Determination 303445

Denial of claim - earth movement and vibration exclusions

FirmFinancial Firm (Unknown - Insurer)
Decided2013-10-22
ProductGeneral Insurance · Strata
OutcomeFor the complainant
Amount awarded$172,844
Non-financial loss—
Amount claimed$172,844
SourceAFCA PDF

Summary

A strata lot owner who runs a business from the building claimed for damage from nearby construction vibration and soil movement, which the FSP declined under exclusions. AFCA found the exclusions did not apply to subsequent damage, ordered payment of $172,844, and required the FSP to stay on risk for up to six months.

Clause B139 excluded the earth movement and vibration exclusions from subsequent damage covered under Benefit 1, and the loss was found to have arisen within the period of cover.

Issues

Subjects and remedies

small businesspay claimreinstate policy or contract

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Case No: 303445 Determination Page 1 of 9 Case number: 303445 General Insurance - Small Business/Farm Insurance - Commercial Property - FSP Decision - Denial of Claim - Exclusion/Condition 21 October 2013 Background 1. The Applicant is the owner of a lot in a Strata Plan that is covered under a commercial strata insurance policy with the Financial Services Provider (FSP). The policy was incepted on 10 March 2008 and was renewed annually until being cancelled by the FSP effective 10 August 2011. 2. The Applicant owns and occupies the building on the strata lot and on 28 April 2010 lodged a claim with the FSP for damage sustained to the building which he believed had been caused by construction works at a nearby property. 3. The FSP appointed a structural engineer „M‟ to inspect the property and determine the cause and extent of the loss. M agreed the damage had arisen as a result of vibrations and soil movement caused by nearby construction works. 4. After considering the claim the FSP advised the Applicant his claim was declined as the cause of the loss was specifically excluded from cover under the policy. The FSP also considered that the loss had arisen, at least partly, prior to the policy inception. 5. The Applicant is seeking a r eview of the FSP‟s decision to decline his claim. Summary of Applicant’s position 6. The Applicant does not dispute M‟s findings, he is in agreement the damage has arisen as a result of the nearby building construction. However, he says this should be covered by the policy of insurance he purchased. 7. The Applicant says the FSP has wrongly interpreted its own policy and is seeking to rely on exclusions which are not relevant to the circumstances of the loss. The Applicant says the FSP has attempted to misconstrue the use of terms in the policy such as the use of the word „normal‟. He does not consider what has occurred to be a „normal‟ occurrence. Determination Case No: 303445 Determination Page 2 of 9 8. Further, the FSP has declined to continue insuring the building. As the building is damaged he cannot obtain insurance elsewhere therefore the FSP‟s actions have left him with a damaged and uninsurable building. The Applicant says he has no option to pursue the developer of the construction site as that company has gone into liquidation. 9. The Applicant says he has provided a pre-construction survey which confirms the damage did not exist prior to the development nearby. He also says the FSP has misinterpreted M‟s advice as to when the damage likely began occurring and believes M is clear in stating the damage first manifested within the period of cover. 10. The Applicant says the FSP‟s policy is constructed in a confusing and misleading manner. The Applicant relies on the rule of „contra proferentum‟, saying any ambiguity in terms should be resolved in his favour. The Applicant also relies on the rule of „ejusdem generis‟ where the terms listed are of generic manner and therefore cannot be read separately. 11. The Applicant feels because the FSP has no avenue of recovery against the developers, who have gone into liquidation, they have declined to cover the claim. He feels the FSP has not operated in good faith and has just tried to wear him down to get him to withdraw his claim. He is also disputing the FSP‟s decision to withdraw insurance coverage on the building. 12. The Applicant confirms construction ceased about 18 months ago and there has been no further damage occasioned to the building since. It is therefore possible to undertake repairs to the building although the Applicant is not in a financial position to do so and the building remains unrepaired. 13. The Applicant says he offered to meet with the FSP and his engineer to demonstrate the building was stable and not at risk of further damage from this incident and was prepared to accept an endorsement or reduced level of cover, but the FSP refused to do so and simply cancelled his policy. Summary of FSP’s position 14. The FSP says it has clear evidence from its engineer M the damage arose as a result of a combination of vibrations, foundation and soil movement caused by nearby building construction. As vibration, soil and foundation movement are excluded from cover, the exclusions operate to defeat the claim. 15. The FSP says the Applicant has not provided any conflicting information to suggest the conclusions reached by M are flawed. Therefore, it is entitled to rely on its expert findings. Further, the FSP says the Applicant has not challenged M‟s conclusions. 