Background
1. The Applicant is a potential beneficiary under a home building and contents
strata unit insurance policy with the Financial Services Provider (FSP).
2. On 28 September 2011, the Applicant alleges that the balcony on his unit
was damaged as a result of a storm and he subsequently lodged a claim
with the FSP on 7 December 2011.
3. The FSP denied the claim on the basis that the damage was a result of long
term deterioration and building defects. It later amended its position to agree
to payment for the resultant damage only, which it estimated at $3,500.
4. The Applicant does not accept this offer and seeks indemnity for the
extensive work required to reinstate the balcony to a workable condition.
These costs are estimated at $34,746.80.
Summary of Applicant’s position
5. The Applicant says that his balcony was damaged as a result of a storm.
The drain couldn’t cope and caused water to flow into the living room
beneath. He says the weight of the water caused the waterproof membrane
of the balcony to split. He also says the FSP’s agent tore the membrane
upon inspection. He denies there were lifted or split tiles, that there was rot
before the storm or that the chip board flooring is illegal. He contends there
were no relevant building codes or regulations at the time of the construction
of the balcony.
6. None of the other si x balconies in the complex have a sump or overflow and
building regulations do not require them to be installed.
7. He notes he has lived at the property since November 1997, had the balcony
redone in 1998 and it was fine until the night of the storm.
8. He considers that the FSP was too slow to assess the claim and so further
damage has been caused in wet weather and that its experts have made a
number of errors in evaluating the cause of the loss.
Determination
Case No: 301605 Determination Page 2 of 9
9. Claims from other residents at the residence have been paid and his should
be too.
Summary of FSP’s position
10. The FSP says that the loss was primarily attributable to the poor construction
of the balcony and the failed water membrane. It is of the view that the area
has suffered from long term water ingress and that this has become more
evident after the storm event.
11. It agrees to cover the Applicant for the resultant damage from the storm but
not the reconstruction of the balcony as proposed by the Applicant’s builder.
12. The FSP relies on the following policy provisions:
Pages 15-17 of the Product Disclosure Statement (PDS)
“ HOW WE PAY CLAIMS
1. REINSTATEMENT AND REPLACEMENT
a. Building(s)
When Damage not excluded by this Section occurs to Your
Building(s), We will pay the reasonable and necessary cost of
rebuilding Your Building(s) or repairing the Damaged portions to the
same condition as when they were new. We decide which one We will
do. If We pay the cost of rebuilding Your Building(s), You can rebuild
on another site. You can do this provided the amount We pay is not
increased.
Where Your Building(s) have any architectural features and/or
structural materials possessing an ornamental, historical or heritage
character, or for which the original materials are not available, We will
rebuild or restore Your Building(s) to an equivalent appearance and
capacity, using the original design and nearest equivalent materials.
...
2. CASH SETTLEMENT
a. If You submit a claim for cash settlement for repairs or replacing Your
Insured Property that have already been carried out, We will:
i. Assess the claim You have submitted for Us to pay.
ii. Obtain quotations for the repairs or replacement that You have carried
out.
iii. Reduce the amount We pay You by the amount which represents any
disadvantage We suffer as a result of the repairs or replacement being
carried out without Our consent.
We will only pay Additional Benefits for the reasonable time it would have
taken for the repairs or replacement to have been carried out.
b. If You choose not to repair or replace Your Insured Property, We will at
Our option:
Case No: 301605 Determination Page 3 of 9
i. Cash settle Your claim based on the cost to repair or replace Your
Insured Property, or
ii. Pay Your claim based on Indemnity Value.
...
7. MATERIALS
We will try to match any material used to repair or replace Your Insured
Property with the original materials. If We cannot, We will use the nearest
equivalent available to the original materials.
8. UNDAM AGED PROPERTY
We will not pay any costs for replacing, repairing, altering or modifying any
undamaged Insured Property or undamaged sections of Your Insured
Property.
9. ILLEGAL INSTALLATIONS
We will not replace, repair or pay for any illegal installation or alteration of
Insured Property of any kind.
...
11. POLICY EXCESS
For each Insured Property claim, We will reduce the amount We pay You for
Your claim by the amount of Your Excess. The amount of Your Excess is
shown on Your Schedule.
...
EXCLUSIONS
We will not cover Your Insured Property for Damage arising from or caused
by:
...
