Text of the determination
Case No: 302486 Determination Page 1 of 30
Case number: 302486
Investments - Managed Investments - Primary Production Schemes -
Disclosure - Insufficient product/service information
28 March 2014
Summary
Description
This d ispute concerns the Applicant‟s investment in an Agribusiness
Project of which the Financial Services Provider was the Responsible
Entity. The Applicant has alleged that the Project‟s Product Disclosure
Statement was defective as it was misleading and deceptive
information and contained representations as to future matters for
which there was no reasonable basis.
Basis of Determination
The PDS was not defective.
Determination
The FSP is not liable to compensate the Applicant for any loss.
Background
Initial Submissions
1. This d ispute concerns the Applicant‟s investment in an Agribusiness Project
(the Project) of which the Financial Services Provider (FSP) was the
Responsible Entity (RE).
2. The Applicant alleged that the FSP breached its disclosure obligations under
the Corporations Act and the ASIC Act . He has made submissions in respect
to misrepresentations, non-disclosures and omissions in or from the PDS.
He has made particular submissions about the representations about future
matters and the assumptions upon which they were based.
3. The FSP denied liability on the basis that there had been no
misrepresentations or non-disclosures that caused the Applicant to suffer a
loss. There were reasonable grounds for the representations about future
matters and the PDS was not otherwise defective.
Determination
Case No: 302486 Determination Page 2 of 30
4. Further, in its defence, the FSP has also pointed out that if it did produce a
defective PDS it had taken reasonable steps to ensure that it was not
defective. It did this by utilising the services of an independent forester and
undertaking a due diligence process in its preparation that was signed off by
lawyers in respect to the compliance of the PDS.
Recommendation
5. This dispute was the subject of a FOS Recommendation which found in
favour of the FSP on the basis that the Applicant had not established that
any reliance on the PDS had caused his loss and made comments on the
calculation of any loss sustained by the Applicant due to the failure to take
into account possible taxation and Centrelink implications. The
Recommendation was rejected by the Applicant. He made subsequent
submissions in regard to the Recommendation‟s findings in respect of
reliance on the PDS by the Applicant and causation of loss, income taxation
considerations and a possible concurrent dispute with Company G. The FSP
responded to this submission.
Law and ASIC Guidelines involved
6. The following law and ASIC Guidelines have been raised or are relevant:
Section728 ss(1and 2), 769C, 1013 1041H, 1022A and 1022B of the
Corporations Act
Sections 12DAof the ASIC Act
ASIC Regulatory Guides
Reasons for decision
7. I have decided this case on its merits, having regard to the relevant law,
good industry practice, codes of practice and previous FOS decisions. I have
taken into account all the material submitted by the parties, both before and
after the Recommendation. I am satisfied that the documentation I have
relied on has been provided to both parties.
8. Both the Applicant and the FSP have been professionally represented in this
dispute. For the purposes of this Determination, submissions made by either
party or their representatives shall be described as being made by the
Applicant or the FSP.
The Background
9. The Project was a managed investment scheme within the meaning of the
Corporations Act 2001 (the Act).
Case No: 302486 Determination Page 3 of 30
10. The Applicant purchased 8 Plantation Units (PUs) in the Project on
2 May 2005. He was then a retail client of a financial advisory company
(Company G). Company G provided him with personal financial product
advice in a Statement of Advice (SOA) in May 2005 to invest in the Project.
11. This was done on the basis that it suited his needs and objectives as an
Absolute Return Investor. This expression is not defined but it is apparent
from the SOA that he, among other things, was looking for a long term
investment generating income.
12. Company G provided the Applicant with the Project PDS and a Project Cash
Flow document on or before the provision of the SOA. The SOA recited that
the Applicant had considered the PDS and was satisfied with its risks and
returns in the light of his objectives. It also recited that he had reviewed the
Cash Flow document and had noted that the returns were not guaranteed by
the Project.
13. The SOA did not analyse or contain any details of the PDS but it did contain
warnings about the risks of investments. The SOA recorded that the Project
had been recommended by two independent research houses. It warned,
however, that the Applicant should read the PDS carefully before signing the
application and to contact Company G if he had any questions.
14. There is no evidence that the Applicant raised any matters about the
contents of the PDS with Company G prior to his applying for the units. The
application form was endorsed by Company G.
The PDS
15. The PDS for the Project was dated 31 January 2005. Investors were
described as Growers. It provided extensive information about the Project,
which involved the plantation of species trees to produce pulpwood and
related products for export. The first harvest was expected to be 10 years
from planting.
16. It relevantly made forecasts of future Project Yields on a PU, which was
defined as an area of land required to produce the Project Yield. The area of
the land varied depending on its productive nature. The ultimate project size
was 23,870 hectares across 29 separate properties representing 22,723
PUs. It was spread across four specified regions in Esperance, Albany,
Queensland and the Green Triangle.
17. The PDS contained warnings about the risks of the investment and steps
that would be taken to mitigate those risks. There was also a statement that
it was difficult to predict future productivity with any accuracy due to the
interaction of a number of independent variables.
18. There is no evidence that Company G or the Applicant contacted the FSP in
relation to any misleading or deceptive statements or the reasonableness of
the basis for representations as to future matters prior to the Application for
the units.
Case No: 302486 Determination Page 4 of 30
Preliminary matters
19. Although not required for my ultimate Determination, I be lieve it is beneficial
to deal with some preliminary matters because of certain issues raised by
the parties in relation to FOS‟s jurisdiction and the Applicant‟s reliance on the
PDS.
Jurisdictional and other matters
20. There have been submissions about a range of issues including:
FOS‟s jurisdiction
its capacity to determine these types of disputes
the withholding of certain material
the need to bring a concurrent dispute against another party, and
causation of loss.
21. FOS‟s jurisdiction has been the subj ect of previous FOS Determinations and
Rulings and has been judicially considered. There has been a recent
decision in Crom well v FOS [2013] VSC 333 and in Determination 255787.
22. Save as to say that FOS has jurisdiction and the capacity under its Terms of
Reference to determine the dispute, it will not be necessary for me to
determine the other matters for reasons that will become apparent. I will,
however, comment on certain matters at the conclusion of the
Determination.
Applicant’s knowledge of risk and r eturns
23. I find at the outset that the Applicant would have been aware of the risks of
investing in agribusiness in Australian conditions .
24. It is commonly known from experiences in this country that agribusiness
schemes, by their nature, carry an inherent risk because they are prone to
environmental factors generally beyond the control of the best endeavours of
their responsible entity.
25. Such factors can range from frequent droughts to excessive rainfalls.
Predicting returns for growing new products can be uncertain, both as to the
crop return and the potential market for the product.
26. If the Applicant did not know this from prior knowledge, I am satisfied that
this would have been explained to him by Company G when the risks
referred to in the SOA were discussed. This knowledge was reinforced by a
reading of the warnings contained in the PDS prior to his making the
application to invest.
Case No: 302486 Determination Page 5 of 30
27. I am further satisfied, from the Applicant‟s specific acknowledgement in the
SOA, that he was aware that the returns forecast in the PDS were not
guaranteed by the Project. I can again infer from the SOA that the Applicant
had received advice from Company G on the issue and this would have
been reinforced by his reading of the PDS.
