Summary

The owner of a strata unit claimed about $34,746.80 to reinstate a storm-damaged balcony, and the FSP accepted only resultant water damage (estimated at $3,500). AFCA held the FSP need not cover balcony reconstruction, ordered an itemised scope of resultant damage to be prepared, and required statutory interest on any cash settlement.

The insured must show the storm caused the damage, and the wider balcony works relate to long-term deterioration and design or installation inadequacy rather than the insured event.

Issues

Subjects and remedies

home or building damagenatural disasterpay interestreassess claim

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Case No: 301605 Determination Page 1 of 9 Case number: 301605 General Insurance - Domestic Insurance - Home Building - FSP Decision - Partial Denial of Claim - Extent of Damage from an Insured Event 12 August 2013 Background 1. The Applicant is a potential beneficiary under a home building and contents strata unit insurance policy with the Financial Services Provider (FSP). 2. On 28 September 2011, the Applicant alleges that the balcony on his unit was damaged as a result of a storm and he subsequently lodged a claim with the FSP on 7 December 2011. 3. The FSP denied the claim on the basis that the damage was a result of long term deterioration and building defects. It later amended its position to agree to payment for the resultant damage only, which it estimated at $3,500. 4. The Applicant does not accept this offer and seeks indemnity for the extensive work required to reinstate the balcony to a workable condition. These costs are estimated at $34,746.80. Summary of Applicant’s position 5. The Applicant says that his balcony was damaged as a result of a storm. The drain couldn’t cope and caused water to flow into the living room beneath. He says the weight of the water caused the waterproof membrane of the balcony to split. He also says the FSP’s agent tore the membrane upon inspection. He denies there were lifted or split tiles, that there was rot before the storm or that the chip board flooring is illegal. He contends there were no relevant building codes or regulations at the time of the construction of the balcony. 6. None of the other si x balconies in the complex have a sump or overflow and building regulations do not require them to be installed. 7. He notes he has lived at the property since November 1997, had the balcony redone in 1998 and it was fine until the night of the storm. 8. He considers that the FSP was too slow to assess the claim and so further damage has been caused in wet weather and that its experts have made a number of errors in evaluating the cause of the loss. Determination Case No: 301605 Determination Page 2 of 9 9. Claims from other residents at the residence have been paid and his should be too. Summary of FSP’s position 10. The FSP says that the loss was primarily attributable to the poor construction of the balcony and the failed water membrane. It is of the view that the area has suffered from long term water ingress and that this has become more evident after the storm event. 11. It agrees to cover the Applicant for the resultant damage from the storm but not the reconstruction of the balcony as proposed by the Applicant’s builder. 12. The FSP relies on the following policy provisions: Pages 15-17 of the Product Disclosure Statement (PDS) “ HOW WE PAY CLAIMS 1. REINSTATEMENT AND REPLACEMENT a. Building(s) When Damage not excluded by this Section occurs to Your Building(s), We will pay the reasonable and necessary cost of rebuilding Your Building(s) or repairing the Damaged portions to the same condition as when they were new. We decide which one We will do. If We pay the cost of rebuilding Your Building(s), You can rebuild on another site. You can do this provided the amount We pay is not increased. Where Your Building(s) have any architectural features and/or structural materials possessing an ornamental, historical or heritage character, or for which the original materials are not available, We will rebuild or restore Your Building(s) to an equivalent appearance and capacity, using the original design and nearest equivalent materials. ... 2. CASH SETTLEMENT a. If You submit a claim for cash settlement for repairs or replacing Your Insured Property that have already been carried out, We will: i. Assess the claim You have submitted for Us to pay. ii. Obtain quotations for the repairs or replacement that You have carried out. iii. Reduce the amount We pay You by the amount which represents any disadvantage We suffer as a result of the repairs or replacement being carried out without Our consent. We will only pay Additional Benefits for the reasonable time it would have taken for the repairs or replacement to have been carried out. b. If You choose not to repair or replace Your Insured Property, We will at Our option: Case No: 301605 Determination Page 3 of 9 i. Cash settle Your claim based on the cost to repair or replace Your Insured Property, or ii. Pay Your claim based on Indemnity Value. ... 7. MATERIALS We will try to match any material used to repair or replace Your Insured Property with the original materials. If We cannot, We will use the nearest equivalent available to the original materials. 8. UNDAM AGED PROPERTY We will not pay any costs for replacing, repairing, altering or modifying any undamaged Insured Property or undamaged sections of Your Insured Property. 