Declined basement water ingress claims under groundwater and accidental damage terms
Text of the determination
Case No: 301417 Determination Page 1 of 22
Case number: 301417
General Insurance - Domestic Insurance - Residential Strata Title - FSP
Decision - Denial of claim - Policy Exclusion
3 June 2013
Background
1. The Applicants hold a strata title building policy with the Financial Services
Provider (FSP) covering a residential apartment complex. The policy was
current at the time of the losses occurring.
2. In October 2009 the Applicants lodged a claim with the FSP for water which
entered the complex‟s basement level car park in April/May of that year.
After considering the claim, the FSP advised the Applicants the claim was
not one for acceptance as the water had not caused any damage to the
building. Furthermore, the water was considered to be groundwater which
falls within a specific policy exclusion.
3. The Applicants had engaged a number of consultants to determine the
reason for water entry into the basement and to suggest a scope of remedial
works to prevent future occurrences of water ingress, prior to lodging the
claim.
4. In January 2011 the Applicants lodged a second claim with the FSP for
water ingress into the basement level car park. The Applicants considered
the water source was due to a drainage channel located adjacent to the
building which was blocked and discharging water into the substrate.
5. The FSP considered the second claim, however was satisfied the cause of
the water ingress was specifically excluded under the policy. Furthermore,
the FSP was not satisfied that any actual damage had been caused to the
building from the water.
6. The Applicants are seeking a review of the FSP‟s decision to decline their
claims.
Summary of Applicants ’ position
7. The Applicants are an owners corporation (OC) who are being represented
by solicitors. For the sake of brevity the OC, any of its members and their
solicitors will be jointly referred to as „the Applicants‟ where appropriate.
Determination
Case No: 301417 Determination Page 2 of 22
8. The Applicants say the policy responds to claims for water leaking or
discharging from a drain, therefore their loss should be covered.
9. The Applicants say the drainage channel was originally constructed to have
a sea outlet but over the years has become silted in and overgrown with
vegetation. Therefore the drain is considered „blocked‟ and leaking and the
policy should respond.
10. The Applicants say were the drain not blocked, the ground water table would
not have risen and entered the car park. The blocked drain artificially raises
the ground water table. Therefore the proximate cause of the loss is water
escaping from the drain rather than natural ground water at the site.
11. The Applicants believe the FSP is being disingenuous in applying the
exclusion for underground or hydrostatic water to their claim. The water has
originated from the council drainage channel therefore it is cove red,
regardless if it travelled over or underground to reach the car park. The
Applicants also say hydrostatic water only refers to water at rest, whereas
the water that has entered the car park is clearly not fluid at rest.
12. The Applicants further disagree that any other policy exclusion can be
applied to their claim and deny there are any defects or design flaws to the
building, saying the original plans included waterproofing for the car park.
13. The Applicants deny that no damage was caused to the building in either
event. They have undertaken ground penetrating radar (GPR) scanners to
determine if voids had been created under the car park. The results of this
showed large voids where the sand had washed away, which may affect the
structural integrity of the building. The Applicants have a quote of $60,000
for the replacement sand.
14. The Applicants question the experience and qualifications of the persons
appointed by the FSP to assess the claim. They believe their expert reports
should hold greater weight than the FSP‟s.
15. The Applicants say the FSP‟s engineer failed to include pertinent information
in his report. He referred to a 1994 Court ruling but failed to mention a later
ruling in 1998 which was far more relevant to the case.
16. The Applicants say the policy wording is misleading, and question the FSP‟s
reliance on some terms which are not contained within. The Applicants rely
on the rule of „contra proferentum‟, saying any ambiguity in terms should be
resolved in their favour. The Applicants also hold concerns over potential
conflicts of interest between the FSP and their broker.
17. The Applicants are claiming under the policy benefit for exploratory costs to
locate the source of the water, as well as for the costs they have incurred in
mitigating their loss and the costs to prevent future water ingress.
18. The Applicants refute the FSP‟s assertion that the damage was not
„accidental‟ in nature. The Applicant s did not court the risk nor did they
Case No: 301417 Determination Page 3 of 22
expect it to materialise. Therefore, the damage was unforseen and
unexpected which is consistent with accidental damage. The Applicants rely
on the legal principle set down in the case Mount Albert City Council v new
Zealand Municipalities Co-Operative Insurance Co Ltd [1983] NZLR 190 at
194 .
Summary of FSP’s position
19. The FSP says the water which entered the car park on both occasions was
ground water, which is specifically excluded in its policy. The FSP further
considers the drain was functioning as it was designed to do, that is,
dissipate excess water into the earth, which then becomes ground water. It
was not blocked, obstructed or leaking and therefore the policy exclusion
applies.
20. The FSP considers had the basement car park been properly constructed
originally, with provision made for elevated surrounding ground water levels,
by adequately water proofing it, water would not have entered the structure.
21. The FSP says no damage was caused to the building from either event. For
its policy to respond there must be actual loss or damage occurring to the
building. The costs which the Applicants are claiming are preventative and
remedial measures which do not fall within the ambit of cover provided by
the policy.
22. The FSP does not cover sand as part of „the building‟. In the event the claim
is covered, if it were determined the sa nd was a crucial support of the
building and laid by the builders it may consider this aspect. However, the
FSP suspects the building foundations are on piers, therefore the sand is not
crucial to the structure. Furthermore, the FSP says it is doubtful the sand
underneath was washed away given the island soil base is made up of sand.
23. The FSP says it has considered the Applicants‟ expert reports as well as its
own. It considers the experts are largely in agreement as to the source of the
water, stating it is ground water. Whilst the FSP accepts some of the ground
water may originate from the drain, the water is widespread throughout the
car park and is not just in proximity to the drain. Therefore the water cannot
have solely originated from the drain.