16. The FSP says it has correctly interpreted its policy to apply the relevant exclusions. It does not agree with the Applic ant‟s reading of the clauses nor Case No: 303445 Determination Page 3 of 9 does it agree the policy is ambiguous or misleading or that the Applicant‟s interpretation of exclusion B139 as a „write back clause‟ is correct. 17. The FSP says even if it were accepted the loss partly arose from an insured peril, it relies on the case law as set down in the case of Wayne Tank and Pump Co Ltd v Employers Liability Assurance Corp Ltd [1974] QB 57). This provides that if there are two causes of a loss where one is subject to cover and the other is not, an insurer is not liable for the loss as the excluded peril is dominant. 18. The FSP says the policy for the risk address was due for renewal on 10 March 2011 and due to the damage sustained to the building, it was no longer considered an acceptable risk. Accordingly, the FSP informed the Applicant via his broker on 8 March 2011 that it would grant an extension of cover until 10 May 2011 to allow time for the Applicant to undertake the repairs to the building. When presented with confirmation the repairs had been completed, the FSP would consider whether to continue covering the risk. 19. The FSP says it did not hear from the Applicant, regardless, it extended cover until 10 August 2011 to allow the Applicant time to remedy the damage. However it was not prepared to consider any further extensions and the policy was cancelled effective 10 August 2011. 20. The FSP relies on the following policy provisions, which the Applicant does not dispute receiving: “ Benefit 1 - Material loss or damage insurance What do we cover? B101 We cover you for any physical loss or destruction of or damage to the insured property during the period of insurance. ... Exclusions applicable to Benefit 1 ... B138 We will not pay for any physical loss, destruction or damage directly or indirectly caused by or arising out of: ... (g) erosion, subsidence, earth movement or collapse unless resulting from earthquake. ... (h) normal setting, seepage, shrinkage or expansion in buildings or foundations, walls, pavements, roads and other structural improvements, creeping, heaving and vibration. ... B139 Exclusions B138 (f) to (w) shall not apply to subsequent loss, destruction or damage to the insured property if that loss, destruction or damage is otherwise covered under benefit 1. ” Case No: 303445 Determination Page 4 of 9 Issues 21. Whether the FSP is entitled to decline the claim. 22. Whether the FSP was entitled to cancel the Applicant‟s policy. Reasons for decision 23. As advised to the parties, FOS has considered it appropriate to expedite the dispute in accordance with the FOS Terms of Reference. This is due to the circumstances of the dispute. This dispute has not been the subject of a FOS Recommendation and has proceeded directly to Determination. 24. This decision has been made by a Panel consisting of an Ombudsman and two Panel members with extensive experience in insurance industry matters and consumer claims. 25. The Panel is satisfied a full exchange of information has taken place between each party and each party has had the opportunity to address any issues raised. 26. Prior to reaching this Determination, the Panel Chair held discussions with the Applicant and the FSP to clarify the issues surrounding the quantum in dispute in this matter. 27. The FSP had queried the jurisdiction of the Ombudsman Service based on a worst case scenario cost of $750,000 as against the Service‟s monetary limits of $280,000. 28. During the course of the discussions, the parties agreed that the dispute was limited to the costs associated with the repair of the building, the relocation of the Applicant during the repair period of approximately 10 weeks and loss of rent. The Applicant subsequently provided a confirmation of the loss excluding GST as follows:  Schedule of costs to relocate for a period of 10 to 12 weeks whilst repair is conducted $56,919  TPS repair quote $89,925  Loss of rent at $2,145 per week x 12 weeks $26,000 29. The Applicant agreed his claim was limited to the amounts above. The Applicant confirmed that he has continued to own and occupy the building since the damage was sustained. He owns two titles on the north side of the building and his business occupies this side of the building. The only damage to the building was on the north side. 30. According to the Applicant, although the quotation was obtained in 2011, the engineers who have now assessed the building and have provided their advice are happy to stand by the quotes provided. Case No: 303445 Determination Page 5 of 9 31. The Applicant advised he was happy to stand by the quote already provided and did not wish to obtain an additional quotation. Although the cracks in the building opened rapidly, the cracks had not opened further and as the advice he had now received was that the building had stabilised, he was happy to rely upon the information provided that the building could be repaired for the costs quoted. 32. In view of the discussions, the parties agreed that the amount in dispute excluding GST as the amount quoted by the Applicant. The Panel accepts the dispute is limited to $172,844. 