9. ILLEGAL INSTALLATIONS We will not replace, repair or pay for any illegal installation or alteration of Insured Property of any kind. ... 11. POLICY EXCESS For each Insured Property claim, We will reduce the amount We pay You for Your claim by the amount of Your Excess. The amount of Your Excess is shown on Your Schedule. ... EXCLUSIONS We will not cover Your Insured Property for Damage arising from or caused by: ... 8. Fading, scratching or marring, developing flaws, normal up-keeping or making good. ... 17. Rust, corrosion, oxidization, gradual deterioration, concrete or brick cancer, wear or tear, wet or dry rot. 18. The failure of or a defect in any item, faulty workmanship, structural defect or faulty design. ... 20. Water entering Your Building(s) because of a structural defect, faulty design or faulty workmanship when Your Building(s) were constructed. ” Issue 13. Whether and to what extent the Applicant’s claim is covered under the FSP’s policy. Case No: 301605 Determination Page 4 of 9 Reasons for decision 14. I am satisfied that a full exchange of the relevant information has taken place between the respective parties and that each party has had the opportunity of addressing any issues raised. 15. As advised to the parties, FOS has considered it appropriate to expedite the dispute in accordance with the Operational Guidelines to the FOS Terms of Reference. This is because of the amount of the claim and the issues to be considered. This dispute has not been the subject of a FOS Recommendation and has proceeded directly to Determination. 16. There is an onus on an insured to establish on the balance of probabilities that a claim fits the definition of an insured event. This is known as a prima facie claim. Should this onus be discharged, it is then the responsibility of the insurer to establish the application of any exclusion on which it relies to deny the claim. 17. To be entitled to cover from the FSP, the onus therefore rests with the Applicant to establish that his loss fits within the scope of what is covered by the FSP’s policy. 18. The policy provides cover for accidental damage. It is not in dispute that the Applicant’s balcony was subjected to a storm on the night claimed and therefore to the extent that this storm has caused any damage not excluded under the terms of the policy, I am satisfied that the policy responds. 19. The FSP has agreed to indemnify the Applicant for the “resultant damage” it has attributed to the rain and on this basis, a prima facie claim has been established. The emphasis therefore will be on evaluating the extent to which the balcony was damaged directly by the storm and the application of any exclusion(s) relied upon by the FSP. 20. After the loss was reported, the FSP retained a loss adjuster, “ CE ” , to first visit the Applicant’s property and assess the damage. CE’s first report of 26 December 2011, identified the cause of the damage as “storm” and noted that: “... [water] entry [into the balcony/property] is possibly due to maintenance issues.” 21. CE retained a plumber, “ FP ”, to inspect the Applicant’s damage and report on the cause. FP identified the premises as a “triple level apartment which has been renovated at some stage”. The property was considered quite old but in good condition. It prepared an initial report dated 2 February 2012, which relevantly provided: “The [Applicant] has reported water damage to the first floor ceiling which is located directly below the outdoor balcony. Our internal inspection of the balcony revealed a tiled balcony in poor condition with lifted tiles and a poorly constructed membrane with yellow tongue chipboard as the sub-strate. This flooring is also beginning to rot and Case No: 301605 Determination Page 5 of 9 is quite soft in areas of the balcony. The chipboard floor is an illegal substrate for external areas and does not comply with Australian Standards. Our test of the floor drain revealed no leaks, however we would note that there is also very minimal fall on the tiling which is not helping the water get away properly. By the appearance of the damage, we suspect this has been an on-going issue for probably 12- 18 months...” 22. Upon being made aware of FP’s observations, the Applicant denied that there were any lifted tiles on the balcony that pre -existed the loss and noted that the only tiles lifted were due to the inspection by FP. He further denied that there had been ongoing problems and stated that there had been no water related problems since work had been conducted on the area about 13 years earlier. 23. The Applicant was unhappy with the classification o f the substrate as “illegal” as the FSP relied upon evidence for this point was building guidelines that came into effect well after the installation of the relevant substrate. I accept that there is no evidence to suggest that the work done was “illegal”, although I also accept the FSP’s point on the evidence provided , that this does not mean it was acceptable to use particle board externally at the time of construction. 24. Further to these issues, the Applicant claims that part of the waterproof membrane was destroyed by the representative from FP whilst demonstrating its apparent condition to his wife. This was denied by FP. 25. To better consider the condition of the balcony and its response to the claim, the FSP retained a second expert, a structural engineer, to inspect the property. 