Home / Financial Firm (Unknown) / Determination 302486

Determination 302486

Defective PDS - misleading yield forecasts and insufficient risk disclosure

FirmFinancial Firm (Unknown)
Decided2014-03-28
ProductInvestments · Managed investment
OutcomeFor the firm
Amount awarded—
Non-financial loss—
Amount claimed$34,748
SourceAFCA PDF

Summary

The investor alleged the responsible entity's product disclosure statement for an agribusiness plantation scheme was misleading and its yield forecasts lacked reasonable grounds, claiming $34,748. AFCA found the PDS was not defective and the FSP is not liable to compensate.

Forecasts in a PDS must have reasonable grounds under section 769C, judged at the time made without hindsight, and the PDS disclosed the risks adequately.

Issues

Subjects and remedies

no remedy

Related

All Financial Firm (Unknown) determinations · Find similar determinations

Text of the determination

Case No: 302486 Determination Page 1 of 30 Case number: 302486 Investments - Managed Investments - Primary Production Schemes - Disclosure - Insufficient product/service information 28 March 2014 Summary Description  This d ispute concerns the Applicant‟s investment in an Agribusiness Project of which the Financial Services Provider was the Responsible Entity. The Applicant has alleged that the Project‟s Product Disclosure Statement was defective as it was misleading and deceptive information and contained representations as to future matters for which there was no reasonable basis. Basis of Determination  The PDS was not defective. Determination  The FSP is not liable to compensate the Applicant for any loss. Background Initial Submissions 1. This d ispute concerns the Applicant‟s investment in an Agribusiness Project (the Project) of which the Financial Services Provider (FSP) was the Responsible Entity (RE). 2. The Applicant alleged that the FSP breached its disclosure obligations under the Corporations Act and the ASIC Act . He has made submissions in respect to misrepresentations, non-disclosures and omissions in or from the PDS. He has made particular submissions about the representations about future matters and the assumptions upon which they were based. 3. The FSP denied liability on the basis that there had been no misrepresentations or non-disclosures that caused the Applicant to suffer a loss. There were reasonable grounds for the representations about future matters and the PDS was not otherwise defective. Determination Case No: 302486 Determination Page 2 of 30 4. Further, in its defence, the FSP has also pointed out that if it did produce a defective PDS it had taken reasonable steps to ensure that it was not defective. It did this by utilising the services of an independent forester and undertaking a due diligence process in its preparation that was signed off by lawyers in respect to the compliance of the PDS. Recommendation 5. This dispute was the subject of a FOS Recommendation which found in favour of the FSP on the basis that the Applicant had not established that any reliance on the PDS had caused his loss and made comments on the calculation of any loss sustained by the Applicant due to the failure to take into account possible taxation and Centrelink implications. The Recommendation was rejected by the Applicant. He made subsequent submissions in regard to the Recommendation‟s findings in respect of reliance on the PDS by the Applicant and causation of loss, income taxation considerations and a possible concurrent dispute with Company G. The FSP responded to this submission. Law and ASIC Guidelines involved 6. The following law and ASIC Guidelines have been raised or are relevant:  Section728 ss(1and 2), 769C, 1013 1041H, 1022A and 1022B of the Corporations Act  Sections 12DAof the ASIC Act  ASIC Regulatory Guides Reasons for decision 7. I have decided this case on its merits, having regard to the relevant law, good industry practice, codes of practice and previous FOS decisions. I have taken into account all the material submitted by the parties, both before and after the Recommendation. I am satisfied that the documentation I have relied on has been provided to both parties. 8. Both the Applicant and the FSP have been professionally represented in this dispute. For the purposes of this Determination, submissions made by either party or their representatives shall be described as being made by the Applicant or the FSP. The Background 9. The Project was a managed investment scheme within the meaning of the Corporations Act 2001 (the Act). Case No: 302486 Determination Page 3 of 30 10. The Applicant purchased 8 Plantation Units (PUs) in the Project on 2 May 2005. He was then a retail client of a financial advisory company (Company G). Company G provided him with personal financial product advice in a Statement of Advice (SOA) in May 2005 to invest in the Project. 11. This was done on the basis that it suited his needs and objectives as an Absolute Return Investor. This expression is not defined but it is apparent from the SOA that he, among other things, was looking for a long term investment generating income. 12. Company G provided the Applicant with the Project PDS and a Project Cash Flow document on or before the provision of the SOA. The SOA recited that the Applicant had considered the PDS and was satisfied with its risks and returns in the light of his objectives. It also recited that he had reviewed the Cash Flow document and had noted that the returns were not guaranteed by the Project. 13. The SOA did not analyse or contain any details of the PDS but it did contain warnings about the risks of investments. The SOA recorded that the Project had been recommended by two independent research houses. It warned, however, that the Applicant should read the PDS carefully before signing the application and to contact Company G if he had any questions. 14. There is no evidence that the Applicant raised any matters about the contents of the PDS with Company G prior to his applying for the units. The application form was endorsed by Company G. The PDS 15. The PDS for the Project was dated 31 January 2005. Investors were described as Growers. It provided extensive information about the Project, which involved the plantation of species trees to produce pulpwood and related products for export. The first harvest was expected to be 10 years from planting. 16. It relevantly made forecasts of future Project Yields on a PU, which was defined as an area of land required to produce the Project Yield. The area of the land varied depending on its productive nature. The ultimate project size was 23,870 hectares across 29 separate properties representing 22,723 PUs. It was spread across four specified regions in Esperance, Albany, Queensland and the Green Triangle. 17. The PDS contained warnings about the risks of the investment and steps that would be taken to mitigate those risks. There was also a statement that it was difficult to predict future productivity with any accuracy due to the interaction of a number of independent variables. 18. There is no evidence that Company G or the Applicant contacted the FSP in relation to any misleading or deceptive statements or the reasonableness of the basis for representations as to future matters prior to the Application for the units. Case No: 302486 Determination Page 4 of 30 Preliminary matters 19. Although not required for my ultimate Determination, I be lieve it is beneficial to deal with some preliminary matters because of certain issues raised by the parties in relation to FOS‟s jurisdiction and the Applicant‟s reliance on the PDS. Jurisdictional and other matters 20. There have been submissions about a range of issues including:  FOS‟s jurisdiction  its capacity to determine these types of disputes  the withholding of certain material  the need to bring a concurrent dispute against another party, and  causation of loss. 21. FOS‟s jurisdiction has been the subj ect of previous FOS Determinations and Rulings and has been judicially considered. There has been a recent decision in Crom well v FOS [2013] VSC 333 and in Determination 255787. 22. Save as to say that FOS has jurisdiction and the capacity under its Terms of Reference to determine the dispute, it will not be necessary for me to determine the other matters for reasons that will become apparent. I will, however, comment on certain matters at the conclusion of the Determination. Applicant’s knowledge of risk and r eturns 23. I find at the outset that the Applicant would have been aware of the risks of investing in agribusiness in Australian conditions . 24. It is commonly known from experiences in this country that agribusiness schemes, by their nature, carry an inherent risk because they are prone to environmental factors generally beyond the control of the best endeavours of their responsible entity. 25. Such factors can range from frequent droughts to excessive rainfalls. Predicting returns for growing new products can be uncertain, both as to the crop return and the potential market for the product. 