Home / Financial Firm (Unknown - Insurer) / Determination 301254

Determination 301254

Claim decline - flood exclusion vs stormwater inundation

FirmFinancial Firm (Unknown - Insurer)
Decided2013-04-13
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded—
Non-financial loss—
Amount claimed$32,000
SourceAFCA PDF

Summary

The applicants' commercial building suffered water inundation in Lockhart, and the FSP declined the claim as flood damage. AFCA found the FSP had not proven flood water caused inundation up to 300mm above floor level, ordered indemnity to that level, interest, and a structural engineer inspection of the piers.

Once the insured shows a prima facie storm loss, the insurer must prove an exclusion applies; the FSP failed to show that riverine floodwater mixed with stormwater up to 300mm above floor level.

Issues

Subjects and remedies

home or building damagenatural disasterpay claimpay interestreassess claim

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Case No: 301254 Determination Page 1 of 9 Case number: 301254 General Insurance - Small Business/Farm Insurance - Commercial Property - FSP Decision - Denial of claim 22 March 2013 Background 1. The Applicants held a commercial policy of insurance with the Financial Services Provider (FSP). The policy covered a commercial building premise situated in “G Street” Lockhart. The policy provides insured event s cover inclusive of accident and storm cover. 2. The Applicants lodged a claim for property damage arising from water inundation on 3 March 2012. 3. The FSP declined the claim on the basis, the water inundation arose from flood which is excluded under the policy. Further, it declined the damage to the stumps under a separate exclusion of earth movement. 4. The Applicants dispute the declinature on the basis the damage arose from stormwater inundation which is covered by the policy. Summary of Applicants ’ position 5. The Applicants rely on the following policy terms and conditions: “Flood means the escape or release of water from the normal confines of a pond, lake, reservoir, canal, dam or uncovered watercourse. ... The events You are insured against ... 6. wind, rain, hail, snow or escape of liquid But not for: Loss or damage directly caused by Flood. ... What is not insured ... 2. loss or damage directly caused by: ... Determination Case No: 301254 Determination Page 2 of 9 - Earth movement (except earthquake) no matter how caused, including erosion, vibration, subsidence, seepage, saturation, creeping, landslip, mudslide, collapse, shrinkage, settling, expansion or heaving” . 6. The Applicants have enclosed a Statement from “JA” who is the Captain of the Fire and Rescue NSW, Lockhart branch. The statement provides the following information:  JA was assisting in the evacuation and sandbagging in Lockhart Township on the evening of 3 March 2012.  JA recalls there was constant heavy rain throughout most of Saturday, 3 March 2012. The rain stopped at or around 5.00am on 4 March 2012.  The water rose quickly at around 6.00pm on 3 March 2012. The water was coming from an easterly direction from “M Road”.  JA was sandbagging the shops located in G Street at 11.00pm. The water was still travelling from the east at this time.  JA was sandbagging shops located in close proximity to the Applicants‟ property in G Street at 2.00am. He recalls that the water was moving in an east-westerly direction at this time. 7. The Applicants have enclosed a quotation from a carpentry company for repairs to the doors, door jambs, skirting, architraves, flooring and tiled flooring. The invoice amount is $32,000 (inclusive of GST). 8. The Applicants note the claim was denied on the basis that the source of water inundation was floodwater or a combination of flood and stormwater. 9. The Applicants have reviewed the hydrology report and noted the following issues with same:  The hydrologist has improperly relied on the Wagga Wagga rainfall gauge which is 76kms distant to the Applicants‟ property. The Lockhart rainfall gauges indicate the rainfall intensities are significantly greater than those in Wagga Wagga. The peak 24 hour rainfall event recorded to 9.00am on 4 March 2012 was 122.6mm at Lockhart, in contrast Wagga Wagga recorded only 78.6mm for the same period.  There is no underground stormwater drainage system in Lockhart. The local runoff is removed via a kerb system and small drains along the road.  JA has confirmed that the water was flowing from the east for the duration of his sandbagging from 3 March 2012, until the early hours of 4 March 2012.  The report makes note of the overflow of stormwater runoff in multiple areas adjacent to the subject property. The Applicants submit this strongly supports the likelihood of the property being initially inundated with stormwater runoff.  The hydrologist does not indicate when the water escaped from Brookong Creek and mixed with stormwater. The Fire Captain indicated Case No: 301254 Determination Page 3 of 9 that the stormwater was more of an issue and was moving toward Brookong Creek.  The hydrologist has acknowledged that stormwater could have entered the property before floodwater. Accordingly, the Wayne Tank principle cannot be applied. 10. The FSP has failed to establish the loss was caused by floodwater. Further, the evidence demonstrates that, on the balance of probabilities, the damage arose from stormwater inundation. 