Flood claim settled with air-conditioning units varied from the agreed scope of works
Text of the determination
Case No: 302954 Determination Page 1 of 11
Case number: 302954
General Insurance - Domestic Insurance - Home Building - FSP Decision -
Denial of claim
30 May 2013
Background
1. The Applicants held an Investor Home and Contents Policy with the
Financial Services Provider (FSP). The policy covered the home building up
to $302,500 and contents up to $23,900. The policy was subject to a
standard excess of $500. The policy provides co ver for flood.
2. This dispute arises out of two flood claims. The first claim was lodged on 2
March 2010. The scope of works included in the building contract listed the
air- conditioners as “per quote supplied by the insured”. The FSP‟s builder
then altered the air- conditioning units and the Applicants‟ disputed that
alteration.
3. The second claim arises out of a flood event on 3 February 2012. The FSP‟s
builder provided a scope of works in the building contract which required the
existing air-conditioners to be replaced by 7kw units. Again, the FSP‟s
builder varied the contract and replaced the air-conditioners with 5kw units.
4. The FSP has reviewed the claim and maintains that it has replaced the
previous air-conditioners, like for like, in accordance with the policy.
5. The Applicants say the air-conditioning units should have been replaced in
accordance with the scope of works.
Summary of Applicants ’ position
6. The Applicants have enclosed an original valuation report dated 26 June
1996, which confirms the air-conditioning consisted of five split level reverse
cycle „carrier‟ units.
7. The Applicants have enclosed an Assessor ‟s report dated 3 March 2010,
which confirms the assessor was awaiting a report on the air-conditioning
units, from the Applicants.
8. The Applicants have enclosed a quotation dated 4 March 2010, from B
Electrical, which lists the items and cost of replacement.
Determination
Case No: 302954 Determination Page 2 of 11
9. The Applicants have enclosed a service report from “APS” dated 7 April
2010. The report confirms that all the air-conditioning units were damaged.
The quotation enclosed with same provides the following:
Lounge 6kw inverter
Kitchen 5kw inverter
Bedrooms 1-2 5.2kw inverter supplying 2 x 2.5kw indoor units
Bedroom 3 2.5kw inverter
10. The Applicants rely on the following email from B Electrical dated 20
September 2010:
“I have already advised your client that I do not wish to be involved in this
argument.
I took the time to properly look at the job in question, measure up and
calculate the correctly sized units. Our calculations take into account things
such as building position, structural materials, windows, doorways, floor,
insulation, etc. We do our job properly.
[D] do not give warranty on incorrectly sized units, as undersizing will cause
excessive stress on the unit and cause problems. This is regardless of what
they are replacing my company does not do quick fixes, like [FSP name]
appear to do.
[FSP] chose not to use locals in Roma for insurance repair work.
I suggest that you ask the experts from out of town that installed them and
also have them service them if they break down”
11. The Applicants note the following in relation to their original claim regarding
the air-conditioners:
The Applicants were asked to provide a quotation for the air-conditioning
units at the property.
The Applicants were also asked to arrange B Electrical to carry out the
assessment of damaged air conditioners.
The FSP paid the Applicants directly for the cost of B Electrical‟s works . As
B Electrical was not a normal supplier, the FSP could not authorise this
directly.
Due to discussions held with the FSP‟s builder, the Applicants believed
that the quotation from B Electrical, had been agreed upon.
The quotation was referred to in the building contract, which was signed
off by each party.
The Applicants became aware later that the agreed upon air-conditioning
units had been altered.
12. The Applicants note that the FSP arranged for other electrical quotations
even though the quote from B Electrical had been accepted. Further, the
Applicants contend that B Electrical will be more familiar with the
requirements of the units than a NSW company.
Case No: 302954 Determination Page 3 of 11
13. The Applicants have enclosed the 2010 building Small Works Contract
between themselves and the FSP‟s builder. The building contract confirms
the works are to be “as per Scope of Works” and within the Scope of Works.
The air-conditioning un its will be „As per quote supplied by the insured‟. I
note the document appears to have been signed by both parties and is dated
13 May 2010. The Applicants submit that the original building contract was
binding and that the FSP has unilaterally changed this contract. The
Applicants seek specific performance of the building contract.
