Text of the determination
Case No: 303445 Determination Page 1 of 9
Case number: 303445
General Insurance - Small Business/Farm Insurance - Commercial Property -
FSP Decision - Denial of Claim - Exclusion/Condition
21 October 2013
Background
1. The Applicant is the owner of a lot in a Strata Plan that is covered under a
commercial strata insurance policy with the Financial Services Provider
(FSP). The policy was incepted on 10 March 2008 and was renewed
annually until being cancelled by the FSP effective 10 August 2011.
2. The Applicant owns and occupies the building on the strata lot and on 28
April 2010 lodged a claim with the FSP for damage sustained to the building
which he believed had been caused by construction works at a nearby
property.
3. The FSP appointed a structural engineer „M‟ to inspect the property and
determine the cause and extent of the loss. M agreed the damage had
arisen as a result of vibrations and soil movement caused by nearby
construction works.
4. After considering the claim the FSP advised the Applicant his claim was
declined as the cause of the loss was specifically excluded from cover under
the policy. The FSP also considered that the loss had arisen, at least partly,
prior to the policy inception.
5. The Applicant is seeking a r eview of the FSP‟s decision to decline his claim.
Summary of Applicant’s position
6. The Applicant does not dispute M‟s findings, he is in agreement the damage
has arisen as a result of the nearby building construction. However, he says
this should be covered by the policy of insurance he purchased.
7. The Applicant says the FSP has wrongly interpreted its own policy and is
seeking to rely on exclusions which are not relevant to the circumstances of
the loss. The Applicant says the FSP has attempted to misconstrue the use
of terms in the policy such as the use of the word „normal‟. He does not
consider what has occurred to be a „normal‟ occurrence.
Determination
Case No: 303445 Determination Page 2 of 9
8. Further, the FSP has declined to continue insuring the building. As the
building is damaged he cannot obtain insurance elsewhere therefore the
FSP‟s actions have left him with a damaged and uninsurable building. The
Applicant says he has no option to pursue the developer of the construction
site as that company has gone into liquidation.
9. The Applicant says he has provided a pre-construction survey which
confirms the damage did not exist prior to the development nearby. He also
says the FSP has misinterpreted M‟s advice as to when the damage likely
began occurring and believes M is clear in stating the damage first
manifested within the period of cover.
10. The Applicant says the FSP‟s policy is constructed in a confusing and
misleading manner. The Applicant relies on the rule of „contra proferentum‟,
saying any ambiguity in terms should be resolved in his favour. The
Applicant also relies on the rule of „ejusdem generis‟ where the terms listed
are of generic manner and therefore cannot be read separately.
11. The Applicant feels because the FSP has no avenue of recovery against the
developers, who have gone into liquidation, they have declined to cover the
claim. He feels the FSP has not operated in good faith and has just tried to
wear him down to get him to withdraw his claim. He is also disputing the
FSP‟s decision to withdraw insurance coverage on the building.
12. The Applicant confirms construction ceased about 18 months ago and there
has been no further damage occasioned to the building since. It is therefore
possible to undertake repairs to the building although the Applicant is not in
a financial position to do so and the building remains unrepaired.
13. The Applicant says he offered to meet with the FSP and his engineer to
demonstrate the building was stable and not at risk of further damage from
this incident and was prepared to accept an endorsement or reduced level of
cover, but the FSP refused to do so and simply cancelled his policy.
Summary of FSP’s position
14. The FSP says it has clear evidence from its engineer M the damage arose
as a result of a combination of vibrations, foundation and soil movement
caused by nearby building construction. As vibration, soil and foundation
movement are excluded from cover, the exclusions operate to defeat the
claim.
15. The FSP says the Applicant has not provided any conflicting information to
suggest the conclusions reached by M are flawed. Therefore, it is entitled to
rely on its expert findings. Further, the FSP says the Applicant has not
challenged M‟s conclusions.
16. The FSP says it has correctly interpreted its policy to apply the relevant
exclusions. It does not agree with the Applic ant‟s reading of the clauses nor
Case No: 303445 Determination Page 3 of 9
does it agree the policy is ambiguous or misleading or that the Applicant‟s
interpretation of exclusion B139 as a „write back clause‟ is correct.
17. The FSP says even if it were accepted the loss partly arose from an insured
peril, it relies on the case law as set down in the case of Wayne Tank and
Pump Co Ltd v Employers Liability Assurance Corp Ltd [1974] QB 57). This
provides that if there are two causes of a loss where one is subject to cover
and the other is not, an insurer is not liable for the loss as the excluded peril
is dominant.