Relevant Law and ASIC Regulatory Guidelines
28. Substantial submissions have been made in respect of the law by both
parties‟ representatives. I am satisfied that they have an understanding of
the applicable law and the ASIC Regulatory Guides (RG) as they apply to
the issues in dispute and the facts upon which their arguments are based.
As a consequence there will be limited referencing in this Determination.
29. I am satisfied that there is an appreciation by the parties that the
determination of this dispute will turn on my assessment of the evidence in
relation to:
the quality and completeness of representations and disclosures in the
PDS
whether the FSP‟s representations in the PDS , including as to the
future Project Yield and price, had reasonable grounds, taking into
account the assumptions upon which they were based, at the time that
they were made, and
whether there had been omissions from the PDS.
30. I note that the Applicant, in making his submissions, has relied in part on
ASIC RG 170 issued in 2011 rather than the Guide applicable at the time the
PDS was issued. The FSP pointed this out but has presented, in any event,
evidence that it believed shows the PDS complied with ASIC requirements. I
believe, in these circumstances, it appropriate to use the requirements of
ASIC RG 170 not as binding but as a useful guide as to industry practice to
which I will refer.
31. The FSP as the RE had both fiduciary and statutory duties in the carrying out
of its powers and the exercise of its duties. As RE, the FSP must, among
other things:
act honestly
exercise the degree of care and diligence that a reasonable person
would exercise if they were in the RE‟s position, and
act in the best interests of members and, if there is a conflict between
the members‟ interest and its own interests, give priority to the
memb ers‟ interests.
32. The general obligations of an RE under the Act do not add to an RE‟s
disclosure obligations, which are dealt with extensively in Part 7.9 of the Act.
An RE has obligations to develop and provide a compliant PDS in respect to
managed investment schemes.
Case No: 302486 Determination Page 6 of 30
33. This Project required the production of a PDS. The FSP, consistent with its
obligation, prepared the PDS.
The requirements of a PDS
34. A PDS must be worded and presented in a clear, concise and effective
manner and contain:
a. Information about significant benefits and the circumstances and way in
which those benefits will or may be provided.
b. Information about significant risks of holding the product.
c. Information about the costs of the product and any amounts that will or
may be deducted from a common fund by way of fees, expenses or
charges.
d. Information about any other significant characteristics or features of the
product and the rights, terms, conditions and obligations attaching to
the product.
e. Any information that might reasonably be expected to have a material
influence on the decision of a reasonable person, as a retail client,
whether to acquire the product.
35. In general the tests whether to include prospective financial forecasts or
information generally in a PDS are its relevance to the audience and its
reliability.
What a PDS does not have to include
36. A PDS will not include information that was not known to the RE or other
persons involved in the production of the PDS and it need not include
information if a reasonable retail client would not expect to find the
information in the PDS. 1
Defective PDS
37. Investors can recover the amount of loss they suffer because a PDS they
were given is “defective.” 2 A PDS is “defective” if:
there is a misleading or deceptive statement in the PDS, or
the PDS omits material required to be in the PDS, as described above. 3
Defence to the production of a deceptive PDS
38. An issuer of a PDS may not be liable to pay an investor for any loss if it took
reasonable steps to ensure the PDS was not defective.
1 Section 1013F(1) of the Act.
2 Civil liability arises under section 1022B(1)(c) of the Act.
3 Section 1021B of the Act.
Case No: 302486 Determination Page 7 of 30
Misleading or deceptive conduct
39. The time to determine whether a representation was misleading or deceptive
is at the time it was made.
40. According to ASIC, responsible entities should consider not only the content
but the way in which information is presented in a PDS, to minimise the risk
that a PDS is misleading or deceptive.
41. A statement is misleading or deceptive where it would cause an ordinary or
reasonable member of the class of persons to whom the representation was
ma de, to “labour under some erroneous assumption”; mere confusion or
“wonderment” is not enough. In the context of a document, whether a
statement is misleading or deceptive is determined by examining the whole
document.
42. Silence may be “the element in all th e circumstances of a case which
renders the conduct in question misleading or deceptive”. Also, “if the
circumstances are such that a person is entitled to believe that a relevant
matter affecting him or her would, if it existed, be communicated, then the
failure to communicate it may constitute conduct which is misleading or
deceptive”. This has been referred to as “circumstantial silence”.
43. A court will more readily find a reasonable expectation of disclosure where
the relationship between two parties gives rise to fiduciary or other duties
under the general law.
Representations without reasonable grounds are misrepresentations
44. Section 769C of the Act provides that representations about future matters
are taken to be misrepresentations if made without reasonable grounds. An
investor may recover loss they suffer caused by misleading or deceptive
forecasts in a PDS in respect to representations about future matters.
45. ASIC has stated:
“A statement about any future matter is misleading or deceptive if the maker
does not have reasonable grounds for making it. For example, a statement
about prospective financial information based on a number of hypothetical
assumptions is unlikely to be based on reasonable grounds. For further
guidance on disclosure of prospective financial information see [RG 170].”
46. There are a number of common problems associated with disclosing
prospective financial information. These include:
a. discounting or not taking into account the variable nature of matters
which influence, or may be influenced by, future events, and
b. the inherent potential to mislead by disclosing prospective financial
information based on hypothetical circumstances or unrealistic
assumptions.
Case No: 302486 Determination Page 8 of 30
47. Relevant to this dispute is that the reliance on an independent report may
provide reasonable grounds for including prospective financial information.
48. In considering good industry practice, I can have regard to ASIC‟s
Regulatory Guides.
49. ASIC set out the Good Disclosure Principles in respect of PDSs in RG 168.
ASIC stated disclosure should:
be timely
relevant and complete
promote product understanding
promote product comparison
highlight important information, and
have regard to consumers‟ needs. 4
50. ASIC notes that a failure to consider the Good Disclosure Principles when
preparing a PDS may increase the possibility of misleading or deceptive
conduct, unconscionable conduct, or indicate that the content obligations of
the PDS requirements (eg that the PDS is clear, concise and effective) have
not been met.
51. ASIC RG 170.17provides:
“ The making of a statement that contains prospective financial information
(i.e. a forward-looking statement) must have reasonable grounds or it will be
taken to be misleading under s728(2) or 769C of the Corporations Act. What
are „ reasonable grounds ‟ should be determined objectively in light of all of the
circumstances at the time of the statement, so that a reasonable person
would view as reasonable the grounds for the statement” .
52. ASIC RG 170.28 states:
“To demonstrate reasonable grounds, an issuer must b e able to point to:
(a) some facts or circumstances;
(b) existing at the time of publication of the information in the disclosure
document or PDS;
(c) on which the issue in fact relied;
(d) which are objectively reasonable; and
(e) which support the information : see Sykes v Reserve Bank of
Australia (1999) ATPR 41-699 Heery J at 42-902 .”
4 ASIC Superseded Regulat ory Guide 16A – Disclosure: Product Disclosure Statements (and other
disclosure obligations), (current 28/11/ 01 – 12/05/05) (SRG 168) para [168.10].
Case No: 302486 Determination Page 9 of 30
Applicant’s Position
53. The Applicant‟s initial submission details a short history of the Project
comparing the disclosures in the PDS with the actual performance of the
Project. Relevantly, he pointed out that the PDS disclosed an estimated
Project Yield of 275 cubic metres per PU and an estimated current price
(exclusive of GST) of $41.60 per cubic metre.
