Cash settlement amount for flood damage to home footings and kitchen

FirmFinancial Firm (Unknown - Insurer)
Decided2013-05-23
ProductGeneral Insurance · Home building and contents
OutcomeFor the firm
Amount awarded—
Non-financial loss—
Amount claimed$100,000
SourceAFCA PDF

Summary

The applicants, represented by a legal aid service, disputed the FSP's $38,985.49 cash settlement for flood damage to their home's stumps and kitchen, citing quotes of about $100,000. AFCA found the settlement based on the FSP engineer's scope of works fair and sufficient to discharge the FSP's liability under new-for-old settlement terms.

Under the policy's new-for-old settlement terms the insurer may pay its own cost of repair, and the engineer's scope restores the home to pre-event condition without betterment.

Issues

Subjects and remedies

home or building damagenatural disasterno remedy

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Case No: 301952 Determination Page 1 of 7 Case number: 301952 General Insurance - Domestic Insurance - Home Building - FSP Decision - Claim amount 22 May 2013 Background 1. The Applicants‟ home was insured with the Financial Services Provider (FSP) under a home and contents policy, with a sum insured of $301,300 (building) and $95,700 (contents). 2. The home sustained damage following significant rains in December 2010 and January 2011 which resulted in flooding underneath the home. 3. The FSP accepted liability and offered to arrange for repair of the damage but the Applicants wished to have the repairs carried out by their nominated builder. 4. The FSP then offered the Applicants a cash settlement of $38,985.49 (net of $100 excess) on the basis that this represented the amount the FSP would incur to repair the damage. 5. The Applicants believe that the offer is inadequate on the basis that they have received several quotes for approximately $100,000 to repair the damage. Summary of Applicants ’ position 6. The Applicants have been represented by a legal aid service. For the sake of clarity and brevity, the Applicants and the legal aid service will hereafter be referred to as “the Applicants”. 7. Significant rains in December 2010 and January 2011 caused severe damage to concrete stump footings of the Applicants‟ home , which resulted in additional damage to the interior of the home. 8. The quotes obtained by the Applicants indicate that it would cost approximately $100,000 to repair the damage, including replacing the concrete stump footings and refitting the existing kitchen. The Applicants wish to use their own builder so as to minimise disruption during a period of personal trauma due to the ill health (and subsequent death) of the male Applicant. Determination Case No: 301952 Determination Page 2 of 7 9. However, the FSP has only offered the Applicants the amount of $38,985.49 to fund the repairs by their own builder because the FSP‟s engineers do not believe that the stumps or the kitchen require replacement. Summary of FSP’s position 10. The FSP‟s engineer has determined that it would cost $39,085.49 to repair the damage to the Applicants‟ home caused by the significant rain events in December 2010 and January 2011. 11. Although the FSP‟s builder was prepared to repair the damage to the Applicants‟ home, the Applicants wanted to use their own builder. In these circumstances, the FSP is entitled to cash settle for the amount it would have incurred had its builder repaired the damage to the home. 12. The repair cost determined by the FS P‟s engineer is based on , among other factors, the existing stump footings and kitchen being repaired rather than replaced. The FSP considers that the stump footings and kitchen do not need to be replaced (rather than repaired) in order to restore the house to its condition prior to the rain damage. The FSP considers that replacing the stump footings and kitchen would constitute an improvement to the home. 13. The FSP relies on the following policy provisions: “ How we settle your claim … We choose how your claim is settled If we agree to pay a claim for loss, theft or damage to your home, … we will decide if we will: – repair damage new for old or – replace home or contents new for old or – pay you what it would cost us to repair or replace home or contents new for old. … We will not: – pay extra to replace your home, contents or landlord‟s fixtures and fittings to a better standard, specification or quality than it was before the loss or damage occurred except as stated in „new for old‟ on the next page – fix a fault that existed before the loss or damage occurred. New for old means: – new materials, new items We replace or repair with new items or new materials that are available at the time of replacement or repair from Australian suppliers. – new for old, regardless of age We replace or repair new for old regardless of age, with no allowance for depreciation. Case No: 301952 Determination Page 3 of 7 ... – same type, standard and specification as when new We replace or repair to the same