11. The Applicants contend that the exclusion cannot be relied upon because the proximate cause of damage to the property was as a result of water inundation which caused the structural damage to the building. Summary of FSP’s position 12. The FSP has enclosed an assessor‟s report dated 15 March 2012. The Panel notes the following from this document:  The assessor obtained the following details regarding the inundation: - The rainwater runoff entered their property from the rear door and also the front door to a height of approximately 30mm inside. - Rainfall was heaviest at 7.00pm on 3 March 2012 and ceased at midday on 4 March 2012. - Rainwater entered the premise from the chimney area. The inundation of the rear of the property commenced at 7.00pm on 3 March 2012. The water entered the property between 10.00pm- 11.00pm on the same night and peaked at about midnight. - The water entering the property was travelling from the east side of the street down to the west side and to the end of G Street. - The water entering the property was dirty and the Applicants have undertaken cleaning the property themselves.  The property rests on stumps and is higher than the street level.  The assessor recommended that the subfloor piers be inspected by a structural engineer. 13. The FSP has encl osed two hydrology reports from “W” from which the Panel notes the following:  The Brookong Creek rises to the east of the town and flows in a generally westerly and south-westerly direction around the town.  A large stormwater catchment to the east of Lockhart generates stormwater runoff that drains to the Brookong Creek via several paths: - A culvert runs under the railway line some 3kms to the south-east of Lockhart. It commands most of the southern half of the local catchment area. Case No: 301254 Determination Page 4 of 9 - An open drain running parallel to east Street and then around properties on the north side of “Galore” Street commands most of the northern area of the local catchment (East Street drain). - When the railway culverts are overloaded, the residual stormwater runoff from the southern area drains towards the East Street drain. - When the East Street drain is overloaded, water overflows into East Street and flows through the town down several streets including G Street. - There are several ponds along Brookong Creek.  There are no defined watercourses draining this catchment which is drained by overland flow. During major storm events , stormwater runoff from the local catchment would flow across paddocks and along the railway embankment in a westerly direction towards the town.  Based on the Wagga Wagga rainfall gauge there were three distinct rainfall bursts: - The first burst of 27mm occurred from 5 .00am to 5.00pm on 28 February 2012. - The second burst of 64mm from 8.00pm on 29 February 2012 to 12.00pm on 1 March 2012. - The third burst of 75mm occurred from 11.00am on 3 March 2012 to 8.00am on 4 March 2012. - According to the rainfall gauge at Lockhart 122.6mm fell in the 24 hours to 9.00am on 4 March 2012. This had an average rainfall event of greater than 100 years ARI.  In the 24 hours to 9.00am on 4 March 2012, 123mm of rain fell in Lockhart. It is not known how representative rainfall behaviour in Wagga Wagga is of local rainfall behaviour in Lockhart. However, the data suggests more severe rainfall in Lockhart than Wagga Wagga.  Anecdotal evidence indicates that the water levels in the town peaked at 2.00-3.00am on 4 March 2012. At the time of the peak, it was still raining in Lockhart.  Initially stormwater from the local catchment to the east of Lockhart would have overtopped East Street and flowed through to G Street, attempting to make its way back into Brookong Creek to the west of the town.  Significant flows occurred down Ulrana Street (up to 900mm-1000mm) delivering a mix of stormwater and floodwater to the intersection of Ulrana and G Streets resulting in the initial above floor inundation of the property.  Rising water levels in Brookong Creek at the G Street causeway will have delivered additional floodwaters into the mix of water around the western end of G Street. Case No: 301254 Determination Page 5 of 9  All of the above sources of water came together to inundate the properties to the maximum recorded depth along the length of G Street to the east of Ulrana Street intersection.  It is not possible to determine the contribution of different sources of water to the inundation of the subject property. It is possible to say that the mix of stormwater and floodwater will have changed during the course of the inundation event, from predominantly stormwater at the beginning with an increasing proportion of floodwater, to predominantly floodwater at the peak.  W has provided a pictorial diagram of the water sources and their respective flow paths.  W states that he obtained anecdotal evidence from several people in Lockhart including the next door neighbour who was interviewed on 20 April 2012. The water levels in the town of Lockhart peaked around 2.00-3.00am on 4 March 2012. JA does not state if he saw the inundation of the insured property.  There was no water level gauge in the Brookong Creek or other waterways in the vicinity of the town. Anecdotal evidence from residents 0.7km and 0.2km east of Brookong Creek suggests the Brookong Creek commenced overflowing its banks downstream of the property before 8.00pm on 3 March 2012. A resident 0.12km north of the subject property, reported observing ponding water near the intersection of G and Ulrana Streets when evacuated at 7.00pm on 3 March 2012.  It is unlikely the depth of stormwater could have reached a sufficient height to inundate above floor level. The property is 180m from Brookong Creek. It is further likely that the free flow of stormwater runoff flowing in a westerly direction along G Street close to the property was impeded by high water levels in Brookong Creek and/or floodwater overflow from the creek. 