14. The Applicants have enclosed a Residential Renovation Contract Schedule
for the 2012 works. The schedule refers to supply and fit new split system –
7kw, but only refers to 1 unit item. The Applicants signatures appear on the
contract which is dated 13 April 2012.
15. An email dated 26 July 2012 from the FSP indicates that the builder‟s scope
of works listing 7.1kw air-conditioner was in error and that “...the scope of
works is used as an outline and can be varied at any stage during the repair
process...” Further, that the new unit was to replace an old 5kw unit.
16. The Applicants note the altered air-conditioning units were undersized in
capacity. In the 2010 claim, they were originally re-assured an error had
been made and that the units would be replaced. The assessor also
confirmed this was the case but the FSP considered no alteration was
required. Further, the Applicants were informed that the air-conditioners
would not be changed because the power supply was inadequate and a
power upgrade would be required. The Applicants investigated this claim
and believe it to be incorrect.
17. The Applicants note the following in relation to their 2012 claim:
The FSP‟s agent signed a residential building contract which was
signed and accepted by the parties.
The scope of works in the contract required the replacement of
damaged air-conditioning units with 7.1kw units.
The FSP unilaterally changed the air-conditioning units to 5kw.
The Applicants dispute the FSP‟s response that the scope of works
was listed in error and can be varied at any stage of the works. The
Applicants state the FSP is bound by all the terms set out in a
contractual document if they have signed it.
18. The Applicants dispute the variation from the contract and state that it was
legally binding on the parties.
19. Based on the email dated 20 September 2010 from B Electrical, the
Applicants have deep concerns about the function of undersized air-
conditioning units.
20. The Applicants were never satisfied with the original air-conditioning unit
replacements and were dissatisfied with the outcome of the 2012 claim.
Case No: 302954 Determination Page 4 of 11
21. The Applicants state that the FSP was aware that the air-conditioner units
were of good quality and charged premiums accordingly.
Summary of FSP’s position
22. The FSP relies on the following policy terms and conditions:
“new for old
This is:
• replacing or repairing with new items or new materials that are available at
the time of replacement or repair from Australian suppliers and
• new for old regardless of age, with no allowance for depreciation and of the
same type, standard and specification as when new.
If the same is not available, it means of a similar type, standard and
specification when new. It can be a different brand.
New for old does not:
• include paying the extra cost of replacing or purchasing an extended
warranty on any home or contents item or
• mean of a better standard, specificat ion or quality than when new.
...
“How claims are paid
Home and contents claims
We choose how your claim is settled. If we agree to pay a claim for loss, theft
or damage to your home or contents, we will decide if we will:
repair damage new for old or
replace home or contents new for old or
pay you what it would cost us to repair or replace home or contents new
for old.
We will not:
pay extra to repair or replace an item to a better standard, specification or
quality than it was before the loss or damage, except as outlined in the
meaning of new for old (see page 11)
fix a fault that existed before the loss or damage occurred.”
23. The FSP has enclosed its claim file notes:
Date listed as 0/0/2010 indicates B Electrical was advised emergency
electrical repairs were authorised up to $500.
Date listed 1/0/2010 indicates another supplier of air-conditioning units
was reluctant to assist as B Electrical are very good and well known in
town. The FSP also received the electrical testing/works in the sum of
$176.
Case No: 302954 Determination Page 5 of 11
22 July 2010 FSP notes it has not paid the $176 invoice on file (12 March
2010) and cannot pay it directly. The Applicants have not been paid for
this item yet.
14 September 2010, the FSP was informed that its builder replaced the
8kw air-conditioner in the lounge-room with a 6kw one. The 7.1kw dining
room air-conditioner has been replaced with a 6kw one. The Applicants
rent to a Government Department and the law requires there must be
200watts for each cubic meter of the house.
Dated listed as 0/10/2010 records a discussion regarding the incorrect
specifications of the air-conditioning units and the scope of works
variation. The Applicants have not produced any lease documentation
confirming the cooling requirements as this was held by the managing
agent. The Applicants, however, did not agree that the FSP should contact
the managing agent given it had B Electrical‟s quotation/report.
19 October 2010 the Applicants raised with the IDR department the fact
that under the building contract any amendments to the scope of works
must be provided in writing. Further, that this was not done. The
Applicants further stated they were originally informed the air-conditioners
would be changed and then were told they would not be due to the need
for a power upgrade. The Applicants further dispute a power upgrade was
required.