18. The FSP says the policy for the risk address was due for renewal on 10
March 2011 and due to the damage sustained to the building, it was no
longer considered an acceptable risk. Accordingly, the FSP informed the
Applicant via his broker on 8 March 2011 that it would grant an extension of
cover until 10 May 2011 to allow time for the Applicant to undertake the
repairs to the building. When presented with confirmation the repairs had
been completed, the FSP would consider whether to continue covering the
risk.
19. The FSP says it did not hear from the Applicant, regardless, it extended
cover until 10 August 2011 to allow the Applicant time to remedy the
damage. However it was not prepared to consider any further extensions
and the policy was cancelled effective 10 August 2011.
20. The FSP relies on the following policy provisions, which the Applicant does
not dispute receiving:
“ Benefit 1 - Material loss or damage insurance
What do we cover?
B101 We cover you for any physical loss or destruction of or damage to the
insured property during the period of insurance.
...
Exclusions applicable to Benefit 1
...
B138 We will not pay for any physical loss, destruction or damage directly or
indirectly caused by or arising out of:
...
(g) erosion, subsidence, earth movement or collapse unless resulting
from earthquake. ...
(h) normal setting, seepage, shrinkage or expansion in buildings or
foundations, walls, pavements, roads and other structural
improvements, creeping, heaving and vibration.
...
B139 Exclusions B138 (f) to (w) shall not apply to subsequent loss,
destruction or damage to the insured property if that loss, destruction
or damage is otherwise covered under benefit 1. ”
Case No: 303445 Determination Page 4 of 9
Issues
21. Whether the FSP is entitled to decline the claim.
22. Whether the FSP was entitled to cancel the Applicant‟s policy.
Reasons for decision
23. As advised to the parties, FOS has considered it appropriate to expedite the
dispute in accordance with the FOS Terms of Reference. This is due to the
circumstances of the dispute. This dispute has not been the subject of a
FOS Recommendation and has proceeded directly to Determination.
24. This decision has been made by a Panel consisting of an Ombudsman and
two Panel members with extensive experience in insurance industry matters
and consumer claims.
25. The Panel is satisfied a full exchange of information has taken place
between each party and each party has had the opportunity to address any
issues raised.
26. Prior to reaching this Determination, the Panel Chair held discussions with
the Applicant and the FSP to clarify the issues surrounding the quantum in
dispute in this matter.
27. The FSP had queried the jurisdiction of the Ombudsman Service based on a
worst case scenario cost of $750,000 as against the Service‟s monetary
limits of $280,000.
28. During the course of the discussions, the parties agreed that the dispute was
limited to the costs associated with the repair of the building, the relocation
of the Applicant during the repair period of approximately 10 weeks and loss
of rent. The Applicant subsequently provided a confirmation of the loss
excluding GST as follows:
Schedule of costs to relocate for a period of 10 to 12
weeks whilst repair is conducted
$56,919
TPS repair quote $89,925
Loss of rent at $2,145 per week x 12 weeks $26,000
29. The Applicant agreed his claim was limited to the amounts above. The
Applicant confirmed that he has continued to own and occupy the building
since the damage was sustained. He owns two titles on the north side of the
building and his business occupies this side of the building. The only
damage to the building was on the north side.
30. According to the Applicant, although the quotation was obtained in 2011, the
engineers who have now assessed the building and have provided their
advice are happy to stand by the quotes provided.
Case No: 303445 Determination Page 5 of 9
31. The Applicant advised he was happy to stand by the quote already provided
and did not wish to obtain an additional quotation. Although the cracks in the
building opened rapidly, the cracks had not opened further and as the advice
he had now received was that the building had stabilised, he was happy to
rely upon the information provided that the building could be repaired for the
costs quoted.
32. In view of the discussions, the parties agreed that the amount in dispute
excluding GST as the amount quoted by the Applicant. The Panel accepts
the dispute is limited to $172,844.
33. Neither party disputes M‟s findings that the loss arose as a result of nearby
construction works. M‟s report provides, in part:
“We believe, from our investigations to date, that it is clear that all damage
appears to have conclusively to have all been caused by a combination of
initial vibration damage during foundation excavation and wall construction
activities to the east, followed subsequently by damage to walls and
foundations resulting from either (or both of) foundation settlements due to the
very heavy building loads being applied at depth to the new building
foundations to the east and/or due to movement of the diaphragm walling on
the eastern boundary line outwards, causing founding soil to move outwards
and downwards.”(sic)
34. The Panel accepts M‟s report is clear in stating the damage to the building
has arisen as a result of vibration, soil settlement and foundation movement,
which has been caused by nearby construction works.