54. The forecast yield was for 2016 (the expiry date of the Project) and current
price was for 2005. The average productivity yield over a 10 year period for
each region was expected to be:
220 cubic metres per hectare in Esperance
270 cubic metres per hectare in Albany
up to 330 cubic metres per hectare in Queensland, and
250 cubic metres per hectare in the Green Triangle, an established
hardwood area.
55. The PDS contained other tables in relation to forecast yields and the
financial outcomes for Growers for a single PU. It also contained statements
and information upon which its forecasts were based.
56. During the period between 2006 and 2008 the FSP advised the Growers,
like him, that due to reduced rainfall and heat there were problems with the
plantings in the Esperance and Queensland regions. Subsequently there
were problems with the plantings in the Albany region.
57. The FSP provided a report to the Growers in 2011 that showed that the
Project had been adversely affected by climatic conditions, insects and
disease. It was apparent by then that the forecasts made in the PDS were no
way near being met. The Applicant contends that this was clear evidence
that the forecasts in the PDS were made without reasonable grounds.
58. The Applicant alleged that the Project‟ s PDS was misleading and deceptive
and contained representations as to future matters for which there were no
reasonable grounds as the assumptions upon which they were based were
flawed. The Applicant, in particular, argues that there were no reasonable
grounds for representations as to future productivity or Product Yield in the
PDS.
59. The Applica nt obtained an independent forester‟s report (the Applicant‟s
forester‟s r eport). He has cited conclusions from this report and other factual
material in support of his argument. There are also contentions that the PDS
was further defective in that it did not contain all necessary or complete
disclosures.
Case No: 302486 Determination Page 10 of 30
60. The Applicant‟s initial submission discussed the misrepresentations and non -
disclosures of the FSP as the RE under headings of:
no reasonable grounds for productivity matrix
the untried regions would be as productive as Albany and the Green
Triangle
location of plantation land was not known at the date of the PDS
no reasonable grounds for Esperance yield forecasts
no reasonable grounds for Queensland yield forecasts
no reasonable grounds for genetic seed improved growth rates
varieties to be planted were not known at the date of the PDS
independent expert report did not meet the requirements of ASIC
RG 170, and
the PDS disclosure.
61. The Applicant outlined specific legal points about:
the obligations of the FSP as an RE
the requirements of a PDS
that representations without reasonable grounds are
misrepresentations with particular reference to section 769C of the Act,
and
the reliance on an expert report.
62. Central to the Applicant‟s claim for compensation is that the FSP failed to
disclose in the PDS that there was a high level of risk associated with
realising the productivity or Project Yield and the assumptions used for
reaching its conclusions were flawed.
63. The Applicant argued that the Project Yield was the crucial forecast upon
which investors relied to make the investment. He maintained there had
been misrepresentations or non-disclosures based on flawed assumptions in
the productivity matrix in the PDS; there had been reliance on an
independent forester ‟ s report which was either incomplete or based on the
FSP‟s opinion rather than fact.
64. He further contends that there were other defects in the PDS disclosures in
relation to prospective financial information. The Applicant relied on the
Applicant‟s forester‟s report in support of his arguments and alleges that
aspects of the Project were of an experimental nature.
65. The Applicant contended, in relation to his claim for compensation for a loss
of $34,748, that central to his decision to invest in 2005 was the Project Yield
and price. He argues that the two key parameters of the investment offer
under the PDS were stumpage price per cubic metre of wood harvested and
the predicted yield per PU.
Case No: 302486 Determination Page 11 of 30
66. The Applicant contended that the FSP, by its misrepresentations or non-
disclosures in relation to these factors, caused him to suffer a loss. The
Applicant summed up in relation to how it was said that the FSP‟s defects in
disclosure affected him:
“ HOW DEFECTS IN DISCLOSURE HAVE AFFECTED THE COMPLAINANT
i. The Complainant would have made other financial arrangements, had
the Responsible Entity disclosed in the PDS that there was a high level
of risk associated with realising the Project Yield and price due to:
104.1. the forecast being over 10 years, with implied assumptions
about pulpwood market conditions, weather patterns, growth
rates and development of port facilities and other infrastructure
which were not made explicit;
104.2. the Productivity matrix assuming a final yield based on final
planation location, when the final geographical disposition was
unknown at the time of the PDS;
104.3. the Independent Forester's Report not satisfying the
requirements of RG 170 by not confirming that all assumptions
– both explicit and implied – were reasonable;
104.4. the majority of the Project being experimental in nature –
planted in areas with little plantation history using varieties with
no growth data – which were incapable of accurate
comparison to more established plantation areas and using
established varieties;
104.5. existing problems had been identified in Esperance and
Queensland and the measures to rectify them had been
inconclusive;
104.6. the Responsible Entity was adopting new and unproven
planation techniques, which would increase the risk of the
project when compared to the use of established techniques;
104.7. the forecast genetic gains being hypothetical in nature and the
forecast percentage gain calculated from a subjective base
rate, designed to re-assure that the forecast yields had some
reasonable grounds;
104.8. the requirement to use untried varieties of Eucalyptus in
Queensland plantations;
104.9. the forecast Queensland and Esperance yields being based
on trials and overseas data, rather than established plantation
history, and as a result forecasts from this area should have
been accompanied by an added level of caution;
104.10. Queensland's sub-tropical environment making the plantations
in this area more susceptible to known fungal diseases such
as Kirramyces; and
Case No: 302486 Determination Page 12 of 30
104.11. the elevated risk of not meeting forecasts when compared to
forecasts for plantations in the more established areas
mentioned in the PDS alongside the experimental areas, using
varieties and planting techniques with an established track
record.” [sic]
67. The Applicant argued that prospective financial information in the PDS was
not properly placed. He said it can be misleading if such information is
presented in isolation from the assumptions and a description of the
methodologies used to develop the information.
68. The Applicant also contends that the following warning should have been
included in a box in the PDS:
“ The final planting locations remain unknown at the date of the PDS. It is likely
that a large portion of the project will be located in Esperance, Western
Australia and the central coast of Queensland where data on tree growth is
limited. The project will also involve plant varieties and planting techniques
that are untried in industrial pulpwood plantations in Australia .”
69. The Applicant also contends that there should have been an expanded
section on the “Pulpwood Project” under headings of “Forecasts for
Esperance” and “Forecasts for Queensland”, setting out additional
information about risk factors.
70. The Applicant further contends that the RE failed to adequately disclose the
assumptions and risks in the same PDS location as the Project Yield
forecasts. As a result, an investor would view the forecast in isolation as
achievable, when in reality it was essentially an investment in plantation
“research and development” and highly speculative , given the limited history
of the likely plantation sites and the hypothetical nature of the assumptions
under which the Project Yield was based.
Further Submissions
71. The Ap plicant made a submission following the FSP‟s initial submission. The
submission dealt with the FSP‟s legal arguments in relation to the basis of
the claim and FOS‟s jurisdiction and the withholding of certain information.
72. The Applicant conceded that he was not relying on section 1041H of the
Corporations Act or section 12DA of the ASIC Act . He confirmed that he was
relying on sections 769C and 1022B and subject to certain proviso 1022A of
the Corporations Act .
73. It foreshadowed that there would be a further submission once the Applicant
received an independent forester‟s report, the Applicant‟s forester‟s report,
that had been commissioned.