33. Neither party disputes M‟s findings that the loss arose as a result of nearby construction works. M‟s report provides, in part: “We believe, from our investigations to date, that it is clear that all damage appears to have conclusively to have all been caused by a combination of initial vibration damage during foundation excavation and wall construction activities to the east, followed subsequently by damage to walls and foundations resulting from either (or both of) foundation settlements due to the very heavy building loads being applied at depth to the new building foundations to the east and/or due to movement of the diaphragm walling on the eastern boundary line outwards, causing founding soil to move outwards and downwards.”(sic) 34. The Panel accepts M‟s report is clear in stating the damage to the building has arisen as a result of vibration, soil settlement and foundation movement, which has been caused by nearby construction works. Does the cause of the damage fall within the terms of the policy? 35. The policy held by the Applicant is a broad form of accidental damage policy. Although the policy does not define the term “accidental”, the High Court of Australia in Australian Casualty Company Limited v Federico (1986) 160 CLR 513 considered the term “accidental” meant “an unlooked for mishap or untoward event which was not expected or designed.” In other words, the question is whether it was an unexpected and unintended mishap. 36. A copy of a pre-construction survey prepared on 20 October 2006 by Chartered Loss Adjustors and Surveyors BF recorded the pre-construction condition of the Applicant‟s premises. It is reasonable to accept that in commissioning such report, the developers at least were aware of the possibility of damage occurring to the Applicant‟s property. In this sense it might be argued that the damage was not unexpected. 37. The damage was certainly unintended. There is no evidence that either the Applicant or the developers deliberately intended for the building to crack or recklessly courted the risk of the damage. The Panel accepts the damage was unintended. 38. Accordingly, the Panel accepts that the Applicant has established a prima facie claim for accidental damage under the terms of the policy. Case No: 303445 Determination Page 6 of 9 Policy exclusions 39. Both parties have provided extensive commentary on their respective interpretations of the policy exclusions and why they each believe it operates favourably to their respective positions. The Panel considers, given each is awar e of the other‟s submissions, it is not necessary to recite this again in detail, save for where specifically relevant. 40. The FSP‟s position is that the damage was caused by or arose out of a combination of soil and foundation movement and vibration, which are two of the exclusions listed. 41. The FSP relies upon the policy exclusions contained at exclusions B138(h) and B138(g): “ any physical loss, destruction or damage directly or indirectly caused by or arising out of... erosion, subsidence, earth movement or collapse unless resulting from earthquake and normal setting, seepage, shrinkage or expansion in buildings or foundations, walls, pavements, roads and other structural improvements, creeping, heaving and vibration . ” 42. The Panel accepts that the cause of the damage was a combination of vibration during foundation excavation and wall construction followed by damage to the walls and foundations during the construction process as outlined in M‟s findings. 43. The Panel accepts the damage attributable to earth movement is not covered unless the cause of the earth movement is earthquake which is clearly not the case in this dispute. Damage that is attributable to vibration however is more difficult to determine. The wording of the particular exclusion causes some ambiguity. Is it normal vibration (whatever that means) or any vibration including vibration from industrial machinery? Fortunately, the Panel does not consider it is necessary to determine this question in this dispute and will accept for the purposes of this Determination the wider wording and that vibration includes vibration from industrial machinery during construction works. 44. If these exclusions were to be read on their own, they would exclude the Applicant from cover. However, the exclusions cannot be read on their own, and must be read as part of the policy and in particular with reference to paragraph B139. Paragraph B139 provides: Exclusions B138 (f) to (w) shall not apply to subsequent loss, destruction or damage to the insured property if that loss, destruction or damage is otherwise covered under benefit 1. 45. Accidental damage is covered under Benefit 1 of the policy as follows: Case No: 303445 Determination Page 7 of 9 “B101: We cover you for any physical loss or destruction of or damage to the insured property during the period of insurance.” 46. The FSP in a submission of 22 April 2013 has argued that as all of the damage to the property has been caused by or arisen either as a result of vibration or soil movement, both of which are excluded perils, B139 has no application. They submit that the damage could not be deemed as subsequent damage. 47. The Panel has carefully considered the policy wording. The word „subsequent‟ as an adjective generally means „coming after something in time‟ or „following‟. It is clear from the report of M that the damage sustained to the Applicant‟s building came after or following the construction works commencing. The report of M refers to the initial vibration damage during the foundation excavation and wall construction followed subsequently by damage to walls and foundations (Panel‟s emphasis). 