Home / Financial Firm (Unknown - Insurer) / Determination 303706

Determination 303706

Water inundation claim declined under flood exclusion

FirmFinancial Firm (Unknown - Insurer)
Decided2013-04-10
ProductGeneral Insurance · Home building and contents
OutcomeFor the firm
Amount awarded—
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

The Applicants' home was inundated on 11-12 January 2011 and the FSP declined the claim under the flood exclusion, with the Applicants arguing the water was stormwater runoff. The Panel found the inundation was flood, so the FSP was entitled to deny the claim.

Floodwater that combines with stormwater runoff remains flood, and the policy excludes flood, so the exclusion applies despite the Applicants' rainfall evidence.

Issues

Subjects and remedies

home or building damagenatural disasterno remedy

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Case No: 303706 Determination Page 1 of 10 Case number: 303706 General Insurance - Domestic Insurance - Home Building - FSP Decision - Denial of claim-Exclusion / condition 08 April 2013 Background 1. The Applicants hold a Home Building and Home Contents policy with the Financial Services Provider (FSP). The policy covers the building for „complete replacement‟ and contents up to $104,650. The policy is not subject to an excess. 2. During 11- 12 January 2011 the Applicants‟ property was inundated by water. 3. The FSP declined the claim on the basis it arose from flood which is an excluded cause of damage under the policy. 4. The Applicants dispute the declinature on the basis that stormwater inundation occurred prior to flood. 5. The Applicants have legal representation; accordingly reference to Applicants throughout this Determination will include both those parties. Summary of Applicants ’ position 6. The home was inundated late at night on 11 January 2011 and the early morning of 12 January 2011. The Applicants have provided the following information regarding same:  There is a waterway at the base of the property‟s eastern edge which is generally around 25cms across.  The inundation commenced at the northern end of the property.  The female Applicant evacuated the property whilst the male Applicant remained.  As the male Applicant watched television in the evening it was raining heavily.  At around 9.00-9.30pm the male Applicant opened the veranda door and water rushed into the house.  The male Applicant collected some items from the house and climbed over a fence to his neighbours. By the time this had been completed Determination Case No: 303706 Determination Page 2 of 10 the water had started to enter the dining room door. The male Applicant left the property around 12.30am and water was approximately 1 metre high at this time. The water was rising rapidly and came from the north.  At approximately 1.00am the rain eased for a short time but water continued to rise within the home.  By dawn, the water had reached the eave gutters of the property. 7. The hydrology report states a total of 123mm of rainfall was recorded in the vicinity of the property in the period between 12.00am on 9 January 2011 and 6.00pm 11 January 2011. Further, no significant rainfall occurred after 4.00pm. The rainfall records utilised do not reflect the male Applicant‟s experience of that time as he could not hear the television on 11 January 2011 due to heavy rain on the tin roof. The Applicants note that approximately 23.5% more rain fell in Karalee than recorded at the Bundamba rainfall gauge. 8. The ICA hydrology report i ndicates that rainfall of approximately 68.2mm fell between 11 January 2011 and 9.00am 12 January 2011. This is a significant amount of water over a 78.6ha catchment area to go into the stormwater drainage and from there to the river. 9. The Applicants further question given the overland catchment area of 78.6ha upstream how the findings of the hydrologist were based on a 0.9ha catchment area from the neighbouring property. 10. The stormwater drain that runs along the property is on the Ipswich government site „PD Online Mapping‟ and this demonstrates that the property has a stormwater flow path and not a stormwater channel. 11. The Applicants submit that all water damage below 1m should be covered in the claim. Summary of FSP’s position 12. The FSP relies on the followi ng policy terms and conditions which are contained within the Home Building and Home Contents policies: “ You are not covered under any section of the policy for damage, loss, cost or liability caused by or arising from or involving: ... Flood, ... Flood means the inundation or covering of normally dry land by water which: escapes or overflows from, or cannot enter (because it is full or has overflowed), or is prevented from entering (because other water has already escaped or been released from it), Case No: 303706 Determination Page 3 of 10 the normal confines of any watercourse or lake, including any that may have been modified by human intervention, or reservoir, canal, dam or stormwater channel. Flood does not mean stormwater runoff from areas surrounding the site or water escaping from any water main, pipe, street gutter, guttering or surface. ” 13. The FSP has enclosed the claim lodgement record which notes the date of loss was recorded as 12 January and the time as “12.00”. It appears the year for the date of loss was inaccurately recorded as „2010‟. The claim is recorded as: “Storm Damage... House totally destroyed by storm water run off House unliveable” 14. The FSP has enclosed an assessor‟s report dated 17 February 2011 from which the Panel notes the following:  The premise is a single storey home with a pitched timber frame and a metal sheeting roof of approximately 120m². The assessor described the property as low set on a slab with a floor level of approximately 30mm above ground level.  The ground level of the property is higher than the street level.  The rain was heaviest on 11 January 2011 and stopped on 13 January 2011.  The property is listed as having been evacuated at 6.00pm.  