurance company. The insured advised that he
normally gets his invoices from IH months later and didn’t think anything of it
and probably should have chased it up. Decided to put in a claim anyway ...”
29. SN also recorded another conversation she had with the Applicant on 11
June 2009 at 10.04am that stated the following:
“I advised that [Q] has recently done a risk survey on the property. Requests
that the fire ext to be serviced every 6 months, the insured advised that he will
arrange that. The carpark has damage and someone should fall, the insured
advised that this has been repaired as the damage was while the construction
on the building however it has all been fixed. Confirmed with the insured that
he gets COC for the contractors when they are at the property.”
30. The contents of these conversations appear to reflect, to a degree, the
Applicant’s recollection of his two conversations with SN. For instance, the
two conversations on 9 March 2009 reflect the Applicant’s version of his first
conversation with SN whereby he had presumed IH had arranged the cover
but was informed by SN that this was not the case.
31. In the conversation on 11 June 2009, this reflects his recollection of the
second conversation. For instance, as this conversation occurred less than 4
weeks prior to SN leaving the FSP, it is likely her impending departure would
have been discussed. Further, in this conversation, she made the following
comment:
“Confirmed with the insured that he gets COC for the contractors when they
are at the property.”
32. COC is presumably “Certificate of Currency”. This note would appear to
indicate that SN provided some form of assurance to the Applicant regarding
insurance cover in place for contractors at the property in the form of COC.
This is relatively consistent with the Applicant’s re collection that she told him
that the buildings work insurance is fine.
33. It would therefore appear that based on the file notes recorded and the
Applicant’s own recollection, the conversations he referred to having with SN
did occur but after he authorised the contractors to begin work and the
damage occurring. Although I acknowledge that his position is that these
Case No: 304352 Determination Page 6 of 6
conversations occurred before December 2008, I note his evidence is set out
in a submission dated 30 April 2012, being more than 3 years after the fact.
34. Given this substantive timeframe, it is open for me to presume that the
Applicant may have been mistaken about the timeframe when attempting to
reconstruct what occurred. Instead, given the file notes recorded and the
Applicant’s reference to SN in forming him of her impending departure in the
second conversation, I accept it is more probable than not that his
conversations with SN did occur but after he authorised the contractors to
begin renovations and after he sustained a loss.
35. I acknowledge the Applicant has consistently stated he operated under the
genuine belief that cover was in place. However, I do not accept that the
Applicant is able to establish this belief was based on a representation or
conversation he had with the FSP prior to the loss.
36. It is possible he presumed this cover was in place after his conversations
with IH although, when reconstructing the series of events a number of years
later, he attributed the belief based on the conversations he had with SN
having omitted to recall their exact timing. However, given the statements he
attributed to IH, I have found that it would not have been reasonable to
interpret IH’s comments as representing that cover was affected.
37. Accordingly, after consideration of all of the available evidence, I therefore
cannot accept that the Applicant is able to establish, on the balance of
probabilities, that the FSP misled him into believing that a policy had been
affected.
38. As such, I am not satisfied the Applicant is able to establish the loss he has
sustained was caused by the FSP breaching an obligation owed to him.
Determination
39. On the basis of the available information I determine that the FSP is not
liable to pay any compensation to the Applicant.