Case No: 302486 Determination Page 13 of 30
74. The Applicant made another submission following the receipt of the
Appli cant‟s forester‟s report. This submission included a summary of the
Applicant‟s forester‟s report and responses to the FSP‟s contentions about
the reasonableness of the basis for future representations, that the
disclosure in the PDS was not defective and its due diligence defence.
75. Based on the Applicant‟s forester‟s report and the contents of the PDS, the
Applicant highlighted that the estimated predicted yield involved assumptions
about rainfall data, site quality and species.
76. The Applicant said in relation to the disclosure of risk that the PDS put the
risk that the PU would not produce the predicted yield on to the investor.
Also the risk of not meeting the Project Yield could have been better
explained so that a reader of the PDS did not draw the incorrect conclusion
that the predicted yield was a reasonable estimate of the likely outcome.
77. He said that while the risks were generally stated in the PDS, the predicted
yields were extremely optimistic based on the information at the time.
78. The Applicant specifically contended (footnotes omitted):
17. The two key parameters of the investment offer under the PDS were the
stumpage price per cubic metre of wood harvested and the Predicted
Yield per PU.
18. The FSP did not have a reasonable basis for the Project Yield adopted in
the PDS for the following reasons:
18.1. the actual locations of the proposed plantations in Esperance and
Central Queensland were unknown at the date of the PDS, making
the adapted site quality and rainfall criteria hypothetical;
18.2. there was no certainty that areas near Esperance could be
purchased with the necessary annual average rainfall to cope with
reasonable variation in rainfall from year to year;
18.3. there was no reasonable basis for the adoption of the SQ2
assumption for the proposed Central Queensland plantings, given
the prevalence of duplex soils and the seasonal variation in rainfall,
as well as the known susceptibility of E grandis and E grandis
hybrids to existing pests and diseases
18.4. the use of the CSIRO 3-PG model for deriving the Predicted Yield
did not take account of the effects of known pests and diseases;
and
18.5. there was no national or international data which provided a
reasonable basis for the Predicted Yield in the PDS
19. While the estimate of the current stumpage price of $41.60 per tonne had
a reasonable basis, the PDS did not include information available to the
FSP that the price was more likely to decline in future, due to then current
trends in woodchip prices and likely increasing supply, due to
Government stimulation.
20. The dramatic effect on the stumpage price for Esperance plantations of
the long distance to an available port was not explained in the PDS.”
Case No: 302486 Determination Page 14 of 30
79. The Applicant co ncluded that the FSP‟s forester did not independently test
the FSP‟s p roductivity assumptions; the report of the forester together with
other data included or referred to in the PDS provided a reasonable basis for
the estimate of the stumpage price of $41.60 but did not provide a
reasonable basis for the predicted yield. He said further, the FSP‟s due
diligence defence failed because:
The independent forester‟s report merely accepted the assumptions of
the FSP and did not independently test the assumptions.
There was information available to the FSP that clearly indicated that
growth rates assumed were unlikely to be achieved and there was no
reasonable basis for the predicted yield in the PDS.
There was information available to the FSP that prices of woodchips
were likely to fall and the transport costs for Esperance plantations
would reduce proceeds to Growers.
FSP’s position
80. The FSP denied liability and responded to the complaint on 19 March 2013.
It made submissions as to the law and in particular sections 728(1) and
1041H of the Act and section 12DA of the ASIC Act , contending that they did
not have application to the issues in dispute. It referred to sections 1022B
and 1022A of Ch 7.9 of the Act but did not argue they did not have
application.
81. The FSP identified the substance of the complaint was that:
The estimated Project Yield represented in the PDS did not have a
reasonable basis.
The PDS did not properly disclose the risks associated with realisation
of the estimated Project Yield.
The Applicant would not have invested in the Project had the risks
associated with the realisation of the estimated Project Yield been
disclosed in the PDS.
82. The FSP set out a summary of the Applicant‟s allegations of
misrepresentation said to have been made. Its submissions provided
information rejecting them on the basis that there were reasonable grounds
and providing its responses to the specific allegations.
83. The FSP also provided other extensive documentation evidencing the
process it followed in making the assumptions it did and formulating the
representations as to future matters.
84. These included the:
productivity matrix
growth and yield equations for the Eucalyptus globus
Harvest yields
Case No: 302486 Determination Page 15 of 30
Actual Yields Eucalyptus globus – Western Australia CSIRO report on a
process to determine a productivity matrix for Eucalyptus grandis grown
in Central Queensland
Calm Esperance Trial
an article on species trials and genetic improvement, and
the 2005 Productivity Matrix: Verification of Productivity projections and
seed certificates.
85. Among other things, it firstly said the Project Yield is defined in the PDS as
“the expected volume of timber for the [Project] at harvest”, being 275 cubic
metres per PU:
“ 3.3 For the reasons set out in sections 4 to 7 below, [the RE] rejects the
above allegations and confirms that it did have reasonable grounds for
representing that the expected volume of timber for the Project would
be 275 cubic metres per Plantation Unit. Further, it says that, in any
event, readers of the PDS – including, presumably, [the Applicant] –
were fully informed and must have understood that achievement of the
productivity estimates described in the document was not free from risk.
It was made clear, for example, that, „ it is difficult to predict future
productivity with accuracy as it is dependent upon the interaction of
many independent variables. ’ Many specific risks relating to the
estimated Project Yield were detailed in section 5.2 of the PDS,
following on from a warning that, „ The Projects are speculative long-
term ventures. They are exposed to agricultural risks inherent in
growing a crop and the commercial risks of a long-term project ’ . ”
86. The FSP defended the data upon which the Project Yield was based,
pointing out that the Project Yield was to be ac hieved by making relevant
adjustments to the sizes of the PUs at the time of their allocation. The
process involved a detailed analysis of plantation locations and employed
the most up-to-date data at the time.
87. The FSP‟s response dealt with the criticism of the assumptions relating to
plantation locations, pointing to what was disclosed in the PDS and
concluding:
” ...that irrespective of the final geographic location of a property (and,
therefore , irrespective of also the range of associated productivity estimates),
the estimated Project Yield of 275 metres could be obtained by making any
necessary increases (or decreases) to the size of the plantation units in that
respective property.”
88. The FSP said that it was reasonable for it to represent the estimated Product
Yield in the PDS because it had data sources, systems and methodologies
(all of which were endorsed by the independent forester) which enabled it to
allocate PUs in a manner that it reasonably expected would permit the
estimated Project Yield to be achieved:
“As explained in the PDS, [the RE] used a Productivity Matrix to determine the
size of the Plantation Units required to achieve the Project Yield. The
Productivity Matrix for the Project was regularly reviewed and updated as new
data became available, including by making any necessary revisions between
Case No: 302486 Determination Page 16 of 30
the time of the PDS and the time of allocating the Plantation Units. All
revisions of the Productivity Matrix were approved by the Independent
Forester before allocation of Plantation Units. A copy of the final Productivity
Matrix for the Project is enclosed behind Tab 2.”
89. The FSP also responded to the Applicant‟s assertion s by detailing
disclosures in the PDS, as well as pointing out or documenting the data upon
which the Project Yield was based, including:
The growth rates in its existing plantations, harvest yields from its own
plantations and other growers in south-west Western Australia.
