Denial of flood damage claim at farm property; claimed misleading cover and premium refund
Text of the determination
Case No: 301987 Determination Page 1 of 9
Case number: 301987
General Insurance - Farm Property - Home Building - FSP Decision - Flood -
Denial of claim
08 April 2013
Background
1. The Applicants held a farm insurance policy with the Financial Services
Provider (FSP) that covered among other things, the home building, contents
and fences.
2. In March 2012, the Applicants‟ property at Boree Creek, NSW , was
inundated by water following severe weather events.
3. The FSP assessed the claim and refused liability on the basis the loss was
caused by flood, which is an exclusion under the policy.
4. The Applicants disputed the decision on the basis that the property was
inundated with stormwater runoff and the FSP covered a similar claim in
2010, leading them to believe they had the appropriate cover.
5. The FSP maintains that the loss is an excluded event.
Summary of Applicant s’ position
6. The Applicants say that in October 2010, they had a similar claim for water
damage which was paid with no explanation. They have paid premiums
since 2010 on the basis that they were covered for water damage claims.
7. They have since been told the 2010 claim was covered because of a
blocked drain; however, they were not told this at that time of that claim.
8. Had they known they did not have flood cover, they would have sought
insurance elsewhere.
9. The FSP has refused the 2012 claim, despite the agent assuring them it
would be covered. On 5 March 2012, they called the agent who advised
“thank goodness we know you are covered” .
10. The hydrologist relied on by the FSP has not visited Boree Creek. The
representatives who did visit Boree Creek did not appear to be hydrologists
as they were unable to identify which way Boree Creek flows and had to ask.
Determination
Case No: 301987 Determination Page 2 of 9
11. When the representatives came to the site, they were late and only stayed
10 minutes. They declined an offer to be shown where the stormwater had
come from, saying they had to get to another location.
12. The report was written in a Sydney office and contains inaccuracies and
lacks local knowledge.
13. The rainfall data relied upon is from Lockhart, which is 21km away. The
Lockhart readings are incomplete and rainfall was different to that in Boree
Creek.
14. The stormwater came from the front of the property, not the back where the
creek is located.
15. A rain gauge on nearby farmland measured 12 inches of rain while they
measured about 10 inches at their site. The other properties had their
insurance claims approved.
16. They have lived at the insured address for 38 years and while water has
pooled under the house several times, only in 2010 and 2012 has there been
damage and this is since the installation of the village drain, which gets
blocked very quickly.
17. The Applicants seek full cover for their loss under the policy and
reimbursement of the 2011 and 2012 premiums.
Summary of FSP’s position
18. The FSP says the expert evidence establishes the loss was caused by flood
and as flood is excluded under the terms and conditions of the policy, it has
no liability.
19. There is no basis upon which to refund premiums as it remained on risk in
2011 and 2012.
20. The hydrologist has provided a supplementary report addressing the
Applicants‟ concerns.
21. In relation to the 2010 claim, that was accepted as a storm claim. The FSP
notes that as the claim was accepted there was no need to outline the
reasons for the decision at the time.
22. The FSP relies on the following policy provisions contained in the Product
Disclosure Statement (PDS):
“ Words that have a special meaning in this policy
In this policy there are words that have a special meaning. These are words
that apply to all of the policy are listed below.
Case No: 301987 Determination Page 3 of 9
The meaning of other words that apply to specific sections of the policy are
shown in the relevant section under the heading „Words that have a special
meaning in this section‟.
Flood is when water from a river, creek, lake, swamp, watercourse,
reservoir, dam or navigable canal (whether they are in their original
state or have been modified), overflows onto normally dry land.
Water that escapes from an irrigation canal is not flood.
We also regard any rainwater on your property
that cannot run off into a river, creek, lake, swamp, watercourse,
reservoir, dam or navigable canal (whether they are in their
original state or have been modified) because it is overflowing in
flood, and/or
that mixes with the floodwater coming from the river, creek, lake
swamp, watercourse, reservoir, dam, or navigable canal (whether
they are in their original state or have been modified),
as water coming from a flood.
...
What all sections of this policy do NOT cover
Any cover we provide is subject to the following exclusions.
