Text of the determination
Case No: 302762 Determination Page 1 of 10
Case number: 302762
General Insurance - Domestic Insurance - Home Building - FSP Decision -
Claim amount
29 August 2013
Background
1. This dispute follows the review of a Recommendation issued on behalf of
FOS on 19 June 2013. The Recommendation was rejected by the Applicant.
2. The Applicant held a home insurance policy with the Financial Services
Provider (FSP) which was current at the time of the loss.
3. On 3 January 2012, the Applicant lodged a claim under the policy for water
damage to his house caused by the 2011 Christmas Day hailstorms.
4. The FSP accepted the Applicant’s claim and elected to repair the damage to
his property. However, a dispute arose in relation to the replacement floor
tiles to be used to complete the repairs.
5. The original floor tiles are only available by special order subject to a
minimum order size significantly larger than that required to complete the
repairs. Accordingly, the FSP has sought to replace the flooring with
alternative tiles which are not subject to a minimum order condition.
6. The Applicant disputes the FSP’s approach and says that, as the original
tiles are available, the FSP should be required to obtain and install them
regardless of the additional cost .
7. The Applicant also seeks rectification of certain other repairs carried out by
the FSP which he says have not been completed in a satisfactory manner,
together with compensation for delays and inconvenience experienced in the
handling of his claim.
Summary of Applicant’s position
8. The Applicant says that:
in taking out the policy, he relied on a brochure published by the FSP
which provides directions as to how to assess an appropriate level of
cover. He says that the brochure evidences that the policies issued by
the FSP provide indemnity based on the standard of materials used in
the home and the FSP prices cover on this basis;
Determination
Case No: 302762 Determination Page 2 of 10
in order to fully indemnify him for his loss, the FSP is required to repair
his home using the original tiles (subject only to the limit imposed by
the total sum insured). The original materials should be used in order to
maintain the aesthetics of the property, ensure that the technical
specifications of the current flooring are achieved and preserve the
value of the property as a whole;
the terms of the policy require the FSP to try to match the materials
used to repair his home with the original materials and to repair the
home to a condition as close to new as possible. This does not allow
the FSP to select an alternative flooring material in lieu of matching the
existing tiles where these are available;
the original tiles are “available” as they can be obtained through a
special order. The FSP is not entitled to use an alternative flooring
material merely because of the costs involved in obtaining the original
tiles and in seeking to do so, the FSP is breaching its duty of good faith;
once the FSP elected to repair his home, it is bound by this election
and cannot subsequently decide to offer a cash settlement for the
flooring component of the repairs merely because this has turned out to
be more expensive than initially anticipated; and
when the FSP elected to repair his home, it also elected to match the
existing flooring. This is supported by the terms of the building contract
entered into with the FSP’s bu ilder and the FSP should not be able to
resile from this position.
9. The Applicant seeks to have the flooring replaced using the original tiles and
for the FSP to attend to all incidental matters such as disconnection of
plumbing equipment, removal and storage of furniture and compensation for
alternate accommodation. The Applicant also seeks to have the FSP rectify
all other elements of the repair works which the FSP has previously
acknowledged as unsatisfactory, as this has been deferred until the flooring
repairs are completed.
10. The Applicant also seeks compensation of $12,000 for non-financial loss
incurred due to the FSP’s handling of his claim. The Applicant says he has
experienced delays and inconvenience, having regard to the time and effort
required to deal with and respond to the FSP’s actions, as well as the
inconvenience of works still being outstanding more than 18 months after the
claim was lodged.
Summary of FSP’s position
11. The FSP says that:
the policy is not a policy of reinstatement and the FSP is only required
to repair the damage to the Applicant’s home, not to “reinstate” the
home using the exact same products;
Case No: 302762 Determination Page 3 of 10
the terms of the policy provide the FSP with a discretion to use either
the original materials or the “nearest equivalent available”, in order to
repair the Applicant’s home. Based on the terms of the policy, the FSP
is only required to match the underlying material from which the tiles
are made (which in this case is rubber);
the original tiles are no longer in production and while the y can be
obtained by way of a special order, this does not mean that they are
“available”. The terms of the policy do not require the FSP to go to the
extent of placing a special order;
given the minimum order size, the cost of obtaining the original tiles is
grossly unreasonable and does not reflect the actual cost to repair the
damage;
the references to “matching” in the building contract refer to ensuring a
consistent appearance with the existing tiles, rather than using the
original tiles to complete the repairs; and
under the policy, the FSP is entitled to elect to cash settle the
Applicant’s claim for the flooring and can do so provided that no work
on the flooring has commenced. The FSP has no choice but to offer a
cash settlement if the Applicant will not allow repairs to proceed unless
the original tiles are used.