24. The FSP also says that in the event there was damage to the building, it
does not consider the damage to be accidental in nature. The FSP says the
1994 Court ruling shows the drainage problems at the site were anticipated
and orders made to overcome the problem. These orders were not
satisfactorily followed by the site developers. Therefore, the water ingress
was largely inevitable and does not fall within the definition of accidental.
The FSP relies on the legal principle set down in the case Australian
Casualty v Federico [1986] 160 CLR 513 .
25. The FSP relies on the following policy provisions:
Case No: 301417 Determination Page 4 of 22
“ What you are covered for
Policy 1 – Insured Property
This policy is designed to cover you for accidental loss or damage to your
insured property (building and common area contents) that occurs during the
period of insurance.
...
Insured Property
Means:
a building or buildings, including:
i outbuildings;
ii fixtures and structural improvements;
iii in-ground swimming pools and spas;
iv marina, wharves, jetties, docks, pontoons, swimming platforms or
similar type facilities (where fixed or floating) which are used for non-
commercial purposes and which do not provide fuel distribution
facilities, unless We are advised and otherwise agree in writing;
v satellite dishes, radio, television and other antennas including their
associated wiring, masts, footings, foundations, moorings and towers;
vi underground and overhead services.
...
Additional Benefits
When Your Sum Insured under Policy 1 is not otherwise expended in respect
of any one Event We will pay for:
7. Exploratory costs, replacement of defective parts
We will pay for the reasonable exploratory costs You necessarily incur in
locating the source of bursting, leaking, discharging or overflowing of tanks,
apparatus or pipes used to hold or carry liquid of any kind.
We will also pay for reasonable costs incurred in:
a repairing the area of Insured Property damaged by such exploratory
work;
b repairing or replacing the defective part or parts of such tanks,
apparatus or pipes, to a limit of $1,000;
c rectifying contamination damage or pollution damage to land at the
Situation caused by the escape of liquid, to a limit of $1,000.
We will not pay for any of these costs if the bursting, leaking, discharging or
overflowing is caused by rust, oxidisation, corrosion, Wear, Tear, gradual
corrosion, gradual deterioration, Earth movement or by trees, plants or their
roots.
...
Exclusions – what we do not insure
1. We will not pay for loss or damage:
Case No: 301417 Determination Page 5 of 22
d caused by non-rectification of an Insured Property defect, error
or omission that You were aware of, or should reasonably
have been aware of
g caused by vibration or from the removal or weakening of or
interference with the support of land or buildings or any other
property, Erosion, subsidence, landslide, mudslide, shrinkage,
or any other earth movement or collapse.
However, We will pay if the loss or damage is due to:
ii bursting, leaking or overflowing of water tanks, pipes, drains,
gutters or other water or liquid carrying apparatus (but not
flood).
h caused by underground (hydrostatic) water.
However We will pay if the loss or damage is due to bursting,
leaking or overflowing of water tanks, pipes or drains.
...
2 We will not pay for:
b the cost of rectifying faulty or defective materials or faulty or defective
workmanship .”
Issues
26. Whether there is damage to the building from either claimed event.
27. Whether the FSP is entitled to decline either or both claims pursuant to the
terms of the policy.
28. Whether the Applicants are entitled to exploratory and other costs incurred.
Reasons for decision
29. As advised to the parties, FOS has considered it appropriate to expedite the
dispute in accordance with the FOS Terms of Reference. This is due to the
circumstances of the dispute. This dispute has not been the subject of a
FOS Recommendation and has proceeded directly to Determination.
30. This decision has been made by a Panel consisting of an Ombudsman, a
representative with extensive experience in the insurance industry, and a
representative with extensive experience in consumer claims.
31. The Panel is satisfied a full exchange of information has taken place
between each party and each party has had the opportunity to address any
issues raised.
32. The Panel notes the Applicants are seeking losses in excess of $346,000.
However, the Applicants are aware of the monetary limits imposed by the
Case No: 301417 Determination Page 6 of 22
Terms of Reference (ToR) and have agreed to limit their claims through the
Service to fall within the ToR.
33. As the Applicants have brought the claims before the FSP, the Applicants
bear the onus of establishing the loss claimed falls within the terms of the
policy. Once the Applicants have discharged their onus, it then shifts to the
FSP to demonstrate why a specific policy exclusion applies or the loss is
otherwise not covered.
34. The two parties have provided voluminous amounts of material in support of
their respective positions. The Panel does not propose to recite this in detail,
save for where specifically relevant. However, it is clear this matter is quite
complex in nature and the Panel therefore considers it necessary to address
the matter in chronological order, in order to properly consider the issues
raised.
2009 Claim (Claim A)
35. The Panel notes Claim A was reported to the FSP in October 2009, and was
for the costs associated with sand removal and cleaning to the car park
resulting from water ingress in April/May 2009, as well as mitigation costs to
prevent further water entry.
36. The FSP appointed loss adjuster „M‟ to inspect the basement and ascertain
the cause and extent of the loss. M‟s report of 9 October 2009 provides:
“The results of our enquiries held in conjunction with [Applicant] and the resort
building manager established during periods of torrential rain on 2, 3, and 4
April and again on 20 May 2009, seepage and percolation of storm/rainwater
has risen via structural cracks and expansion joins within the concrete floor of
the below ground car parking facility, with further evidence of seepage and
percolation of ground water occurring via the external core filled masonry
block walls which, according to [Applicant], appear to have not been
waterproofed at the time of original construction.
It would appear from the investigations conducted by [Applicant] the main
contributing factor to the seepage and percolation of ground water is due to
the rising water table within the direct vicinity of the subject allotment.
...
The results of our site inspection revealed no visible evidence of structural
damage being occasioned to the insured property.
However, we refer to subparagraph 6.5, page 3 of [Applicant] findings which
would suggest the body corporate is seeking possible compensation for the
erosion and subsidence of lost sand from an estimated 36 locations beneath
the slab floor of the below ground car park area at an estimated cost totalling
$35,000.”