We will NOT pay claims arising from the following:
Flood, storm surge, the action of the sea, tidal wave or high water. This
exclusion is not applicable to Sections 7, 9 and 10 of this policy.
...
Section 1
Domestic Buildings and Domestic Contents
What is insured
The property set out on your schedule is insured if it is destroyed, lost or
damaged. It is insured only if you own or are liable for the property.
...
Cover 2 – Accidental Damage
We will cover your domestic farm buildings and domestic contents, shown on
your schedule, for any accidental damage or accidental loss including that
caused by the following:
Storm, rainwater or wind ...
We will not cover your domestic farm buildings and domestic contents for
accidental damage or accidental loss caused by or arising from the following:
Flood
...
Section 2
Farm Property
What is insured
Case No: 301987 Determination Page 4 of 9
The property set out on your schedule is insured against destruction, loss or
damage. It is insured only if you own, or are liable for, the property.
...
Cover 2 – Accidental Damage
We will cover your farm property for any accidental damage or accidental loss
while at the situation, including that caused by the following:
Storm, rainwater or wind ...
…
We will not cover you farm property for accidental damage or accidental loss
caused by or arising from the following:
…
Flood
Flood.”
Issues
23. Whether the Applicants were misled as to the cover under the policy?
24. Whether the loss was caused by stormwater runoff or flood?
25. Whether the Applicants are entitled to a refund of premiums?
Reasons for decision
26. As advised to the parties, the Financial Ombudsman Service has considered
it appropriate to elevate the dispute in accordance with the Operational
Guidelines to the Terms of Reference. This is because of the potential
amount of the claim and the issues to be considered. This dispute has not
been the subject of a Recommendation and has proceeded directly to
Determination.
27. The decision has been made by a Panel of three decision makers, including
an Ombudsman and decision makers with experience in the insurance
industry and consumer rights.
Whether the Applicants were misled as to the cover under the policy?
28. The Applicants say that due to the claim being covered in 2010, they thought
they were covered for water inundation events. They say the agent said they
would be covered when they called her on 5 March 2012.
29. The FSP says the 2010 claim was deemed stormwater damage and as the
claim was covered there was no need to provide details to the Applicants as
to why the claim had been accepted at the time.
Case No: 301987 Determination Page 5 of 9
30. Section 35 of the Insurance Contract Act 1984 (the Act), provides that an
insurer that wishes to exclude an event covered under a Prescribed Contract
in the Insurance Contracts Regulations 1985 , must do so by clearly
informing the insured that it is derogating from the prescribed cover.
31. Under Regulations 9 and 13 of the Insurance Contracts Regulations 1985 ,
home building and contents insurance policies are described as Prescribed
Contracts. Under Regulations 10 and 14, flood is described as a Prescribed
Event. Therefore, if an insurer chooses not to cover flood, it has the onus to
clearly inform the insured that it is excluding loss or damage caused by
flood. This is usually done by providing a PDS outlining that flood is
excluded. There is no dispute that the PDS was provided and received.
32. In this dispute the Applicants say they have been prejudiced by the FSP‟s
acceptance of the 2010 claim.
33. In the Panel‟s view this does not constitute prejudice. The Panel accepts tha t
an FSP is entitled to assess each claim made on its individual merits; further,
acceptance of a claim by an FSP (in this case a water damage claim in
2010) cannot be taken as an indication that all future claims arising from
water damage (in this case alleged flood) will be accepted. Had the
Applicants been advised in 2010 that the FSP was agreeing to provide cover
for flood then the Panel may take a different view, however, there is no
evidence the Applicants were told in 2010 that they were being covered for
flood.
34. The PDS which outlines the terms and conditions of cover clearly stipulates
that flood is an excluded event under all sections of the policy (apart from
sections 7, 8 and 10 which have no relevance to the substance of this
dispute).
35. The onus at law rests with an insured to read and consider the terms and
conditions of an insurance contract to ensure it meets his or her needs.
36. In the Panel‟s view, the PDS clearly outlines that flood, broadly defined as
water escaping a watercourse, is excluded.
