Text of the determination
Case No: 302753 Determination Page 1 of 9
Case number: 302753
General Insurance - Domestic Insurance - Home Building - FSP Decision -
Denial of claim
29 April 2013
Background
1. The Applicant holds a Home Insurance policy underwritten by the Financial
Services Provider (FSP). The policy covers the Applicant‟s home building
against defined events and accidental damage. The policy incepted on 1
September 2008 and remained current during the period in which damage
occurred to the building.
2. On 10 February 2012 the Applicant‟s repre sentative lodged a claim with the
FSP for cracking in some walls and subsidence in one room. The claim was
for damage that arose following heavy rainfall. The date of the occurrence
was not determined and a nominal date of 30 September 2010 was
established.
3. The FSP arranged for a builder to inspect the property. The builder
concluded that the damage arose because:
a. Recent renovations had affected the structural integrity of some of the
walls.
b. The installation of a swimming pool contributed to the subsidence in
one room.
4. On 13 March 2012 the FSP advised the Applicant‟s representative that the
claim would be rejected. The Applicant accepted the claim rejection, but his
representative raised the issue of rising damp which had affected parts of
the property.
5. Over the course of discussions between the Applicant and the FSP, the
Applicant has indicated that the damage arose following heavy rainfall that
occurred between December 2010 and January 2011 and again in February
2011.
6. On 4 April 2012 an engineer, appointed by the FSP, inspected the property.
The engineer, in his report dated 12 April 2012, concluded:
“The rising damp in the house is typical of problems that occur due to
deterioration of the original damp proof course. Normally a damp proof course
is provided in a solid brick house to prevent moisture extending from the
ground up into the walls.
Determination
Case No: 302753 Determination Page 2 of 9
It would appear in this case that problems have been occurring with the damp
proof course previously as the previous owner has carried out major
replacement of the damp proof course particularly to the external walls and
some of the interior walls.
It would appear however that some of the interior walls did not have the damp
proof course replaced by the previous owner and dampness has now become
evident in the house i n the walls.”
7. On 10 May 2012 the FSP wrote to the Applicant reiterating its rejection of the
first claim and confirming its rejection of the second claim for rising damp.
The FSP gave the following reasons for rejecting the claim for rising damp:
“The report from (FSP‟s engineer) further states that the rising damp evident
in the house has resulted due to long term deterioration of the damp proof
course and it would appear that the recent heavy rains have highlighted a pre-
existing problem that occurred with the damp proof course.”
8. Following rejection of the second claim, the Applicant arranged for an
opinion from another engineer (the Applicant‟s engineer). The Applicant also:
Researched the history of the property by contacting previous owners.
Submitted a statement from a builder who had inspected the sub -floor
in 2006.
Submitted a property inspection report that was completed pre -
purchase in 2001.
9. The FSP reviewed this material and sought further comments from its
engineer. The claim was submitted thr ough the FSP‟s internal dispute
resolution process and, in a letter dated 31 August 2012, the FSP again
rejected the Applicant‟s claim saying:
a. That the Applicant had failed to mitigate his loss.
b. That it was evident from the pre-purchase report that the sub-floor area
needed to be addressed and that if it was not it could lead to problems.
c. That the Applicant had failed to establish that the damage being
claimed was the result of a single event covered under the policy.
d. That the damage was pre-existing and occurred over an extended time
due to rising damp from the sub-floor area and general wear and tear
over the life of the home.
10. The Applicant, in his submission to the Financial Ombudsman Service has
also raised the following issues:
That the FSP had planned to breach his privacy by directly contacting
the author of the pre-purchase report without his permission.
That the FSP (or an employee of the FSP) had then attempted to cover
up its actions.
That the email sent to him in error by the FSP shows that the
relationship between the FSP and the engineer it appointed is not
independent or unbiased.
Case No: 302753 Determination Page 3 of 9
That the FSP had incorrectly lodged his claim as a „flood‟ claim,
resulting in another insurer increasing the Applicant‟s insurance
premium in relation to the insurance of home contents.
Summary of Applicant’s position
11. The Applicant says that on 5 February 2011 storm water inundated the
property. Water did not enter the doors but, unknown to him at the time it did
enter the sub-floor area.
12. Around September/October 2011 he noticed a slight bubbling of paint in the
bathroom area and intended to ask his builder to look at it during the final
renovation.