24. The FSP relies on an email dated 21 September 2010 from its assessor. The
email confirms the air-conditioner units do not match the B Electrical ‟s report,
as included in the scope of works, signed by the insured. The assessor,
however, formed the view that the air- conditioning units supplied were „like
for like‟ , if not better.
25. The FSP relies on an email dated 15 September 2010, from its builder. The
builder confirms that its electrician advised that if the air-conditions on the
scope of works are to be installed then the main power will need to be
upgraded. The basis for this was that the phase would be pushed over the
standard 100amps and the upgrade of power supply to 3 phase would cost
an additional $2,000-$2,500. The repairer believes the same size of air-
conditioner has been installed.
26. The FSP relies on an email dated 21 September 2010, from its assessor.
The assessor confirms the air-conditioner units do not match up with those
listed and detailed in the B Electrical reports , as replacement units. However,
APS informed him that the air-conditioners are like for like if not better than
the old units.
27. The FSP has enclosed claim notations from 2012, from which I note the
following:
Telephone call between the Applicant and FSP employee on 24 July 2012.
The Applicant noted that his 7.1kw air-conditioner had been replaced by
5kw air-conditioner. The Applicant was told to forward a copy of the
contract with photographs of the air-conditioners. If the FSP can confirm
that he had a 7.1kw air-conditioner, it indicated it would replace same.
Case No: 302954 Determination Page 6 of 11
On 26 July 2012 the FSP confirms that the model number of the air-
conditioner removed shows it as a 5.1kw. The builder indicates his belief
that the Applicant has been placed back into the same position as
previously. The builder confirms the Applicants had a 5.1kw air-
conditioner. Although the scope of works had an air-conditioner of 7.1kw,
the scope of works can be altered at any time.
28. The FSP has enclosed a report from the builder regarding the variation. The
builder provided the following statement:
“At the time of quoting the repairs that requir ed to be carried out the insured
informed us that the air-conditioner that has been inundated was a 7kw
reverse cycle. At the time of replacement the electrician has informed us that
it is only a 5kw reverse cycle air-conditioner. What we have installed is a like
for like air-conditioner. The following is the cost difference between the 7kw
and the 5kw air- conditioner.”
29. The FSP relies on a report dated 6 December 2012, from electrician “A”. I
note the following from this report:
In the dining room a 5kw air-conditioner has been installed and the scope
of works clearly shows a 7.1kw unit should be installed. The information
provided indicates the original unit was a 5kw system.
In the lounge-room a 6kw unit has been installed and the scope of works
clearly indicates an 8kw unit was to be installed. The information indicates
the original unit was 6kw.
In bedroom 3, a 2.5kw unit has been installed whereas the scope of works
clearly shows a 3.5kw unit was to be installed. The information suggests
that the original unit was 2.5kw.
In bedroom 1 and 2, a Daiken 5.2kw unit (with 2 x 2.5kw head units) has
been installed. B electrical quoted for 3.5kw rating to each head unit and
APS quoted for 2.5kw head units. The scope of works clearly shows that a
Daiken multi-head unit is to be installed in each bedroom.
30. The FSP relies on a further email dated 8 December 2012 , from A,
confirming that:
“It is my professional opinion that the Air Conditioning brands of Carrier,
Daiken, and Mitsubishi are of similar quality without exception....I can say
without doubt in my opinion, that the three mentioned brands of Air
Conditioner are in the top 5 available in Australia for performance and
reliability.”
31. The FSP submits that it is a general principle of insurance law that the policy
holder must prove that the damage claimed is covered under the terms of
the policy of insurance.
32. The policy covers new for old, but the definition of new for old does not mean
the item will be replaced to a better standard.
Case No: 302954 Determination Page 7 of 11
33. The air-conditioner units replaced by the FSP are of a similar type, standard
and specification. Accordingly, it is the FSP‟s position that it has met its
obligations under the policy.
34. The FSP submits that the B Electrical quotation for new units was based on
the area to be serviced without regard to the units being replaced. Further,
the FSP submits that B Electrical does not support the contention that the
units quoted upon are in fact of the same or a similar type, standard and
specification as those damaged in the 2010 flood event.
35. The report dated 7 April 2010, from APS, identified the model numbers and
capacity details of the damaged units and the y provided a quotation for the
cost of replacement units of the same or similar capacity, as the damaged
units.