Independent F orester‟s Report.
Research from overseas countries with similar climates and conditions
to Esperance and Queensland.
Modelling conducted by the CSIRO.
Trial results obtained from the Department of Conservation and Land
Management.
90. The FSP also responded in detail to the issue of the genetic seed
improvement forecasts with documented information on what it was based
and the risks that were disclosed in the PDS.
91. It also responded to the Applicant‟s criticism of the independent forester‟s
report and the process by which it was obtained. It provided a copy of a letter
to its forester that indicates he was asked to provide an opinion in relation to
matters ranging from the suitability of the species, land selection and design,
forestry risks, marketing issues and the reasonableness of assumptions or
comments in respect to projected timber yields and current timber prices.
92. The forester was also asked to review the PDS, with specific items detailed,
and to identify forestry matters incorrectly stated or omitted from the PDS
which was information that an investor and their professional advisers would
reasonably require and would reasonably expect to find in a PDS for the
purpose of making an informed assessment.
93. The review was to address financial position and prospects of the Project,
the rights attaching to the financial products, the merits of participating in the
Project and the extent of the risks and how the Project ‟s property was to be
held. The FSP also points to the fact that it had engaged solicitors to assist
in the preparation of the PDS and to set up a due diligence committee and
program to provide legal advice on the requirements of the Act and the
compliance of the PDS . A copy of the legal opinion confirming the PDS‟s
compliance and the efficacy of the due diligence process was provided.
94. It submitted under the heading of Defences:
“10.1 If a person has provided a defective productive disclosure statement,
that person is nevertheless not liable to any person if they took
reasonable steps to ensure that the document would not be defective.
Case No: 302486 Determination Page 17 of 30
10.2 [the FSP] maintains that it did take reasonable steps to ensure that the
PDS was not defective, including, relevantly, taking steps to ensure
that:
(1) there were reasonable grounds for representing the expected
volume of timber for the Project; and
(2) information was provided in relation to all significant risks
associated with investing in the Project.
10.3 The reasonable steps taken by [the FSP] included:
(1) Conducting a due diligence program which included setting up
a due diligence committee, preparing and following a due
diligence planning memorandum, carrying out detailed
investigations, regular reporting to the committee and obtaining
final verification of the PDS from persons who possessed
relevant knowledge of the matters described in the PDS.
(Copies of documents evidencing key aspects of the due
diligence program are enclosed behind Tab I6, including copies
of the Due Diligence Planning Memorandum, Directors &
Management Questionnaire, signed Verification Memorandum,
signed Due Diligence Committee Reports and signed
verification copy of the PDS).
(2) Engaging an independent expert [Mr Name] of [Name] Forestry
Consultants) to:
(a) provide an opinion in relation to:
(i) suitability of the selected plantation species;
(ii) land selection methods and plantation design criteria;
(iii) the proposed methods of establishment and
management of the plantations for use in each Project;
(iv) proposed plantation tending and protection measures;
(v) proposed harvesting and transport systems and access
to markets;
(vi) the capacity of (Initials of FSP) and other relevant
group companies to manage each of the Projects, and
their experience and technical expertise to support the
Projects;
(vii) proposed plantation monitoring and reporting to
investors;
(viii) the forestry risks and steps to be taken to manage
those risks in each Project;
(ix) proposed products, alternative products, markets and
marketing strategy;
(x) the reasonableness of assumptions in relation to the
projected timber yields shown in the PDS;
(xi) the reasonableness of comments in relation to the
current timber prices shown in the PDS; and
(b) review the PDS and identify forestry matters incorrectly
stated or omitted from the PDS, being information that
investors and their professional advisers would reasonably
require, and reasonably expect to find in a PDS for the
purpose of making an informed assessment of:
(i) the assets and liabilities, financial position, profits and
losses and prospects of each Project;
(ii) the rights attaching to the financial products;
Case No: 302486 Determination Page 18 of 30
(iii) the merits of participating in each Project, and the
extent of risks involved; and
(iv) how each Project's property 1sto be held.
(a copy of the letter of engagement to [Name] of
[Name] Forestry Consultants is enclosed behind Tab
17)
(3) Engaging solicitors [Name] to assist in the preparation of the
PDS, assist in the set up and conduct of the due diligence
program and due diligence committee, act as chair of the due
diligence committee and provide legal advice in relation to the
requirements of the Corporations Act and compliance of the
PDS. Enclosed behind Tab 18 is a copy of the legal opinion
provided by [Name of Solicitors] by which they confirmed that:
(a) they were not aware of any issues which caused them to
believe that the PDS contained a misleading or deceptive
statement or an omission or that the issues of the PDS may
involve conduct that is misleading or deceptive;
(b) the due diligence and verification systems followed by [the
FSP] constituted reasonable steps to ensure that the PDS
was not defective and that it was reasonable for (Initials of
FSP) and its directors to rely on information and sign-offs
supplied pursuant to those systems.
10.4 Accordingly, even if the PDS was defective (which is denied), [the
FSP) would not be liable to [the Applicant] because it took reasonable
steps to ensure that the PDS was not defective.”
Expert Witness Reports
95. Opinions from an expert or experts with experience and knowledge of the
underlying commodity, its geographical location, product yields and markets
and other factors affecting the agribusiness scheme are generally provided
by the responsible entity in promoting a scheme. They are usually relied
upon by investors or their advisers in assessing the investment‟s prospects.
96. Both parties have relied on the opinions of independent foresters in respect
to the reasonableness of the basis for the FSP‟s representation about the
future Project Yield and the wood price.
The FSP’s Forester
97. The FSP, among other things, utilised an independent forester in the
formulation of the PDS and relies in part upon his report in responding to the
Applicant‟s allegations. The Applicant has challenged the quality of the
report and its uncritical reliance on information and assumptions provided by
the FSP. The Applicant has provided a copy of the Applicant‟s forester‟s
report together with a summary in a submission.
Case No: 302486 Determination Page 19 of 30
The Applicant’s Forester
98. The Applicant‟s forester, before preparing his report, was provided with
copies of the Applicant‟s complaint and the FSP‟s response which included
the PDS. The report responded to a series of questions put by the Applicant
in relation to the quality of the PDS, including the FSP‟s forester‟s report.
99. The Applicant‟s forester‟s report, among other things :
expressed an opinion that the FSP‟s forester‟s report merely endorsed
the position as established by the FSP in the PDS and that the forester
appeared to accepted the FSP‟s assumption without testing that they
were reasonable.
The Applicant‟s forester‟s report expressed adverse opinions about the
failings in the FSP‟s process and the incorrectness of some of the
assumptions upon which the PDS‟s representat ions as to future
matters were made.
It reviewed the FSP‟s assumptions about site quality, species matching
and growth rates, national and international productivity yields, and the
FSP‟s productivity matrix (including the CSIRO 3 -PG modelling, gains
from improved genetics, supporting data from overseas).
The Applicant‟s forester‟s report summarised the elements used by the
FSP to estimate the Project Yield and concluded that there was no
reasonable basis for the predicted yields adopted in the PDS. The
report suggested a more appropriate method (SQ 4 index) would have
got a more realistic estimation of the Project Yield.
It commented that the temporary variable nature of the PU as stated in
the PDS could have been better explained to avoid the possibility of an
investor incorrectly drawing a conclusion that the yield per PU was a
reasonable estimate of a likely outcome.