37. After considering this report, the FSP denied the claim on the basis that
damage caused by underground or hydrostatic water is excluded from cover.
Further, there was no evidence of damage to the structure.
Case No: 301417 Determination Page 7 of 22
Appl icants’ investigations for Claim A
38. The Panel notes prior to lodging the claim, the Applicants appointed
engineer „MC‟ to investigate the cause of the water ingress. MC‟s initial
report dated 20 July 2009 provides:
„The water is flowing under pressure into the car park as the level of the water
table is above the car park floor level. The level of the water table on [B]
Island, is like the water level in a dam. It is dependent upon the residual
rainfall, not just recent rainfalls.
...
If the recent water table level is an abnormality then the solution would be to
install a de-watering system which could be used for a period of a few months
when required every few years. It would also be prudent to install valves in the
floor to ensure the slabs did not float should the dewatering system fail.
Alternatively, if the water level could be anticipated to be above the basement
floor level for an extended period of time then strengthening the floor slab to
resist water pressure and sealing the slab joints to reduce water ingress
would be the appropriate solution.”
39. As a result of MC‟s report, the Applicants engaged the services of
hydrologist „E‟ to ascertain the long term peculiarities of the water table on B
Island. E‟s repo rt dated 8 October 2009 is detailed and extensive, from
which the Panel notes the following:
“In summary, the available groundwater level data points to the very heavy
seasonal rainfall events that occurred in late 2008 (i.e. 239.6mm in November
2008 and 120.5mm in December) and then again in early 2009 (i.e. 177mm in
February, 116mm in March, 349mm in April, 366mm in June and 188mm in
June[sic]) being the primary cause of the sharp groundwater level rise at the
[property] rather than the cessation of pumping from the main water extraction
trench and the continued management of treated wastewater by Council via
land application in areas to the south west of [property].
However, it should be noted that the cessation of groundwater pumping from
the main water supply trench in concert with the continued land application of
treated wastewater could be expected to result in broadly more elevated
groundwater levels in the area between the land application area and the
main water extraction trench and while this may not have directly induced a
rise in groundwater levels in the vicinity of [property], it may have supported
groundwater levels that would otherwise have declined before the onset of
major rainfall events.
...
On the longer term there is potential for a repeat of the groundwater ingress to
the car park, and moreover for the duration of the ingress to be longer than
that experienced in the most recent event and for the magnitude of the head
above the car park floor to be potentially greater.
...
If the groundwater is found to be significantly corrosive then specific
engineering advice should be sought regarding the elevation to which the
groundwater levels will need to be drawn to prevent possible damage to
building foundations.”
Case No: 301417 Determination Page 8 of 22
40. The Panel notes further comment was sought from MC, which his
correspondence of 8 November 2009 sets out:
“Since my letter of 20 th July I have established that the basement slabs may
become buoyant if the water table was to be greater than experienced
recently. This may result in significant damage to the basement slabs.
...
The [E] report has shown that the recent water level is not an abnormality and
that the groundwater levels may be higher for an extended period of time.
...
The location and distribution of the voids formed by loss of sand from beneath
the slabs is not known at this stage. Injection of replacement sand has the
potential to lift the existing slabs. As the slabs are performing satisfactorily,
monitoring is recommended. If movement or damage is noted, then advice on
rectification of the affected area should be sought.”
41. The Applicants appointed „A‟ to undertake GPR scans of the car park in
order to determine if voids were present. A‟s report of 4 February 2010
shows the presence of voids under the slabs were possible, although the
limitations of this technique could not definitely confirm the presence of
voids. The Applicants also sought a quotation from „UM‟ to underseal the
concrete basement floor.
42. In MC‟s subsequent correspondence of 1 March 2010, the Panel notes MC
has made a number of recommendations for remedial and mitigation works
to be undertaken to prevent damage from occurring to either the basement
slabs or building foundations. MC also recommended installation of a
groundwater level gauge to monitor groundwater levels at the site and
installation of a de-watering system to ensure the groundwater is maintained
at below the level of the basement, and contingency measures in case of
failure of the de-watering system.
43. The Panel notes after these enquiries were undertaken, on 29 April 2010 the
Applicants requested an internal dispute resolution (IDR) review of the
decision to decline the claim, on the basis the damage arose not from
underground water as stated by the FSP, but that the water originated from
the council drainage channel adjacent to the building which had become
„blocked‟.
44. The Panel is unsure as to the basis for the Applicants forming the view the
drainage channel was responsible for the water ingress to the car park,
given that none of the material before the Panel from the experts to date
hypothesise this as a potential source of the water. Rather, they all point to
an elevated water table as the source of the water.
45. The Applicants also sent a letter to the local council on 4 May 2010
regarding the drainage channel, requesting that it be cleared of vegetation
which they considered was impeding the flow of water away from the
property. The Panel notes the Applicants appear to have originally
approached the council in December 2009, although the reason for that
Case No: 301417 Determination Page 9 of 22
approach is unknown as a copy of that correspondence has not been
provided to the Panel.
46. After the FSP‟s IDR decision to maintain denial of the claim, further reports
were sought from MC. These reports dated 19 September 2010, 20
December 2010 and 4 and 5 January 2011 respectively, provide:
“As discussed, clearing of the drain to the east and southeast of the basement
should reduce the potential height and duration of the water table being above
the basement floor level. However, as the conclusion of the [E] report is that
the water table will in the future be higher than the basement floor level,
mitigation measured (sic) should be undertaken.”
And
“Photographs 2&3 show the water ponding in the drain near the building has
been recently cleared by Council. Photograph 4 shows the drain is blocked
and does not flow. It appears the water level in the drain is above the car park
basement level.
To drain the basement car park the water in the drain needs to flow towards
the ocean and discharge to ground at a level below the basement level.”