Does the cause of the damage fall within the terms of the policy?
35. The policy held by the Applicant is a broad form of accidental damage policy.
Although the policy does not define the term “accidental”, the High Court of
Australia in Australian Casualty Company Limited v Federico (1986) 160
CLR 513 considered the term “accidental” meant “an unlooked for mishap or
untoward event which was not expected or designed.” In other words, the
question is whether it was an unexpected and unintended mishap.
36. A copy of a pre-construction survey prepared on 20 October 2006 by
Chartered Loss Adjustors and Surveyors BF recorded the pre-construction
condition of the Applicant‟s premises. It is reasonable to accept that in
commissioning such report, the developers at least were aware of the
possibility of damage occurring to the Applicant‟s property. In this sense it
might be argued that the damage was not unexpected.
37. The damage was certainly unintended. There is no evidence that either the
Applicant or the developers deliberately intended for the building to crack or
recklessly courted the risk of the damage. The Panel accepts the damage
was unintended.
38. Accordingly, the Panel accepts that the Applicant has established a prima
facie claim for accidental damage under the terms of the policy.
Case No: 303445 Determination Page 6 of 9
Policy exclusions
39. Both parties have provided extensive commentary on their respective
interpretations of the policy exclusions and why they each believe it operates
favourably to their respective positions. The Panel considers, given each is
awar e of the other‟s submissions, it is not necessary to recite this again in
detail, save for where specifically relevant.
40. The FSP‟s position is that the damage was caused by or arose out of a
combination of soil and foundation movement and vibration, which are two of
the exclusions listed.
41. The FSP relies upon the policy exclusions contained at exclusions B138(h)
and B138(g):
“ any physical loss, destruction or damage directly or indirectly caused by or
arising out of...
erosion, subsidence, earth movement or collapse unless resulting from
earthquake
and
normal setting, seepage, shrinkage or expansion in buildings or foundations,
walls, pavements, roads and other structural improvements, creeping,
heaving and vibration . ”
42. The Panel accepts that the cause of the damage was a combination of
vibration during foundation excavation and wall construction followed by
damage to the walls and foundations during the construction process as
outlined in M‟s findings.
43. The Panel accepts the damage attributable to earth movement is not
covered unless the cause of the earth movement is earthquake which is
clearly not the case in this dispute. Damage that is attributable to vibration
however is more difficult to determine. The wording of the particular
exclusion causes some ambiguity. Is it normal vibration (whatever that
means) or any vibration including vibration from industrial machinery?
Fortunately, the Panel does not consider it is necessary to determine this
question in this dispute and will accept for the purposes of this Determination
the wider wording and that vibration includes vibration from industrial
machinery during construction works.
44. If these exclusions were to be read on their own, they would exclude the
Applicant from cover. However, the exclusions cannot be read on their own,
and must be read as part of the policy and in particular with reference to
paragraph B139. Paragraph B139 provides:
Exclusions B138 (f) to (w) shall not apply to subsequent loss, destruction or
damage to the insured property if that loss, destruction or damage is
otherwise covered under benefit 1.
45. Accidental damage is covered under Benefit 1 of the policy as follows:
Case No: 303445 Determination Page 7 of 9
“B101: We cover you for any physical loss or destruction of or damage to the
insured property during the period of insurance.”
46. The FSP in a submission of 22 April 2013 has argued that as all of the
damage to the property has been caused by or arisen either as a result of
vibration or soil movement, both of which are excluded perils, B139 has no
application. They submit that the damage could not be deemed as
subsequent damage.
47. The Panel has carefully considered the policy wording. The word
„subsequent‟ as an adjective generally means „coming after something in
time‟ or „following‟. It is clear from the report of M that the damage sustained
to the Applicant‟s building came after or following the construction works
commencing. The report of M refers to the initial vibration damage during the
foundation excavation and wall construction followed subsequently by
damage to walls and foundations (Panel‟s emphasis).
48. Based on the submissions and material exchanged in this dispute, the Panel
accepts that the damage sustained to the Applicant‟s building occurred
subsequent to the construction works commencing and therefore attracts the
application of paragraph B139 of the policy. The relevant exclusions relating
to either earth movement or vibration do not apply in this case and the FSP
is liable to meet the costs of the damage sustained t o the Applicant‟s
building.