The report conceded that the PDS disclosed the risks involved in the
reaching of the Project Yield and PU and current price was disclosed. It
argued, however, that the inferences used by the FSP were incorrect
and that the predicted yields to achieve the Project Yield were
extremely optimistic.
100. The Applicant in his submission indicated that although the FSP‟s forester‟s
report together with the other data included or referred to in the PDS
provided a reasonable basis for the estimate of the current stumpage price
of $41.60 per cubic metre, it did not provide a reasonable basis for the
predicted yield.
Case No: 302486 Determination Page 20 of 30
101. The FSP criticised the Applicant‟s forester‟s report for:
Relying on information and data which post-dated the PDS.
Not citing relevant sources or the date of such sources for some
statements made and conclusions reached.
Section 7 of the report incorrectly assumed the size of the PUs were
predetermined at the time of the PDS.
102. The FSP pointed out that the Applicant‟s forester‟s report acknowledges that
the risks that came to pass were disclosed in the PDS and the report raised
new issues.
103. Although I will be assisted by the foresters‟ reports, op inions expressed by
expert witnesses cannot lead to the abdication of the decision-making
responsibility. Expert opinion can often vary and in fact experts can adopt
different approaches and reach conflicting conclusions based on the same
evidence.
104. I will be guided by them along with other lay evidence in the dispute: 5 As has
been said:
“The law does not call for [a scientific] standard of proof, but rather proof on
the balance of probabilities on the whole of the evidence, both scientific and
lay, and as the decision of the High Court in Ramsay v. Watson ...
demonstrates, a tribunal of fact must not abdicate its task to the scientific
and/or medical experts, albeit being guided by their evidence alongside the
lay evidence in the case.”
OMBUDSMAN’S CONCLUSI ONS
Misrepresentations, Non-disclosures and Omissions from the PDS
The Framework
105. I believe that in view of the criticism by the Applicant of the content and
quality of the PDS and the allegations of misleading and deceptive conduct
that it is pertinent to examine the process by which the PDS was developed.
106. The FSP had a process which focused on the assessing of the risk factors
associated with forestry projects and addressed those factors in the PDS.
107. The FSP:
used research from its own plantations
utilised research from overseas countries it believed had comparative
climates
used CSIRO modelling
5 State of New South Wales t/a New South Wales Department of Agricult ure v Allen [2000] NSWCA
141 at [99]; quoting Ramsay v Watson (1961) 108 CLR 642, at 645.
Case No: 302486 Determination Page 21 of 30
used material from a relevant Government Department
employed an independent forester, and
had a due diligence done to verify the PDS‟s compliance.
The Applicant has argued that the process was flawed and incomplete for
the reasons previously set out.
108. Despite this, I am satisfied that the FSP‟s processes involved an appropriate
methodology for producing a compliant PDS and establishing that the
grounds for the PDS representations as to future matters had an appropriate
basis.
109. I find that the FSP ‟s use of internal and external information which focused
on the risk factors associated with forestry projects together with the utilising
of independent professionals was sound. It provided a basis for the
formulation of a PDS that could be considered by investors or financial
advisers in determining the suitability of the investment.
110. This, in itself, does not determine the matters raised by the Applicant but I
am satisfied that it resulted in the production of a PDS which, with the
attached FSP‟s independent expert report, recognised matters relevant to
the success of the Project. These included, in addition to favourable climatic
conditions, a wide range of factors such as soil suitability, forestry practices
and the suitability of different varieties or species of trees to particular
regions or for particular purposes.
111. This again does not mean that the PDS was not defective as the FSP cannot
outsource its responsibility for the PDS but it is an indication that the FSP
took reasonable steps to ensure that the PDS did not contain
misrepresentations or failed in respect to disclosure obligations. This is
relevant both to the efficacy of the documentation as well as any defence of
the FSP for producing a defective PDS.
Was the PDS defective?
112. I have outlined the Applicant ‟ s submissions in relation to a number of
misrepresented or not disclosed matters in paragraph 60 above. I intend to
deal with these matters under the heading “Representa tions as to Future
Matters” .
113. The Applicant has raised other issues in relation to whether the PDS was
defective. The Applicant has drawn attention, in particular, to the fact that:
a specific warning should have been given about plantings, the
experimental nature of the Project and the fact that investors might
have lost money
there should have been an additional warning about plantings with an
expanded sections on the forecast for plantings in the Esperance and
Queensland regions, and
Case No: 302486 Determination Page 22 of 30
the financial information and other information should not have been
disclosed in isolation to the risks involved.
114. The FSP has responded in some detail about the extent of the disclosures
and its basis for the disclosures. It points to the fact that the Project had
been examined by a number of research houses, including one particularly
experienced in agribusiness schemes, and its due diligence group with no
fault being found with the PDS.
115. The Applicant‟s model for the PDS contains information that is fuller and
more comprehensive but I am not persuaded that it was necessary for it to
be provided at the time for the FSP to meet its statutory and regulatory
obligations at that time.
116. The PDS provided a summary together with comprehensive details about
the nature of the Project including its costs, returns, risks and risk mitigation
strategy. The document contained details about the operations of the RE
and related companies and included a copy of the independent forester‟s
report.
117. This report included information on project management, suitability of
selected species, silviculture and management, land selection and
productivity, markets and price. It also discusses markets and price and
warns of deductions to be made for costs of harvest, transport, processing,
shipping and allowances for fibre and moisture losses.
118. The PDS contained warnings about the uncertainties in the calculation of
predicted Project Yield. It also contained warnings about the possible lack of
rainfall and resultant insect infestation which eventually occurred.
119. In relation to risk, the Applicant, in a submission after he had received his
independent forester‟s report, conceded that while the risks were generally
stated in the PDS, the predicted yields were extremely optimistic based on
the information at the time.
120. Irrespective of that concession, I am satisfied that the risks associated with
the Project were fully disclosed to investors in the PDS. There was a detailed
explanation of the risks in the PDS with disclosure of more specific risks
relevantly made in other sections of the PDS. The risks associated with
productivity in relation to the predicted yield are clearly explained in the
document.
121. There must always be a judgement call to make about the structure of a
PDS and the extent and detail of the information provided in a PDS that is
needed to properly inform potential investors. Opinions will vary as to what
should be included and how it is expressed in order to ensure its
compliance, bearing in mind the need to be clear, concise and effecti ve.
Case No: 302486 Determination Page 23 of 30
The experimental nature of the project
122. In respect to the Applicant‟s allegation that the Project‟s experimental nature
was not disclosed, I note that the PDS does indicate that this was an
innovative project based on Government support and initiatives with an
emphasis on environmental considerations and the incorporation of such
things as indigenous traineeships.
123. The PDS, in addition to a number of general statements in this regard,
included specific information about the nature of the project. The FSP‟s
independent forester‟s report in the sec tion on the “ Suitability of Selected
Species, Silviculture and Management” in the PDS in respect to the
pulpwood project, says for example, among other things, that:
“This will be the first major hard wood plantation in the central coastal region
of Queensland and the first industrial pulpwood plantations based on Spotted
gums and their hybrids. There are uncertainties associated with innotative
projects including growth rates and returns. Spotted gum has been identified
as suitable for pulpwood plantations in published research. ” [sic]
124. I note that the report also recognised that in addition to there being limited
data supporting growth rates for the Spotted gum, and that the FSP had
identified the risks of genetic gain not being realised over the entire rotation.