And
“The council drain which is located on two sides of the basement is tending to
increase the water table in its vicinity as surface water from the neighbouring
subdivision flows into the drain.
I reiterate my previous advice, that to drain the basement car park the water in
the council drain needs to flow and discharge to ground at a level below the
basement level.
As the basement level is in danger of becoming buoyant due to the high level
of the water table these works need to be undertaken urgently prior to further
rainfall.”
47. The Panel has considered the material supplied in support of claim A and
considers the information establishes that the water ingress arose as a result
of groundwater seeping into the basement level. However it is clear further
details were obtained during the investigations into claim B which may be
materially pertinent to claim A. The Panel therefore will examine this
additional material before addressing the content of the material for claim A.
2011 Claim (Claim B)
48. On 31 January 2011 the Applicants lodged the second claim for water
ingress to the basement car park, which was reported to have occurred
sometime in early January 2011. The FSP appointed loss adjuster „C‟ to
assess the cause and extent of the loss. C‟s report was not provided until 12
December 2011, although the Panel notes this was after extensive enquiries
by both the FSP and the Applicants. C‟s preliminary report provides:
“The water table in the area of the Insured proper ty has risen, primarily due to
the higher than average rainfall during the periods in question. The level of the
water table may also have been affected by infiltration of water from the
nearby Council drain into the surrounding water table as well as the cessation
Case No: 301417 Determination Page 10 of 22
of pumping and continuation of wastewater disposal. At no time has there
been any surface flow of water from the drain into the basement car park.
In our opinion any water from the drain infiltrating the surrounding ground
becomes underground water at that time. The water entering the basement
car park is underground water or hydrostatic water not water escaping from
the drain.”
49. C had arranged for hydrologists „W‟ to provide a report on the source of the
water, and the Applicants sought further reports from MC and from
hydrologist „D‟. The Applicants also sought peer reviews from „PD‟ and „JH‟.
The Panel has carefully considered the reports supplied from the various
experts.
50. D‟s report dated February 2011 includes comprehensive data from the bores
installed by the Applicants to monitor the groundwater tables at the property
and provides:
“Groundwater inflows to the basement car park of [property] have occurred
during periods of unusually high rainfall. Total rainfall during April/May of 2009
was the 2 nd highest on record for an April/May period and included a number
of days where rainfalls were in excess of 25mm. On 2 particular days, rainfall
totalled ~100mm, and in excess of 200mm. These are significant rainfall
events.
...
Rainfall during April/May of 2009 and during December 2011/January 2011
caused the groundwater table in the vicinity of [property] to rise significantly.
Groundwater flowed through joints in the basement car park slab, and through
joints between the slab and pillar columns. Groundwater inflow had to be
pumped virtually continuously from the sump in the basement car park to the
stormwater system and thence to the [council] drain which borders the
property.
The [council] drain has no effective outlet. The drain is blocked approximately
120m downstream of the box culvert at [property].
...
Because the [council] drain is blocked with no effective outlet, it ponds and
retains water during the wet season. The drain has the effect of artificially
raising groundwater levels in the vicinity of [property] and maintaining
groundwater at a higher elevation and for a longer period than would
otherwise be the case. The drain is acting as a groundwater mound.
...
In order to alleviate the problem of groundwater seepage into the basement
car park of [property], the adjacent [council] drain should be extended to an
ocean outfall. This would prevent water accumulating in the drain for long
periods of time during the wet season, and the consequent rise in
groundwater levels in the vicinity of the property.
If the [council] drain was cleared and had an effective outlet, it would act as a
groundwater sink, and prevent the groundwater table from rising to a level at
or above the basement car park slab.”
51. MC‟s report of 13 May 2011 provides :
Case No: 301417 Determination Page 11 of 22
“ Ingress of water into the car park is due to the water table being above the
basement floor level. The level of the water table in the vicinity of the
basement car park has been elevated due to the blockage of the council drain
located immediately to the east and south east of the basement.
...
As the drain is blocked it effectively forms a lake elevating the water table
immediately adjacent to the basement car park.
The basement was not constructed for an elevated water table. The slab-on-
ground floor to the basement car park was not built to resist water pressure.
The slabs could be buoyed upwards by the water pressure from an elevated
water table.
It appears that the building design was based on the level of the water table
being maintained below basement floor level by the council drain. If the
stormwater drain was cleared to allow water to flow out of the drain, then the
water table in the vicinity of the drain would be drawn down to the level of the
base of the drain. This is below the level of the basement floor.
...
Council have investigated drainage options and have concluded that cleaning
out the existing drain for a further 250m to the south west and possibly
extending the drain by 250m to the south east to achieve a freefall outlet is
the preferred drainage solution. ”
52. The Panel notes the Applicants sought peer reviews of D and MC‟s reports
from hydrogeologist JH and consulting engineer PD. The Panel has
considered these reports, however the Panel is of the view those reports are
of limited benefit. Neither gentlemen have conducted his own enquiries or
observations of the site, and therefore the Panel‟s view is that PD and JH‟s
reports can only be considered in the context of adding weight to the earlier
reports rather than on their own merits. However, the Panel does note that
both JH and PD agree with D and MC‟s conclusions regarding the
groundwater levels at the site.
53. The report from hydrologist W provides:
“Having reviewed the various studies, I am also in agreement on the
mechanisms of water ingress to the property as identified in the various expert
reports.
...
The inflow of water to the basement car park of the subject property was due
to elevated groundwater levels caused by substantially above average
rainfalls in April/May 2009 and December/January 2011.
The elevated groundwater levels were the result of a combination of direct
rainfall infiltration and infiltration to groundwater from elevated water levels in
the drainage channel adjacent to the subject property. Water in the drainage
channel was derived from stormwater runoff from the subject property and a
much larger urban catchment to the north of the subject property. Elevated
water levels in the drainage channel persisted for an extended period due to
the lack of a defined outlet for the drainage channel.