26. If the Applicant did not know this from prior knowledge, I am satisfied that this would have been explained to him by Company G when the risks referred to in the SOA were discussed. This knowledge was reinforced by a reading of the warnings contained in the PDS prior to his making the application to invest. Case No: 302486 Determination Page 5 of 30 27. I am further satisfied, from the Applicant‟s specific acknowledgement in the SOA, that he was aware that the returns forecast in the PDS were not guaranteed by the Project. I can again infer from the SOA that the Applicant had received advice from Company G on the issue and this would have been reinforced by his reading of the PDS. Relevant Law and ASIC Regulatory Guidelines 28. Substantial submissions have been made in respect of the law by both parties‟ representatives. I am satisfied that they have an understanding of the applicable law and the ASIC Regulatory Guides (RG) as they apply to the issues in dispute and the facts upon which their arguments are based. As a consequence there will be limited referencing in this Determination. 29. I am satisfied that there is an appreciation by the parties that the determination of this dispute will turn on my assessment of the evidence in relation to:  the quality and completeness of representations and disclosures in the PDS  whether the FSP‟s representations in the PDS , including as to the future Project Yield and price, had reasonable grounds, taking into account the assumptions upon which they were based, at the time that they were made, and  whether there had been omissions from the PDS. 30. I note that the Applicant, in making his submissions, has relied in part on ASIC RG 170 issued in 2011 rather than the Guide applicable at the time the PDS was issued. The FSP pointed this out but has presented, in any event, evidence that it believed shows the PDS complied with ASIC requirements. I believe, in these circumstances, it appropriate to use the requirements of ASIC RG 170 not as binding but as a useful guide as to industry practice to which I will refer. 31. The FSP as the RE had both fiduciary and statutory duties in the carrying out of its powers and the exercise of its duties. As RE, the FSP must, among other things:  act honestly  exercise the degree of care and diligence that a reasonable person would exercise if they were in the RE‟s position, and  act in the best interests of members and, if there is a conflict between the members‟ interest and its own interests, give priority to the memb ers‟ interests. 32. The general obligations of an RE under the Act do not add to an RE‟s disclosure obligations, which are dealt with extensively in Part 7.9 of the Act. An RE has obligations to develop and provide a compliant PDS in respect to managed investment schemes. Case No: 302486 Determination Page 6 of 30 33. This Project required the production of a PDS. The FSP, consistent with its obligation, prepared the PDS. The requirements of a PDS 34. A PDS must be worded and presented in a clear, concise and effective manner and contain: a. Information about significant benefits and the circumstances and way in which those benefits will or may be provided. b. Information about significant risks of holding the product. c. Information about the costs of the product and any amounts that will or may be deducted from a common fund by way of fees, expenses or charges. d. Information about any other significant characteristics or features of the product and the rights, terms, conditions and obligations attaching to the product. e. Any information that might reasonably be expected to have a material influence on the decision of a reasonable person, as a retail client, whether to acquire the product. 35. In general the tests whether to include prospective financial forecasts or information generally in a PDS are its relevance to the audience and its reliability. What a PDS does not have to include 36. A PDS will not include information that was not known to the RE or other persons involved in the production of the PDS and it need not include information if a reasonable retail client would not expect to find the information in the PDS. 1 Defective PDS 37. Investors can recover the amount of loss they suffer because a PDS they were given is “defective.” 2 A PDS is “defective” if:  there is a misleading or deceptive statement in the PDS, or  the PDS omits material required to be in the PDS, as described above. 3 Defence to the production of a deceptive PDS 38. An issuer of a PDS may not be liable to pay an investor for any loss if it took reasonable steps to ensure the PDS was not defective. 1 Section 1013F(1) of the Act. 2 Civil liability arises under section 1022B(1)(c) of the Act. 3 Section 1021B of the Act. Case No: 302486 Determination Page 7 of 30 Misleading or deceptive conduct 39. The time to determine whether a representation was misleading or deceptive is at the time it was made. 40. According to ASIC, responsible entities should consider not only the content but the way in which information is presented in a PDS, to minimise the risk that a PDS is misleading or deceptive. 41. A statement is misleading or deceptive where it would cause an ordinary or reasonable member of the class of persons to whom the representation was ma de, to “labour under some erroneous assumption”; mere confusion or “wonderment” is not enough. In the context of a document, whether a statement is misleading or deceptive is determined by examining the whole document. 42. Silence may be “the element in all th e circumstances of a case which renders the conduct in question misleading or deceptive”. Also, “if the circumstances are such that a person is entitled to believe that a relevant matter affecting him or her would, if it existed, be communicated, then the failure to communicate it may constitute conduct which is misleading or deceptive”. This has been referred to as “circumstantial silence”. 43. A court will more readily find a reasonable expectation of disclosure where the relationship between two parties gives rise to fiduciary or other duties under the general law. Representations without reasonable grounds are misrepresentations 44. Section 769C of the Act provides that representations about future matters are taken to be misrepresentations if made without reasonable grounds. An investor may recover loss they suffer caused by misleading or deceptive forecasts in a PDS in respect to representations about future matters. 45. ASIC has stated: “A statement about any future matter is misleading or deceptive if the maker does not have reasonable grounds for making it. For example, a statement about prospective financial information based on a number of hypothetical assumptions is unlikely to be based on reasonable grounds. For further guidance on disclosure of prospective financial information see [RG 170].” 46. There are a number of common problems associated with disclosing prospective financial information. These include: a. discounting or not taking into account the variable nature of matters which influence, or may be influenced by, future events, and b. the inherent potential to mislead by disclosing prospective financial information based on hypothetical circumstances or unrealistic assumptions. Case No: 302486 Determination Page 8 of 30 47. Relevant to this dispute is that the reliance on an independent report may provide reasonable grounds for including prospective financial information. 48. In considering good industry practice, I can have regard to ASIC‟s Regulatory Guides. 49. ASIC set out the Good Disclosure Principles in respect of PDSs in RG 168. ASIC stated disclosure should:  be timely  relevant and complete  promote product understanding  promote product comparison  highlight important information, and  have regard to consumers‟ needs. 4 50. ASIC notes that a failure to consider the Good Disclosure Principles when preparing a PDS may increase the possibility of misleading or deceptive conduct, unconscionable conduct, or indicate that the content obligations of the PDS requirements (eg that the PDS is clear, concise and effective) have not been met. 51. ASIC RG 170.17provides: “ The making of a statement that contains prospective financial information (i.e. a forward-looking statement) must have reasonable grounds or it will be taken to be misleading under s728(2) or 769C of the Corporations Act. What are „ reasonable grounds ‟ should be determined objectively in light of all of the circumstances at the time of the statement, so that a reasonable person would view as reasonable the grounds for the statement” . 52. ASIC RG 170.28 states: “To demonstrate reasonable grounds, an issuer must b e able to point to: (a) some facts or circumstances; (b) existing at the time of publication of the information in the disclosure document or PDS; (c) on which the issue in fact relied; (d) which are objectively reasonable; and (e) which support the information : see Sykes v Reserve Bank of Australia (1999) ATPR 41-699 Heery J at 42-902 .” 