125. The PDS warns that :
“Due to a number of significant variables, the long -term nature of the Projects
and the potential for agricultural projects to produce a wide range of
outcomes, it is not possible to determine future cash flows with certainty.
This section contains estimates of the main variables that influence the
outcomes. The directors believe that the estimates are reasonable.
Potential investors can make their own assessment of the returns likely from
the Projects by inserting values for the variables in the cash flow calculator
available on the [Name] website at [address]. The calculated returns and
estimated values should be read in conjunction with Section 5.2, which lists
the risks to the projects …”
126. Section 5 discloses the Project growi ng risks which include climatic risks,
below average rainfall, seasonal conditions and pests and disease. It also
includes a discussion of a range of financial and commercial risks.
127. I am satisfied that the PDS adequately disclosed the innovative nature of the
Project together with what may be considered experimental aspects together
with the growing and commercial risks to investors. The PDS was not
misleading or deceptive in this regard.
Warnings about plantations
128. The Applicant also contends that the PDS, by stating that a majority of the
plantations would be in Esperance and Queensland regions, contained
misrepresentations and non-disclosures in that it gave the impression that
the past performance of established areas was representative of the future
performance of the less established areas.
Case No: 302486 Determination Page 24 of 30
129. This is clearly not the case. In addition to the specific disclosures to which I
have referred, the PDS says that:
“The Projects are speculative long -term ventures. They are exposed to
agricultural risks inherent in growing a crop and the commercial risks of a
long-term project. ”
130. There is also a clear warning about future timber yields in Section 5.2 with
respect to young plantations. The PDS expressly says that there may be
incorrect interpretation of relevant factors and overestimation of the expected
productivity because limited data and experience existed with respect to the
production of timber from mature plantations. It goes on to detail the reasons
for such a problem.
131. I also find that it was not necessary to include the warning or the expanded
sections on Queensland and Esperance as there was appropriate disclosure
in the PDS, about location and the risks involved.
Positioning of information and Warning of Risks involved.
132. Even if there are reasonable grounds to state prospective financial
information, issuers should consider including a warning so that a reader of
the document would understand its predictive character and the risks in
placing undue reliance on that information. 6
133. Any cautionary language should be displayed together with the prospective
information or otherwise in a manner sufficiently prominent to ensure that a
reader of the disclosure document or PDS would be no less likely to view it
than the prospective financial information itself. 7
134. Disclosure should include unambiguous statements clarifying that the
prospective financial information: 8
is predictive in character
may be affected by inaccurate assumptions or by known or unknown
risks and uncertainties, and
may differ materially from results ultimately achieved.
135. I am satisfied that the PDS met these requirements . The PDS was
unambiguous in making it clear that some information was predictive, may
be affected by inaccurate assumptions and may differ materially from the
results ultimately achieved. Further it is not defective in respect to the
positioning of provision of the financial information or the assumptions and
risks in the same PDS location as the Project Yield forecasts. The PDS was
indexed and well laid out so it could be readily followed to avoid a suggestion
that these risks were not placed in isolation to the other matters relevant for
its consideration.
6 SPS 170.55
7 SPS 170.87
8 SPS 170.88
Case No: 302486 Determination Page 25 of 30
Other Matters
136. There is evidence before me that gives strength to this contention. This
evidence indicates that the PDS was examined by the two independent
research houses, Company G , the FSP‟s due diligence committee and the
Applicant. An examination of their conduct shows:
The research houses recommended the investment.
Company G recommended the investment and endorsed the
App licant‟s application to invest in the Project.
The Due Diligence Committee verified the PDS‟s compliance.
The Applicant, warned of the risks of the investment, did not raise any
questions about the PDS after reading it, with either Company G or the
FSP.
137. While not conclusive, the fact that not one of this group raised issues about
representations, non-disclosures or significant omissions with the FSP prior
to the Applicant making the investment is telling.
138. Leaving this aside, I have examined the PDS and compared the information
provided with the information that the Applicant says should have been
disclosed. I have considered the Applicant‟s expert opinion in this context.
139. I am satisfied that the PDS in relation to these issues was not misleading or
decepti ve. I find that the Applicant‟s specific allegations as to
misrepresentations, non-disclosures or omissions are not sustained.
140. By way of completeness, having examined the FSP‟s process, I am also
satisfied that if the PDS had been defective that the FSP would have a due
diligence defence to the Applicant‟s claim based on the reasonableness of
its conduct in the development and formulation of the PDS.
Representations as to Future Matters
141. I will now deal with the Applicant‟s contentions that the representati ons as to
future matters did not have reasonable grounds. Central to this submission is
that the assumptions used by the FSP in assessing the reasonableness of
the grounds were flawed in respect to:
its assessment of climatic conditions
site selection and untied plantation regions
Esperance and Queensland Yield forecasts
the national and i nternational data that was used
the inappropriate CSIRO modelling
suitability of species and genetic yield growth rates
the calculation of the predicted Project Yield under the FSP‟s Matrix, and
the quality of the FSP‟s independent forester‟s report .
Case No: 302486 Determination Page 26 of 30
142. If not completely explicit but certainly implicit in the Applicant ‟ s argument, is
that the assumptions were so flawed that the FSP could not have reasonable
grounds for its representations. The FSP has referred to ASIC RG 170.31
and RG 170.49 in this regard.
143. The Applicant had submitted the two key parameters of the investment offer
under the PDS were the stumpage price per cubic metre of wood harvested
and the predicted yield per PU. In a latter submission he conceded that
although the FSP‟s forester‟s report together with the other data included or
referred to in the PDS provided a reasonable basis for the estimate of the
current stumpage price of $41.60 per cubic metre, it did not provide a
reasonable basis for the predicted yield of 275 cubic metres per PU.
144. Care must be taken not to evaluate the reasonableness of the FSP ‟ s
representations and the assumptions upon which they are based as to the
future and the assumptions upon which they were made with the benefit of
hindsight. The mere fact the representations made in 2005 did not come to
pass does not, in itself, mean that they did not have a reasonable basis.
145. The FSP did not and could not guarantee representations as to the future
matters made in the PDS. There can be unforeseeable events outside of the
control of any RE of agribusiness which can impact on future events.
146. The basis of the FSP‟s representations contained in the PDS was on a
number of factors that I previously outlined. Relevantly, these included an
independent forester‟s report.
Independent Foresters ’ Reports
147. An RE, as previously indicated, normally uses independent foresters to
provide expert opinion to assess the suitability and risks of agribusinesses
like the Project. ASIC RG 170 .30 indicates that reasonable grounds for the
disclosure of financial information may exist where there is reliance upon an
independent industry report. The Applicant has not accepted that the FSP‟s
forester‟s report should b e so treated.
148. The FSP‟s forester made assessments of all the matters referred to him by
the FSP and came to the conclusion that subject to the risks disclosed in the
PDS that a Project Yield of 275 cubic metres per PU was reasonable for the
Project. The A pplicant said that the FSP‟s forester did not independently test
the productivity assumptions of the FSP but merely endorsed them. In this
regard the report of the forester did not comply with ASIC RG 170.32.