Case No: 301417 Determination Page 12 of 22
Based on information provided by the insured, the drainage channel has not,
at any time, overflowed its banks in the vicinity of the subject property to
inundate the building by direct overflow from the drainage channel.
There was no direct backflow from the drainage channel into the basement
via the stormwater discharge pipe.
All of the inflow to the basement through the floor slab was via sub-surface
flow through the surrounding soil. There was no surface flow from the
drainage channel into the basement and no backflow through the stormwater
pipe system in the basement.
These findings are consistent with the findings of the previous expert reports
commissioned by the insured.”
54. The Panel notes that during the IDR review of Claim B, the FSP
comm issioned a further report from engineer “RB” to comment on all of the
material provided and conduct his own enquiries into the matter. RB‟s report
provides:
“All of the learned opinion by the various consultants engaged by the Insured
and the loss assessors agree that water is entering the car park from the
groundwater contained within the earth outside the basement. The water is
flowing in under the action of hydrostatic pressure within that earth. I am in full
agreement with those opinions.
It may be wort h explaining that the term „hydrostatic‟ is used as a convention
amongst engineers and scientists to distinguish the state of the water at a
particular point in time and location from other influences such as velocity,
friction, turbulence and the like, all of which can occur at the same time. It
does NOT mean that the water has to be still for hydrostatic pressure to
occur.
The phenomenon of high levels of groundwater in [B] island in general and
around the area of the property is well described in various consultant reports,
particularly that of [E]. It is clear that the groundwater level around this
building rises above the level of the car park slab from time to time and when
it does, water flows in through the various joints in the structure.
There is no evidence that there has been any drain, either piped or open
channel that has burst, leaked or overflowed.
It needs to be noted that the council drain located to the east and south of the
property contributes to groundwater level by allowing water to pass through its
invert. This is because it was designed as a pond rather than a watercourse
and has acted in that way for many years before the property was developed
to its current form.
...
In other words, irrespective of any issues with the adjacent council drain, the
water table around the report is likely to rise as a naturally occurring
phenomenon due to greater rainfall.
...
I found no evidence of structural damage arising from this event and none
was presented by the consultants presented by the insured. [MC] instigated
investigations into the possibility of voids occurring under some of the slabs
due to the inflow of water and sand through joints in the car park floor. I do not
believe that this has been proven and in any event if there are voids, these
Case No: 301417 Determination Page 13 of 22
have been caused by defects in the building as described in my response to
Question 6 below.”
55. The Panel notes the Applicants question RB‟s findings and qualifications to
provide an expert commentary on the matters in dispute. However, the Panel
is satisfied each of the experts who have commented in this matter are
suitably qualified to so do and have contained their comments to the areas
within their expertise. Furthermore, the Panel notes that save for one or two
minor differences in opinion, the experts are in agreement that the source of
the water ingress into the basement is the level of groundwater at the site.
56. The Panel further notes the experts are in agreement that the drainage
channel, in its current form, has contributed to the elevated groundwater
table at the site.
57. Therefore, the issues remaining before the Panel are threefold. The Panel
must now determine whether there is any loss or damage to the „building‟
which would be covered under the terms of the policy; then, whether the
drainage channel could reasonably be considered to be blocked and
therefore causing leakage or overflow which falls within the ambit of cover
provided by the policy for soil movement or erosion and lastly, if there is
damage to the building, whether such damage could be considered to be
accidental, as contemplated by the policy.
58. The Panel notes in order for the policy to respond to a claim, there must be
actual loss or physical damage sustained to the building itself.
59. The Panel has carefully considered the reports from the various experts as
well as the numerous receipts, invoices and quotations provided by the
Applicants. However, the Panel notes, thus far, there is little evidence of any
actual physical damage being sustained to the building. Rather, most of the
expenditure to date has been incurred in consultant reports, groundwater
monitoring and pumps installed to clear the basement of water.
60. The Panel accepts there are significant works required to ensure the
basement level car park does not become buoyant as a result of the rising
water tables and to ensure the property is watertight, or at least able to
withstand the groundwater levels, in future.
61. Similarly, the Panel notes extensive costs have been incurred in pumping
water from the basement to prevent damage from occurring, and bores and
other monitoring equipment installed to gauge groundwater levels at the site.
62. However, the Panel accepts that remedial or mitigation costs incurred to
safeguard and protect the building against future losses are not covered by
the FSP‟s policy. Therefore , these costs will remain the responsibility of the
Applicants.
63. On this basis, the Panel considers the costs incurred thus far and anticipated
by the Applicants in ensuring the basement level car park is protected from
Case No: 301417 Determination Page 14 of 22
potential damage from water ingress are not covered pursua nt to the terms
of the policy.
64. The Panel considers there is potential for the substrate sand having been
washed away as a result of the water ingress. The GPR scans indicate there
are possible voids now existing under the structure. The Panel notes that the
policy purchased by the Applicants insures the „building‟ at the site. The
Panel has considered the policy definition contained within the policy booklet
of what the FSP covers as „the building‟ a nd accepts it does not extend to
covering sand or soil at the site.
65. However, the FSP has previously indicated in the event of a claim being
established, it would consider covering sand or soil where this is crucial to
the structural support of the building, and where such damage has arisen as
a result of bursting, leaking or overflowing of drains, pipes or water tanks and
not subject to any other overriding exclusion in the policy.
66. The Panel has considered the available evidence and is satisfied that on the
balance of probabilities, voids now exist under the basement slabs, which
would form part of the building‟s foundations. However, the Panel notes loss
of soil or sand by erosion or soil movement would only be covered where a
claim was admitted for water leaking/escaping from a drain or pipe.
Is the drain ‘blocked’ and leaking into the premises?
67. The Panel agrees the channel adjacent to the property was constructed by
the council to function as a drain, albeit an open drainage channel. The
Panel notes all of the experts are in agreement that water from the drain is at
least a contributing factor to the water entry to the car park.