4 ASIC Superseded Regulat ory Guide 16A – Disclosure: Product Disclosure Statements (and other disclosure obligations), (current 28/11/ 01 – 12/05/05) (SRG 168) para [168.10]. Case No: 302486 Determination Page 9 of 30 Applicant’s Position 53. The Applicant‟s initial submission details a short history of the Project comparing the disclosures in the PDS with the actual performance of the Project. Relevantly, he pointed out that the PDS disclosed an estimated Project Yield of 275 cubic metres per PU and an estimated current price (exclusive of GST) of $41.60 per cubic metre. 54. The forecast yield was for 2016 (the expiry date of the Project) and current price was for 2005. The average productivity yield over a 10 year period for each region was expected to be:  220 cubic metres per hectare in Esperance  270 cubic metres per hectare in Albany  up to 330 cubic metres per hectare in Queensland, and  250 cubic metres per hectare in the Green Triangle, an established hardwood area. 55. The PDS contained other tables in relation to forecast yields and the financial outcomes for Growers for a single PU. It also contained statements and information upon which its forecasts were based. 56. During the period between 2006 and 2008 the FSP advised the Growers, like him, that due to reduced rainfall and heat there were problems with the plantings in the Esperance and Queensland regions. Subsequently there were problems with the plantings in the Albany region. 57. The FSP provided a report to the Growers in 2011 that showed that the Project had been adversely affected by climatic conditions, insects and disease. It was apparent by then that the forecasts made in the PDS were no way near being met. The Applicant contends that this was clear evidence that the forecasts in the PDS were made without reasonable grounds. 58. The Applicant alleged that the Project‟ s PDS was misleading and deceptive and contained representations as to future matters for which there were no reasonable grounds as the assumptions upon which they were based were flawed. The Applicant, in particular, argues that there were no reasonable grounds for representations as to future productivity or Product Yield in the PDS. 59. The Applica nt obtained an independent forester‟s report (the Applicant‟s forester‟s r eport). He has cited conclusions from this report and other factual material in support of his argument. There are also contentions that the PDS was further defective in that it did not contain all necessary or complete disclosures. Case No: 302486 Determination Page 10 of 30 60. The Applicant‟s initial submission discussed the misrepresentations and non - disclosures of the FSP as the RE under headings of:  no reasonable grounds for productivity matrix  the untried regions would be as productive as Albany and the Green Triangle  location of plantation land was not known at the date of the PDS  no reasonable grounds for Esperance yield forecasts  no reasonable grounds for Queensland yield forecasts  no reasonable grounds for genetic seed improved growth rates  varieties to be planted were not known at the date of the PDS  independent expert report did not meet the requirements of ASIC RG 170, and  the PDS disclosure. 61. The Applicant outlined specific legal points about:  the obligations of the FSP as an RE  the requirements of a PDS  that representations without reasonable grounds are misrepresentations with particular reference to section 769C of the Act, and  the reliance on an expert report. 62. Central to the Applicant‟s claim for compensation is that the FSP failed to disclose in the PDS that there was a high level of risk associated with realising the productivity or Project Yield and the assumptions used for reaching its conclusions were flawed. 63. The Applicant argued that the Project Yield was the crucial forecast upon which investors relied to make the investment. He maintained there had been misrepresentations or non-disclosures based on flawed assumptions in the productivity matrix in the PDS; there had been reliance on an independent forester ‟ s report which was either incomplete or based on the FSP‟s opinion rather than fact. 64. He further contends that there were other defects in the PDS disclosures in relation to prospective financial information. The Applicant relied on the Applicant‟s forester‟s report in support of his arguments and alleges that aspects of the Project were of an experimental nature. 65. The Applicant contended, in relation to his claim for compensation for a loss of $34,748, that central to his decision to invest in 2005 was the Project Yield and price. He argues that the two key parameters of the investment offer under the PDS were stumpage price per cubic metre of wood harvested and the predicted yield per PU. Case No: 302486 Determination Page 11 of 30 66. The Applicant contended that the FSP, by its misrepresentations or non- disclosures in relation to these factors, caused him to suffer a loss. The Applicant summed up in relation to how it was said that the FSP‟s defects in disclosure affected him: “ HOW DEFECTS IN DISCLOSURE HAVE AFFECTED THE COMPLAINANT i. The Complainant would have made other financial arrangements, had the Responsible Entity disclosed in the PDS that there was a high level of risk associated with realising the Project Yield and price due to: 104.1. the forecast being over 10 years, with implied assumptions about pulpwood market conditions, weather patterns, growth rates and development of port facilities and other infrastructure which were not made explicit; 104.2. the Productivity matrix assuming a final yield based on final planation location, when the final geographical disposition was unknown at the time of the PDS; 104.3. the Independent Forester's Report not satisfying the requirements of RG 170 by not confirming that all assumptions – both explicit and implied – were reasonable; 104.4. the majority of the Project being experimental in nature – planted in areas with little plantation history using varieties with no growth data – which were incapable of accurate comparison to more established plantation areas and using established varieties; 104.5. existing problems had been identified in Esperance and Queensland and the measures to rectify them had been inconclusive; 104.6. the Responsible Entity was adopting new and unproven planation techniques, which would increase the risk of the project when compared to the use of established techniques; 104.7. the forecast genetic gains being hypothetical in nature and the forecast percentage gain calculated from a subjective base rate, designed to re-assure that the forecast yields had some reasonable grounds; 104.8. the requirement to use untried varieties of Eucalyptus in Queensland plantations; 104.9. the forecast Queensland and Esperance yields being based on trials and overseas data, rather than established plantation history, and as a result forecasts from this area should have been accompanied by an added level of caution; 104.10. Queensland's sub-tropical environment making the plantations in this area more susceptible to known fungal diseases such as Kirramyces; and Case No: 302486 Determination Page 12 of 30 104.11. the elevated risk of not meeting forecasts when compared to forecasts for plantations in the more established areas mentioned in the PDS alongside the experimental areas, using varieties and planting techniques with an established track record.” [sic] 67. The Applicant argued that prospective financial information in the PDS was not properly placed. He said it can be misleading if such information is presented in isolation from the assumptions and a description of the methodologies used to develop the information. 68. The Applicant also contends that the following warning should have been included in a box in the PDS: “ The final planting locations remain unknown at the date of the PDS. It is likely that a large portion of the project will be located in Esperance, Western Australia and the central coast of Queensland where data on tree growth is limited. The project will also involve plant varieties and planting techniques that are untried in industrial pulpwood plantations in Australia .” 69. The Applicant also contends that there should have been an expanded section on the “Pulpwood Project” under headings of “Forecasts for Esperance” and “Forecasts for Queensland”, setting out additional information about risk factors. 70. The Applicant further contends that the RE failed to adequately disclose the assumptions and risks in the same PDS location as the Project Yield forecasts. As a result, an investor would view the forecast in isolation as achievable, when in reality it was essentially an investment in plantation “research and development” and highly speculative , given the limited history of the likely plantation sites and the hypothetical nature of the assumptions under which the Project Yield was based. Further Submissions 71. The Ap plicant made a submission following the FSP‟s initial submission. The submission dealt with the FSP‟s legal arguments in relation to the basis of the claim and FOS‟s jurisdiction and the withholding of certain information. 