26. This engineer, “ CS ” , provided a report dated 23 May 2012. In summary, CS noted:  The balcony was lined with terracotta tiles measuring 300mm x 300mm;  The tiles were installed over a cement screed on a latex waterproof membrane, on chipboard flooring with a timber floor frame;  There is a step up from the balcony of about 70mm over the threshold of the door into the unit;  A galvanised steel flashing was installed under the threshold of the doorway about 35mm above the top of the balcony floor;  There is a drain in the southwest corner of the enclosed balcony area which was 50mm in diameter;  Some of the tiles and screed had been removed and the waterproof membrane underneath damaged. The particleboard flooring underneath was “saturated and spongy”; Case No: 301605 Determination Page 6 of 9  Using a spray test, it was discovered that there were some areas of the balcony in which water collected, particularly on the south side, though generally there was a slope towards the drain;  There was no overflow area and the drain was not located in a sump;  Timber stains from the northeast corner were visible on the northern wall;  The damage was consistent with an ingress of water such as observed through the delamination of the plasterboard ceiling lining and blistering of paint on the plasterboard wall lining at the western side of the living area;  The timber floor appeared undamaged and there was no evidence of water ingress below. 27. In conclusion, CS considered that: “It is our opinion that the ingress of water to the [Applicant’s] prop erty is a result of the waterproof membrane failure. We expect that water has entered the building through the failed waterproof membrane and has caused the saturation of the chipboard flooring under the balcony. We expect that the saturation of the chipboard has resulted in the deflections of the tile floor – causing the observed ponding.” 28. CS accepted that water had entered the building, affecting the ceiling lining of the living area and entering the wall cavity of the western wall of the living room. 29. There was no overflow area or sump under the balcony and the Applicant allegedly informed CS that ingress occurred into the home despite the balcony not being subject to flooding. In CS’ opinion, the ingress would therefore have occurred regardless of whether a sump had been installed or not. 30. Aside from other works CS recommended, he also suggested the drain is replaced with a drainage sump with a suitable grate and that an overflow is installed. 31. The Applicant obtained two reports from his chosen repairer, “ BC ”. BC’s first report of 1 November 2011 notes that: “... [the d]rain to [the] balcony [is] unable to cope with excessive rainfall causing water to get under tiles and run inside and damage plaster work. Water damage also causing tiles to lift and sub-[strate] under tiles is not now extremely water logged and unsafe...” 32. The parties largely agree over the failure of the waterproof membrane being a major factor in the loss but differ over its cause. 33. When asked to review the extent of damage related to the insured event and the failure of the membrane, BC provided a second report dated 18 February 2013. In it, BC noted: Case No: 301605 Determination Page 7 of 9 “When investigating the damage and... carefully removing tiles, I observed tears or splits in the membrane. These are caused by the amount of weight from the water pooling on the veranda and causing the pressure forcing the membrane to split. This is a veranda surrounded by walls and in the instance of extreme rains, the drain cannot cope and the volume of water is extremely damaging to an area about 24m2 x 80mm deep before it floods in [the] door way. This would be nearly [two tonnes] of water or 2000 [litres] of water. This is far in excess of what the deck or membrane could sustain.” 34. In consideration of the various reports, I am satisfied that the Applicant is covered for the resultant damage from the storm event, which has led to the ingress of water into areas of the home. It is not possible to evaluate how much of this might have been caused at the time of the event or since that time, but I am satisfied that the FSP should indemnify the Applicant for the resultant damage from the storm event. 35. The FSP prepared a rough estimate for the repair of this damage and estimated the repair costs at $3,500. A more thorough quote will be required to itemise the actual areas affected and the repair of same. 36. The question is therefore as to whether the split in the membrane was caused as a result of the insured event or through a possible build up of wear and tear or some other possible cause. 37. I note that the Applicant has suggested that the balcony had sustained no problems for 13 or so years prior to the insured event. He had no problems with leakage. This suggests that the situation was changed in some way or form, on or about the time of the storm. 38. Critical to the consideration of the extent of damage that the policy should respond to, is whether the waterproof membrane was damaged in the storm event. The parties agree that there were tears or splits in it and whilst the Applicant suggested that this was do ne by the FSP’s agent (which was denied); in my view, it is unlikely that the agent was completely responsible for the breakdown of the membrane. 