68. The Applicants state the drain originally had a sea outlet and over time, has
become silted in and overgrown with vegetation. They therefore consider it
„blocked‟, with water then escaping or leaking from it into the building. This
theory is supported, in part, by the expert commentary.
69. The Panel notes the drain has variously been described by the experts as
blocked at a point approximately 250 metres from the property, or as simply
reaching its termination point.
70. The Panel has carefully considered the evidence presented by the parties,
and has examined a number of aerial photographs of the site. The Panel
notes that in an earlier amalgamation of councils, much information
pertaining to the drain has been lost or misplaced which has not helped the
current situation.
71. However, the Panel understands from the available information the drain
was constructed sometime in the 1970‟s when con struction of the adjacent
golf course began. Accordingly, the Panel considers the aerial photographs
taken in 1978 as the most relevant to this dispute.
Case No: 301417 Determination Page 15 of 22
72. The Panel has examined these photographs and notes the drainage channel
is clearly visible. Whilst it is difficult to ascertain how far the drain extended in
1978 as the photographs have no scale, it would appear to the Panel the
drainage channel extends for approximately 500 metres past the property. It
is certainly not visibly extended to a sea outlet.
73. In his report of 13 May 2011, MC has included a closer aerial view of the
drain. Whilst this image is not dated, the Panel notes it would appear the
drain has been constructed to terminate at the join of the drain coming from
the golf course area. Neither drain appears to have a sea outlet.
74. The Panel has been provided with a copy of correspondence from the local
council, in which they propose a number of solutions to the drainage issues
at the site. The Panel has reviewed this letter and notes the following
comments:
“However, at this site the original development designs were not afforded a
reliable „free - flowing‟ outfall. The drainage designs instead rely on dissipation
of excess stormwater from the site (and adjoining areas) into the groundwater
system.
...
Option 5: clean out the existing drain for a further 250m to the south west
(reach 1) and golf course dam side drain (reach 2). Then, only if considered
necessary after a period of observation make a „dog - leg‟ and create a new
drain for an additional 100m south- eastwards to a natural low point (reach 3).”
75. The Panel notes that the council considers extending the drain past the golf
course drain to be a „new‟ drain as opposed to clearing or reinstatement of
an original drain. Accordingly, the Panel is not persuaded the drain was
originally constructed to have a sea outlet nor was it designed as a free
flowing drain.
76. Furthermore, the council has confirmed the drain is functioning in the way it
was intended, that is, when full it dissipates excess water into the
groundwater system. That this then contributes to the elevation of the
groundwater table at the site appears to be either an unintended, or simply
ignored, consequence.
77. The Panel notes the council has agreed to „clean out‟ the existing drain for
an additional 250 metres. The Panel considers therefore, the drain capacity
has been reduced from its originally intended capacity due to becoming
either silted in, or overgrown with vegetation or a combination of both.
78. However, as the drain was not a free-flowing outlet to begin with, it is
questionable whether the drain could be considered to be „blocked‟ and
therefore leaking water into the subject property. The ordinary meaning of
the term blocked is to have an obstruction impeding flow. However, this drain
did not flow and was never designed to, and therefore the Panel questions
whether it can reasonably be considered to be obstructed.
Case No: 301417 Determination Page 16 of 22
79. The Panel considers the drain has had its capacity reduced over the years
due to a combination of factors. That it requires cleaning out and re-
establishment for an additional 250 metres to adequately divert groundwater
from the property is beyond doubt.
80. However, even if the Panel accepted the drain was blocked, the Panel is
doubtful the drain can be considered for the purposes of the policy to be
„leaking or overflowing‟ into the car park. All parties agree the drain did not
overflow its banks at any point which leaves it before the Panel to consider if
the drain is „leaking‟. Macquarie Dictionary defines the word „ leak ‟ as an
unintended hole, crack, or the like by which fluid, gas, etc., enters or
escapes or any avenue or means of unintended entrance or escape, or the
entrance or escape itself .
81. It is agreed by the experts and council that the drain was intended to
discharge into the water table at the site. It is functioning as designed. The
Panel agrees the drain certainly could be considered to be inadequate for
the present purposes and requires upgrading. However, the Panel is not
persuaded the drain is leaking within the ordinary meaning of the word.
82. The Applicants have raised a concern with the policy wording, stating that it
is misleading with the use of the term „underground (hydrostatic) water‟. The
Applicants say hydrostatic water refers only to fluids at rest, which cannot be
the case with water flowing into the car park. The Applicants further say
underground water only refers to water occurring naturally underground
which is not the case here as the drain artificially raises the groundwater
level.
83. Accordingly, the Applicants say the policy wording is misleading and when
properly deconstructed, the exclusion refers only to fluids at rest and fluids
which are not naturally occurring and therefore cannot be applied to their
claim. The Applicants are relying on the rule of „contra proferentum‟ which
means that any ambiguity of a policy term should be read in the favour of the
Applicants.
84. The Panel has carefully considered the policy wording. In the Panel‟s view,
the reference to underground water is clear as to its intention and the Panel
does not believe this can be interpreted any other way. The Panel notes the
Macquarie definition of underground water as being all water occurring
naturally underground, as artesian water, water tables, etc. There is no
dispute there is a water table occurring naturally at the site, which the Panel
accepts would fall within the definition of underground water.
85. The inclusion of the word hydrostatic on its own is unusual, given it is usually
referred to in the context of „hydrostatic pressure‟, which is the pressure
exerted by a fluid at equilibrium due to the force of gravity. Broadly speaking,
in the event of the car park slabs floating or being forced upwards,
hydrostatic pressure would be the force that would cause this.