type, standard and specification as when new. If the same is not available, it means of a similar type, standard and specification when new. It can be a different brand. New for old does not: … – mean of a better standard, specification or quality than when new. … How we settle home claims If we agree to pay a claim for loss, theft or damage to your home, we will decide if we will: – repair damage new for old or – rebuild your home new for old or – pay you what it would cost us to repair or rebuild your home new for old. … If you want to change the design of your home When rebuilding your home, if we agree, you can choose to change the design of your home or upgrade parts of it, providing you pay the extra costs of doing this. If you want to downsize your home for less cost than you are entitled to claim, we will not pay more than it costs us to rebuild the downsized home. ” Issue 14. Whether the FSP‟s $39,085.49 cash set tlement offer (subject to $100 excess) is fair and reasonable, and sufficient to discharge its liability under the policy. Reasons for decision 15. Due to the nature and quantum of the dispute , the Financial Ombudsman Service (FOS) has considered it appropriate to expedite the dispute in accordance with the Operational Guidelines to the FOS Terms of Reference. Accordingly, this dispute has not been the subject of a FOS Recommendation and has proceeded directly to an Ombudsman for a Determination. The parties have been previously advised that a Determination will be issued. 16. I am satisfied that there has been an exchange of all relevant information between the parties and that each party has been given the opportunity to respond to the issues raised. Case No: 301952 Determination Page 4 of 7 Policy provisions 17. I have considered the following policy provisions in addition to the provisions referred to by the FSP: “ Lifetime guarantee on home repairs When we repair or rebuild your home, we guarantee the quality of materials and workmanship of that work for the lifetime of your home if we: – authorise and – arrange and – pay the builder or repairer directly for this work. What we guarantee We guarantee the material used and standard of the workmanship to be free of defects. If a defect arises in the lifetime of your home as a result of poor quality workmanship or use of incorrect materials, then we will rectify the problem. This guarantee does not apply: – to repairs you authorise or make yourself ” Cost of repairs 18. The FSP‟s cash settlement offer reflects a quote prepared by the FSP‟s builder “QC” based on a scope of works prep ared by the FSP‟s engineer “C” following an inspection of the property. C‟s scope of works included the following items:  re-levelling the home floors by using inert packers and jacking bearers at stumps;  installing an additional stump at the rear bearer adjacent to the left side of the rumpus room and jacking the bearer to eliminate the movement gap between the kitchen cupboard and the side wall;  a contingency amount of $1,500 for plasterboard repairs and repainting where necessary following the stump repairs set out above;  re-levelling the east window of the rumpus room where movement has occurred, including removing the window, reframing in installing the sill and head flashings and reinstating the existing window plumb ;  packing concrete under the footing at the rear rumpus room slab at the junction of the home at the left side, including engineer inspection and certification;  filling all cracks to plasterboard walls i nternally, re-setting where set joints have opened after the foundation works and jacking and painting all internal walls of the home with two coats to Insured‟s colour selection;  resecuring the kitchen cupboards where movement has occurred at the wall and moulding to cover misalignment and painting; Case No: 301952 Determination Page 5 of 7  re-securing the front verandah to the home where differential movement has occurred;  repairing the front driveway to reinstate to pre-existing condition; and  re-pointing brickwork cracking at the rear right side corner below cladding level and replacing cracked bricks to match. 19. The Applicants have provided several quotes to carry out repair works on their home including:  a quote of $110,000 from builder “SS” to pull out all gyprock linings and replace with new, replaster and paint all walls and ceilings, pull out and refit existing kitchen, re-level house and straighten stumps, secure front verandah back to the house, create proper site drainage to the back of the house, resecure rumpus room and repair concrete driveway;  a quote of $94,720 from builder “NM” to repair the footings and plaster walls, refit the kitchen, reinstate the front veranda h, adjust the windows in the rumpus room, paint walls, replace soil, adjust doors and procure engineer designed footings; and  a quote of $107,800 from builder “PS” to re-level and re-stump the home, including soil test, engineer design for steel adjustable stumps and footing depths, jacking and blocking of the sub-floor, removal of the existing stumps, installing new steel stumps, patchwork and painting (excluding any structural damage as a result of re-levelling the floor). Scope of works 20. The key consideration in determining whether the cash settlement offered b y the FSP is fair and reasonable is whether the measures contained in the detailed scope of works pre pared by the FSP‟s engineer C are sufficient to repair the damage to the Applicants‟ home caused by the insured event. 