Did the loss occur in the period of cover?
49. The FSP says it is likely that at least some, if not all, of the damage occurred
prior to it coming on risk on 10 March 2008. The FSP bases its reasoning on
the fact the digging for foundations commenced in 2007 and concluded in
early 2008. The Applicant says the damage did not arise until significantly
later, when the FSP was already on risk.
50. The Panel notes M has made enquiries into the matter which reveal the
excavation was commenced in October 2007 and concluded in early 2008.
Although M has not provided supporting evidence of this, this information
would appear consistent with the timing of the BS pre -construction
inspection and the neighbouring buildings to the Applicant‟s premis es, who
both reported damage evident in late 2008 and early 2009.
51. Further, in his report M states:
„In my opinion judging by the depth of the excavation and the total height of
the building it is highly unlikely that it occurred within the 5 month period from
October 2007 (commencement of construction) to March 2008 and certainly
the geotechnical problem at depth (9-10m) then it may not have manifested
itself until 12- 18 months after the commencement of construction.”
52. In the Panel‟s view , given the information exchanged, there is insufficient
information before it to suggest that any or all of the damage from this event
occurred prior to the FSP coming on risk. On this basis, the Panel accepts
Case No: 303445 Determination Page 8 of 9
the loss arose within the period of cover and the FSP is required to
indemnify the Applicant for same.
Was the FSP entitled to decline to offer renewal of the policy?
53. It is not disputed that the FSP declined to offer renewal of the policy to the
Applicant on the basis of the damage sustained to the building, making it an
unacceptable risk for the FSP. The Applicant says the flow on effect of this is
the building is also an unacceptable risk to any other insurer leaving him in
the position of being unable to source alternative insurance.
54. The Panel has been provided with the following documents from the FSP:
letter dated 8 March 2011 to the Applicant‟s broker „W‟ advising they
were prepared to offer an extension of the policy until 10 May 2011;
closing instructions from W dated 20 May 2011 securing cover for the
period 10 May 2011 to 10 August 2011; and
policy schedule for the same period.
55. The Panel has carefully considered the documents supplied. In the Panel‟s
view the FSP was entitled to decline to renew the policy on the information
available to them at the time and has fulfilled its obligations pursuant to
Section 58 of the Act to inform the Applicant they were not prepared to offer
renewal of the policy.
56. The FSP had offered to extend the original contract for two periods of three
months each to allow the Applicant time to undertake repairs or source
alternative insurance, which the Panel also considers reasonable in the
circumstances. The Panel accepts the FSP was not obliged to offer further
extensions of the original contract to the Applicant.
57. The Panel understands that fortuitously, the Applicant has not suffered any
losses in the timeframe since the FSP ceased to be on risk.
58. In the Panel‟s view, had the FSP not declined the Applicant‟s claim, then in
all likelihood the FSP would have remained on risk througho ut at least the
repair process.
59. Given the Panel‟s finding that the FSP is liable to meet the Applicant‟s claim,
it would be, in the Panel‟s opinion, unfair in the circumstances for the
Applicant to be required to undertake these repairs without having
appr opriate insurance cover available to him. In the Panel‟s view, having
regard to the relevant legal principles, good industry practice and relevant
industry codes, it would be fair in all the circumstances that the FSP remain
on risk during the period of repairs or for a period of six months from the date
of this Determination, whichever is sooner, subject to the Applicant paying
an appropriate premium for the cover. In the event that the Applicant
chooses not to insure with the FSP during this period, or in the event that the
Case No: 303445 Determination Page 9 of 9
Applicant has obtained alternative insurance, then the FSP is entitled to go
off risk.
Determination
60. On the basis of the available information the Panel determines the FSP is
obliged to accept the Applicant‟s claim for the damage to the building.
61. The Panel determines the FSP is to pay the Applicant the sum of $172,844
in accordance with the calculation of loss as provided by the Applicant.
62. As the Applicant has agreed to the calculation of losses being the current
loss suffered, then the Panel determines that no interest is payable on the
cash settlement.
63. The Panel further determines the FSP is to remain on risk for a period of six
months from the date of this Determination or the completion of repairs,
whichever is sooner, subject to the Applicant paying the appropriate
premium for such cover. The FSP is entitled to re-evaluate the risk at that
time and inform the Applicant accordingly if it is prepared to offer cover, and
on what terms.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.