Text of the determination
Case No: 303687 Determination Page 1 of 9
Case number: 303687
General Insurance - Small Business/Farm Insurance - Commercial Property -
FSP Decision - Denial of claim-Exclusion/ condition
14 June 2013
Background
1. The Applicant is a director of a business which holds a Business Insurance
Policy with the Financial Services Provider (FSP). The policy provided
defined events cover for the insured building up to $20,700, contents up to
$56,925 and stock up to $46,575 subject to a policy excess of $250.
2. On or about 11 January 2011, the Applicant‟s business premise in
Seventeen Mile Rocks, Queensland, suffered water inundation which
resulted in loss.
3. The FSP declined the claim on the basis the loss arose from flood, which is
an excluded cause of damage under the policy.
4. The Applicant disputes the declinature on the basis that the inundation first
arose from storm water runoff, which is a covered event under the policy.
Summary of Applicant’s position
5. The Applicant is represented by an insurance broker; for the sake of
simplicity both the Applicant and the broker will be referred to jointly as „the
Applicant‟
6. The Applicant provides the following account of events leading up to the
inundation based on its employee‟s experience:
The factory is not situated immediately adjacent to the river and there is
a depression between the river bank and the factory where the water
collects. It is estimated that runoff water would have been between
0.5m to 1.2m before the river water made an impact and reached 3m,
as at 5am on Wednesday 12 January 2011 the water was
approximately 1.8m over the factory and the river water had not quite
joined the inland water. (sic)
They left the premise at around 3-3.30pm on Tuesday 11 January 2012
(sic). The storm water was pooling in the adjacent “C Road”. The
insured left the premise to avoid being stranded by the rising
stormwater runoff in C Road.
Determination
Case No: 303687 Determination Page 2 of 9
At the time of departing the premise, it was obvious the stormwater was
not getting away.
Runoff stormwater entering from C Road into “B Street” was observed
in the early evening of Tuesday 11 January 2011. At that time no flood
water from the Brisbane River was entering B Street.
It is noteworthy that C Road has been subject to stormwater flooding i n
2010 following heavy rainfall and it is understood that around
December 2010, vehicles had been submerged by stormwater flooding.
Further, even during normal rainfall the back of the factory floor always
has water come in to about a quarter of the factory but dries within 2
days.
At 5am on Wednesday 12/1/12 (sic) an employee of the Applicant
returned to the property via canoe. At this time the water was 1.8m
above floor level of the property (height of door frame). The employee
estimated the water level in the river was about 1m below the water
level at the property at the time.
The cause of the initial inundation remains in dispute and the insured
remains adamant that damage to the internal fit-out, contents and stock
was the result of initial inundation of the insured premise by storm
water runoff, which occurred prior to flood water from Brisbane River
entering B Street.
7. The Applicant states that rain and stormwater initially inundated the property
and damage was caused prior to floodwater entering the property. The
stormwater entered from C Road and the new housing estate site in B
Street.
8. The Applicant notes that there is authority to suggest that in the case of two
or more independent proximate causes, that at least a portion of the damage
should be covered. The Applicant relies on Elilade Pty Ltd v Nonpareil Pty
Ltd [2002] in this regard.
9. The Applicant has noted the submission by the FSP and responds as
follows:
a. The ICA report relied on by the FSP specifically states that local factors
are required to be taken into consideration in hydrologic modelling of a
storm event and local stormwater drainage issues.
b. The FSP did not initially engage its own hydrologist to investigate,
which the Applicant considers a breach of clause 3.4(1) and (2) of the
General Insurance Code of Practice. It is further a breach of the duty of
utmost good faith under section 13 of the Insurance Contracts Act
(1984) (the Act).
c. The individual hydrology report was undertaken 16 months after the
fact.
d. The Applicant refutes the finding that the premise could not have been
inundated above floor level by stormwater runoff. The stormwater runoff
entering the premises to a height of around 0.9m would have caused
significant damage to the internal fit out, contents and stock.
Case No: 303687 Determination Page 3 of 9
e. The Applicant argues that it is possible that the initial inundation of the
area was caused by stormwater runoff unable to drain away. She also
notes that the hydrology report does not address the stormwater runoff
from the new Housing Estate site in B Street. .
f. The hydrology report ignores vital factual and topographical information
suggesting runoff from C Street, the back of the factory and from the
new estate being the primary cause of damage.