48. Based on the submissions and material exchanged in this dispute, the Panel accepts that the damage sustained to the Applicant‟s building occurred subsequent to the construction works commencing and therefore attracts the application of paragraph B139 of the policy. The relevant exclusions relating to either earth movement or vibration do not apply in this case and the FSP is liable to meet the costs of the damage sustained t o the Applicant‟s building. Did the loss occur in the period of cover? 49. The FSP says it is likely that at least some, if not all, of the damage occurred prior to it coming on risk on 10 March 2008. The FSP bases its reasoning on the fact the digging for foundations commenced in 2007 and concluded in early 2008. The Applicant says the damage did not arise until significantly later, when the FSP was already on risk. 50. The Panel notes M has made enquiries into the matter which reveal the excavation was commenced in October 2007 and concluded in early 2008. Although M has not provided supporting evidence of this, this information would appear consistent with the timing of the BS pre -construction inspection and the neighbouring buildings to the Applicant‟s premis es, who both reported damage evident in late 2008 and early 2009. 51. Further, in his report M states: „In my opinion judging by the depth of the excavation and the total height of the building it is highly unlikely that it occurred within the 5 month period from October 2007 (commencement of construction) to March 2008 and certainly the geotechnical problem at depth (9-10m) then it may not have manifested itself until 12- 18 months after the commencement of construction.” 52. In the Panel‟s view , given the information exchanged, there is insufficient information before it to suggest that any or all of the damage from this event occurred prior to the FSP coming on risk. On this basis, the Panel accepts Case No: 303445 Determination Page 8 of 9 the loss arose within the period of cover and the FSP is required to indemnify the Applicant for same. Was the FSP entitled to decline to offer renewal of the policy? 53. It is not disputed that the FSP declined to offer renewal of the policy to the Applicant on the basis of the damage sustained to the building, making it an unacceptable risk for the FSP. The Applicant says the flow on effect of this is the building is also an unacceptable risk to any other insurer leaving him in the position of being unable to source alternative insurance. 54. The Panel has been provided with the following documents from the FSP:  letter dated 8 March 2011 to the Applicant‟s broker „W‟ advising they were prepared to offer an extension of the policy until 10 May 2011;  closing instructions from W dated 20 May 2011 securing cover for the period 10 May 2011 to 10 August 2011; and  policy schedule for the same period. 55. The Panel has carefully considered the documents supplied. In the Panel‟s view the FSP was entitled to decline to renew the policy on the information available to them at the time and has fulfilled its obligations pursuant to Section 58 of the Act to inform the Applicant they were not prepared to offer renewal of the policy. 56. The FSP had offered to extend the original contract for two periods of three months each to allow the Applicant time to undertake repairs or source alternative insurance, which the Panel also considers reasonable in the circumstances. The Panel accepts the FSP was not obliged to offer further extensions of the original contract to the Applicant. 57. The Panel understands that fortuitously, the Applicant has not suffered any losses in the timeframe since the FSP ceased to be on risk. 58. In the Panel‟s view, had the FSP not declined the Applicant‟s claim, then in all likelihood the FSP would have remained on risk througho ut at least the repair process. 59. Given the Panel‟s finding that the FSP is liable to meet the Applicant‟s claim, it would be, in the Panel‟s opinion, unfair in the circumstances for the Applicant to be required to undertake these repairs without having appr opriate insurance cover available to him. In the Panel‟s view, having regard to the relevant legal principles, good industry practice and relevant industry codes, it would be fair in all the circumstances that the FSP remain on risk during the period of repairs or for a period of six months from the date of this Determination, whichever is sooner, subject to the Applicant paying an appropriate premium for the cover. In the event that the Applicant chooses not to insure with the FSP during this period, or in the event that the Case No: 303445 Determination Page 9 of 9 Applicant has obtained alternative insurance, then the FSP is entitled to go off risk. Determination 60. On the basis of the available information the Panel determines the FSP is obliged to accept the Applicant‟s claim for the damage to the building. 61. The Panel determines the FSP is to pay the Applicant the sum of $172,844 in accordance with the calculation of loss as provided by the Applicant. 62. As the Applicant has agreed to the calculation of losses being the current loss suffered, then the Panel determines that no interest is payable on the cash settlement. 63. The Panel further determines the FSP is to remain on risk for a period of six months from the date of this Determination or the completion of repairs, whichever is sooner, subject to the Applicant paying the appropriate premium for such cover. The FSP is entitled to re-evaluate the risk at that time and inform the Applicant accordingly if it is prepared to offer cover, and on what terms.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.