86. Macquarie Dictionary defines hydrostatics as the statics of fluids, a branch of
science usually confined to the equilibrium and pressure of liquids , which the
Case No: 301417 Determination Page 17 of 22
Panel considers would include groundwater. Accordingly, whilst the Panel
agrees the wording of the exclusion is somewhat clumsily constructed, the
Panel is not persuaded that it is necessarily ambiguous or misleading or that
the inclusion of the word hydrostatic alters the meaning of the exclusion. The
Panel is further not persuaded that hydrostatic refers only to fluids at rest.
Therefore the rule of „contra proferentum‟ would not apply in this instance.
However, even with a favourable construction on that issue, the Panel does
not believe it would assist the Applicants in discharging their onus to claim.
87. In addition to this, the Panel notes the experts agree that [B] Island has a
high water table due in part to its construction atop a sand aquifer and
regardless of the state of the drain, future water ingress is likely given it is
expected that rainfalls, and therefore the subsequent groundwater levels, in
the area will increase.
88. The Panel also notes the water ingress to the car park is widespread
throughout the area, and not confined to the side adjacent to the drai n. The
experts agree the drain contributes to raised groundwater levels at the site.
However, for the drain to contribute to or raise the levels there must also be
groundwater present at the site from another source or sources.
89. The factors contributing to the water table have been variously stated by the
experts in their reports as being higher than average rainfall, council
cessation of pumping, wastewater disposal and the aquifer underneath B
Island. Both D and W have addressed this aspect in their reports, with W
stating „ the elevated groundwater levels were the result of a combination of
direct rainfall infiltration and infiltration to groundwater from elevated water
levels in the drainage channel adjacent to the subject property ’.
90. D‟s later report of January 2012 states the primary cause of the inflow to the
car park was the water in the drain, although it concedes this has mixed with
water from the unusually high rainfall.
91. Accordingly, the Panel accepts any water dissipating from the drain has
combined with water in the ground from other sources such as through
higher than average rainfall. However, the Panel recognises established
case law which provides that if there are two causes of a loss where one is
subject to cover and the other is not, an insurer is not liable for the loss as
set down in the case of Wayne Tank and Pump Co Ltd v Employers Liability
Assurance Corp Ltd [1974] QB 57). As the FSP‟s policy specifically excludes
loss or damage arising from underground water, the Panel accepts the
excluded cause is dominant and defeats the claim.
92. Therefore, for the reasons set out above, the Panel is not persuaded the
Applicants have discharged their onus to establish a claim for the lost
substrate sand, pursuant to the terms of the policy.
Case No: 301417 Determination Page 18 of 22
Could the water ingress be considered to be ‘accidental’?
93. The Panel furthers notes the policy held by the Applicants is a broad form of
accidental damage policy. Therefore, for the policy to respond, the damage
must be accidental in nature.
94. Whilst the Panel has concluded, based on the available information, there is
currently no damage visible to the premises; this does not preclude damage
from these two events from becoming evident at some point in the future.
Therefore it is still necessary to consider if, such damage should arise,
whether the policy will respond.
95. The FSP says the construction of the basement level is such that water
ingress is considered inevitable. The FSP considers had the basement been
constructed appropriately and/or waterproofed, the water would not have
entered. Therefore the water ingress was foreseeable, and thus, is not
accidental in nature.
96. The High Court of Australia has previously considered the meaning of the
term „accidental‟ and held that it meant ‘an unlooke d-for mishap or untoward
event which was not expected or designed.’ (see Australian Casualty
Company Limited v Federico (1986) 160 CLR 513 at 534 -535).
97. The Applicants say they were unaware of any issues surrounding the
basement and therefore it was unexpected and is accidental. The Applicants
rely on the standard set down in the case of Mount Albert City Council v new
Zealand Municipalities Co-Operative Insurance Co Ltd [1983] NZLR 190 at
194, which provides that the insured must have deliberately courted the risk
and must have done so without a reasonable belief that the risk was
insubstantial.
98. The Panel notes the following from RB‟s report:
“Document 33 is a copy of a judgement made by Judge [S] in the Planning
and Environment Court on 27 January 1974 in a matter between [A] (either
the developer or an agent for the developer) and [C] council. The matter
appeared to concern various issues concerning the size, height and inclusions
of the development on the property.
...
It is easy to see therefore that the combination of 6 storeys over a 21m height
would have meant that the car park had to be pushed into the earth as a
basement so that the building could achieve its required capacity whilst
complying with the town planning requirements.
This appears to have been confirmed and clarified by a further judgement by
Judge [S] in the same court on 20 April 1994 as seen in Document 34. Item 3
of that judgement states:
...‟the underground car parking area shall be designed and constructed to the
satisfaction of the Shire Engineer. Appropriate methods of waterproofing and
drainage shall be incorporated into the design which is to be determined and
assessed at the time of lodging a building application...‟
Case No: 301417 Determination Page 19 of 22
Item 8(a) of Document 34 includes some quite specific directions for the car
park pavement slabs and substructure but directs that the pavements are to
be designed by a Civil Engineer.
Item 11 of Document 34 states:
...‟specifically all stormwater from the subject land is to be directed to [L] court
via an internal piped drainage system and connected to the existing box
culverts, under [L] court. The minimum capacity of the piped drainage system
is for a 1 in 10 year storm event. Stormwater drainage is not to be directed
into the open drain at other locations...‟
...
The whole point of mentioned Documents 33 and 34 is to point out that the
issue of having a large basement penetrating into the earth and then having to
waterproof that basement because of drainage concerns was clearly known
as far back as 1994.
...
The insured took ownership of a building that was so vulnerable to flooding
that it was, in my opinion, not fit for its intended purpose. It has not been
„waterproofed‟ as directed in a judgement in the 1994 Planning and
Environment Court but has been built in such a way that water inflow through
hydrostatic pressure from the surrounding groundwater is inevitable.”
99. The Applicants have raised issue with RB‟s comments in this regard, stating
there was a later judgement in 1998 that was far more relevant to the case
as it addressed the basement level design, which was subsequently
approved by council.
