Home / Financial Firm (Unknown - Insurer) / Determination 303888

Determination 303888

Declinature of storm damage claim as soil movement

FirmFinancial Firm (Unknown - Insurer)
Decided2013-05-09
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant
Amount awarded—
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

An elderly insured's storm damage claim was declined as soil movement, relying on the 72-hour and expansion-of-earth exclusions. AFCA found the storm was the proximate cause, ordered the FSP to meet the footing-related damage cost other than the retaining wall, and ordered interest on the settlement.

The storm was the effective cause of the footing uplift, and the shrinkage or expansion exclusion and the groundwater argument did not defeat cover under the storm definition.

Issues

Subjects and remedies

home or building damagenatural disasterpay claimpay interest

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Case No: 303888 Determination Page 1 of 7 Case number: 303888 General Insurance - Domestic Insurance - Home Building - FSP Decision - Denial of claim-Applicant non-disclosure 9 April 2013 Background 1. The Applicant holds a Home Building Insurance policy with the Financial Services Provider (FSP). The policy covers the insured building up to $420,763, subject to a $300 excess for defined events. 2. On 29 March 2012 the Applicant lodged a claim for damage resulting from the extreme weather events in Queensland during January 2011. The FSP arranged for an assessor and an engineer to attend the property and report on the cause of the damage. 3. The FSP declined the claim on the basis the damage arose from soil expansion which is an excluded cause of loss under the event. 4. The Applicant disputes the declinature on the basis the damage arose from the insured storm event. Summary of Applicant’s position 5. The Applicant is an elderly pensioner who was widowed shortly after the 2011 flood event which caused the damage to the insured property. The death of the Applicant’s husband occurred in March 2011 and the Applicant was not well for several months after this. The Applicant was in fact admitted to hospital in February 2012 and was not expected to return home. Unfortunately, this meant the damage to the home was not able to be dealt with. 6. The house is 150m above sea level in Minden. During the 2011 flood event Minden received excessive rainfall, during which time the Applicant was trapped due to excess flooding in the Minden valley. There was excessive water flowing from the top of the Minden Range through the insured property down towards the valley. 7. In December 2011 the Applicant’s son noted cracks in the property and made a claim on the Applicant’s behalf. The Applicant the n received contact from the FSP declining the claim on the basis of soil movement and erosion. However, the FSP then asked the Applicant to obtain a quote from the Determination Case No: 303888 Determination Page 2 of 7 plumber, but the Applicant was dissatisfied by the process and threw the letter in the bin. An assessor and engineer then separately attended the property. 8. The Applicant submits that the house had no pre -existing problems or damage to the internal property structure, prior to the extreme rain event in 2011. The Applicant notes the following in re lation to the claim:  The property is surrounded by sandstone.  There is no cracking to the floor and the tiles are still in situ with no sign of cracking to the floor tile grouting. The Applicant queries if there was soil movement under the slab whether the slab and flooring would have signs of cracking.  The only cracks appear to be to the internal ceiling and wall joins and some cracking to the external walls.  The volume of rain that fell during October 2010 and January 2011 was significantly higher than any other rain event in the history of the property. The rain event created excess water flow through the property. The excess run-off is due to the house being built on the Eastern side of the Minden Range. The property is situated part of the way up the range and water flowed from the top of the range down through the property. 9. The Applicant seeks indemnity from the FSP for the claimed damage. Summary of FSP’s position 10. The FSP relies on the following policy terms and conditions: “Words with special meaning s ... Rainwater means rain falling naturally from the sky onto the buildings and/or ground. ... Run-off means rainwater that has collected on or has flowed across normally dry ground or has overflowed from swimming pools or spas. ... Storm means violent wind (including cyclones and tornadoes), thunderstorms and hail which may be accompanied by rain or snow. ... 9. Storm, rainwater or run-off (Applicable whether you have buildings and/or contents cover) We will pay for loss or damage caused by storm, rainwater or run-off. ... We will not pay for loss or damage: Case No: 303888 Determination Page 3 of 7 ... c. caused by: - soil movement including erosion, landslide, mudslide or subsidence; - shrinkage or expansion of earth or land, or - hydrostatic pressure;” 11. The FSP has enclosed its claim records from which I note the following:  Notation dated 12 April 2012 the notations record the following: “I have authorised the assessor to arrange an engineer to attend, report on the cause of damage and advise of the resultant damage had an (sic) runoff waters physically touched these areas, and has the damage occurred within 72 hours of the storm event?”  