8. Fading, scratching or marring, developing flaws, normal up-keeping or
making good.
...
17. Rust, corrosion, oxidization, gradual deterioration, concrete or brick
cancer, wear or tear, wet or dry rot.
18. The failure of or a defect in any item, faulty workmanship, structural
defect or faulty design.
...
20. Water entering Your Building(s) because of a structural defect, faulty
design or faulty workmanship when Your Building(s) were constructed. ”
Issue
13. Whether and to what extent the Applicant’s claim is covered under the FSP’s
policy.
Case No: 301605 Determination Page 4 of 9
Reasons for decision
14. I am satisfied that a full exchange of the relevant information has taken place
between the respective parties and that each party has had the opportunity
of addressing any issues raised.
15. As advised to the parties, FOS has considered it appropriate to expedite the
dispute in accordance with the Operational Guidelines to the FOS Terms of
Reference. This is because of the amount of the claim and the issues to be
considered. This dispute has not been the subject of a FOS
Recommendation and has proceeded directly to Determination.
16. There is an onus on an insured to establish on the balance of probabilities
that a claim fits the definition of an insured event. This is known as a prima
facie claim. Should this onus be discharged, it is then the responsibility of the
insurer to establish the application of any exclusion on which it relies to deny
the claim.
17. To be entitled to cover from the FSP, the onus therefore rests with the
Applicant to establish that his loss fits within the scope of what is covered by
the FSP’s policy.
18. The policy provides cover for accidental damage. It is not in dispute that the
Applicant’s balcony was subjected to a storm on the night claimed and
therefore to the extent that this storm has caused any damage not excluded
under the terms of the policy, I am satisfied that the policy responds.
19. The FSP has agreed to indemnify the Applicant for the “resultant damage” it
has attributed to the rain and on this basis, a prima facie claim has been
established. The emphasis therefore will be on evaluating the extent to
which the balcony was damaged directly by the storm and the application of
any exclusion(s) relied upon by the FSP.
20. After the loss was reported, the FSP retained a loss adjuster, “ CE ” , to first
visit the Applicant’s property and assess the damage. CE’s first report of 26
December 2011, identified the cause of the damage as “storm” and noted
that:
“... [water] entry [into the balcony/property] is possibly due to maintenance
issues.”
21. CE retained a plumber, “ FP ”, to inspect the Applicant’s damage and report
on the cause. FP identified the premises as a “triple level apartment which
has been renovated at some stage”. The property was considered quite old
but in good condition. It prepared an initial report dated 2 February 2012,
which relevantly provided:
“The [Applicant] has reported water damage to the first floor ceiling which is
located directly below the outdoor balcony.
Our internal inspection of the balcony revealed a tiled balcony in poor
condition with lifted tiles and a poorly constructed membrane with yellow
tongue chipboard as the sub-strate. This flooring is also beginning to rot and
Case No: 301605 Determination Page 5 of 9
is quite soft in areas of the balcony. The chipboard floor is an illegal substrate
for external areas and does not comply with Australian Standards.
Our test of the floor drain revealed no leaks, however we would note that
there is also very minimal fall on the tiling which is not helping the water get
away properly.
By the appearance of the damage, we suspect this has been an on-going
issue for probably 12- 18 months...”
22. Upon being made aware of FP’s observations, the Applicant denied that
there were any lifted tiles on the balcony that pre -existed the loss and noted
that the only tiles lifted were due to the inspection by FP. He further denied
that there had been ongoing problems and stated that there had been no
water related problems since work had been conducted on the area about 13
years earlier.
23. The Applicant was unhappy with the classification o f the substrate as “illegal”
as the FSP relied upon evidence for this point was building guidelines that
came into effect well after the installation of the relevant substrate. I accept
that there is no evidence to suggest that the work done was “illegal”,
although I also accept the FSP’s point on the evidence provided , that this
does not mean it was acceptable to use particle board externally at the time
of construction.
24. Further to these issues, the Applicant claims that part of the waterproof
membrane was destroyed by the representative from FP whilst
demonstrating its apparent condition to his wife. This was denied by FP.
25. To better consider the condition of the balcony and its response to the claim,
the FSP retained a second expert, a structural engineer, to inspect the
property.
