Home / Financial Firm (Unknown - Insurer) / Determination 303888
Determination 303888
Declinature of storm damage claim as soil movement
Summary
An elderly insured's storm damage claim was declined as soil movement, relying on the 72-hour and expansion-of-earth exclusions. AFCA found the storm was the proximate cause, ordered the FSP to meet the footing-related damage cost other than the retaining wall, and ordered interest on the settlement.
The storm was the effective cause of the footing uplift, and the shrinkage or expansion exclusion and the groundwater argument did not defeat cover under the storm definition.
Issues
- Claim denial primary · upheld
“I determine the FSP is to meet its liability in accordance with the terms of the policy to cover the cost sustained as a result of the uplifting of the footings.”
- Product terms interpretation secondary · upheld
“there is no basis for me to read down the policy cover for storm as suggested by the FSP.”
Subjects and remedies
home or building damagenatural disasterpay claimpay interest
Text of the determination
Case No: 303888 Determination Page 1 of 7
Case number: 303888
General Insurance - Domestic Insurance - Home Building - FSP Decision -
Denial of claim-Applicant non-disclosure
9 April 2013
Background
1. The Applicant holds a Home Building Insurance policy with the Financial
Services Provider (FSP). The policy covers the insured building up to
$420,763, subject to a $300 excess for defined events.
2. On 29 March 2012 the Applicant lodged a claim for damage resulting from
the extreme weather events in Queensland during January 2011. The FSP
arranged for an assessor and an engineer to attend the property and report
on the cause of the damage.
3. The FSP declined the claim on the basis the damage arose from soil
expansion which is an excluded cause of loss under the event.
4. The Applicant disputes the declinature on the basis the damage arose from
the insured storm event.
Summary of Applicant’s position
5. The Applicant is an elderly pensioner who was widowed shortly after the
2011 flood event which caused the damage to the insured property. The
death of the Applicant’s husband occurred in March 2011 and the Applicant
was not well for several months after this. The Applicant was in fact admitted
to hospital in February 2012 and was not expected to return home.
Unfortunately, this meant the damage to the home was not able to be dealt
with.
6. The house is 150m above sea level in Minden. During the 2011 flood event
Minden received excessive rainfall, during which time the Applicant was
trapped due to excess flooding in the Minden valley. There was excessive
water flowing from the top of the Minden Range through the insured property
down towards the valley.
7. In December 2011 the Applicant’s son noted cracks in the property and
made a claim on the Applicant’s behalf. The Applicant the n received contact
from the FSP declining the claim on the basis of soil movement and erosion.
However, the FSP then asked the Applicant to obtain a quote from the
Determination
Case No: 303888 Determination Page 2 of 7
plumber, but the Applicant was dissatisfied by the process and threw the
letter in the bin. An assessor and engineer then separately attended the
property.
8. The Applicant submits that the house had no pre -existing problems or
damage to the internal property structure, prior to the extreme rain event in
2011. The Applicant notes the following in re lation to the claim:
The property is surrounded by sandstone.
There is no cracking to the floor and the tiles are still in situ with no sign
of cracking to the floor tile grouting. The Applicant queries if there was
soil movement under the slab whether the slab and flooring would have
signs of cracking.
The only cracks appear to be to the internal ceiling and wall joins and
some cracking to the external walls.
The volume of rain that fell during October 2010 and January 2011 was
significantly higher than any other rain event in the history of the
property. The rain event created excess water flow through the
property. The excess run-off is due to the house being built on the
Eastern side of the Minden Range. The property is situated part of the
way up the range and water flowed from the top of the range down
through the property.
9. The Applicant seeks indemnity from the FSP for the claimed damage.
Summary of FSP’s position
10. The FSP relies on the following policy terms and conditions:
“Words with special meaning s
...
Rainwater means rain falling naturally from the sky onto the buildings and/or
ground.
...
Run-off means rainwater that has collected on or has flowed across normally
dry ground or has overflowed from swimming pools or spas.
...
Storm means violent wind (including cyclones and tornadoes), thunderstorms
and hail which may be accompanied by rain or snow.
...
9. Storm, rainwater or run-off
(Applicable whether you have buildings and/or contents cover)
We will pay for loss or damage caused by storm, rainwater or run-off.
...
We will not pay for loss or damage:
Case No: 303888 Determination Page 3 of 7
...
c. caused by:
- soil movement including erosion, landslide, mudslide or subsidence;
- shrinkage or expansion of earth or land, or
- hydrostatic pressure;”
11. The FSP has enclosed its claim records from which I note the following:
Notation dated 12 April 2012 the notations record the following:
“I have authorised the assessor to arrange an engineer to attend, report on
the cause of damage and advise of the resultant damage had an (sic) runoff
waters physically touched these areas, and has the damage occurred within
72 hours of the storm event?”