13. The Applicant says that in February 2012 the builders removed a cabinet
from the old kitchen area and the full extent of the rising damp was realized.
He contacted the FSP to lodge a claim for the rising damp and the sinking of
the southeast timber extension.
14. The Applicant says that when the claim was submitted he was not aware of
the date of the storm and was advised by a representative of the FSP to give
any date and it could be changed subsequently. When the FSP‟s builder
attended the property on 22 February 2012 he was shown the rising damp
but did not comment on it in his report.
15. The Applicant says that on 28 February 2012 there was another severe
storm and the property was inundated. A couple of days later the floor in the
kitchen was opened up to facilitate access for plumbers and the sub-floor
area had an inch of water in it.
16. When the Applicant was advised that the claim for the sinking extension
would be rejected, he says that he accepted that decision, but asked that the
rising damp be addressed.
17. The Applicant says that when the FSP‟s engineer attended the premises on
4 April 2012, the engineer questioned when the four lower courses of brick
had been re-pointed. The Applicant says that he informed the engineer that it
could have been the previous owner, who was a builder, and that he (the
Applicant) could contact the previous owner and find out. The Applicant says
that the FSP‟s engineer told him not to bother then subsequently, in his
report, represented the comment as fact and it has become the basis of
denial of the claim. (Refer extract from engineer‟s report at paragraph 6
above).
18. The Applicant says that he has now contacted all of the previous owners
going back to the children of the people who owned the property in the
1950‟s. It is now clear that no repairs or replacement to the damp course has
taken place since at least the 1950‟s. The Applicant says that there has been
no indication of rising damp problems in the intervening years and disputes
Case No: 302753 Determination Page 4 of 9
that the property has a history of this issue evidenced by recent rectification
of the damp proof course.
19. The Applicant arranged for an engineer (Applicant‟s engineer) to inspect the
damage. The Applicant‟s engineer inspected the property on 30 April 2012
and in an undated report said:
“Witness evidence and ground level observations support that a flood event
has occurred which has led to very high sub floor moisture levels and likely
sub floor ground surface flooding. Cupped floor boards observed support this.
The subsequent high capillary moisture loads in the wall have exceeded the
capabilities of any dampcourse installed, except in the outer skin of the
external walls where a remedial dampcourse seems to have been installed.
Moisture levels above floor level have risen to a level adequate to cause
damage to solid plastered walls.”
20. The Applicant‟s engineer suggests in his report that the damp course may
not have deteriorated at all. The building is over 100 years old and the
Applicant‟s engineer says that damp courses of that time were never 100%
waterproof and would not have coped with the level of inundation that he
believes occurred.
Summary of FSP’s position
21. The FSP says that the Applicant has failed to prove that the damage to his
property arose from an incident. Page 3 of the policy reads:
“This policy provides cover for
i. Incidents listed on pages 6 to 17
ii. The additional cover listed on pages 18 to 23 which applies when we
pay a claim for the incidents listed on pages 6 to 17 and
iii. Options that you can add to your policy by paying more, which are
Increased contents cover for valuables, pages 32 to 34
Accidental damage, page 30 and
Fusion of electric motors page 31
22. An incident is defined in the policy as:
“ Incident
Is a single occurrence, or a series of occurrences arising out of the one event”
23. The FSP says that the Applicant has given various descriptions of the
incident and provides a schedule of 12 different references by the Applicant
and his representative to the possible date or dates of occurrence. The
schedule indicates six variations to the date of occurrence for the first storm.
24. The FSP says that the Applicant has failed to show that the rising damp is
connected to any of the events he has nominated as the cause of the
damage.
Case No: 302753 Determination Page 5 of 9
25. The FSP says that the Applicant‟s attempts to prove that the condition of the
property was sound prior to the weather events of 2011 and 2012 is
unsubstantiated. In any event the absence of dampness prior to those
events does not eradicate the probability that the damage was caused by a
deterioration of the existing damp course, the condition of the sub-floor and
property generally, or other events.
26. The FSP says that the pre-purchase property report identified some pre-
existing damp and sub-floor ventilation problems and that the Applicant, at
the time of the damage, had not addressed the need for sub -floor vents.