72. The Applicant conceded that he was not relying on section 1041H of the Corporations Act or section 12DA of the ASIC Act . He confirmed that he was relying on sections 769C and 1022B and subject to certain proviso 1022A of the Corporations Act . 73. It foreshadowed that there would be a further submission once the Applicant received an independent forester‟s report, the Applicant‟s forester‟s report, that had been commissioned. Case No: 302486 Determination Page 13 of 30 74. The Applicant made another submission following the receipt of the Appli cant‟s forester‟s report. This submission included a summary of the Applicant‟s forester‟s report and responses to the FSP‟s contentions about the reasonableness of the basis for future representations, that the disclosure in the PDS was not defective and its due diligence defence. 75. Based on the Applicant‟s forester‟s report and the contents of the PDS, the Applicant highlighted that the estimated predicted yield involved assumptions about rainfall data, site quality and species. 76. The Applicant said in relation to the disclosure of risk that the PDS put the risk that the PU would not produce the predicted yield on to the investor. Also the risk of not meeting the Project Yield could have been better explained so that a reader of the PDS did not draw the incorrect conclusion that the predicted yield was a reasonable estimate of the likely outcome. 77. He said that while the risks were generally stated in the PDS, the predicted yields were extremely optimistic based on the information at the time. 78. The Applicant specifically contended (footnotes omitted): 17. The two key parameters of the investment offer under the PDS were the stumpage price per cubic metre of wood harvested and the Predicted Yield per PU. 18. The FSP did not have a reasonable basis for the Project Yield adopted in the PDS for the following reasons: 18.1. the actual locations of the proposed plantations in Esperance and Central Queensland were unknown at the date of the PDS, making the adapted site quality and rainfall criteria hypothetical; 18.2. there was no certainty that areas near Esperance could be purchased with the necessary annual average rainfall to cope with reasonable variation in rainfall from year to year; 18.3. there was no reasonable basis for the adoption of the SQ2 assumption for the proposed Central Queensland plantings, given the prevalence of duplex soils and the seasonal variation in rainfall, as well as the known susceptibility of E grandis and E grandis hybrids to existing pests and diseases 18.4. the use of the CSIRO 3-PG model for deriving the Predicted Yield did not take account of the effects of known pests and diseases; and 18.5. there was no national or international data which provided a reasonable basis for the Predicted Yield in the PDS 19. While the estimate of the current stumpage price of $41.60 per tonne had a reasonable basis, the PDS did not include information available to the FSP that the price was more likely to decline in future, due to then current trends in woodchip prices and likely increasing supply, due to Government stimulation. 20. The dramatic effect on the stumpage price for Esperance plantations of the long distance to an available port was not explained in the PDS.” Case No: 302486 Determination Page 14 of 30 79. The Applicant co ncluded that the FSP‟s forester did not independently test the FSP‟s p roductivity assumptions; the report of the forester together with other data included or referred to in the PDS provided a reasonable basis for the estimate of the stumpage price of $41.60 but did not provide a reasonable basis for the predicted yield. He said further, the FSP‟s due diligence defence failed because:  The independent forester‟s report merely accepted the assumptions of the FSP and did not independently test the assumptions.  There was information available to the FSP that clearly indicated that growth rates assumed were unlikely to be achieved and there was no reasonable basis for the predicted yield in the PDS.  There was information available to the FSP that prices of woodchips were likely to fall and the transport costs for Esperance plantations would reduce proceeds to Growers. FSP’s position 80. The FSP denied liability and responded to the complaint on 19 March 2013. It made submissions as to the law and in particular sections 728(1) and 1041H of the Act and section 12DA of the ASIC Act , contending that they did not have application to the issues in dispute. It referred to sections 1022B and 1022A of Ch 7.9 of the Act but did not argue they did not have application. 81. The FSP identified the substance of the complaint was that:  The estimated Project Yield represented in the PDS did not have a reasonable basis.  The PDS did not properly disclose the risks associated with realisation of the estimated Project Yield.  The Applicant would not have invested in the Project had the risks associated with the realisation of the estimated Project Yield been disclosed in the PDS. 82. The FSP set out a summary of the Applicant‟s allegations of misrepresentation said to have been made. Its submissions provided information rejecting them on the basis that there were reasonable grounds and providing its responses to the specific allegations. 83. The FSP also provided other extensive documentation evidencing the process it followed in making the assumptions it did and formulating the representations as to future matters. 84. These included the:  productivity matrix  growth and yield equations for the Eucalyptus globus  Harvest yields Case No: 302486 Determination Page 15 of 30  Actual Yields Eucalyptus globus – Western Australia CSIRO report on a process to determine a productivity matrix for Eucalyptus grandis grown in Central Queensland  Calm Esperance Trial  an article on species trials and genetic improvement, and  the 2005 Productivity Matrix: Verification of Productivity projections and seed certificates. 85. Among other things, it firstly said the Project Yield is defined in the PDS as “the expected volume of timber for the [Project] at harvest”, being 275 cubic metres per PU: “ 3.3 For the reasons set out in sections 4 to 7 below, [the RE] rejects the above allegations and confirms that it did have reasonable grounds for representing that the expected volume of timber for the Project would be 275 cubic metres per Plantation Unit. Further, it says that, in any event, readers of the PDS – including, presumably, [the Applicant] – were fully informed and must have understood that achievement of the productivity estimates described in the document was not free from risk. It was made clear, for example, that, „ it is difficult to predict future productivity with accuracy as it is dependent upon the interaction of many independent variables. ’ Many specific risks relating to the estimated Project Yield were detailed in section 5.2 of the PDS, following on from a warning that, „ The Projects are speculative long- term ventures. They are exposed to agricultural risks inherent in growing a crop and the commercial risks of a long-term project ’ . ” 86. The FSP defended the data upon which the Project Yield was based, pointing out that the Project Yield was to be ac hieved by making relevant adjustments to the sizes of the PUs at the time of their allocation. The process involved a detailed analysis of plantation locations and employed the most up-to-date data at the time. 87. The FSP‟s response dealt with the criticism of the assumptions relating to plantation locations, pointing to what was disclosed in the PDS and concluding: ” ...that irrespective of the final geographic location of a property (and, therefore , irrespective of also the range of associated productivity estimates), the estimated Project Yield of 275 metres could be obtained by making any necessary increases (or decreases) to the size of the plantation units in that respective property.” 88. The FSP said that it was reasonable for it to represent the estimated Product Yield in the PDS because it had data sources, systems and methodologies (all of which were endorsed by the independent forester) which enabled it to allocate PUs in a manner that it reasonably expected would permit the estimated Project Yield to be achieved: “As explained in the PDS, [the RE] used a Productivity Matrix to determine the size of the Plantation Units required to achieve the Project Yield. The Productivity Matrix for the Project was regularly reviewed and updated as new data became available, including by making any necessary revisions between Case No: 302486 Determination Page 16 of 30 the time of the PDS and the time of allocating the Plantation Units. All revisions of the Productivity Matrix were approved by the Independent Forester before allocation of Plantation Units. A copy of the final Productivity Matrix for the Project is enclosed behind Tab 2.” 89. The FSP also responded to the Applicant‟s assertion s by detailing disclosures in the PDS, as well as pointing out or documenting the data upon which the Project Yield was based, including:  The growth rates in its existing plantations, harvest yields from its own plantations and other growers in south-west Western Australia.  