14. The FSP relies on the hydrology report which concludes, the initial inundation of the premises was caused by a mixture of stormwater and floodwater from the Brookong Creek. Accordingly, the FSP relies on the Wayne Tank principle to decline the claim. 15. The policy does not cover earth movement „no matter how caused‟. Accordingly, the FSP reserves its right to investigate this issue further in the event that FOS finds that stormwater alone initially inundated the premises and caused the damage complained of. 16. The FSP submits that in the event FOS finds for the Applicants, that no interest payment should be awarded because the FSP has at all times acted in a reasonable and fair manner. 17. The FSP further notes that the jurisdictional limits should apply to any Determination. Case No: 301254 Determination Page 6 of 9 18. In response to the Applicants‟ submissions regarding inundation, the FSP responds as follows:  Rainfall data suggests greater intensities of rainfall in Lockhart and Wagga Wagga.  There is little doubt that stormwater initially inundated G Street late on Saturday night and flowed in a general east to west direction towards Brookong Creek. However, it is unlikely the depth of stormwater runoff alone could have reached the height of the floor level of the subject property and it is unlikely the property was initially inundated solely by stormwater runoff from the local catchment.  The earth movement exclusion was not relevant to the assessment of the Applicants‟ claim because it was declined on the basis of flood. In the event FOS does determine the stormwater was the sole cause o f damage – the FSP reserves the right to obtain a report regarding the cracking/structural damage. Issues 19. Whether the FSP was entitled to decline the Applicants‟ claim for water inundation. 20. Whether the earth movement exclusion is relevant to a stormwater claim. Reasons for decision 21. There has been an exchange of material between each party and the Panel is satisfied each party has had an opportunity to reply to the issues raised. 22. The Panel has read each party‟s submissions and materials and will only refer to the relevant submissions and materials raised. 23. This decision has been made by a Panel consisting of an Ombudsman, a representative with extensive experience in insurance industry matters and a representative with extensive experience in consumer claims. 24. The Panel note there are two discrete issues (listed above) which will be dealt with separately below. Whether the FSP was entitled to decline the Applicants’ claim for water inundation 25. The Panel has reviewed the hydrology and witness evidence provided to it. The Panel notes that the hydrologist refers to statements provided by residents, but has not provided same. The Panel is accordingly reluctant to rely on such statements as it does not have any notes or formal statements from these individuals from whom the statements were taken. There is also no evidence regarding the building up of any riverine flooding and how quickly the levels rose. This is in stark contrast to the Applicants obtaining a Case No: 301254 Determination Page 7 of 9 formal statement from JA who is a direct witness of events in G Street and the direction of the water flow. Given JA‟s position and duties at the time, the Panel considers the statement of some evidential weight. 26. There is no dispute regarding the fact that a high degree of stormwater runoff would have been directed down G Street and flowed in an easterly direction toward Brookong Creek. 27. The dispute which has arisen is whether the source of the initial inundation to the property is the result of stormwater runoff alone or a mixture of stormwater runoff and flood water. The Panel notes that should it find the source of inundation was a mixture of flood and stormwater runoff, that this would all be deemed flood water, in accordance with Eastern Suburbs Leagues Club v Royal & Sun Alliance Australia Limited . 28. The hydrol ogist‟s diagram of flow paths indicates that G Street would have stormwater flows to just before the Ulrana Street intersection. It should be noted that the commercial property is in the area where the hydrologist has indicated the stormwater and flood water would meet. 29. The Panel is somewhat troubled by the fact there is no objective evidence in terms of river gauges or witness statements regarding when the Brookong Creek broke its banks or how quickly the river flooding occurred. This would appear critical in terms of demonstrating that it was flood water mixed with stormwater runoff that entered the property. 30. The Panel is further concerned regarding the entry of flood water from the rear of the commercial property. This is particularly given that the street running parallel to G Street is also designated as having stormwater flows. 31. The Panel has read with some interest JA‟s description of the inundation event. JA is clearly in close vicinity to the Applicants‟ property and describes the water as continuing eastward during the inundation event. The Panel notes that an eastward flow toward the creek would be indicative of stormwater runoff. The reverse would be suggestive of floodwater backing up along the street. This is particularly so, given the statements from JA that the rain was continuing to fall heavily throughout Saturday 3 March 2012 and stopping at approximately 5.00am on 4 March 2012. There is also evidence that the water was rising quickly at 6 .00pm on 3 March 2012 – this is even before the hydrol ogist‟s anecdotal evidence of riverine flooding at 7 .00pm. 32. The Panel further notes that there is insufficient information to determine when the creek broke its banks, when the riverine flooding should have reached the intersection of U and G Streets and whether the stormwater flows would have been heavy enough to prevent riverine flooding into G Street. 