26. This engineer, “ CS ” , provided a report dated 23 May 2012. In summary, CS
noted:
The balcony was lined with terracotta tiles measuring 300mm x 300mm;
The tiles were installed over a cement screed on a latex waterproof
membrane, on chipboard flooring with a timber floor frame;
There is a step up from the balcony of about 70mm over the threshold of
the door into the unit;
A galvanised steel flashing was installed under the threshold of the
doorway about 35mm above the top of the balcony floor;
There is a drain in the southwest corner of the enclosed balcony area
which was 50mm in diameter;
Some of the tiles and screed had been removed and the waterproof
membrane underneath damaged. The particleboard flooring underneath
was “saturated and spongy”;
Case No: 301605 Determination Page 6 of 9
Using a spray test, it was discovered that there were some areas of the
balcony in which water collected, particularly on the south side, though
generally there was a slope towards the drain;
There was no overflow area and the drain was not located in a sump;
Timber stains from the northeast corner were visible on the northern
wall;
The damage was consistent with an ingress of water such as observed
through the delamination of the plasterboard ceiling lining and blistering
of paint on the plasterboard wall lining at the western side of the living
area;
The timber floor appeared undamaged and there was no evidence of
water ingress below.
27. In conclusion, CS considered that:
“It is our opinion that the ingress of water to the [Applicant’s] prop erty is a
result of the waterproof membrane failure. We expect that water has entered
the building through the failed waterproof membrane and has caused the
saturation of the chipboard flooring under the balcony. We expect that the
saturation of the chipboard has resulted in the deflections of the tile floor –
causing the observed ponding.”
28. CS accepted that water had entered the building, affecting the ceiling lining
of the living area and entering the wall cavity of the western wall of the living
room.
29. There was no overflow area or sump under the balcony and the Applicant
allegedly informed CS that ingress occurred into the home despite the
balcony not being subject to flooding. In CS’ opinion, the ingress would
therefore have occurred regardless of whether a sump had been installed or
not.
30. Aside from other works CS recommended, he also suggested the drain is
replaced with a drainage sump with a suitable grate and that an overflow is
installed.
31. The Applicant obtained two reports from his chosen repairer, “ BC ”. BC’s first
report of 1 November 2011 notes that:
“... [the d]rain to [the] balcony [is] unable to cope with excessive rainfall
causing water to get under tiles and run inside and damage plaster work.
Water damage also causing tiles to lift and sub-[strate] under tiles is not now
extremely water logged and unsafe...”
32. The parties largely agree over the failure of the waterproof membrane being
a major factor in the loss but differ over its cause.
33. When asked to review the extent of damage related to the insured event and
the failure of the membrane, BC provided a second report dated 18 February
2013. In it, BC noted:
Case No: 301605 Determination Page 7 of 9
“When investigating the damage and... carefully removing tiles, I observed
tears or splits in the membrane. These are caused by the amount of weight
from the water pooling on the veranda and causing the pressure forcing the
membrane to split. This is a veranda surrounded by walls and in the instance
of extreme rains, the drain cannot cope and the volume of water is extremely
damaging to an area about 24m2 x 80mm deep before it floods in [the] door
way. This would be nearly [two tonnes] of water or 2000 [litres] of water. This
is far in excess of what the deck or membrane could sustain.”
34. In consideration of the various reports, I am satisfied that the Applicant is
covered for the resultant damage from the storm event, which has led to the
ingress of water into areas of the home. It is not possible to evaluate how
much of this might have been caused at the time of the event or since that
time, but I am satisfied that the FSP should indemnify the Applicant for the
resultant damage from the storm event.
35. The FSP prepared a rough estimate for the repair of this damage and
estimated the repair costs at $3,500. A more thorough quote will be required
to itemise the actual areas affected and the repair of same.
36. The question is therefore as to whether the split in the membrane was
caused as a result of the insured event or through a possible build up of
wear and tear or some other possible cause.
37. I note that the Applicant has suggested that the balcony had sustained no
problems for 13 or so years prior to the insured event. He had no problems
with leakage. This suggests that the situation was changed in some way or
form, on or about the time of the storm.
38. Critical to the consideration of the extent of damage that the policy should
respond to, is whether the waterproof membrane was damaged in the storm
event. The parties agree that there were tears or splits in it and whilst the
Applicant suggested that this was do ne by the FSP’s agent (which was
denied); in my view, it is unlikely that the agent was completely responsible
for the breakdown of the membrane.