Independent F orester‟s Report.  Research from overseas countries with similar climates and conditions to Esperance and Queensland.  Modelling conducted by the CSIRO.  Trial results obtained from the Department of Conservation and Land Management. 90. The FSP also responded in detail to the issue of the genetic seed improvement forecasts with documented information on what it was based and the risks that were disclosed in the PDS. 91. It also responded to the Applicant‟s criticism of the independent forester‟s report and the process by which it was obtained. It provided a copy of a letter to its forester that indicates he was asked to provide an opinion in relation to matters ranging from the suitability of the species, land selection and design, forestry risks, marketing issues and the reasonableness of assumptions or comments in respect to projected timber yields and current timber prices. 92. The forester was also asked to review the PDS, with specific items detailed, and to identify forestry matters incorrectly stated or omitted from the PDS which was information that an investor and their professional advisers would reasonably require and would reasonably expect to find in a PDS for the purpose of making an informed assessment. 93. The review was to address financial position and prospects of the Project, the rights attaching to the financial products, the merits of participating in the Project and the extent of the risks and how the Project ‟s property was to be held. The FSP also points to the fact that it had engaged solicitors to assist in the preparation of the PDS and to set up a due diligence committee and program to provide legal advice on the requirements of the Act and the compliance of the PDS . A copy of the legal opinion confirming the PDS‟s compliance and the efficacy of the due diligence process was provided. 94. It submitted under the heading of Defences: “10.1 If a person has provided a defective productive disclosure statement, that person is nevertheless not liable to any person if they took reasonable steps to ensure that the document would not be defective. Case No: 302486 Determination Page 17 of 30 10.2 [the FSP] maintains that it did take reasonable steps to ensure that the PDS was not defective, including, relevantly, taking steps to ensure that: (1) there were reasonable grounds for representing the expected volume of timber for the Project; and (2) information was provided in relation to all significant risks associated with investing in the Project. 10.3 The reasonable steps taken by [the FSP] included: (1) Conducting a due diligence program which included setting up a due diligence committee, preparing and following a due diligence planning memorandum, carrying out detailed investigations, regular reporting to the committee and obtaining final verification of the PDS from persons who possessed relevant knowledge of the matters described in the PDS. (Copies of documents evidencing key aspects of the due diligence program are enclosed behind Tab I6, including copies of the Due Diligence Planning Memorandum, Directors & Management Questionnaire, signed Verification Memorandum, signed Due Diligence Committee Reports and signed verification copy of the PDS). (2) Engaging an independent expert [Mr Name] of [Name] Forestry Consultants) to: (a) provide an opinion in relation to: (i) suitability of the selected plantation species; (ii) land selection methods and plantation design criteria; (iii) the proposed methods of establishment and management of the plantations for use in each Project; (iv) proposed plantation tending and protection measures; (v) proposed harvesting and transport systems and access to markets; (vi) the capacity of (Initials of FSP) and other relevant group companies to manage each of the Projects, and their experience and technical expertise to support the Projects; (vii) proposed plantation monitoring and reporting to investors; (viii) the forestry risks and steps to be taken to manage those risks in each Project; (ix) proposed products, alternative products, markets and marketing strategy; (x) the reasonableness of assumptions in relation to the projected timber yields shown in the PDS; (xi) the reasonableness of comments in relation to the current timber prices shown in the PDS; and (b) review the PDS and identify forestry matters incorrectly stated or omitted from the PDS, being information that investors and their professional advisers would reasonably require, and reasonably expect to find in a PDS for the purpose of making an informed assessment of: (i) the assets and liabilities, financial position, profits and losses and prospects of each Project; (ii) the rights attaching to the financial products; Case No: 302486 Determination Page 18 of 30 (iii) the merits of participating in each Project, and the extent of risks involved; and (iv) how each Project's property 1sto be held. (a copy of the letter of engagement to [Name] of [Name] Forestry Consultants is enclosed behind Tab 17) (3) Engaging solicitors [Name] to assist in the preparation of the PDS, assist in the set up and conduct of the due diligence program and due diligence committee, act as chair of the due diligence committee and provide legal advice in relation to the requirements of the Corporations Act and compliance of the PDS. Enclosed behind Tab 18 is a copy of the legal opinion provided by [Name of Solicitors] by which they confirmed that: (a) they were not aware of any issues which caused them to believe that the PDS contained a misleading or deceptive statement or an omission or that the issues of the PDS may involve conduct that is misleading or deceptive; (b) the due diligence and verification systems followed by [the FSP] constituted reasonable steps to ensure that the PDS was not defective and that it was reasonable for (Initials of FSP) and its directors to rely on information and sign-offs supplied pursuant to those systems. 10.4 Accordingly, even if the PDS was defective (which is denied), [the FSP) would not be liable to [the Applicant] because it took reasonable steps to ensure that the PDS was not defective.” Expert Witness Reports 95. Opinions from an expert or experts with experience and knowledge of the underlying commodity, its geographical location, product yields and markets and other factors affecting the agribusiness scheme are generally provided by the responsible entity in promoting a scheme. They are usually relied upon by investors or their advisers in assessing the investment‟s prospects. 96. Both parties have relied on the opinions of independent foresters in respect to the reasonableness of the basis for the FSP‟s representation about the future Project Yield and the wood price. The FSP’s Forester 97. The FSP, among other things, utilised an independent forester in the formulation of the PDS and relies in part upon his report in responding to the Applicant‟s allegations. The Applicant has challenged the quality of the report and its uncritical reliance on information and assumptions provided by the FSP. The Applicant has provided a copy of the Applicant‟s forester‟s report together with a summary in a submission. Case No: 302486 Determination Page 19 of 30 The Applicant’s Forester 98. The Applicant‟s forester, before preparing his report, was provided with copies of the Applicant‟s complaint and the FSP‟s response which included the PDS. The report responded to a series of questions put by the Applicant in relation to the quality of the PDS, including the FSP‟s forester‟s report. 99. The Applicant‟s forester‟s report, among other things :  expressed an opinion that the FSP‟s forester‟s report merely endorsed the position as established by the FSP in the PDS and that the forester appeared to accepted the FSP‟s assumption without testing that they were reasonable.  The Applicant‟s forester‟s report expressed adverse opinions about the failings in the FSP‟s process and the incorrectness of some of the assumptions upon which the PDS‟s representat ions as to future matters were made.  It reviewed the FSP‟s assumptions about site quality, species matching and growth rates, national and international productivity yields, and the FSP‟s productivity matrix (including the CSIRO 3 -PG modelling, gains from improved genetics, supporting data from overseas).  The Applicant‟s forester‟s report summarised the elements used by the FSP to estimate the Project Yield and concluded that there was no reasonable basis for the predicted yields adopted in the PDS. The report suggested a more appropriate method (SQ 4 index) would have got a more realistic estimation of the Project Yield.  It commented that the temporary variable nature of the PU as stated in the PDS could have been better explained to avoid the possibility of an investor incorrectly drawing a conclusion that the yield per PU was a reasonable estimate of a likely outcome.  