36. The FSP further submits that the builder‟s scope of works dated 9 April
2010, confirmed the models recommended by B Electrical were not the
same or similar type, standard or specification as the damaged items and
the items were provisional sum items. The FPS submits that as the items
quoted by B Electrical were of a different standard and specification to the
damaged air-conditioner units, the FSP is not bound to provide the
Applicants with the particular units as described in the scope of works.
37. The FSP submits that A‟s report de monstrates the Applicants have been
provided with replacement air-conditioner units of the same or similar type,
standard and specification as the original units, in accordance with the terms
and conditions of the policy.
38. In relation to the 2012 flood, the scope of works provides for a 7.1kw unit.
The FSP, however, states that this scope of works was prepared in reliance
upon information obtained from the Applicants that the unit was in fact a
7.1kw unit. The variation occurred on the advice of the electrician that the
7kw air-conditioner would require an upgrade to the power systems of the
home.
39. The FSP contends that it has met its obligations under the policy terms and
conditions. Further, the FSP notes the Applicants have not demonstrated
any prejudice or loss arising from any alleged representations made to the
Applicants in regard to the replacement of the air-conditioner units. The FSP
maintains the replacement air-conditioners are an upgrade on the pre -2010
flood units, installed in the home.
Issue
40. Whether the FSP has appropriately settled the Applicants‟ claim.
Case No: 302954 Determination Page 8 of 11
Reasons for decision
41. Due to the nature of the dispute, the FOS has considered it appropriate to
expedite the dispute in accordance with the Operational Guidelines to the
FOS Terms of Reference. Thus, this dispute has not been the subject of a
FOS Recommendation and has proceeded directly to Determination. The
parties have been previously advised that a Determination will be issued in
this case.
42. There has been an exchange of material between each party, and I am
satisfied each party has had an opportunity to reply to the issues raised.
43. I have read each party‟s submissions and materials and will only refer to the
relevant submissions and materials raised.
44. In considering this matter I have had regard to section 79 of the Queensland
Domestic Building Contracts Act 2000. The legislation governs domestic
building contracts and variations to same. Unless the work required is
urgent, a written variation of contract is required to be consented to by both
parties (building contractor and building owner).
45. The parties do not appear to dispute the following:
There was a flood event in 2010, which damaged the air-conditioning units
contained within the insured home.
The FSP requested the Applicants provide a quotation for the replacement
of the air-conditioners. The Applicants provided a quotation from B
Electrical.
The FSP arranged its own quotations but the building contract scope of
works included the „as per quote supplied by the insured‟ statement.
The builder varied the scope of works from B Electrical‟s quotation.
The Applicants were dissatisfied with the variation.
The second flood event in 2012, resulted in the placement of a 7.1kw air-
conditioner in the scope of works of the building contract.
The contract scope of works was varied and a 5.1kw air-conditioner was
provided.
At all relevant times the builder was the authorised repairer (and agent) of
the FSP and the Applicants were the building owners.
There is no signed variation to either scope of works to confirm the
Applicants‟ consent to the installation of different air -conditioners.
46. I note the FSP has relied on the Product Disclosure terms and conditions
regarding the replacement requirements of a new for old item. In contrast,
the Applicants have relied on Contract Law. In particular, they have sought
specific performance under the original building contract scope of works.
Case No: 302954 Determination Page 9 of 11
47. I consider that the breach of contract complained of is predominantly
governed by the Queensland Domestic Building Contracts Act 2000. The
application of the Insurance Contracts Act (1984) to this dispute and the
policy terms are somewhat secondary, given there is no reference to these
documents as governing instruments to the contract itself.
48. Given this, I have reviewed the evidence regarding how the original contract
was entered into. I note the following:
The Applicants provided a quotation from B Electrical dated 4 March 2010.
The quotation itemises the air-conditioning unit for each room and the
specifications for each.
The FSP‟s claim file notations indicate that emergency electrical works
were performed and invoiced on 12 March 2010.
The FSP was unable to obtain alternative suppliers for the replacement of
the air-conditioners as B Electrical is very good and well known in town.