Notation dated 31 May 2012 the FSP records state: “I have emailed assessor requesting a breakdown, if possible on how much of the damage has been attributed to this storm event. If not determined claim will be denied as policy excludes damages due to storm events” 12. The FSP relies on an assessor’s report dated 13 April 2012, from which I note the following:  The assessor confirms that a large amount of rain fell in the Minden area and the Applicant’s property is at the top of the ranges. Accordingly, whilst it did not suffer from flood it did receive a large amount of run-off which caused damage to the foundations of the property. The resultant damage includes the brick section of the house dropping which in turn caused extensive damage to the inside of the house.  The assessor notes the retaining walls would not be covered under the policy as this is an exclusion for this under the storm event. 13. The FSP relies on an assessor’s report dated 21 May 2012, from which I note the following:  The assessor notes the structural engineer states the footings of the structure will be subject to high ground movement due to the moisture changes in the expansive clay soils. The storm has resulted in lifting of the outside walls and this was possibly caused by swelling in the founding material under the existing external footings.  As the swelling of the foundation material occurs, this lifts the external footing. The swelling and lifting of the external walls causes the trusses to lift off the internal walls. This appears to have happened over the majority of the internal walls. When the soils dry over time, some settlement in the footings may occur but this is generally limited.  The engineer notes that due to the significant period of time which had passed since the storm event in January 2011, this made it difficult to determine the cracking was due to the storm. However, the storm event may have contributed to the cracking that is e vident. Case No: 303888 Determination Page 4 of 7  The assessor concludes that the drying out of the soil and the resulting cracking to the insured property resulted after the 72 hour period that is mentioned as an exclusion in the insured’s policy. Accordingly, the assessor recommended the declinature of the claim. 14. The FSP relies on the expert engineer’s report dated 18 May 2012, from which I note the following:  The block of land is up on a hill overlooking the Minden Range. The slab on the ground is supported by a cut/fill profile platform. The engineer expects the footings for the house to be less stiff than those specified under current Australian standards. As such the footings would be subject to higher ground movements due to changes in moisture levels in the expansive clay soils.  These storm events resulted in the lifting of the outside walls. A possible cause of this is the swelling of the founding material under the external footings. This type of action can occur with expansive clay foundations.  As the swelling of the foundation material occurs, this lifts the external footings. The swelling and lifting of the external walls causes the trusses to lift off the internal walls. This is what appears to have happened over the majority of the internal walls. When the soils dry out over time some settlement in the footing may occur but this is generally limited.  A significant time period has passed since the storm event of January 2011. This time difference makes it difficult to confirm that the cracking that is evident is due to this storm. However, the engineer notes the volume of water that fell on the Minden region during this storm event, would have contributed to the cracking that is evident. 15. The FSP has enclosed an email dated 14 June 2012 between the engineer and the assessor from which I note the following:  The engineer confirms the damage to the residence is due to movement in the founding soils. The movement is “likely to have been influenced by the storm of January 2011”.  The water did not directly cause the cracking that is evident. It is the movement of the founding soils that has caused the cracking and the storm water contributed to this founding soils movement. 16. The FSP has enclosed an email dated 16 July 2012 from the assessor confirming the engineer concluded the soil type was expansive clay based on geological maps of the area, years working in the area and inspection of the insured’s residence. 17. The FSP has enclosed an email dated 19 July 2012 from the engineer to the assessor from which I note the following: Case No: 303888 Determination Page 5 of 7  The movement of the founding soils is not independent of the soil type. Expansive clay soils exhibit significantly more movement than sandy soils when exposed to changes in moisture content.  If there is a dispute on the site classification then the engineer recommends a soil testing company be engaged to test samples.  The engineer is still of the opinion that the primary cause of the damage to the residence is the movement in the founding soils. 18. The FSP notes that the Applicant must establish that a loss falls within the provisions of the contract. Once the Applicant has established this the FSP must establish the claim falls outside the cover offered. 19. The Applicant did not notice cracking to the property until December 2011, 11 months after the event. 20. The FSP relies on its expert reports which indicate the damage was caused by earth movement as a result of water saturating the earth and foundations. 21. It is the FSP’s position that once rainwater enters the earth it becomes part of the soil and can no longer be considered rainwater. The FSP submits the water mingled with the earth should be considered groundwater. There is no cover under the PDS for damage arising from groundwater. 22. In the alternative, the FSP contends the damage arises from the expansion of earth under the defined event, which is a specifically excluded event. Issues 23. Whether the FSP was entitled to decline the Applicant’s claim for damage. Reasons for decision 24. There has been an exchange of material between each party, and I am satisfied each party has had an opportunity to reply to the issues raised. 