12. Accordingly, the FSP says that it is entitled to repair the damage to the
Applicant’s floor using a flooring product which is similar to, but not exactly
the same as the original tiles.
13. T he FSP says that any delays in settling the Applicant’s claim have been
caused by the Applicant’s refusal to allow the FSP’s service providers to
carry out the repair work in accordance with the terms of the policy.
Issues
14. Whether the FSP is required to use the original tiles to repair the damage to
the floor of the Applicant’s home.
15. Whether the Applicant is entitled to compensation for non-financial loss due
to the FSP’s handling of his claim.
Reasons for decision
16. I am satisfied that there has been a full exchange of material between the
parties and that each party has had the opportunity to address any issues
raised therein.
Case No: 302762 Determination Page 4 of 10
17. The parties have provided extensive submissions which I have reviewed in
their entirety. However, for the sake of brevity, in this Determination I will
only refer to submissions made by the parties to the extent that I consider
them to be directly relevant to my decision.
18. The following matters are not in dispute:
the original rubber floor tiles (Norament Luxor 4627) used in the
Applicant’s home are manufactured in Germany ;
the original tiles are no longer in production but are available by special
order, subject to a minimum order size of 400 square metres;
the cost of obtaining and installing th e tiles is approximately $85,000
(given the minimum order size); and
the area of the Applicant’s home to be retiled is approximately 64 to 70
square metres .
19. The FSP argues that the cost of using the original tiles to repair the
Applicant’s property is unr easonable and therefore it is entitled to use an
alternative tile. The FSP has proposed using either Norament Luxor 4766 or
Norament Luxor 4900, each of which appears to be made from the same
materials as the original tiles, but is not of precisely the same colour and
pattern. The Applicant rejects these suggested alternatives in place of the
original tiles.
20. Accordingly, the primary issue to be considered is the nature and content of
the FSP’s obligation to repair the Applicant’s property and in particular,
whether, in the current circumstances, this requires the FSP to use the
original Norament Luxor 4627 tiles.
Election to repair
21. The Applicant’s policy states that where his home suffers loss or damage,
the FSP will decide whether to:
repair;
rebuild; or
pay the cost to repair or replace the part of the home that suffered loss
or damage.
22. It is not disputed that, following lodgement of the Applicant’s claim, the FSP
elected to repair the damage to the Applicant’s home. Once the FSP made
an election to r epair the Applicant’s home (rather than to cash settle him for
the cost of the repairs), it was obliged to complete the repairs in accordance
with the terms of the policy. At this point, the FSP effectively assumed the
financial and other risks associated with completing the repairs.
Case No: 302762 Determination Page 5 of 10
Obligation to repair
23. Under the Applicant’s policy, the obligation to repair is an absolute
obligation. This is consistent with an insurer’s obligation to indemnify the
insured for loss or damage sustained. However, the obligation to repair does
not of itself necessarily require the insurer to “reinstate” the damaged
property, so that post-repair the insured property is in all respects exactly the
same as it was pre-repair. In order to determine the nature and extent of the
FSP ’s obligation to repair, it is necessary to have regard to the specific terms
of the policy.
24. I note that the Applicant says that, by entering into the building contract and
through its subsequent conduct, the FSP has not only elected to repair the
damage but has elected to match the existing tiles. I do not accept that the
actions of the FSP referred to by the Applicant have this effect.
25. While the scope of work in the building contract refers to the supply and
laying of floor tiles “to match existing”, it is not apparent that the use of the
expression “match” in this context refers to anything more than the need to
ensure that the appearance of the replacement tiles was consistent with (but
not necessarily identical to) that of the existing tiles.
26. The actions of the FSP in seeking to match the existing tiles were consistent
with its obligation under the policy to “try to match” the repair materials (as
discussed further below). However, absent some form of estoppel argument
(which the Applicant has not adva nced), the FSP’s actions in seeking to
comply with its obligations under the policy cannot result in it being required
to do anything more than it would otherwise be required to do under the
terms of the policy itself.
Replacement benefit
27. The Applican t’s policy includes “replacement benefit” and therefore, in
repairing the damage to his home, the FSP is required to comply with the
following provision:
“We will repair or rebuild the part of your buildings that suffered the loss or
damage to a condition as close as possible to when new, but not better.”
28. The purpose of the above provision is to clarify that the FSP must repair the
property so as to ensure that the repaired property reflects the condition of
the damaged property when new, rather than its co ndition at the time of the
loss. However, I do not accept that the above provision necessarily requires
the FSP to use the original product when carrying out repairs.
29. The expression “condition” refers to the state of the property at the relevant
time. Accordingly, the relevant provision is intended to ensure that any
decline in the condition of the property due to factors such as wear and tear
and gradual deterioration are not taken into account for the purpose of
determining the standard which the FSP is required to meet in carrying out
repairs.