21. In addition to generally querying QC‟s for the cost of repairs as too low, the Applicants have referred to certain specific deficiencies in C‟s scope of works including the following:  the scope of works provides for the repair of the existing footings, whereas the Applicants‟ engineer has recommended that the existing footings be replaced in their entirety;  the scope of works provides for the repair of certain identified damage to the existing kitchen, whereas the Applicants consider that the existing kitchen should be pulled out and completely refitted; and  the scope of works does not include the installation of additional drainage on the property. 22. In relation to the footings, the scope of works reflects C‟s conclusion that the existing stumps are in “sound condition with no obvious signs of deterioration of the concrete” and therefore can be effectively repaired by “packing and jacking”. Case No: 301952 Determination Page 6 of 7 23. The Applicants have engaged an engineer “PW” who has provided a report confirming that:  he does not consider the existing stumps to be adequate without the fitting of an adjustable head to compensate for the differential movement that will continue to occur for some time; and  due to the non-availability of adjustable heads for concrete stumps, it is more cost effective to remove the existing stumps and replace them with steel adjustable stumps bedded on the solid rock. 24. Following receipt of PW‟s report, the FSP sought confirmation from its engineer C as to the nature of repairs required to the stumps. C reviewed PW‟s report and concluded that:  the existing piers were in reasonable condition except for one, replacement of which had been included in the scope of works;  while PW‟s recommendation to replace the existing stumps and pier the home to rock would constitute a “great improvement”, the steps identified in the original scope of works were sufficient to return the stumps to their condition prior to the insured event. In passing, C also noted that in Australia only very recent constructions have the type of foundations recommended by PW. 25. In relation to the kitchen, neither the Applicants nor their builders have provided an explanation as to why complete refitting is required. Analysis 26. Under the terms of the policy, in settling a claim for home damage, the FSP is entitled to decide whether to repair damage new for old or pay the insured what it would cost the FSP to repair the damage. The policy clearly states that “new for old” does not mean of a better standard, specification or quality than when new. 27. On balance, I am satisfied that the measures recommended by the FSP‟s engineer C (as reflected in the scope of works) are appropriate to repair the damage to the home on a “new for old” basis in accordance with the terms of the policy. In particular, I consider that:  the proposed approach to repairing both the existing concrete stumps and the kitchen is sufficient to restore them to their condition prior to the rainstorms in December 2010 and January 2011; and  while the installation of additional drainage was identified by the FSP‟s engineer in his report, this was intended as a recommended improvement only. No damage to the drainage system was identified as arising from the insured events and therefore this item was appropriately excluded from the scope of works. 28. The FSP was prepared to arrange for its builder CQ to repair the damage to the Applican ts‟ home , and in these circumstances, the FSP would have Case No: 301952 Determination Page 7 of 7 provided a lifetime guarantee for the repairs in accordance with the terms of the policy. 29. In circumstances where the FSP has offered to cash settle the claim due to the Applicants‟ preference to hav e the repairs carried out by their own builder, the amount of the cash settlement is equivalent to the amount which it would cost the FSP to repair the claim, being the quotation of $39,085.49 provided by the FSP‟s builder. 30. For completeness, I note that the Applicants ‟ solicitors have raised the application of section 46 of the Insurance Contracts Act . I consider that section 46 is of no relevance, as the FSP is not alleging that the loss claimed by the Applicants is excluded under the policy because it occurred as a result of a pre-existing defect in their home. Determination 31. I therefore determine that the FSP‟s cash settlement offer of $38,985.49 (net of $100 excess) is fair and reasonable, and sufficient to discharge its liability under the policy.