25. I have read each party’s submissions and materials and will only refer to the relevant submissions and materials raised. 26. As advised to the parties, FOS has considered it appropriate to expedite the dispute in accordance with clause 8.6 of the FOS Terms of Reference. This is due to the circumstances and quantum of the dispute. This dispute has not been the subject of a FOS Recommendation and has proceeded directly to Determination. 27. First, there is no dispute between the parties that a significant storm event occurred in Minden and that the property was subject to a high level of rainfall. Case No: 303888 Determination Page 6 of 7 28. Second, I note the personal circumstances of the Applicant shortly after the January 2011 storm event are such that I am not inclined to draw an adverse inference from the belated claim. Further, it is unclear when the cracking commenced. The Applicant’s son noticed cracking 11 months after the event but it is unclear whether he had been regularly in the home during the period the Applicant was in hospital etc. Further, given the expert reports it is highly unlikely that the mechanism of loss occurred 11 months after the event. Given this, I do not accept the time of lodgement as indicative of when the damage occurred. 29. Third, ther e is no dispute that the Applicant’s property had no da mage prior to the storm event. 30. There is significant evidence before me that the cause of loss is attributed to heavy rainfall which in turn led to the reactive clay soil producing an upheave effect. This in turn put pressure on the external footings, lifting the walls which caused the trusses to lift the internal walls resulting in the damage. The engineer noted that whilst some soils dry out over time the settlement of the footing may occur - but this is generally limited. 31. The engineer further concluded the volume of water that fell on the Minden region during this storm event, would have contributed to the cracking that was evident at the home. There is no evidence contained in the report that other factors such as defective footings or tree roots are the cause of the damage to the Applicant’s home. In my view, this establishes a prime facie claim for the Applicant who has claimed for building damage resulting from the January 2011 storm event. 32. The engineer clearly expressed in an email to the assessor that the movement of the founding soil is not independent of the soil type. The expansive clay soils will move significantly more when exposed to changes in the moisture content. 33. It is somewhat puzzling that after the receipt of the engineer ’ s report the FSP has attempted (by email dated 31 May 2012) to obtain a breakdown of how much damage was attributed to the storm. Further, the FSP considered if a breakdown could not be provided it would wholly deny the claim. 34. The FSP has argued that the Service should consider the water mingled with the ground as “ground water”. A review of the policy definitions of rainwater and run-off both include rain that has fallen onto the ground or flowing across normally dry ground. At some point this water would necessarily interact and mingle with the earth as it flowed across it. Furthermore, there is no exclusion contained within the PDS to suggest that rainwater that mixes with the earth will no longer be considered rainwater or run-off. Accordingly, there is no basis for me to read down the policy cover for storm as suggested by the FSP. 35. I have considered the exclusion relied on by the FSP which states the FSP will not pay for loss or damage caused by....shrinkage or expansion of earth or land . Case No: 303888 Determination Page 7 of 7 36. As stated by the engineer, the damage has occurred due to the storm event impacting the moisture level of the soil which has then created an upheave under the external footings. The soil has not undergone seasonal expansion or shrinkage, this particular damage has been attributed to the 2011 storm event. The soil expansion would therefore be the resulting effect of the heavy rainfall. Insofar as the uplift of the external footings has caused damage, the insured event of storm would be seen to be the proximate cause, that is, the effective cause of the footings uplifting and therefore causing the movement and damage to the property. Accordingly, there would appear to be no reason the policy should not respond. 37. In the circumstances, I am satisfied that the FSP is liable to meet the cost of the damage sustained as a result of the movement of the footings as identified by the engineer and assessor. I am satisfied that liability does not extend to replacement of any retaining wall which is a structure to which cover does not extend under the policy. 38. The parties are asked to work cooperatively together to determine the cost of repair. 39. If the parties are unable to agree as to the amount, then the matter can be returned to FOS and I will determine the amount for the parties, subject to further submissions. Determination 40. I determine the FSP is to meet its liability in accordance with the terms of the policy to cover the cost sustained as a result of the uplifting of the footings, caused by the insured event of “storm”. 41. The FSP is not liable to pay damage to any retaining wall. 42. If the parties are unable to agree as to the amount of the damage, then the parties are invited to make further submissions and the matter will be determined accordingly. 43. Insofar as the FSP determines to cash settle the Applicant’s claim, the FSP is to pay interest in accordance with Section 57 of the Act, on the settlement amount, from 27 July 2012, being the date of the decision to deny the claim, to the date of payment of the claim.