37. The Panel is concerned the FSP‟s agent reportedly thought the Applicants
would be covered; however, there is no submission to indicate she told the
Applicants flood was a covered event before the loss and she may have
made these statements without full knowledge of the nature of the event.
Further there is no evidence that the Applicants have suffered any prejudice
having been informed by the agent that the event would be covered.
38. In any case, the PDS clearly excludes flood and in the Panel‟s view, th e
acceptance of a previous storm related claim does not dictate the FSP is
now reasonably liable to pay the 2012 claim.
39. The Panel finds the FSP has met its onus to clearly inform and therefore
may rely on the terms and conditions of the policy.
Case No: 301987 Determination Page 6 of 9
Whether the loss was caused by stormwater runoff or flood?
40. The Applicants say the loss was caused by stormwater runoff from the front
of the property.
41. The FSP says the loss was caused by flood.
42. The FSP provides a copy of an assessment report dated 27 March 2012,
prepared by an external loss adjustor. The report provides the following
information:
“ Circumstances
In interview with your Insured they explained that rain began to fall heavily on
the evening of Monday 27 February 2012 and continued until 5 March 2012
with approximately 8 -10 inches of rain being recorded in the district in that
period. Ground water was evident throughout the week and at about 5pm on 4
March 2012 the Insured evidenced water breaking the creek bank with the
rise peaking at approximately 7am on 5 March 2012.
The water rose to the height of approximately 1.2 metres beneath the house
and ran through the workshop at that level. Emergency services were active
through the region, but not particularly the Insured premises.”
43. The FSP also appointed a hydrologist to prepare a report on the loss. The
subsequent report from „W‟, dated May 2012, provides the following
information:
No rainfall data is available for Boree Creek, however, data is available for
Lockhart, with is approximately 15km away. At Lockhart 118mm of rain
was recorded in the five days to 2 March 2012. 123mm was recorded in
the 24 hours to 9.00am on 4 March 2012.
This would be in excess of a one in one hundred year ARI event.
The Applicants‟ property is 300m west of Boree Creek town. The dwelling
is raised 2.5m above ground level and is adjacent to Boree Creek.
Boree Creek is a small watercourse and would respond quickly to rainfall.
There is no gauge data available for Boree Creek.
W visited the site on 3 May 2012 and the female Applicant provided the
following version of events:
- There was around 10 inches of rain on 3 March 2012.
- There was no water in Boree Creek prior to 28 February 2012.
- They were at the property at the time of the event and at around
6.00pm on 3 March 2012, water overtopped Boree Creek and
reached the dwelling. At one point there was a 200mm rise in the
water level in a 30 minute period.
Case No: 301987 Determination Page 7 of 9
- The peak inundation at 1.1m above ground level occurred around
7.00am on 4 March 2012.
- The store room and laundry of the main dwelling were inundated as
well as the main shed to the east. The inundation caused the toilet
and piping to rupture.
- Fencing around the dwelling and paddocks was damaged.
- No rainwater entered through the roof.
- The railway line to the east overtopped causing flooding to the
township.
Rainfall data for the region, including areas between 17km and 109km
from Boree Creek indicates a severe rain event occurred in the period from
approximately 8.00am on 3 March 2012.
The Applicants advise the inundation occurred around 6.00pm on 3 March
2012, being some 10 hours after the commencement of the causal rain.
Boree Creek upstream of the insured site occupies an area of
approximately 130km 2 with a stream length of 20 to 30km. According to
standard hydraulic calculations, the peak level experienced in the creek
adjacent to the site would be expected to occur eight to 12 hours after the
commencement of the heavy rain.
CONCLUSION
“In our opinion, the inundation of the site… in Boree Creek was related to high
water levels escaping the confines of Boree Creek and inundating the site.”
44. The Applicants have raised a number of concerns with the hydrology report.
They noted that Boree Creek was nearly full from the earlier rain but had
dropped off by Friday 2 March 2012.
45. The Applicants say the water came from the front of the property first, as it
did during the 2010 event. They also note that the rain data relied upon by
the hydrologist is for locations many kilometres from Boree Creek.