27. The FSP says that the Applicant has failed to prove that the damage was
caused by an event that is insured under the policy. The Applicant has
variously described the cause of the damage as being:
Storm
Flood
Heavy rainfall
28. The FSP says that the policy does not cover flood and that damage arising
solely from heavy rain is specifically excluded from the cover provided under
“Storm”. To sustain a claim for storm damage the Applicant would need to
prove an occurrence of:
a. Violent winds, cyclone or tornado
b. Thunderstorm or hail
c. A sudden excessive run-off of water as a direct result of a storm (as
defined in the policy) in the Applicant‟s local area
The FSP says that the Applicant has failed to prove any such occurrence is
the cause of the damage.
29. The FSP says that the wording used in the policy in relation to Accidental
Damage makes it plain, particularly that part of the definition that
distinguishes it from a malicious act, that this cover is for damage caused by
human conduct and is therefore not relevant to this claim.
30. The FSP says that even if the Applicant were able to prove that the damage
was caused by an event insured by the policy, it would still be entitled to rely
on policy exclusions and refers to the following general exclusions:
“ we will NOT cover
loss, damage, injury or death that occurs as a result of
i. wear, tear, rust, corrosion, deterioration or erosion
ii. atmospheric conditions or extreme temperature
iii. mechanical, structural or electrical failure of an item”
31. The FSP says that if the Applicant were able to prove that the damage was
caused by Accidental Damage as defined in the policy, it would still be
Case No: 302753 Determination Page 6 of 9
entitled to rely on the following exclusion specific to that cover in relation to
the defective nature of the damp proof course:
“We will not cover damage caused by inherent defects and structural defects”
32. The FSP says that if the Applicant were able to prove that the damage was
caused by Storm as defined in the policy, it would still be entitled to rely on
the following exclusion specific to that cover:
“ however under building insurance
We will NOT cover loss or damage by storm to retaining walls or when water
enters through an opening that was not created by the storm”
33. The FSP says that if the Applicant is able to prove that the damage was
caused by an event insured under the policy then it will have occurred
concurrently with at least one of the causes excluded by the policy. The FSP
relies on the law in relation to concurrent causes which allows that where an
insured event and an excluded event occurs concurrently the excluded event
will prevail and the insurer is entitled to deny indemnity under the policy.
34. The FSP says that the Applicant is in breach of the conditions of the policy
and that it is entitled to deny the claim on the basis of the breach of
condition. The FSP relies on the following policy condition:
“ Things that may put your claim or cover at risk
You may put your insurance claim or cover at risk if you do not meet
your obligations to us. We may refuse a claim, cancel your policy, or do
both if you
iv. do not take all reasonable care to protect your home and contents
against loss or damage
v. do not maintain your home in good repair and condition. This means
your home must be structurally sound, secure and well maintained.”
35. The FSP says that the Applicant failed to complete maintenance
recommended in the pre-purchase inspection report obtained by the
Applicant in 2001 despite being aware of sub-ventilation and dampness
issues in the sub-floor and the alleged heavy rains described by him. As
such, he did not:
a. Take all reasonable care to protect the property against loss or
damage; or
b. Maintain it in good repair and condition.
36. The FSP says that it would have been entitled to approach the author of the
pre-purchase report but, in any event, since it did not do so, the allegation of
a breach of privacy is unfounded.
37. The FSP says that the premiums charged by another insurer in relation to
the Applicant‟s contents insurance are not as a result of any action that it has
taken and is a matter that the Applicant should pursue with that insurer.
Case No: 302753 Determination Page 7 of 9
Issues
38. Whether the Applicant is able to demonstrate that, on the balance of
probabilities, the damage was caused as a result of an incident, as defined
in the policy.
39. Whether the Applicant is able to prove that, on the balance of probabilities,
his loss was caused by an event against which the policy provides cover.
40. Whether the FSP is able to prove that the damage was caused by an event
that is excluded under the terms of the policy or, alternatively, that an event
excluded under the terms of the policy operated concurrently with an insured
event to cause the damage.
41. Whether the FSP is able to demonstrate that the Applicant is in breach of a
condition of his policy and that the breach is material to the loss for which the
Applicant is claiming.
Reasons for decision
42. As advised to the parties, FOS has considered it appropriate to expedite the
dispute in accordance with clause 8.6 of the FOS Terms of Reference. This
is due to the quantum and complexity of the dispute. This dispute has not
been the subject of a FOS Recommendation and has proceeded directly to
Determination.