The inundation of the property commenced on the evening of 11 January 2011.  The water reached ceiling level and the entire shed was covered by water.  The water came from the road and was described as „dirty‟. 15. A second assessment form was completed on 4 May 2011 from which the Panel notes the following:  The Applicant‟s son -in- law “D” stated the water initially came from the water course along the eastern boundary of the property. D advised that water initially came from the north.  The inundation occurred at 1.00am on Wednesday 12 January 2011. The property was evacuated at this time.  D notes the initial inundation peaked at approximately 1-1.2m through the house prior to reaching a peak of 3m at 3.00am.  The assessor confirmed there is a watercourse along the eastern boundary of the property and a stormwater pipe passes under “Gascoyne Drive” prior to continuing north. The assessor could not determine the source of the watercourse. Case No: 303706 Determination Page 4 of 10  The floodwater from the Brisbane River to the north of the property did not meet with floodwater from the Bremer River located south of the property.  Overland floodwater from the Bremer River to the south ultimately flooded the property. However, if D and neighbour accounts of the events are correct it would appear that clean water from the north caused initial inundation. This water would still appear to be an excluded event as overflow has occurred from what appears to be a stormwater channel.  The assessor questioned a neighbour in Gascoyne Drive who was at his home at the time of the flooding and obtained the following information: i. The stormwater runoff came from the north before mixing with floodwater to the south. ii. Flood water was approximately 6m above ground level at his place. iii. Water came from the north from a stormwater channel. iv. The water was clean. v. Whenever it rained heavily water flowed from the north. 16. The FSP relies on hydrology report from “W” dated 22 June 2011. The following information was obtained from this report:  The subject property was inundated above floor level by floodwater overflowing from the Bremer River.  Due to low rainfall intensities recorded in the vicinity of the property, stormwater runoff from the local catchment or the overland flow path would not have inundated the subject property above floor level prior to the arrival of floodwater from the Bremer River. 17. A second hydrology report dated 11 December 2012 was obtained from W. The Panel notes the following from this report:  A drainage path flows through the eastern portion of the property. A catchment area of approximately 78ha drains to the drainage path at Gascoyne Drive. The drainage path appears to have a defined low flow channel and is considered a watercourse by W.  A small stormwater catchment area of less than 1 hectare drains onto the subject property from the adjoining property to the west as overland flow.  The drainage path through the subject property flows to the south and joins with other tributaries draining catchments to the west before discharging into the Bremer River. The total area of the tributary catchment draining to the Bremer River at this location is about 290 hectares. Case No: 303706 Determination Page 5 of 10  Daily rainfall for the period of interest is available at the Karalee rainfall station, located about 800 metres northwest of the property. Since no short-duration rainfall data is available for the Karalee rainfall station, an estimate of peak rainfall intensities at Karalee was made by factoring up the recorded intensities at the Bundamba gauge by the ratio of daily rainfalls at the two stations. The estimated average recurrence interval (ARI) of the increased rainfall intensities was still below 2 years ARI for all durations up to 24 hours. Hence, the estimated rainfall intensities at Karalee were not particularly severe. Similar or greater rainfall intensities would be expected to occur on average every two years.  Based on information from Ipswich City Council, observed peak wa ter level marks and topographic data, the peak water level of the Bremer River in the vicinity of the subject property was approximately 18.5mAHD. The peak water level is estimated to have occurred at approximately 4.00pm Wednesday 12 January 2011.  A Flood Information report for the property prepared by Ipswich City Council indicates that the eave level of the subject property is approximately 17.2mAHD. Assuming a height of 2.5m from the property floor level to the eave level, the property floor leve l would be approximately 14.7mAHD. Based on the interpolated river level hydrograph, the Bremer River water level would have reached the floor level of the subject property at approximately 10.30pm on 11 January 2011.  The peak of stormwater runoff would have occurred within a short time (less than 30 minutes) after the peak rainfall intensity because the stormwater runoff has only a short distance to travel (of the order of a few hundred metres) to reach the subject property. The peak rainfall intensity was recorded prior to 2.00pm on 11 January. Hence, the peak of stormwater runoff would have occurred prior to 3.00pm on 11 January 2011. The version of events from the insured indicates that initial inundation did not occur until about 9.00pm, some 7 hours a fter the peak rainfall intensity and about 5 hours after rainfall in the area had effectively ceased. It is extremely unlikely that significant rainfall occurred at the property after about 7.00pm on 11 January 2011.  Backwater flooding from the Bremer River would have reached the floor level of the subject property at about 10.30pm on 11 January. This is within 1 hour of the reported time of initial inundation and, allowing for the uncertainty in the property floor level, this timing is generally consistent with the insured‟s version of events. There is no other source of water that could have resulted in major inundation of the property above floor level at about this time.  