Case No: 302486 Determination Page 27 of 30
The FSP’s Forester
149. The FSP‟s forester‟s report appears to comply with ASIC‟s requirements but
the Applicant argues again that the forester relied on the FSP‟s flawed
assumptions and did not test them as reasonable in meeting the test under
section 769C. The Applicant contended, in particular, that the underlying
Productivity Matrix used by the FSP was not disclosed or explicitly deemed
as reasonable within the forester‟s report contained in the PDS and that the
forester did not have the expertise to make assumptions as to the final
geographic disposition of the Project.
150. The FSP has countered these allegations by pointing out that its
independent forester confirmed at page 47 of the PDS that he had:
“…examined each regional productivity matrix and checked the relationships
between the forest environments and measured forest growth and yields
achieved in actual harvesting operations where available.”
151. The FSP also drew attention to the forester‟s qualifications in the introduction
to his report and argued that he was qualified to make assumptions as to the
geographic disposition of the Project.
152. I have examined the FSP‟s forester‟s qualifications and I am satisfied that
the forester was qualified to make the assumptions and reach the
conclusions he did in his report. I consider that due weight should be given
to this report in assessing the FSP‟s assumptions and the reasonableness of
the grounds for the PDS‟s representations as to future matters.
153. RG 170.31 provides that he, as an expert, could adopt a management‟s
assumptions if the expert states that those assumptions were reasonable.
The forester did this in sections of his report in relation to the Project. For
example, he outlined the history of the Project Manager‟s previous forestry
plantation management and stated that:
“ The acquisition of land for inclusion in the Projects is on-going at the date of
this report. [Initial of Project Manager] use a suitable procedure for assessing
land. This takes into account the climate and landforms evaluated by suitably
qualified professionals and regional attributes such as export facilities and
distance to markets. ”
154. I am satisfied, however, that the forester went further than this as I am not
satisfied on the evidence that he just accepted the FSP‟s assumptions as to
the Project Yield without testing them. His report includes a discussion of the
relevant issues that required consideration of the FSP‟s assumptions before
coming to the conclusion that the Project Yield of 275 cubic metres per PU
for the Pulpwood project was reasonable.
Case No: 302486 Determination Page 28 of 30
155. The determination of the Applicant‟s argument that the FSP‟s assumptions
were flawed turns on the Applicant‟s forester‟s opinion, not only on any
failings in the FSP‟s forester‟s report but on his eval uations of the other
sources of information upon which the FSP relied. This led the Applicant‟s
forester to the following conclusions, among other things:
That as the actual locations of proposed plantations in Esperance and
Queensland were unknown at the date of the PDS, the site quality and
rainfall criteria were hypothetical.
There was no certainty that areas near Esperance could be purchased
with the necessary annual rainfall to cope with reasonable variation in
rainfall from year to year.
There was no reasonable basis for the adoption of the SQ2 assumption
for the proposed Central Queensland plantings given soil quality,
rainfall and susceptibility of some plantings to pests and diseases.
There was no international data which provided a reasonable basis for
the predicted yield in the PDS.
156. The FSP has responded to the Applicant‟s submissions and provided
considerable documentation in support, as I have outlined. I must weigh up
the representations in the PDS in the light of the competing forester s‟
opinions and all the other material before me. Having examined all the
material I am satisfied that the FSP had grounds to form the assumptions
that were to be the basis for making the representations in the PDS from its
experience and research.
157. There were reasonable grounds for the productivity matrix as explained in
the PDS and supporting documentation provided by the FSP. This included
documentation to support assumptions about productivity in Albany, the
Green Triangle, Esperance and Queensland yield forecasts and genetic
growth rates together with other matters raised by the Applicant.
158. In relation to the specific issue of the Project Yield, I find that there were
clear explanations in the PDS as to the basis of its assumptions and they
were reasonable on the evidence before me. It is also made clear in a
disclosure in the PDS of the risks inherent in the assumptions that had been
made when it is recited in the PDS:
“However the Project Yield estimates are based upon
professional judgement and there is a ris k that these estimates
may prove to be inaccurate.
Factors that may impact on the estimates of Productivity
include the following:
Estimates of Productivity require an assessment of the
soil types and site quality across each property. There
is a risk that some elements may be misinterpreted and
Productivity over estimated.
The estimates assume that the long term average
annual rainfall and annual rainfall distribution will be
Pulpwood
Sandalwood
Pulpwood
Case No: 302486 Determination Page 29 of 30
received at Properties for the term of the Project.
Sustained periods of below av erage rainfall could
reduce the estimated Productivity or in extreme cases
cause the death of the trees. Different rainfall
distributions could also reduce the estimated
Productivity. A combination of the above factors could
contribute to a lower Productiv ity than estimated.
[The RE] has attributed gains of 30% in the estimates
of Productivity from genetic improvement of seed. The
attributed gains are those above the productivity
expected from plantations established from unselected
native seed. The estimat ed gains are supported by 3.5
year old data from trials undertaken by [Name] in
Australia and information from overseas from
plantations established with similar material
approaching the end of their rotation. [The RE] has
access to data from trials and re search from Portugal
(where E. globulus has been grown and bred for over
80 years), and Brazil and South Africa (where intensive
breeding work has been undertaken on E. grandis and
its hybrids.) There is a risk that [the RE] has over
estimated the gains at tributed to genetic improvement.
There is the risk that gains anticipated from improved
genetics may be not be as assumed but limited by
other factors such as soil moisture, site quality or pest
and disease attack.” [sic]
Pulpwood
Pulpwood
159. I am further satisfied that the FSP considered and relied upon information or
opinion from a range of reputable sources, in addition to the independent
forester, in the making of the assumptions for the representations about
future matters.
160. This included research based on its previous forestry plantations, information
from other plantations, CSIRO modelling and information from the
appropriate Government body. The FSP has provided a number of research
papers on growth and yield in respect of the species used in the plantations
and genetic seed improvement.
161. Despite the Applicant‟s forester‟s report and the criticism of aspects of this
documentation.
162. I am satisfied that the FSP has established reasonable grounds based on :
some facts or circumstances
existing at the time of publication of the information in the disclosure
document or PDS
on which the issue in fact relied
which are objectively reasonable, and
which support the information.
Case No: 302486 Determination Page 30 of 30
163. I find that the assumptions upon which the FSP‟s representations as to
future matters were made were reasonably formed and provided a sound
basis for the FSP‟s representations as to future matters.
164. Again strength is given to this conclusion by the fact that the PDS and the
Project had been reviewed by agribusiness and research houses before they
recommended it as an investment.
Other Matters
165. The Applicant has submitted that even if the FSP‟s representations did have
reasonable grounds, it did not mean that they still could not be
misrepre sentations. I have noted the conflicting opinion from the Applicant‟s
forester but I do not find that the FSP‟s representations were
misrepresentations under section 769C or otherwise.
166. Accordingly, I am satisfied that the FSP had a reasonable basis for its
representations in respect of the Product Yield and price in its PDS and that
they were not otherwise misrepresentations.
167. I agree with the FSP‟s conclusion that the PDS included specific reference to
the very factors which ultimately did affect the success of the Project, namely
drought and disease; matters that were disclosed in the PDS.
Determination
168. On the basis of the available information I determine the FSP is not liable to
compensate the Applicant.