Notation dated 31 May 2012 the FSP records state:
“I have emailed assessor requesting a breakdown, if possible on how much of
the damage has been attributed to this storm event. If not determined claim
will be denied as policy excludes damages due to storm events”
12. The FSP relies on an assessor’s report dated 13 April 2012, from which I
note the following:
The assessor confirms that a large amount of rain fell in the Minden
area and the Applicant’s property is at the top of the ranges.
Accordingly, whilst it did not suffer from flood it did receive a large
amount of run-off which caused damage to the foundations of the
property. The resultant damage includes the brick section of the house
dropping which in turn caused extensive damage to the inside of the
house.
The assessor notes the retaining walls would not be covered under the
policy as this is an exclusion for this under the storm event.
13. The FSP relies on an assessor’s report dated 21 May 2012, from which I
note the following:
The assessor notes the structural engineer states the footings of the
structure will be subject to high ground movement due to the moisture
changes in the expansive clay soils. The storm has resulted in lifting of
the outside walls and this was possibly caused by swelling in the
founding material under the existing external footings.
As the swelling of the foundation material occurs, this lifts the external
footing. The swelling and lifting of the external walls causes the trusses
to lift off the internal walls. This appears to have happened over the
majority of the internal walls. When the soils dry over time, some
settlement in the footings may occur but this is generally limited.
The engineer notes that due to the significant period of time which had
passed since the storm event in January 2011, this made it difficult to
determine the cracking was due to the storm. However, the storm event
may have contributed to the cracking that is e vident.
Case No: 303888 Determination Page 4 of 7
The assessor concludes that the drying out of the soil and the resulting
cracking to the insured property resulted after the 72 hour period that is
mentioned as an exclusion in the insured’s policy. Accordingly, the
assessor recommended the declinature of the claim.
14. The FSP relies on the expert engineer’s report dated 18 May 2012, from
which I note the following:
The block of land is up on a hill overlooking the Minden Range. The
slab on the ground is supported by a cut/fill profile platform. The
engineer expects the footings for the house to be less stiff than those
specified under current Australian standards. As such the footings
would be subject to higher ground movements due to changes in
moisture levels in the expansive clay soils.
These storm events resulted in the lifting of the outside walls. A
possible cause of this is the swelling of the founding material under the
external footings. This type of action can occur with expansive clay
foundations.
As the swelling of the foundation material occurs, this lifts the external
footings. The swelling and lifting of the external walls causes the
trusses to lift off the internal walls. This is what appears to have
happened over the majority of the internal walls. When the soils dry out
over time some settlement in the footing may occur but this is generally
limited.
A significant time period has passed since the storm event of January
2011. This time difference makes it difficult to confirm that the cracking
that is evident is due to this storm. However, the engineer notes the
volume of water that fell on the Minden region during this storm event,
would have contributed to the cracking that is evident.
15. The FSP has enclosed an email dated 14 June 2012 between the engineer
and the assessor from which I note the following:
The engineer confirms the damage to the residence is due to
movement in the founding soils. The movement is “likely to have been
influenced by the storm of January 2011”.
The water did not directly cause the cracking that is evident. It is the
movement of the founding soils that has caused the cracking and the
storm water contributed to this founding soils movement.
16. The FSP has enclosed an email dated 16 July 2012 from the assessor
confirming the engineer concluded the soil type was expansive clay based
on geological maps of the area, years working in the area and inspection of
the insured’s residence.
17. The FSP has enclosed an email dated 19 July 2012 from the engineer to the
assessor from which I note the following:
Case No: 303888 Determination Page 5 of 7
The movement of the founding soils is not independent of the soil type.
Expansive clay soils exhibit significantly more movement than sandy
soils when exposed to changes in moisture content.
If there is a dispute on the site classification then the engineer
recommends a soil testing company be engaged to test samples.
The engineer is still of the opinion that the primary cause of the
damage to the residence is the movement in the founding soils.
18. The FSP notes that the Applicant must establish that a loss falls within the
provisions of the contract. Once the Applicant has established this the FSP
must establish the claim falls outside the cover offered.
19. The Applicant did not notice cracking to the property until December 2011,
11 months after the event.
20. The FSP relies on its expert reports which indicate the damage was caused
by earth movement as a result of water saturating the earth and foundations.
21. It is the FSP’s position that once rainwater enters the earth it becomes part
of the soil and can no longer be considered rainwater. The FSP submits the
water mingled with the earth should be considered groundwater. There is no
cover under the PDS for damage arising from groundwater.
22. In the alternative, the FSP contends the damage arises from the expansion
of earth under the defined event, which is a specifically excluded event.