39. Based on the evidence from the respective experts, either the membrane failed as it had reached the end of its serviceable life, was not properly installed or it was overwhelmed by the storm event and began to break apart. 40. BC ventures that the sheer weight of the water on the balcony (estimated at two tonnes) was sufficient to cause the membrane to split. The FSP disagrees and relied upon the observations of CS, (though no further report was obtained) to suggest that the scenario suggested by the Applicant and BC was simply not plausible. 41. The FSP’s submission was that the height of the entry point into the home was set at 70mm and the home was not immersed in overflow from the balcony, so any water accumulation on the balcony should not have exceeded this level. It allowed a nominal amount of 80mm depth and Case No: 301605 Determination Page 8 of 9 estimated that the accumulated pressure per square metre would only be about half of what was required to cause the sort of failure hypothesised. 42. As a matter of practicality, I do not consider it likely that the rainfall from a single event would be so prevalent as to create a 2,000 litre pool of water on the balcony and ultimately to lead to the failure of the waterproof membrane. I agree with the submission from the FSP that a build up to that extent would be suggestive of an inadequate drainage system on the balcony. This in turn, would be an obvious design flaw and would further imply that the loss would not be covered. 43. Ultimately, I accept that the Applicant has sustained some resultant damage from the storm event and that a full and proper quote should be prepared to address this. I am not satisfied, on balance, that the membrane failed as a result of this singular storm event and consider it more likely that it failed over a period of time. 44. This policy of insurance serves to indemnify parties for a singular insured event. There is no compelling evidence before me to conclude that the waterproof membrane was accidentally damaged (as distinct from it merely failing due to installation inadequacy or gradually deteriorated over time). Whilst I am not persuaded that the FSP has established that this aspect of the loss is excluded, it does not need to until the Applicant provides evidence that it was damaged as a result of a singular incident. The evidence before me is not indicative of this. 45. With respect to the scope of works proposed by BC, I accept that much of this relates to work that would improve and/or replace aspects of the balcony. There is no evidence attesting to this work being directly related to the repair of damage arising from the incident itself. 46. Whilst I concede that the balcony likely requires work to the extent suggested in the BC quote, this is not to say that it is necessary as a direct result of the insured event. 47. Accordingly, I am of the view that a new scope of works should be prepared to quantify the damage caused by the incident, which I consider to be limited to the resultant water damage to the property. A proper, itemised quote of this damage should be prepared by the FSP as a basis for the settlement of the claim. 48. Insofar as the Applicant requires a redesign of the balcony to better facilitate water drainage or otherwise seek quotes for work not directly related to the resultant water damage to the home, I am satisfied that the FSP should not be liable for this. 49. The Applicant has also raised issues with the time taken by the FSP to assess and process his claim, which he considers was unacceptable. 50. I note that the insured event occurred on 28 September 2011 and that the FSP was not informed of the loss until 7 December 2011. After arranging an Case No: 301605 Determination Page 9 of 9 inspection by CE, the FSP then spent several months appointing experts and considering their various reports in relation to the damage. 51. The nature of the damage and what should or should not be claimable under the policy is not immediately apparent and I am satisfied that the FSP has acted appropriately. I accept that there was some delay over the Christmas period and the initial report from FP could and probably should have been prepared prior to February 2012. That said, the initial report of the claim was delayed by the Applicant and the complexities involved in the consideration of the matter suggest that the evaluation of the damage was not easy. 52. Whilst I am of the view that the matter might have been handled more quickly, I am not persuaded that the Applicant has been unfairly prejudiced as a result of this. 53. I note the Applicant says other claims have been paid and so he should be too but I cannot comment on the relevance of this assertion as I do not know what damage was done referable to those claims or the cause of that damage and how the policy responds to those other claims. Determination 54. On the basis of the available information, I determine that the FSP is not obliged to offer the Applicant cover for more that the resultant water damage to the home, as it has already done. 55. I determine that a proper scope of works outlining the specific extent of this resultant damage should be prepared by the FSP and used as a basis for the settlement of the claim. 56. Insofar as any cash settlement of the claim is to occur, I determine that the FSP must pay interest at the statutory rate on any payment, calculated from 14 August 2012 (the date of its final IDR decision) until the date of settlement.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.