100. However, the Panel notes a copy of this documentation has not been
provided to the Panel, so the Panel is unable to consider this aspect further.
The Panel has been provided with a copy of the basement level construction
plan, which includes a waterproof membrane, although it is not clear if the
plan provided was the actual one used as the plan is marked „not for
construction‟.
101. However, in the Panel‟s opinion, the later judgement from Judge S may not
be particularly relevant given that it appears the plans approved for the
basement were not followed by the developers, as the available information
suggests the structure was constructed without waterproofing. The Panel
notes that both MC and RB raised this as a concern in their various reports:
“The jointing in the slab through which the water is flowing is also consistent
with a typical slab-on-ground. This along with the basement drainage and
sump pump is consistent with typical slab on ground construction. Hence,
unless proven otherwise it should be assumed that the basement slabs may
float upwards if the water table were to rise. The level of the water table to
cause floating of the slab will depend upon slab thickness, slab restraints and
the slabs ability to slab between restraints.”
And
“It should be noted that the basement has not been constructed as a tanked
structure and that leakage through the floor and walls should be expected
Case No: 301417 Determination Page 20 of 22
during periods of elevated water table. The cost of this or any other floor
strengthening system would be significant.”
And
“Despite directions by the Planning and Environment Court judgement, the
building does not appear to have been „tanked‟ such that water from the
surrounding earth is kept out of the basement car park area. [MC] points this
out on the first page of his report dated 19 September 2010. Instead, the
developers appear to have accepted that water will be allowed to flow in and
have relied on the sumps and pumping system to remove the inflow.
...
Tanking a building is neither easy nor cheap. This is mostly thought of as
applying a bituminous compound to the rear of the basement walls and to the
joint at the base. But in an environment with high porosity earth, such as
sand, it is essential to consider the joints in the basement floor as well. As
mentioned above, the floors have been constructed as „infill‟ slabs with joints
around the columns and shafts. They appear to have been poured in a series
of panels with a construction joint between each panel.
As the floor slabs dry and cure, they shrink slightly, which causes the joints to
separate. In a tanked design, these joints would have been provided with
devices called reglets or waterstops, which are usually made of neoprene and
which act as barriers either by spanning across the joint or by being held to
both sides of the joint.”
102. The Panel has carefully considered the information supplied by the experts.
The information before the Panel confirms the basement was constructed as
a slab-on-ground structure, which would not appear to be suitable for a
below ground level structure. This has been compounded by joints that have
not been adequately sealed, nor does it appear any waterproof membrane
was installed.
103. Accordingly, the Panel is persuaded the basement level has been
constructed in such a way that water ingress, at some point, was inevitable.
104. The issue which has now arisen was foreseeable and largely preventable.
Therefore, the damage cannot be said to be „accidental‟ in nature. Rather, it
has arisen as a result of the defective design and construction of the
basement level. Had the basement level been waterproofed and constructed
in an appropriate manner for a sub-ground construction, water would not be
able to enter the structure.
105. Similarly, the hire of acrow props to „prop up‟ the existing stormwater piping
to stop them from bursting suggests the pipes were not given adequate
support to carry the weight when fully loaded. Therefore, the potential for
failure was high and entirely foreseeable. The Panel furthers notes the hire
of acrow props to prevent the pipes from bursting would be considered
preventative works and not covered pursuant to the terms of the policy.
106. The Panel agrees the Applicants did not court the risk within the meaning
considered in the case above. However, in the Panel‟s view that case is not
overly relevant to the present matter, as there is no suggestion the
Applicants knew of, or had anything to do with, the flawed construction of the
Case No: 301417 Determination Page 21 of 22
site and no negligence on their behalf is alleged. The Panel acknowledges
the Applicants could not have known of the deficiencies with the building and
purchased it in good faith.
107. However, as the parties seeking indemnity under the FSP‟s policy for
accidental damage, the onus is on the Applicants to demonstrate they have
suffered a loss which is accidental in nature – that is, unforseen and
unexpected.
108. Unfortunately for the Applicants, the information confirms the issue
surrounding adequate drainage for the basement level car park were
foreseen by a number of parties. Those consequences of not adequately
constructing the basement level were ignored or disregarded by a number of
those parties, to the end detriment of the Applicants.
109. The Panel empathises greatly with the Applicants and the predicament they
find themselves in. However, the Panel is satisfied any damage which may
arise to the building cannot be considered to be accidental in nature and
therefore does not fall within the ambit of cover provided by the FSP‟s policy,
Furthermore, the FSP‟s policy specifically excludes claims for the cost of
rectifying faulty or defective workmanship. The FSP is therefore entitled to
decline the claims.
Investigative Costs
110. The Panel notes the bulk of the Applicants‟ costs incurred to d ate are for
what could broadly be considered to be investigative costs, and for which the
Applicants are seeking cover. The Panel notes the FSP‟s policy does contain
a provision for reasonable exploratory costs where the costs have been
necessarily incurred in locating the source of bursting, leaking, discharging
or overflowing of tanks, apparatus or pipes used to hold or carry liquid of any
kind. The Panel further notes payment of this benefit is not incumbent on a
valid claim for loss or damage to the bui lding being established first.
111. The Panel accepts the Applicants had to undertake investigative measures
to determine the source of the water ingress to the property. However, these
costs were not incurred in the process of engaging a plumber to locate a
leaking pipe, for example.
112. The Panel has carefully considered the wording of this benefit and considers
this benefit is not payable where the costs incurred have been for
consultants, water table monitoring or similar fees. Accordingly, the Panel is
satisfied the FSP is entitled to decline the claim for investigative costs.
Determination
113. On the basis of the available information the Panel determines the FSP is
entitled to decline both of the Applicants‟ claims.
Case No: 301417 Determination Page 22 of 22
114. The Panel further determines the Applicants are not entitled to be
reimbursed any of their investigative costs.