The initial and maximum above floor level inundation of the subject property was caused by floodwaters from the Bremer River and/or the Brisbane River which flowed back up the drainage path located adjacent to the subject property. Case No: 303706 Determination Page 6 of 10  The insured has indicated that water flowed on to the property from north to south. During the afternoon of 11 January 2011, while heavy local rainfall was occurring, it is likely that the predominant direction of flow in the drainage path was from north to south. However, as floodwaters in the Bremer River rose to inundate the lower levels of the yard, which would have occurred on the evening of 11 January 2011, flow patterns would have become more complex. By the time the water level reached the floor level of the house, the width of flow in the drainage path would have been approximately 90 metres. It is unlikely that flow velocity was uniform in speed and direction across this wide area, resulting in areas of recirculation. In the darkness, it would have been extremely difficult for the insured to obtain a detailed understanding of flow velocity across the entire watercourse.  Based on an assessment of the available data, it is concluded that the initial and maximum above floor level inundation of the subject property was from floodwaters from the Bremer River and/or Brisbane River which flowed back up the drainage path located adjacent to the subject property. 18. The FSP has enclosed a property and flood level information regarding the property. The property levels range from 10.4mAHD to 16mAHD. The eave level is 17.2mAHD and the flood level for the 2011 event was 18.5mAHD. 19. The FSP relies on the expert hydrology evidence to establish that the property was inundated by floodwaters from the Bremer River and accordingly its decision to maintain the denial is justified. Further, the Applicants‟ version of events as prov ided to the assessor and their representatives do not detail any damage that would be consistent with storm damage and consequent runoff. The rainfall intensity was insufficient to inundate the property above floor level at the time of inundation. Further, the source of damage was the Bremer River some 630m to the south of the insured property. 20. The FSP has further argued that the water feature approximate to the Applicants‟ home has been described as a water course, a creek running on the eastern side and a drainage easement – overland flow path. The FSP submits that the water feature variously referred to may properly be characterised as a stormwater channel or a watercourse. 21. The FSP submits that a watercourse need not be named a watercourse or river or creek, but may still be a natural channel or a channel formed for the conveyance of water. The normal definition of a channel is a hollow or open bed for a natural or artificial waterway. The FSP contends the water feature is in fact a watercourse or stormwater channel within the normal definitions of the terms. 22. The FSP submits that water overflowing or escaping from the feature, whether it be characterised as an overland flow path, watercourse, or stormwater channel is properly excluded under the terms and conditions of the policy. Case No: 303706 Determination Page 7 of 10 23. The drainage channel is immediately adjacent to the home building and is determined to be a watercourse which drains to the Bremer River. 24. As the water that inundated the building above floor level was flood water from the Bremer River which backflowed up the watercourse or drainage easement on the insured property the cause of loss falls under the flood exclusion. 25. The FSP submits that it is entitled to rely on the flood exclusion contained in the policy documents to deny the claim. Issue 26. Whether the FSP was entitled to decline the Applicants‟ claim for water inundation. Reasons for decision 27. There has been an exchange of material between each party and the Panel is satisfied each party has had an opportunity to reply to the issues raised. 28. Due to the nature of the dispute, it has been referred to the Panel for Determination in accordance with the Operational Guidelines to the Financial Ombudsm an Service‟s Terms of Reference. 29. The Panel has read each party‟s submissions and materials and will only refer to the relevant submissions and materials raised. 30. This decision has been made by a Panel consisting of an Ombudsman, a representative with extensive experience in insurance industry matters and a representative with extensive experience in consumer claims. 31. There is no dispute that the policy excludes cover for flood. The policy definition is clear. The policy however, provides that flood does not include stormwater runoff from areas surrounding the site or water escaping from a water main, pipe, street gutter, guttering or surface. 32. In the circumstances, the main issue before the Panel is whether the Applicants‟ property was inundated by stormwater runoff or from areas surrounding the site or water escaping from the water main, pipe, street gutter, guttering or surface. 33. The Panel notes the following information:  The assessor confirmed there was a watercourse along the eastern boundary.  There is also a stormwater pipe that passes under Gascoyne Drive. Case No: 303706 Determination Page 8 of 10  The neighbour and D have indicated the water overflowed a stormwater channel.  The Applicants describe it alternatively as a creek, a waterway and a stormwater drain that runs along the property. The Applicants relied on the Ipswich government site „PD Online Mapping‟ (not enclosed) to demonstrates that the property has a stormwater flow path and not a stormwater channel.  W states the drainage path flows through the eastern portion of the property and defines it as a low flow channel that is a watercourse.  The FSP has noted the descriptions include watercourse, creek, drainage easement and overland flow path. The FSP however contends that it is properly defined as a watercourse or stormwater channel. 