Case No: 302762 Determination Page 6 of 10
Obligation to match
30. The Applicant’s policy states that, where the FSP carries out repairs, it will:
“try to match any material used to repair [the] buildings with the original
materials or nearest equivalent availa ble to the original materials”.
31. Both parties have provided a number of suggested alternative constructions
of this provision, in support of their arguments as to whether it does or does
not require the FSP to use the original tiles in the current circumstances.
32. It is helpful to have regard to the following well-known statement by Gleeson
CJ ’s regarding the construction of insurance contracts, in the case of
McCann v Switzerland Insurance Australia Ltd (2001) 11 ANZ Ins Cases 61-
479:
“A policy of insurance, even one required by statute, is a commercial contract
and should be given a businesslike interpretation. Interpreting a commercial
document requires attention to the language used by the parties, the
commercial circumstances which the document addresses, and the objects
which it is in tended to secure.”
33. Unlike the obligation to complete repairs, the obligation to match the
materials used to repair the property is not an absolute obligation – the
policy merely requires that the FSP “try” to do so. In my view, this is in the
nature of a “reasonable endeavours” or “best endeavours” obligation (noting
that Australian courts to date have not identified any substantive difference
between the two).
34. In Transfield Pty Ltd v Arlo International Ltd (1980) 144 CLR 83, Mason J
stated that a best endeavours obligation:
“ prescribed a standard of endeavour which is measured by what is
reasonable in the circumstances, having regard to the nature, capacity,
qualifications and responsibilities of the [contracting party] viewed in the light
of the particul ar contract” .
35. The extent to which a “best endeavours” obligation may be limited in
particular circumstances is reflected by the decision in Transfield . In that
case, the High Court held that one party’s obligation under a licence
agreement to use “best endeavours” to sell the product manufactured by the
other party did not prevent the first party using its own product when carrying
out works under a construction contract with a third party.
36. Accordingly, in considering the nature and extent of the FSP’s “matching”
obligation, it is necessary to have regard to the circumstances of the FSP,
viewed in the context of the policy of insurance.
37. In his submissions, the Applicant says that the standard of behaviour
imposed by the expression “try” cannot be determined based on a strict cost
based test. While I agree that cost is not the only factor, I consider that it can
be a relevant factor in determining to what lengths it is reasonable to expect
an insurer to go, when seeking to match repair materials. Other factors
which may be relevant include the inconvenience and/or delay associated
Case No: 302762 Determination Page 7 of 10
with trying to match materials (although this does not appear to be relevant
in the current dispute) and/or the availability of an appropriate substitute. The
assessment of what is “reasonable” necessarily involves consideration of the
facts and circumstances of each particular case.
38. In the circumstances of the current dispute, I do not consider that it is
reasonable to require the FSP to acquire the original Norament Luxor 4627
rubb er tiles in a quantity which vastly exceeds the number of tiles required to
repair the damage to the Applicant’s property, where doing so will require the
FSP to incur significant additional expense, in both a relative and a bsolute
sense. In these circumst ances, the issue is of a materially different scale
than in the example referred to in the Applicant’s submissions , where it is
expected that an insurer will fund the cost of a full tin of paint, even where
only a very small proportion of that amount will actually be used to undertake
repairs .
39. In the current circumstances, the availability of an alternative material is also
relevant. The Applicant has referred to the particular technical specifications
of the Norament Luxor tile. The alternative tile proposed by the FSP is a tile
of the same make, but of a slightly different colour and pattern. I have
reviewed online photographs of both the alternatives (4766 and 4900)
proposed by the FSP and the original tile (4762) and consider that 4766 (in
particular) appears very similar in colour and design to the original tile 4762.
40. In his submissions, the Applicant says that only cost constraint to which the
FSP can properly have regard in completing the repairs is the total sum
insured. I do not accept this position. The sum insured imposes a limit on the
total amount for which the FSP is required to indemnify the Applicant under
the policy and the FSP is not entitled to depart from its absolute obligation to
complete the repairs to the Applicant’s property merely on the basis that
doing so is too expensive. However, for the reasons outlined above, the
obligation to “try to match” is a “best endeavours” rather than an absolute
obligation and therefore it is appropriate to have regard to cost (as well as
other factors) in considering what will be required of the FSP in order to
satisfy this obligation.
41. In my view, having regard to the disproportionate costs associated with
acquiring the original tiles does not constitute the imposition of an arbitrary
and uncertain cost- based limit on the FSP’s obligations. Rather, it seeks to
give effect to the words of the policy as written and in particular, the
expression “try to match” where used in the relevant provision.