33. In short, the Panel considers there is sufficient evidence of stormwater inundation to the property from the front, rear and minimal amounts through the chimney of the property. However, there is insufficient evidence regarding the riverine flooding and whether it did in fact mix with the Case No: 301254 Determination Page 8 of 9 stormwater at the time of the initial property inundation. There is a statement that the stormwater runoff would be insufficient to reach the relevant floor level, however, it is unknown whether there was a build-up of stormwater along G Street due to the alleged flood flows down Ulrana Street. Accordingly, the Panel considers that the FSP has failed to demonstrate that the initial inundation up to the level of the 300mm above floor level as reported by the Applicants, was a mix of stormwater and floodwater. 34. As such the FSP is required to indemnify the Applicants for their loss up to that height. 35. The Panel notes the application of interest is directed by section 57 of the Insurance Contracts Act (1984) . The application of interest is to be calculated from the date it was unreasonable for the insurer to have withheld payment. Whilst there is evidence that the FSP has acted in what it considered a reasonable manner, the Panel notes that it did have the relevant hydrological evidence at the time of the final decision letter. Given this, the Panel will apply interest from the date of the final decision letter as the FSP had the opportunity to consider the insufficiency of the hydrological evidence in demonstrating the flood exclusion. 36. The Panel has considered the FSP‟s concerns regarding jurisdictional limits. The Panel has noted the only quantum received on file relates to a quota tion for $32,000 which is well below the jurisdictional limit. However, the Panel agrees that it may only order an amount that does not exceed its jurisdictional limit. Damage to Sub-floor Piers 37. The assessor‟s report refers to the possibility of damage to the sub-floor piers although he notes he did not observe same, rather, he recommended the appointment of a structural engineer to provide an appropriate scope of works. 38. The parties have made no submission on this point and there is nothing contained in the dispute as to the likely extent or cost or cause of any such damage. 39. Although the Panel has determined that the property was initially inundated up to 300mm above floor level by stormwater, the Applicants conceded that floodwaters ultimately inundated the property. However, neither party has addressed the nature, extent or cause of the alleged sub-floor movement. 40. The FSP has dismissed this part of the claim on the basis that the policy excludes earth movement “no matter how caused”. However, it is not cl ear as to whether any damage to the piers would be due to earth movement, impact of stormwater runoff or impact of floodwaters. 41. The total wording of the exclusion commences that it is required to be “loss or damage directly caused by” earth movement no mat ter how caused. This exclusion includes saturation, shrinkage, settling, expansion or heaving. Case No: 301254 Determination Page 9 of 9 42. The Panel is satisfied that it is incorrect to look at the most immediate cause when considering the proximate cause of damage instead, one looks to the “quality of the connection between [the] cause and the injury”. The correct test for proximate cause is that it should be the “active, efficient cause that sets in motion a train of events without intervention of any independent force”. 43. Although the Panel notes that there is no cover for earth movement including saturation, there is insufficient evidence regarding the cause of damage to the stumps. However, the Panel does not accept that the exclusion will be made out simply because there was earth movement if it was temporally proximate to the heavy rainfall. 44. The FSP is required to appoint an appropriately qualified structural engineer to assess the nature, extent and cause of the damage to the sub-floor piers in order to determine the extent of its indemnity under the policy (if any). 45. Once determined, the FSP is required to indemnify the Applicants for any damage so insured. The Panel would encourage the parties to work cooperatively to agree this aspect of the claim. 46. If the parties are unable to agree on the extent of liability they may refer the matter back to the Panel for a further determination. Determination 47. On the basis of the available information the Panel determines the FSP was not entitled to decline the Applicants‟ claim for water inundation. 48. The FSP is required to indemnify the Applicants for their loss arising from stormwater inundation to the level of 300mm above floor level, in accordance with the terms of the policy. 49. The Panel further determines that the FSP is to pay interest in accordance with section 57 of the Act from 24 August 2012 being the date of the FSP‟s Internal Dispute Resolution decision to deny the claim, to date of payment of the claim. 50. On the basis of the available information the Panel determines the FSP is to arrange a thorough inspection of the issues with the stumps to determine whether the damage arises from the covered event of stormwater inundation, or excluded under the terms of the policy.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.