Issues
23. Whether the FSP was entitled to decline the Applicant’s claim for damage.
Reasons for decision
24. There has been an exchange of material between each party, and I am
satisfied each party has had an opportunity to reply to the issues raised.
25. I have read each party’s submissions and materials and will only refer to the
relevant submissions and materials raised.
26. As advised to the parties, FOS has considered it appropriate to expedite the
dispute in accordance with clause 8.6 of the FOS Terms of Reference. This
is due to the circumstances and quantum of the dispute. This dispute has not
been the subject of a FOS Recommendation and has proceeded directly to
Determination.
27. First, there is no dispute between the parties that a significant storm event
occurred in Minden and that the property was subject to a high level of
rainfall.
Case No: 303888 Determination Page 6 of 7
28. Second, I note the personal circumstances of the Applicant shortly after the
January 2011 storm event are such that I am not inclined to draw an adverse
inference from the belated claim. Further, it is unclear when the cracking
commenced. The Applicant’s son noticed cracking 11 months after the event
but it is unclear whether he had been regularly in the home during the period
the Applicant was in hospital etc. Further, given the expert reports it is highly
unlikely that the mechanism of loss occurred 11 months after the event.
Given this, I do not accept the time of lodgement as indicative of when the
damage occurred.
29. Third, ther e is no dispute that the Applicant’s property had no da mage prior
to the storm event.
30. There is significant evidence before me that the cause of loss is attributed to
heavy rainfall which in turn led to the reactive clay soil producing an upheave
effect. This in turn put pressure on the external footings, lifting the walls
which caused the trusses to lift the internal walls resulting in the damage.
The engineer noted that whilst some soils dry out over time the settlement of
the footing may occur - but this is generally limited.
31. The engineer further concluded the volume of water that fell on the Minden
region during this storm event, would have contributed to the cracking that
was evident at the home. There is no evidence contained in the report that
other factors such as defective footings or tree roots are the cause of the
damage to the Applicant’s home. In my view, this establishes a prime facie
claim for the Applicant who has claimed for building damage resulting from
the January 2011 storm event.
32. The engineer clearly expressed in an email to the assessor that the
movement of the founding soil is not independent of the soil type. The
expansive clay soils will move significantly more when exposed to changes
in the moisture content.
33. It is somewhat puzzling that after the receipt of the engineer ’ s report the FSP
has attempted (by email dated 31 May 2012) to obtain a breakdown of how
much damage was attributed to the storm. Further, the FSP considered if a
breakdown could not be provided it would wholly deny the claim.
34. The FSP has argued that the Service should consider the water mingled with
the ground as “ground water”. A review of the policy definitions of rainwater
and run-off both include rain that has fallen onto the ground or flowing across
normally dry ground. At some point this water would necessarily interact and
mingle with the earth as it flowed across it. Furthermore, there is no
exclusion contained within the PDS to suggest that rainwater that mixes with
the earth will no longer be considered rainwater or run-off. Accordingly, there
is no basis for me to read down the policy cover for storm as suggested by
the FSP.
35. I have considered the exclusion relied on by the FSP which states the FSP
will not pay for loss or damage caused by....shrinkage or expansion of earth
or land .
Case No: 303888 Determination Page 7 of 7
36. As stated by the engineer, the damage has occurred due to the storm event
impacting the moisture level of the soil which has then created an upheave
under the external footings. The soil has not undergone seasonal expansion
or shrinkage, this particular damage has been attributed to the 2011 storm
event. The soil expansion would therefore be the resulting effect of the
heavy rainfall. Insofar as the uplift of the external footings has caused
damage, the insured event of storm would be seen to be the proximate
cause, that is, the effective cause of the footings uplifting and therefore
causing the movement and damage to the property. Accordingly, there
would appear to be no reason the policy should not respond.
37. In the circumstances, I am satisfied that the FSP is liable to meet the cost of
the damage sustained as a result of the movement of the footings as
identified by the engineer and assessor. I am satisfied that liability does not
extend to replacement of any retaining wall which is a structure to which
cover does not extend under the policy.
38. The parties are asked to work cooperatively together to determine the cost of
repair.
39. If the parties are unable to agree as to the amount, then the matter can be
returned to FOS and I will determine the amount for the parties, subject to
further submissions.
Determination
40. I determine the FSP is to meet its liability in accordance with the terms of the
policy to cover the cost sustained as a result of the uplifting of the footings,
caused by the insured event of “storm”.
41. The FSP is not liable to pay damage to any retaining wall.
42. If the parties are unable to agree as to the amount of the damage, then the
parties are invited to make further submissions and the matter will be
determined accordingly.
43. Insofar as the FSP determines to cash settle the Applicant’s claim, the FSP
is to pay interest in accordance with Section 57 of the Act, on the settlement
amount, from 27 July 2012, being the date of the decision to deny the claim,
to the date of payment of the claim.