42. Accordingly, in light of the significant costs involved in obtaining the original
tiles and the availability of an appropriate alternative, I find that the FSP has
complied with its obligations to “try to match” the replacement tiles, by
proposing the use of Norament Luxor 4762.
43. I note that I have assumed for the purposes of the above discussion that the
“matching” provision requires the FSP to try to match the replacement
materials to the original material, rather than the nearest equivalent
available. While I consider that this to be the better view of the pro vision, I
Case No: 302762 Determination Page 8 of 10
have not explored the issue in detail for the purposes of this Determination
as it is not critical to my final decision.
44. Finally, I note that the Applicant has referred to a brochure issued by the
FSP to provide guidance to customers as to how to determine an
appropriate sum insured. The Applicant says that he relied on
representations and warranties in this brochure to the effect that the policy
would provide indemnity for the full cost of replacing his existing floor tiles.
45. I do not accept that the brochure referred to by the Applicant contains
representations and warranties to this effect. The brochure assists
customers to determine an appropriate sum insured, based on the cost of
rebuilding given the particular features of their home. In my view, it is
intended to draw customers’ attention to the fact that homes with high quality
finishes and design features will cost relatively more to rebuild and therefore
customers should ensure that the sum insured under their policy is
sufficiently high.
46. The current dispute does not turn upon whether or not the sum insured
under the Applicant’s policy was sufficient (see paragraph 40 above). There
is nothing in the relevant brochure which states that, in repairing damage to
the insured property, the FSP must use the original products. While the FSP
is obliged to repair the property using products of an equivalent standard,
this is satisfied by the use of an alternative Norament Luxor tile.
Cash settlement
47. It is clear from his submissions that the Applicant is understandably very
concerned to maintain the appearance of his home, which is architect
designed and finished to a very high standard.
48. While I have found that the FSP’s proposed use of the alternative Norament
Luxor tile to repair the damage complies with the terms of the policy, it is
possible that the Applicant may nevertheless prefer to make arrangements
to obtain and install the original tiles. Given that the FSP has already offered
a cash settlement at an earlier stage in the claims process, I consider that
the Applicant should be entitled to choose to be cash settled for an amount
equal to the cost of supplying and installing the Norament Luxor 4766/4900
tiles, as reflected in the quote for $21,340 quote dated 12 October 2012
obtained by the FSP and provided to the Applicant during the course of this
dispute.
Other issues
49. The Applicant says that, in repairing the damage to the tiles, the FSP should
be required to attend to all incidental matters such as disconnection of
plumbing equipment, removal and storage of furniture and compensation for
alternate accommodation.
Case No: 302762 Determination Page 9 of 10
50. The FSP has not disputed this aspect of the Applicant’s cl aim. Accordingly, I
find that, subject to the terms of the policy, the FSP should be required to
bear the cost of the matters identified by the Applicant, subject to any
restrictions or limitations which apply under the terms of the policy. If the
Applicant elects to be cash settled, the cash settlement should include
appropriate provision for these items to be determined by the FSP, based on
the costs it would anticipate occurring were it responsible for funding these
items directly. Any amount paid in respect of alternative accommodation
should be subject to the provision of appropriate invoices by the Applicant.
51. The Applicant also seeks rectification of certain repairs carried out by the
FSP to other damaged parts of his property. The FSP has acknowledged
that these repairs were defective and has agreed to arrange for rectification.
52. The Applicant seeks compensation for non-financial loss due to the delays
and inconvenience associated with the handling of his claim.
53. In large part, the delays and inconvenience experienced by the Applicant
have been a consequence of the current dispute, as the progress of repairs
has been delayed while the parties disputed the particular tiles to be used.
As I have found for the FSP on this issue, I am not satisfied that the
Applicant should be entitled to compensation for non-financial loss.
Determination
54. On the basis of the available information I determine that:
the FSP is entitled to repair the damage to the floor of the Applicant’s
home using Norament Luxor tiles (model 4766 or 4900);
if the Applicant accepts this Determination, the Applicant is entitled to
choose to have the FSP:
a. repair the property using Norament Luxor tiles model 4766 or
4900 (as chosen by the Applicant); or
b. cash settle the Applicant for the amount of $21,340, being the
quoted cost of supplying and installing the Norament Luxor tiles;
the FSP is to bear the costs of incidental matters associated with the
supply and installation of the replacement tiles, in accordance with the
terms of the policy. If the Applicant is cash settled, the amount of the
cash settlement is to be increased to include a reasonable estimate for
such items, provided that any amount paid in respect of alternative
accommodation will be subject to the provision of relevant invoices by
the Applicant;
the FSP is to arrange for the rectification of previous unsatisfactory
repair works; and
Case No: 302762 Determination Page 10 of 10
the Applicant is not entitled to compensation for non-financial loss due
to the FSP’s handling of his claim.