The report conceded that the PDS disclosed the risks involved in the reaching of the Project Yield and PU and current price was disclosed. It argued, however, that the inferences used by the FSP were incorrect and that the predicted yields to achieve the Project Yield were extremely optimistic. 100. The Applicant in his submission indicated that although the FSP‟s forester‟s report together with the other data included or referred to in the PDS provided a reasonable basis for the estimate of the current stumpage price of $41.60 per cubic metre, it did not provide a reasonable basis for the predicted yield. Case No: 302486 Determination Page 20 of 30 101. The FSP criticised the Applicant‟s forester‟s report for:  Relying on information and data which post-dated the PDS.  Not citing relevant sources or the date of such sources for some statements made and conclusions reached.  Section 7 of the report incorrectly assumed the size of the PUs were predetermined at the time of the PDS. 102. The FSP pointed out that the Applicant‟s forester‟s report acknowledges that the risks that came to pass were disclosed in the PDS and the report raised new issues. 103. Although I will be assisted by the foresters‟ reports, op inions expressed by expert witnesses cannot lead to the abdication of the decision-making responsibility. Expert opinion can often vary and in fact experts can adopt different approaches and reach conflicting conclusions based on the same evidence. 104. I will be guided by them along with other lay evidence in the dispute: 5 As has been said: “The law does not call for [a scientific] standard of proof, but rather proof on the balance of probabilities on the whole of the evidence, both scientific and lay, and as the decision of the High Court in Ramsay v. Watson ... demonstrates, a tribunal of fact must not abdicate its task to the scientific and/or medical experts, albeit being guided by their evidence alongside the lay evidence in the case.” OMBUDSMAN’S CONCLUSI ONS Misrepresentations, Non-disclosures and Omissions from the PDS The Framework 105. I believe that in view of the criticism by the Applicant of the content and quality of the PDS and the allegations of misleading and deceptive conduct that it is pertinent to examine the process by which the PDS was developed. 106. The FSP had a process which focused on the assessing of the risk factors associated with forestry projects and addressed those factors in the PDS. 107. The FSP:  used research from its own plantations  utilised research from overseas countries it believed had comparative climates  used CSIRO modelling 5 State of New South Wales t/a New South Wales Department of Agricult ure v Allen [2000] NSWCA 141 at [99]; quoting Ramsay v Watson (1961) 108 CLR 642, at 645. Case No: 302486 Determination Page 21 of 30  used material from a relevant Government Department  employed an independent forester, and  had a due diligence done to verify the PDS‟s compliance. The Applicant has argued that the process was flawed and incomplete for the reasons previously set out. 108. Despite this, I am satisfied that the FSP‟s processes involved an appropriate methodology for producing a compliant PDS and establishing that the grounds for the PDS representations as to future matters had an appropriate basis. 109. I find that the FSP ‟s use of internal and external information which focused on the risk factors associated with forestry projects together with the utilising of independent professionals was sound. It provided a basis for the formulation of a PDS that could be considered by investors or financial advisers in determining the suitability of the investment. 110. This, in itself, does not determine the matters raised by the Applicant but I am satisfied that it resulted in the production of a PDS which, with the attached FSP‟s independent expert report, recognised matters relevant to the success of the Project. These included, in addition to favourable climatic conditions, a wide range of factors such as soil suitability, forestry practices and the suitability of different varieties or species of trees to particular regions or for particular purposes. 111. This again does not mean that the PDS was not defective as the FSP cannot outsource its responsibility for the PDS but it is an indication that the FSP took reasonable steps to ensure that the PDS did not contain misrepresentations or failed in respect to disclosure obligations. This is relevant both to the efficacy of the documentation as well as any defence of the FSP for producing a defective PDS. Was the PDS defective? 112. I have outlined the Applicant ‟ s submissions in relation to a number of misrepresented or not disclosed matters in paragraph 60 above. I intend to deal with these matters under the heading “Representa tions as to Future Matters” . 113. The Applicant has raised other issues in relation to whether the PDS was defective. The Applicant has drawn attention, in particular, to the fact that:  a specific warning should have been given about plantings, the experimental nature of the Project and the fact that investors might have lost money  there should have been an additional warning about plantings with an expanded sections on the forecast for plantings in the Esperance and Queensland regions, and Case No: 302486 Determination Page 22 of 30  the financial information and other information should not have been disclosed in isolation to the risks involved. 114. The FSP has responded in some detail about the extent of the disclosures and its basis for the disclosures. It points to the fact that the Project had been examined by a number of research houses, including one particularly experienced in agribusiness schemes, and its due diligence group with no fault being found with the PDS. 115. The Applicant‟s model for the PDS contains information that is fuller and more comprehensive but I am not persuaded that it was necessary for it to be provided at the time for the FSP to meet its statutory and regulatory obligations at that time. 116. The PDS provided a summary together with comprehensive details about the nature of the Project including its costs, returns, risks and risk mitigation strategy. The document contained details about the operations of the RE and related companies and included a copy of the independent forester‟s report. 117. This report included information on project management, suitability of selected species, silviculture and management, land selection and productivity, markets and price. It also discusses markets and price and warns of deductions to be made for costs of harvest, transport, processing, shipping and allowances for fibre and moisture losses. 118. The PDS contained warnings about the uncertainties in the calculation of predicted Project Yield. It also contained warnings about the possible lack of rainfall and resultant insect infestation which eventually occurred. 119. In relation to risk, the Applicant, in a submission after he had received his independent forester‟s report, conceded that while the risks were generally stated in the PDS, the predicted yields were extremely optimistic based on the information at the time. 120. Irrespective of that concession, I am satisfied that the risks associated with the Project were fully disclosed to investors in the PDS. There was a detailed explanation of the risks in the PDS with disclosure of more specific risks relevantly made in other sections of the PDS. The risks associated with productivity in relation to the predicted yield are clearly explained in the document. 121. There must always be a judgement call to make about the structure of a PDS and the extent and detail of the information provided in a PDS that is needed to properly inform potential investors. Opinions will vary as to what should be included and how it is expressed in order to ensure its compliance, bearing in mind the need to be clear, concise and effecti ve. Case No: 302486 Determination Page 23 of 30 The experimental nature of the project 122. In respect to the Applicant‟s allegation that the Project‟s experimental nature was not disclosed, I note that the PDS does indicate that this was an innovative project based on Government support and initiatives with an emphasis on environmental considerations and the incorporation of such things as indigenous traineeships. 123. The PDS, in addition to a number of general statements in this regard, included specific information about the nature of the project. The FSP‟s independent forester‟s report in the sec tion on the “ Suitability of Selected Species, Silviculture and Management” in the PDS in respect to the pulpwood project, says for example, among other things, that: “This will be the first major hard wood plantation in the central coastal region of Queensland and the first industrial pulpwood plantations based on Spotted gums and their hybrids. There are uncertainties associated with innotative projects including growth rates and returns. Spotted gum has been identified as suitable for pulpwood plantations in published research. ” [sic] 124. I note that the report also recognised that in addition to there being limited data supporting growth rates for the Spotted gum, and that the FSP had identified the risks of genetic gain not being realised over the entire rotation. 