39. Based on the evidence from the respective experts, either the membrane
failed as it had reached the end of its serviceable life, was not properly
installed or it was overwhelmed by the storm event and began to break
apart.
40. BC ventures that the sheer weight of the water on the balcony (estimated at
two tonnes) was sufficient to cause the membrane to split. The FSP
disagrees and relied upon the observations of CS, (though no further report
was obtained) to suggest that the scenario suggested by the Applicant and
BC was simply not plausible.
41. The FSP’s submission was that the height of the entry point into the home
was set at 70mm and the home was not immersed in overflow from the
balcony, so any water accumulation on the balcony should not have
exceeded this level. It allowed a nominal amount of 80mm depth and
Case No: 301605 Determination Page 8 of 9
estimated that the accumulated pressure per square metre would only be
about half of what was required to cause the sort of failure hypothesised.
42. As a matter of practicality, I do not consider it likely that the rainfall from a
single event would be so prevalent as to create a 2,000 litre pool of water on
the balcony and ultimately to lead to the failure of the waterproof membrane.
I agree with the submission from the FSP that a build up to that extent would
be suggestive of an inadequate drainage system on the balcony. This in
turn, would be an obvious design flaw and would further imply that the loss
would not be covered.
43. Ultimately, I accept that the Applicant has sustained some resultant damage
from the storm event and that a full and proper quote should be prepared to
address this. I am not satisfied, on balance, that the membrane failed as a
result of this singular storm event and consider it more likely that it failed
over a period of time.
44. This policy of insurance serves to indemnify parties for a singular insured
event. There is no compelling evidence before me to conclude that the
waterproof membrane was accidentally damaged (as distinct from it merely
failing due to installation inadequacy or gradually deteriorated over time).
Whilst I am not persuaded that the FSP has established that this aspect of
the loss is excluded, it does not need to until the Applicant provides evidence
that it was damaged as a result of a singular incident. The evidence before
me is not indicative of this.
45. With respect to the scope of works proposed by BC, I accept that much of
this relates to work that would improve and/or replace aspects of the
balcony. There is no evidence attesting to this work being directly related to
the repair of damage arising from the incident itself.
46. Whilst I concede that the balcony likely requires work to the extent
suggested in the BC quote, this is not to say that it is necessary as a direct
result of the insured event.
47. Accordingly, I am of the view that a new scope of works should be prepared
to quantify the damage caused by the incident, which I consider to be limited
to the resultant water damage to the property. A proper, itemised quote of
this damage should be prepared by the FSP as a basis for the settlement of
the claim.
48. Insofar as the Applicant requires a redesign of the balcony to better facilitate
water drainage or otherwise seek quotes for work not directly related to the
resultant water damage to the home, I am satisfied that the FSP should not
be liable for this.
49. The Applicant has also raised issues with the time taken by the FSP to
assess and process his claim, which he considers was unacceptable.
50. I note that the insured event occurred on 28 September 2011 and that the
FSP was not informed of the loss until 7 December 2011. After arranging an
Case No: 301605 Determination Page 9 of 9
inspection by CE, the FSP then spent several months appointing experts
and considering their various reports in relation to the damage.
51. The nature of the damage and what should or should not be claimable under
the policy is not immediately apparent and I am satisfied that the FSP has
acted appropriately. I accept that there was some delay over the Christmas
period and the initial report from FP could and probably should have been
prepared prior to February 2012. That said, the initial report of the claim was
delayed by the Applicant and the complexities involved in the consideration
of the matter suggest that the evaluation of the damage was not easy.
52. Whilst I am of the view that the matter might have been handled more
quickly, I am not persuaded that the Applicant has been unfairly prejudiced
as a result of this.
53. I note the Applicant says other claims have been paid and so he should be
too but I cannot comment on the relevance of this assertion as I do not know
what damage was done referable to those claims or the cause of that
damage and how the policy responds to those other claims.
Determination
54. On the basis of the available information, I determine that the FSP is not
obliged to offer the Applicant cover for more that the resultant water damage
to the home, as it has already done.
55. I determine that a proper scope of works outlining the specific extent of this
resultant damage should be prepared by the FSP and used as a basis for
the settlement of the claim.
56. Insofar as any cash settlement of the claim is to occur, I determine that the
FSP must pay interest at the statutory rate on any payment, calculated from
14 August 2012 (the date of its final IDR decision) until the date of
settlement.