Summary of FSP’s position
10. The FSP relies on the following policy terms and conditions:
“What we cover
Loss or damage to your property at your premises caused by one or more of
the following insured events:
7. Wind or water (including snow, sleet, hail and tsunami).
What we exclude
We will not pay:
Loss or damage:
...
i. Caused by flood, the sea, tidal wave, high water, unless the
damage is caused by or arises directly from a seismic
disturbance...
...
12. Accidental Damage.
…
What we exclude
…
Loss or damage which is insurable under any other section of the
policy whether effected or not, or loss or damage which is excluded
under any other section of the policy
…
Definitions
Word
…
Flood
Meaning:
The inundation of normally dry land by water escaping or released
from the normal confines of any natural water course or lake, whether
or not altered or modified, or of any reservoir, canal or dam.”
Case No: 303687 Determination Page 4 of 9
11. The FSP has submitted an assessor‟s report from “C” dated 9 February
2011, entitled “First report – flood damage claim” from which the Panel notes
the following:
The Brisbane River is located a few blocks east of the risk premise.
The river breached its banks and inundated surrounding low lying areas
of Seventeen Mile Rocks/Jindalee during the early hours of 12 January
2011.
The assessor was advised that by 5am (12 January 2011) flood waters
had reached a depth of approximately 2 metres at the risk site causing
extensive property damage.
The floor level of the risk premises is similar to street level.
12. The FSP has enclosed a report from its hydrologist “W” from which the Panel
notes the following:
The subject property is located on relatively flat land about 350m from
the Brisbane River. Stormwater runoff from B Street is collected in a
pipe stormwater drainage system that discharges to the Brisbane River.
W obtained the following information from “M”, an employee of the
Applicant:
a. M left the property at about 3:30pm on Tuesday 11 January 2011.
There was no water on or around the property at that time.
b. M attempted to return to the property at about 5am on
Wednesday 12 January, but C Street was inundated and he was
not able to reach the property.
c. M paddled to the property in a canoe. The water was about 1.8 m
above floor level at the property at that time.
d. M estimated that the water level in the river was about 1 m lower
than the water level at the subject property.
e. The peak water level was about 3m above the lower floor level.
f. M returned to the property on Friday 13 January.
g. The drainage in C Street is quite poor. In the years that he has
been working at the property, he has seen water back up in B
Street, but it has never come into the factory before.
h. Based on information from Brisbane City Council, the peak water
level in the vicinity of the subject property was about 11.6m AHD.
Based on the observed peak depth of inundation above floor level
(approximately 3m), the floor level of the subject property is
approximately 8.6m AHD. W calculates the Brisbane River water
levels would have reached the floor level of the subject property at
approximately 0100 hours on Wednesday 12 January 2011.
i. The peak rainfall intensities recorded on 11 January 2011 were
not exceptional. Based on the relatively low intensity of rainfall
and the timing of inundation, the subject property could not have
been inundated above floor level by stormwater runoff. Similar
Case No: 303687 Determination Page 5 of 9
rainfall intensities would have occurred numerous times in the
past, without any inundation of the subject property above floor
level. In addition, the peak rainfall intensity occurred about 4
hours before the property was vacated and no inundation was
observed prior to evacuation of the property.
j. Brisbane River flood levels would have reached the floor level of
the subject property at about 0100 hours on 12 January, about 5
hours after rainfall in the area had ceased. It is possible that the
initial inundation of the area surrounding the subject property was
caused by backflow of floodwater from the Brisbane River through
the stormwater pipe drainage system, just prior to inundation by
direct overland flow of floodwater.
13. The FSP submits its policy wording is clear and unambiguous.
14. The FSP contends that whether the Applicant‟s property was inundated by
overland flow or surcharging drains or both that the policy would not
respond. This is because the water escaping from the drain is sourced from
the nearby flooding watercourse as this is water which has „escaped‟ from
the watercourse.
15. Further, if the rainwater runoff inundation occurred at the same time as flood
then pursuant to the Wayne Tank principle both sources of inundation would
be excluded.
16. The FSP submits that all the information sources available indicated that the
insured property was inundated by floodwaters from the overflow and
backwater flooding of the Brisbane River and that its decision to deny the
Applicant‟s claim was justified. The rainfall data d oes not support the
Applicant‟s property as being inundated above ground level by stormwater
runoff.
Issue
17. Whether the FSP was entitled to decline the Applicant‟s claim for water
inundation.
Reasons for decision
18. As advised to the parties, this dispute has been referred directly to a Panel
for determination. The decision has been made by a Panel consisting of an
Ombudsman, a representative with extensive experience in insurance
industry matters and a representative with extensive experience in consumer
claims.