125. The PDS warns that : “Due to a number of significant variables, the long -term nature of the Projects and the potential for agricultural projects to produce a wide range of outcomes, it is not possible to determine future cash flows with certainty. This section contains estimates of the main variables that influence the outcomes. The directors believe that the estimates are reasonable. Potential investors can make their own assessment of the returns likely from the Projects by inserting values for the variables in the cash flow calculator available on the [Name] website at [address]. The calculated returns and estimated values should be read in conjunction with Section 5.2, which lists the risks to the projects …” 126. Section 5 discloses the Project growi ng risks which include climatic risks, below average rainfall, seasonal conditions and pests and disease. It also includes a discussion of a range of financial and commercial risks. 127. I am satisfied that the PDS adequately disclosed the innovative nature of the Project together with what may be considered experimental aspects together with the growing and commercial risks to investors. The PDS was not misleading or deceptive in this regard. Warnings about plantations 128. The Applicant also contends that the PDS, by stating that a majority of the plantations would be in Esperance and Queensland regions, contained misrepresentations and non-disclosures in that it gave the impression that the past performance of established areas was representative of the future performance of the less established areas. Case No: 302486 Determination Page 24 of 30 129. This is clearly not the case. In addition to the specific disclosures to which I have referred, the PDS says that: “The Projects are speculative long -term ventures. They are exposed to agricultural risks inherent in growing a crop and the commercial risks of a long-term project. ” 130. There is also a clear warning about future timber yields in Section 5.2 with respect to young plantations. The PDS expressly says that there may be incorrect interpretation of relevant factors and overestimation of the expected productivity because limited data and experience existed with respect to the production of timber from mature plantations. It goes on to detail the reasons for such a problem. 131. I also find that it was not necessary to include the warning or the expanded sections on Queensland and Esperance as there was appropriate disclosure in the PDS, about location and the risks involved. Positioning of information and Warning of Risks involved. 132. Even if there are reasonable grounds to state prospective financial information, issuers should consider including a warning so that a reader of the document would understand its predictive character and the risks in placing undue reliance on that information. 6 133. Any cautionary language should be displayed together with the prospective information or otherwise in a manner sufficiently prominent to ensure that a reader of the disclosure document or PDS would be no less likely to view it than the prospective financial information itself. 7 134. Disclosure should include unambiguous statements clarifying that the prospective financial information: 8  is predictive in character  may be affected by inaccurate assumptions or by known or unknown risks and uncertainties, and  may differ materially from results ultimately achieved. 135. I am satisfied that the PDS met these requirements . The PDS was unambiguous in making it clear that some information was predictive, may be affected by inaccurate assumptions and may differ materially from the results ultimately achieved. Further it is not defective in respect to the positioning of provision of the financial information or the assumptions and risks in the same PDS location as the Project Yield forecasts. The PDS was indexed and well laid out so it could be readily followed to avoid a suggestion that these risks were not placed in isolation to the other matters relevant for its consideration. 6 SPS 170.55 7 SPS 170.87 8 SPS 170.88 Case No: 302486 Determination Page 25 of 30 Other Matters 136. There is evidence before me that gives strength to this contention. This evidence indicates that the PDS was examined by the two independent research houses, Company G , the FSP‟s due diligence committee and the Applicant. An examination of their conduct shows:  The research houses recommended the investment.  Company G recommended the investment and endorsed the App licant‟s application to invest in the Project.  The Due Diligence Committee verified the PDS‟s compliance.  The Applicant, warned of the risks of the investment, did not raise any questions about the PDS after reading it, with either Company G or the FSP. 137. While not conclusive, the fact that not one of this group raised issues about representations, non-disclosures or significant omissions with the FSP prior to the Applicant making the investment is telling. 138. Leaving this aside, I have examined the PDS and compared the information provided with the information that the Applicant says should have been disclosed. I have considered the Applicant‟s expert opinion in this context. 139. I am satisfied that the PDS in relation to these issues was not misleading or decepti ve. I find that the Applicant‟s specific allegations as to misrepresentations, non-disclosures or omissions are not sustained. 140. By way of completeness, having examined the FSP‟s process, I am also satisfied that if the PDS had been defective that the FSP would have a due diligence defence to the Applicant‟s claim based on the reasonableness of its conduct in the development and formulation of the PDS. Representations as to Future Matters 141. I will now deal with the Applicant‟s contentions that the representati ons as to future matters did not have reasonable grounds. Central to this submission is that the assumptions used by the FSP in assessing the reasonableness of the grounds were flawed in respect to:  its assessment of climatic conditions  site selection and untied plantation regions  Esperance and Queensland Yield forecasts  the national and i nternational data that was used  the inappropriate CSIRO modelling  suitability of species and genetic yield growth rates  the calculation of the predicted Project Yield under the FSP‟s Matrix, and  the quality of the FSP‟s independent forester‟s report . Case No: 302486 Determination Page 26 of 30 142. If not completely explicit but certainly implicit in the Applicant ‟ s argument, is that the assumptions were so flawed that the FSP could not have reasonable grounds for its representations. The FSP has referred to ASIC RG 170.31 and RG 170.49 in this regard. 143. The Applicant had submitted the two key parameters of the investment offer under the PDS were the stumpage price per cubic metre of wood harvested and the predicted yield per PU. In a latter submission he conceded that although the FSP‟s forester‟s report together with the other data included or referred to in the PDS provided a reasonable basis for the estimate of the current stumpage price of $41.60 per cubic metre, it did not provide a reasonable basis for the predicted yield of 275 cubic metres per PU. 144. Care must be taken not to evaluate the reasonableness of the FSP ‟ s representations and the assumptions upon which they are based as to the future and the assumptions upon which they were made with the benefit of hindsight. The mere fact the representations made in 2005 did not come to pass does not, in itself, mean that they did not have a reasonable basis. 145. The FSP did not and could not guarantee representations as to the future matters made in the PDS. There can be unforeseeable events outside of the control of any RE of agribusiness which can impact on future events. 146. The basis of the FSP‟s representations contained in the PDS was on a number of factors that I previously outlined. Relevantly, these included an independent forester‟s report. Independent Foresters ’ Reports 147. An RE, as previously indicated, normally uses independent foresters to provide expert opinion to assess the suitability and risks of agribusinesses like the Project. ASIC RG 170 .30 indicates that reasonable grounds for the disclosure of financial information may exist where there is reliance upon an independent industry report. The Applicant has not accepted that the FSP‟s forester‟s report should b e so treated. 