43. I am satisfied that a full exchange of information has taken place between
each party and that each party has had the opportunity to address any
issues raised.
44. Both the FSP and the Applicant have raised arguments relating to possible
causes of loss and the application of policy exclusions. Many of the
arguments raised on both sides of this dispute have merit, however I am
satisfied that, regardless of the outcome of those arguments, there has been
a clear and material breach of policy conditions by the Applicant.
45. The property, which is the subject of this claim, is, according to the
Applicant, over 100 years old. The house has been constructed in such a
way that the site was “bunded”. In other words, the ground below the site of
the house was excavated so that the area below the floor is lower than the
ground surrounding the house. The Applicant says that, on at least two
occasions, during periods of heavy rainfall, water pooled in the sub-floor
area and resulted in rising damp.
46. In 2001, prior to the purchase of the property, the Applicant commissioned a
building report. At point 49 of that report the author said:
“No access is available to sub -floor and no direct assessment is able to be
made. Some indicators of possible defects are noted (refer notes 13, 52 and
59). These are that the floors are set too close to the ground to achieve
adequate ventilation below bearers (when this house was constructed, site
Case No: 302753 Determination Page 8 of 9
was often “bunded” [excavated] below floor, but this can lead to harbouring
storm water if very careful attention is not given to surrounding site and
exclusion of site water). The surrounding sub-walls are not well provided with
sub-ventilation and the flatness of the site would make water retention in this
area possible. It is suggested that floor hatches be cut in each accessible
space, areas inspected carefully, surrounding site, paving, landscaping and
drainage is advised to be carefully addressed under professional direction if
found necessary.”
47. The defects to which the report referred at points 13, 52 and 59 related to
movement in the floor and evidence of some subsidence.
48. Whilst the pre-purchase report did not specifically refer to rising damp, it
clearly provided warning to the Applicant of the likely occurrence of water
pooling in the sub-floor area and recommended remedial action to mitigate
damage from that source.
49. Even if only the inspection hatches had been installed, then it might have
been possible to mitigate the loss immediately after the February 2011
event. As it was, the Applicant did not become aware of rising damp until
many months after that event and not fully aware of the extent of damage
until removal of a cabinet in the old kitchen area in February 2012. The
pooling of water in the sub-floor area was not discovered until floor boards
were removed to facilitate access by a plumber, sometime after 28 February
2012.
50. Given this, I am satisfied that the Applicant has breached the following policy
condition:
“ Things that may put your claim or cover at risk
You may put your insurance claim or cover at risk if you do not meet
your obligations to us. We may refuse a claim, cancel your policy, or do
both if you
vi. do not take all reasonable care to protect your home and contents
against loss or damage
vii. do not maintain your home in good repair and condition. This means
your home must be structurally sound, secure and well maintained.”
51. I am also satisfied that the policy condition, on which the FSP is relying, is
material to the cause and nature of the loss for which the Applicant is
claiming. The pre-purchase report, completed in 2001, clearly raised the
likelihood of storm water pooling under the house and recommended that the
Applicant take action to:
a. Install hatches so that the sub-floor area could be easily accessed and
inspected.
b. Address drainage and paving around the house to avoid the build-up of
water.
Had this work been undertaken in a timely manner it is likely that the pooling
of water under the sub-floor, which ultimately led to the issue of rising damp,
could have been avoided.
Case No: 302753 Determination Page 9 of 9
At the very least, the presence of pooled water could have been detected by
inspection and action could have been taken to rectify the situation before it
led to damage such as the onset of rising damp.
52. I have noted the arguments advanced by both parties in relation to breach of
privacy, however, since the action contemplated did not, in fact, occur, I do
not regard the issue as being substantive to the dispute.
53. I have also noted the issue raised by the Applicant in regard to an increased
premium by another insurer, but I am not satisfied that the Applicant
demonstrated that the FSP was, in any way, the cause of the increased
premium. If the Applicant wishes to pursue this issue he should do so with
the insurer concerned.
Determination
54. On the basis of the available information, and for the reason stated above, I
determine that the FSP is entitled to deny indemnity to the Applicant in
respect of the damage to his house which is the subject of this dispute.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.