19. There has been an exchange of material between each party and the Panel
is satisfied each party has had an opportunity to reply to the issues raised.
Case No: 303687 Determination Page 6 of 9
20. The Panel has read each party‟s submissions and materials and will only
refer to the relevant submissions and materials raised.
21. On 4 June 2013, the Panel Chair Ombudsman attended on site, where he
met with the Applicant and representatives of the FSP.
22. It is not in dispute the policy provides cover for loss or damage caused by
water, including rainwater. Further, it is not in dispute that the policy
excludes loss or damage caused by flood.
23. What is in dispute is whether the water that first inundated the premise and
caused damage to the insured property was rainwater or floodwater.
24. Having considered the construction of this policy, the Panel notes that the
onus is on the Applicant to show on the balance of probabilities the damage
was caused under „event 7‟ by „w ater ’, in this case rainwater (which was not
also by floodwater). The Panel notes that although Accidental Damage is
available under the policy, this event is not enlivened where the
circumstances of the loss are covered or excluded by another section of the
policy, in this case „wind or water‟ .
25. The Panel notes the Applicant has provided evidence that ordinary rainfall
would cause flooding around and sometimes within the business premise.
According to M, the water was between 1.5m and 1.8m above floor level at
the property at the time of his visit at between 5.00am and 6.00am on 12
January 2011. However, the water level in the river was about 1m lower than
the water level at the subject property. The peak water level was about 3m
above the lower floor level.
26. During the site visit, M confirmed that during the day, 11 January 2011,
water had seeped in through the rear of the factory and was pooling on the
concrete slab to a point about half way in the factory, from its rear.
27. This pooling of water in the factory‟s rear, was prior to a ny inundation from
the pooling of water from C Street or inundation from the river itself.
28. The Panel notes that the Applicant evacuated at approximately 3-3.30pm on
Tuesday 11 January 2011. Accordingly, it is unknown what time the further
inundation occurred or the precise source of the inundation. The Panel does
note that there was reported to be substantial water pooling in the
depression in C Street prior to overland flooding.
29. The Panel Chair Ombudsman observed that the area behind the factory
slopes up sharply towards SMR Road and away from the factory.
30. In this regard, the Panel notes the rainfall data that confirms the rainfall
amounts throughout 11 January 2011, consistent with the Applicant‟s
evidence of seepage through the rear of the factory.
31. The Panel accepts that the initial seepage of water from the rear to about
half way within the factory was as a result of rain water runoff from the
steepness of the slope behind the factory.
Case No: 303687 Determination Page 7 of 9
32. However, the Panel notes that this inundation, at the time when the
Applicant left (3.30pm 11 January 2011), consisted of only minor pooling to
the back half of the factory.
33. The Panel accepts the Applicant would have suffered some loss as a result
of this inundation, as the Panel Chair Ombudsman observed many stock and
parts items were stored at ground level.
34. The Panel is prepared to allow coverage for loss and damage to a level of
inundation of 100mm, for items kept at ground level and only for the rear half
of the factory.
35. The Panel has no information to assess the Applica nt‟s loss in this regard
and urges the parties to work cooperatively to assess the extent of the
Applicant‟s loss.
36. In the event the parties cannot agree upon the extent of the loss, the parties
may refer the matter back to the Service for further consideration.
37. The issue for the Panel is now the question of any further inundation of the
subject property.
38. The Applicant contends that it is possible that further inundation was caused
by storm water, unable to drain away.
39. In contrast, the only expert evidence, from W, concludes that the rainfall
levels were not significant and that it was water surcharging from the
stormwater drains and overland riverine water that caused the initial and
peak inundation of approximately 3 metres above floor level.
40. The Panel notes the rainfall data does not suggest that the stormwater
inundation was of itself responsible for the whole of the inundation and nor is
the Applicant suggesting it did. The Applicant states that water has
previously pooled in the area and that the drainage in the street is poor.
41. It is not clear whether the area of pooling was where the drains are located.
W notes that it is possible that water would have surcharged from the drain
shortly prior to the overland flow and as such this scenario cannot be
disregarded. The Panel cannot rule out that the witness was viewing pooling
caused by surcharging stormwater drains, as the Panel accepts that there
were some drainage issues in the area.
42. However, the Panel is perplexed that the witness stated the level of
inundation (runoff) at the property was still 1 metre above the level of the
river at 5.00am, on 12 January 2011. Such a conclusion is not supported by
the data available, which estimates that the floor level of the property would
have been at the same level as the river, by about 1.00am on 12 January.