148. The FSP‟s forester made assessments of all the matters referred to him by the FSP and came to the conclusion that subject to the risks disclosed in the PDS that a Project Yield of 275 cubic metres per PU was reasonable for the Project. The A pplicant said that the FSP‟s forester did not independently test the productivity assumptions of the FSP but merely endorsed them. In this regard the report of the forester did not comply with ASIC RG 170.32. Case No: 302486 Determination Page 27 of 30 The FSP’s Forester 149. The FSP‟s forester‟s report appears to comply with ASIC‟s requirements but the Applicant argues again that the forester relied on the FSP‟s flawed assumptions and did not test them as reasonable in meeting the test under section 769C. The Applicant contended, in particular, that the underlying Productivity Matrix used by the FSP was not disclosed or explicitly deemed as reasonable within the forester‟s report contained in the PDS and that the forester did not have the expertise to make assumptions as to the final geographic disposition of the Project. 150. The FSP has countered these allegations by pointing out that its independent forester confirmed at page 47 of the PDS that he had: “…examined each regional productivity matrix and checked the relationships between the forest environments and measured forest growth and yields achieved in actual harvesting operations where available.” 151. The FSP also drew attention to the forester‟s qualifications in the introduction to his report and argued that he was qualified to make assumptions as to the geographic disposition of the Project. 152. I have examined the FSP‟s forester‟s qualifications and I am satisfied that the forester was qualified to make the assumptions and reach the conclusions he did in his report. I consider that due weight should be given to this report in assessing the FSP‟s assumptions and the reasonableness of the grounds for the PDS‟s representations as to future matters. 153. RG 170.31 provides that he, as an expert, could adopt a management‟s assumptions if the expert states that those assumptions were reasonable. The forester did this in sections of his report in relation to the Project. For example, he outlined the history of the Project Manager‟s previous forestry plantation management and stated that: “ The acquisition of land for inclusion in the Projects is on-going at the date of this report. [Initial of Project Manager] use a suitable procedure for assessing land. This takes into account the climate and landforms evaluated by suitably qualified professionals and regional attributes such as export facilities and distance to markets. ” 154. I am satisfied, however, that the forester went further than this as I am not satisfied on the evidence that he just accepted the FSP‟s assumptions as to the Project Yield without testing them. His report includes a discussion of the relevant issues that required consideration of the FSP‟s assumptions before coming to the conclusion that the Project Yield of 275 cubic metres per PU for the Pulpwood project was reasonable. Case No: 302486 Determination Page 28 of 30 155. The determination of the Applicant‟s argument that the FSP‟s assumptions were flawed turns on the Applicant‟s forester‟s opinion, not only on any failings in the FSP‟s forester‟s report but on his eval uations of the other sources of information upon which the FSP relied. This led the Applicant‟s forester to the following conclusions, among other things:  That as the actual locations of proposed plantations in Esperance and Queensland were unknown at the date of the PDS, the site quality and rainfall criteria were hypothetical.  There was no certainty that areas near Esperance could be purchased with the necessary annual rainfall to cope with reasonable variation in rainfall from year to year.  There was no reasonable basis for the adoption of the SQ2 assumption for the proposed Central Queensland plantings given soil quality, rainfall and susceptibility of some plantings to pests and diseases.  There was no international data which provided a reasonable basis for the predicted yield in the PDS. 156. The FSP has responded to the Applicant‟s submissions and provided considerable documentation in support, as I have outlined. I must weigh up the representations in the PDS in the light of the competing forester s‟ opinions and all the other material before me. Having examined all the material I am satisfied that the FSP had grounds to form the assumptions that were to be the basis for making the representations in the PDS from its experience and research. 157. There were reasonable grounds for the productivity matrix as explained in the PDS and supporting documentation provided by the FSP. This included documentation to support assumptions about productivity in Albany, the Green Triangle, Esperance and Queensland yield forecasts and genetic growth rates together with other matters raised by the Applicant. 158. In relation to the specific issue of the Project Yield, I find that there were clear explanations in the PDS as to the basis of its assumptions and they were reasonable on the evidence before me. It is also made clear in a disclosure in the PDS of the risks inherent in the assumptions that had been made when it is recited in the PDS: “However the Project Yield estimates are based upon professional judgement and there is a ris k that these estimates may prove to be inaccurate. Factors that may impact on the estimates of Productivity include the following:  Estimates of Productivity require an assessment of the soil types and site quality across each property. There is a risk that some elements may be misinterpreted and Productivity over estimated.  The estimates assume that the long term average annual rainfall and annual rainfall distribution will be Pulpwood Sandalwood Pulpwood Case No: 302486 Determination Page 29 of 30 received at Properties for the term of the Project. Sustained periods of below av erage rainfall could reduce the estimated Productivity or in extreme cases cause the death of the trees. Different rainfall distributions could also reduce the estimated Productivity. A combination of the above factors could contribute to a lower Productiv ity than estimated.  [The RE] has attributed gains of 30% in the estimates of Productivity from genetic improvement of seed. The attributed gains are those above the productivity expected from plantations established from unselected native seed. The estimat ed gains are supported by 3.5 year old data from trials undertaken by [Name] in Australia and information from overseas from plantations established with similar material approaching the end of their rotation. [The RE] has access to data from trials and re search from Portugal (where E. globulus has been grown and bred for over 80 years), and Brazil and South Africa (where intensive breeding work has been undertaken on E. grandis and its hybrids.) There is a risk that [the RE] has over estimated the gains at tributed to genetic improvement.  There is the risk that gains anticipated from improved genetics may be not be as assumed but limited by other factors such as soil moisture, site quality or pest and disease attack.” [sic] Pulpwood Pulpwood 159. I am further satisfied that the FSP considered and relied upon information or opinion from a range of reputable sources, in addition to the independent forester, in the making of the assumptions for the representations about future matters. 160. This included research based on its previous forestry plantations, information from other plantations, CSIRO modelling and information from the appropriate Government body. The FSP has provided a number of research papers on growth and yield in respect of the species used in the plantations and genetic seed improvement. 161. Despite the Applicant‟s forester‟s report and the criticism of aspects of this documentation. 162. I am satisfied that the FSP has established reasonable grounds based on :  some facts or circumstances  existing at the time of publication of the information in the disclosure document or PDS  on which the issue in fact relied  which are objectively reasonable, and  which support the information. Case No: 302486 Determination Page 30 of 30 163. I find that the assumptions upon which the FSP‟s representations as to future matters were made were reasonably formed and provided a sound basis for the FSP‟s representations as to future matters. 164. Again strength is given to this conclusion by the fact that the PDS and the Project had been reviewed by agribusiness and research houses before they recommended it as an investment. Other Matters 165. The Applicant has submitted that even if the FSP‟s representations did have reasonable grounds, it did not mean that they still could not be misrepre sentations. I have noted the conflicting opinion from the Applicant‟s forester but I do not find that the FSP‟s representations were misrepresentations under section 769C or otherwise. 166. Accordingly, I am satisfied that the FSP had a reasonable basis for its representations in respect of the Product Yield and price in its PDS and that they were not otherwise misrepresentations. 167. I agree with the FSP‟s conclusion that the PDS included specific reference to the very factors which ultimately did affect the success of the Project, namely drought and disease; matters that were disclosed in the PDS. Determination 168. On the basis of the available information I determine the FSP is not liable to compensate the Applicant.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.