46. W provided a memorandum dated 2 July 2012 to clarify some of the issues
raised by the Applicants. It provides the following relevant information:
W says it appreciates that the rain data it has reviewed is for areas some
distance from Boree Creek, however, the rain data provides a consistent
pattern across the region.
While the original report stated there was no river level gauges for Boree
Creek, subsequent inspection establishes the peak level was 1.7m at a
gauge upstream of Boree Creek town.
It is likely that Boree Creek flooded into Richmond Street in the vicinity of
the golf course on the eastern edge of town (near the intersection of
Richmond Street, Orara Street and Boree Creek Road). At this location
Case No: 301987 Determination Page 8 of 9
Boree Creek passes within 100 metres of the road. Flow from Boree Creek
would have flowed along Richmond Street and Eades Street before flowing
across the railway line and Boree Creek Road.
Anecdotal evidence confirms that a portion of the flow from Boree Creek
made its way down Richmond Street. As a result, a portion of the flow
would have come from the north side of the railway line as nominated by
the Applicants.
The catchment area that could potentially drain towards the insured
property from the north is 370 hectares, and as such the runoff from this
catchment would not be expected to have been more than 180mm deep on
the north side of the railway line without additional flooding from Boree
Creek.
On the south side of the railway line where the Applicants‟ property is
located such flows would be expected to flow into Boree Creek and be
confined within the banks. However, debris along the creek, gauge
markings and anecdotal evidence demonstrates the flows were substantial
in Boree Creek on the evening of 3 March 2012.
Any catchment runoff would have only made an insignificant contribution to
water levels and could only have reached the property after joining with the
flows from Boree Creek. Accordingly, the inundation was caused by water
escaping Boree Creek.
Discussion
47. The Applicants‟ reported versions in the loss adjustor‟s assessment report
and the original hydrology report indicate the Applicants saw the water from
the Boree Creek inundate the property. However, the loss adjustors report
states this occurred around 5.00pm on 4 March 2012 while the hydrology
report says it occurred at approximately 6.00pm on 3 March 2012. The Panel
also notes that in the Applicants‟ submission to the Service they state
“…damage from flood waters on 4 th March 2012…”
48. It may be that the water first reached the vicinity of the Applicants‟ dwelling in
the afternoon of 3 March 2012 and by the morning of 4 March 2012 the
water reached it maximum level in the property. This view is supported by
the hydrologist‟s notation of the Applicants‟ report that the peak occurred at
approximately 7.00am on 4 March 2012.
49. The Panel is inclined to the view that water first reached the property in the
afternoon of 3 March 2012 and reached the peak level at about 7.00am on 4
March 2012.
50. The hydrologist states that water which was noted as entering from the front
of the property would have included floodwater from Boree Creek.
The Panel has considered the evidence presented and, on the balance of
probabilities, is persuaded that the loss was most likely caused by a mix of
stormwater runoff from the catchment area and water from Boree Creek. In
Case No: 301987 Determination Page 9 of 9
line with the flood definition contained within the policy and prevailing
Australian insurance case law this would be characterised as flood.
51. Accordingly, while the Applicants have a prima facie claim under the
„Accidental Damage‟ cover under s ections 1 and 2 of the policy, the FSP has
established on the balance of probabilities, that the excluded eve nt of flood
is the proximate cause of the loss and it may therefore refuse liability.
52. Section 5 of the policy does not cover fences for the insured event of storm.
Further the policy exclusion for flood applies to all sections of the policy other
than 7, 8 and 10.
Whether the Applicants are entitled to a refund of premiums?
53. The Applicants seek reimbursement of premiums paid in 2011 and 2012.
54. The Panel notes that even though the Applicants believed they were covered
for all water inundation events, the property remained on risk for other
events covered by the policy, throughout those periods.
55. Further, the Panel is satisfied that in providing the PDS, the FSP met its
obligation to clearly inform of the relevant flood exclusion.
56. Accordingly, the Panel determines the FSP is not required to reimburse the
premiums.
Determination
57. On the basis of the available information the Panel determines the FSP is
entitled to refuse liability.
58. The Panel further determines that the FSP is not required to reimburse
premiums.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.