43. Having considered the evidence provided by each party and in the absence
of any direct eyewitness evidence at the time of the initial inundation, the
Panel must rely on the other evidence available, namely the assembled
hydrological data.
Case No: 303687 Determination Page 8 of 9
44. Noting that the Panel Chair Ombudsman attended on site and observed the
topography of the local area, the Panel is satisfied that at 5.00am the
inundation of the property was to a level of approximately 1.5 metres above
floor l evel. Given the Panel Chair Ombudsman‟s observations of the local
topography, the Panel is of the view that the river level is likely to have been
at the same level as the inundation at the property.
45. Further, i n the Panel‟s view, on the balance of probabilities the initial water
inundation from the factory‟s front, was likely caused by a mixture of pooling
rainwater, surcharging stormwater drains and overland inundation.
46. The policy does indicate water which has escaped from a watercourse or
canal is deemed flood. Kirby J in the case of Provincial Insurance Australia v
Consolidated Wood Products (1991) 25 NSWLR 541 considered the
meaning of canal and storm water channel and preferred the Macquarie
Dictionary definition for canal and stormwater channel which were:
“Canal
An artificial waterway for navigation draining, irrigation, etc
A channel or watercourse
Stormwater Channel
An artificial passage from stormwater and floodwater; floodway.
Also, stormwater canal, s tormwater drain.”
47. Accordingly, the policy definition and common law definition of flood,
includes water which has surcharged from a stormwater drain.
48. Second, the courts have determined that water which is unable to drain into
a river because it was in flood is deemed to be flood water. The authority for
this ruling is K Sika Plastics v Cornhill Insurance (1982) 2NZLR 50CA . In that
case His Honour Justice Cooke in part stated:
“In ordinary and natural language, I think that a watercourse is said to overflow
its normal banks when all the water that would not otherwise drain into it cannot
be contained in it because it is full. All the surplus water is then overflow no
matter whether or not it has at one time been within the banks and then forced
out.”
49. Whilst the Panel agrees that the Elilade case can be utilised in the event of
consecutive inundations which arise from independent causes, there is
insufficient evidence to establish that this did occur. There is no other expert
opinion proffered to contradict W‟s analysis of the rainfall data, river data or
topographical/location analysis of the cause of inundation to the Applicant‟s
property. W has categorically stated that the rainfall data indicates
stormwater runoff was not sufficient to inundate the property above ground
level. To the extent this is correct then rather than consecutive causes
( Elilade’s Case), this would be characterised as concurrent causes ( Wayne
Tank’s Case).
50. The observations of the Applicant‟s employees were that water was pooling,
but there is no reliable contemporaneous evidence as to the origins or nature
of this pooling water.
Case No: 303687 Determination Page 9 of 9
51. It is established law (see Eastern Suburbs Leagues Club v Royal & Sun
Allianz Australia Limited) that the mixture of stormwater and flood water is
deemed flood water.
52. After careful analysis of the available material, the Panel concludes that the
damage claimed was caused by flood water as defined and is not covered
by the policy.
53. The Panel further notes the assertions by the Applicant regarding the FSP‟s
failure to properly and transparently review the claim in accordance with the
General Insurance Code of Practice. The Panel is also mindful of the specific
clause 4 of the General Insurance Code of Practice relating to catastrophes
and disasters that was applicable at the time of loss and claims handling. It
is noted that the Code recognises the inherent difficulties in dealing with a
high volume of claims which results from such an event. Clauses 4.3 and 4.4
state:
“4.3 Due to the large number of claims we may not be able to meet all
standards of this Code following a catastrophe or disaster.
4.4 We will establish our own internal processes for responding to
ca tastrophes and disasters”
54. The Panel notes that due to the number of claims and the limited number of
hydrologists, many insurers did opt to review claims solely on the basis of
the ICA hydrology report. The Panel understands that from an Applicant‟s
point of view this may be unsatisfactory. However, the Panel cannot find in
the circumstances that the Code has been breached.
Determination
55. The Panel determines that the FSP is to meet the Applicant‟s claim for loss
and damage arising from an inundation to a level of 100mm above the floor
level of the rear half of the Applicant‟s factory.
56. Should the FSP elect to cash settle this aspect of the claim, the FSP is to
pay interest on the cash settlement from the date of denial of the claim, to
the date of settlement of the claim and in accordance with the Insurance
Contracts Act 1984.
57. On the basis of the available information the Panel determines that the FSP
was entitled to decline the balance of the Applicant‟s claim for inundation.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.