The date the original small works contract was signed is 13 May 2010. The
signing of the contract was subsequent to a 7 April 2010, onsite meeting,
which involved the Applicants, a representative of RPF Building, a
representative of APS and a third party. The contract works were
described “ A s per scope of works”. The scope of works attached is dated
11 March 2010 (Amended 09/04/2010) and in regard to air-conditioning
units, refers to “As per quote supplied b y the insured”.
The service report and quote from APS (both dated 7/4/10), confirmed that
the air-conditioning units originally at the property, were not those listed in
the scope of works (as stated in B Electrical‟s quotation).
There is a reference to the fact that the power grades in the home would
need to be updated to install the quoted units. However, the Applicants
disputed this and there is no report from the electrician to confirm this was
in fact the case. The report from A does not support this statement from
the builder‟s electrician.
49. The information before me indicates that there was in fact a meeting of the
minds on entry into the 2010 building contract. The parties were aware of the
items described by B Electrical‟s quotation. It is noted that the quote pre -
dates the scope of works as provided to me and there is no allegation of
confusion or lack of clarity in relation to the original scope of works.
50. The signing of the contract is also after the onsite meeting which included
both RPF Building and APS and the provision of the service report and quote
by APS.
51. The authorised repairer acting on behalf of the FSP has then unilaterally
altered the scope of works, without seeking consent by way of written
variation. Given there was no apparent emergency works required to the
building, the governing legislation requires such a variation to be in writing.
52. The unilateral variation is not permissible under the legislation and would
constitute a breach of the building contract. The FSP is aware of this breach,
Case No: 302954 Determination Page 10 of 11
but has relied on its policy terms. I am not satisfied with the position taken by
the FSP as it does not appear to be in accordance with the requirements of
the relevant legislation, which governs the variation of the domestic building
contract.
53. The Applicants have sought to remedy this breach of contract by way of
specific performance. This remedy is viable in the circumstances and is an
ordinary manner of resolving contractual breaches.
54. I have considered whether the signing of the 2012 contract of works is a new
and intervening act which overrides the original domestic building contract. I
am of the opinion that it would have, but for the fact there was clearly no
proper agreement reached by the parties. It is quite clear that the Applicants
believed a 7kw air-conditioner was to be installed, whereas the FSP states
the 7.1kw air-conditioner was entered into the scope of works in error.
Further, the FSP was of the belief the scope of works could be changed at
any time. For reasons, stated above , I do not believe the scope of works can
be changed at any time, without the consent of both parties by way of written
variation.
55. Given the circumstances, I am satisfied tha t any disagreement with regard to
the terms of the 2012 contract, is clarified by reference to the terms of the
2010 contract.
56. The 2010 contract clearly provides for air conditioning units as per the quote
provided by the Applicant (that is, the B Electrical ‟s quote).
57. The only reasonable alternative is that the FSP is bound by the 7.1kw air
conditioning unit as listed in the scope of works to the 2012 contract.
58. The breach of the 2010 contract was still a live issue as at the time of signing
the new 2012 contract. The Applicants state they were induced to sign the
2012 contract on the basis that they believed this contract would remedy the
specific performance issues with the 2010 contract, given the 7.1kw
notations on the scope of works for the air-conditioning units.
59. Based on all the information before me, I do not consider that the FSP has
appropriately settled the Applicants claim. I have formed the view that it
would be fair in all the circumstances to require the FSP to arrange for
specific performance of the 2010 contract, by providing the air-conditioning
units as specified by B Electrical‟s quotation.
Determination
60. On the basis of the available information I determine that the FSP has not
appropriately settled the Applicants claim. The FSP is directed to specifically
perform the scope of works in the 2010 contract in line with B Electrical‟s
quotation, within 30 days of receiving notice of the Applicants‟ acceptance of
this Determination. The FSP may keep any removed air-conditioning units
from the A pplicants‟ property as salvage.
Case No: 302954 Determination Page 11 of 11
61. If the FSP provides a cash settlement to the Applicants, I further determine
that the FSP is to pay interest in accordance with section 57 of the Act from
1 November 2010, being the date of the FSP‟s Internal Dispute Resolut ion
decision to deny the claim, to the date of payment of the claim.
62. I note the FSP has recently offered to settle this matter with a lump sum
amount (plus interest) that represents the difference in the quotes provided
by B Electrical and APS. For the sake of completeness, I confirm that such
an offer does not meet the requirements of my Determination, contained in
paragraph 60 above.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.