34. In order to assist the Panel determining this dispute, the Panel Chair Ombudsman conducted a site inspection of the property on 2 April 2013. Present at the site inspection were the Applicants, their son-in-law and representatives from the FSP. 35. The area described in the various hydrology reports as a drainage easement or open drainage channel is a low lying area that runs beside the creek that runs through the Applicants‟ property. The creek is a natural creek, although it has at some stage been dredged. It feeds into a series of drains before eventually draining down through to the Bremer River. The easement or open drainage channel beside it, is clearly either a man made or natural stormwater channel designed to alleviate overflow, where with excessive runoff, it would otherwise flow through the area. 36. Although the female Applicant had left the property by 5.00pm, the male Applicant remained until approximately 10.30 – 11.00pm on the evening of 11 January 2011. He describes the rainfall as being quite steady all throughout that time. It is clear from the information exchanged, that there is some uncertainty as to the rainfall intensity occurring over the area during the evening of 11 January 2011. 37. The Applicants described the rain from the previous day as causing the creek to run furiously and to start inundating the open drainage or easement levels. This continued to rise and the water continued to flow from the northern end of the property. In the Panel‟s view this is significant given the topographical area in which the property is situated. It is quite clear that water from the surrounding catchment areas would flow towards the Applicants‟ property. Water would flow from higher properties across the road, down to the Applicants‟ property towards the creek and ul timately towards the Bremer River. The Panel notes the Applicants‟ neighbour‟s property is elevated compared to the Applicants‟ property and it is likely during heavy rainfall that significant runoff would come from that area. The Panel also notes that whi lst the initial hydrologist‟s report has referred to low rainfall intensities which is subsequently clarified, he has not discussed the fact that the Applicants observed clear water in the area and observed a Case No: 303706 Determination Page 9 of 10 change in flow or direction of the river. The Panel notes the hydrologist initially stated that water from the drainage easement inundated the home at about 1.00pm before there was a change of direction; but he does not identify whether this was partly due to backflow from the Bremer River. 38. During the site inspection, the Panel Chair Ombudsman observed a garage on the property that was nearer the front of the property closer to the road. This was possibly lower than the house. According to the Applicants, this was previously the male Applicant‟s work sh op. The male Applicant had been a motor mechanic and had tools etc throughout this building. This building was ultimately inundated through to the roof. 39. The Applicants confirm they have no recollection of water bubbling up through the drainage system inside the house or through the toilet system. The area itself is an area that has septic tanks. These tanks have overflowed and they confirmed that the sewerage covered everything throughout the house after it was inundated, to just under the level of the eaves. 40. Following the site inspection and a review of the relevant hydrology, the Panel is satisfied that the area described in the hydrology reports as the drainage easement or open drainage channel is in fact an open stormwater channel. The easement is a grass covered flat area on the side of the creek that drains to the Brisbane River. Although it does not contain guttering, pipes or water mains, it is nevertheless an overflow drainage path that assists in conveying water travelling towards the Bremer River. 41. There is little doubt from the information provided that although water was initially running from the north through the Applicants‟ property towards the Bremer River, that water eventually backflowed from the Bremer River to the stormwater channel and that this ultimately rose to a level where the Applicants‟ property was inundated. Although the Panel does not dispute the Applicants comments regarding the rainfall on the evening of 11 January 2011, it is likely than any continual stormwater runoff would have met with the waters backflowing from the Bremer River and these waters ultimately led to the inundation of the Applicants‟ property. This would explain the observations of the male Applicant of the water rising from the open stormwater channel. 42. It is a well established legal principal that where flood waters ie water escaping from the confines of a river, creek etc. combine with stormwater runoff that the combined waters are still floodwaters. 43. Bearing this in mind, whilst the Panel does not question the Applicants‟ statements with respect to the rainfall on the evening of 11 January 2011, the Panel is satisfied based on the information available that the Applicants‟ property was inundated by water rising from the open drainage area, such water being a combination of backflow from the Brisbane River and stormwater runoff. The Panel is satisfied that this water initially inundated the Applicants‟ property most likely around 10.30 -11.00pm which in consistent with the hydrology information and the statements of the Applicants themselves and ultimately led to the complete inundation of the home. Case No: 303706 Determination Page 10 of 10 44. Although the Panel understands the Applicants‟ beliefs in this matter, the Panel is of the view that the policy does not extend to cover the loss and that the FSP is entitled to rely upon the flood exclusion contained within the terms of the policy to deny the claim. Determination 45. On the basis of the available information the Panel determines the FSP was entitled to decline the Applicants‟ claim for water inundation.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.