Determination 301108
Denial of second storm damage claim to culvert and driveway due to faulty rectification works
Summary
Homeowners sought repair of a culvert and driveway damaged by a second storm, after an earlier claim was settled in cash and repaired by a builder. The FSP denied the second claim as caused by faulty builder workmanship and storm-to-driveway exclusions. AFCA agreed, found the initial handling reasonable, and made no order.
The policy's specific exclusions for faulty workmanship and storm damage to driveways applied, and the FSP acted with the utmost good faith under sections 13 and 14 of the Insurance Contracts Act 1984.
Issues
- Claim denial primary · not upheld
“I consider that the FSP is entitled to rely on the exclusions under the policy to deny liability for the Applicants' second claim.”
- Poor claim handling secondary · not upheld
“I consider that the FSP has acted fairly and reasonably in dealing with the Applicants' initial claim, and has complied with its statutory duty to act with the utmost good faith.”
- Failure to disclose secondary · not upheld
“I consider that the material is sufficient to establish, on the balance of probabilities, that the Applicants received a copy of the PDS.”
Subjects and remedies
home or building damageno remedy
Text of the determination
Case No: 301108 Determination Page 1 of 7
Case number: 301108
General Insurance - Domestic Insurance - Home Building - FSP Decision -
Denial of claim-Exclusion/ condition
14 June 2013
Background
1. The Applicants held a home and contents insurance policy with the Financial
Services Provider (FSP) covering their Queensland property. The policy was
incepted in August 2010 and was current at the time of the loss.
2. On 11 January 2011, a culvert under the driveway at the Applicants ’ property
suffered stormwater damage as a result of severe storms affecting the area.
The Applicants lodged a claim for damage to the culvert and the driveway
(the “initial claim”).
3. The FSP initially denied the initial claim on the basis that it fell within a
specific exclusion under the policy for storm and rainwater damage to
driveways.
4. The FSP subsequently accepted the initial claim to the extent it related to the
culvert. The FSP paid the $37,315.60 to the Applicants to fund the costs of a
builder (“T”) engaged by the Applicant s to repair the damage. As a condition
of payment, the Applicants signed a Release Agreement under which he
agreed to release the FSP from any further liability arising directly or
indirectly out of the initial claim.
5. In or around late January 2012, the Applicants again suffered storm damage
to their culvert and driveway and lodged a further claim with the FSP
(the “second claim”).
6. The FSP denied the second claim in reliance on a report by its engineer
(“N”), which found that the damage was due to faulty work undertaken by the
builder (T) engaged to repair the initial damage.
7. The Applicants claim that the FSP has failed to manage their claims
properly. The Applicants seek to have the culvert and driveway restored to
their pre-loss condition.
Determination
Case No: 301108 Determination Page 2 of 7
Summary of Applicants ’ position
8. The Applicants claim that they were not provided with a copy of the policy
wording when the policy was incepted.
9. The Applicants claim that the FSP has failed to manage their claims properly
and with the requisite degree of skill and care. In particular, the Applicants
allege that:
the FSP should have obtained an engineering report in respect of the
initial claim and ensured that the initial repair works complied with
applicable standards; and
they have encountered unacceptable delays in having their claims dealt
with by the FSP and have had to continua lly follow up the FSP in order to
have their claims progressed.
10. The Applicants state that, as a result of delays by the FSP in managing their
initial claim, their preferred contractor was no longer available to undertake
the repair work as a priority, and therefore they were obliged to engage an
alternative contractor.
11. The Applicants also claim that the FSP has breached the General Insurance
Code of Practice and certain express and implied warranties under the
applicable sections of the Trade Practices Act 1974 (Cth) and the
Competition and Consumer Act 2010 (Cth).
12. The Applicants seek to have the FSP arrange and fund the rectification of
the culvert and driveway to their pre-loss condition.
Summary of FSP’s position
13. The FSP says that the Applicants were provided with a copy of the PDS
when the policy was incepted in August 2010. An updated PDS was
enclosed when a renewal notice for the policy was sent in July 2011.
14. The FSP considers that the handling of the Applicants’ initial claim was
reasonable, particularly in light of the high level of claims being dealt with at
the time arising out of the extensive natural disasters experienced in
Queensland and Victoria.
15. The Applicants have not identified any specific breaches of the Trade
Practices Act and the Competition and Consumer Act. Further, under the
Insurance Contracts Act 1984 , insurance contracts are excluded from the
operation of the Trade Practices Act and the Competition and Consumer Act.
16. In respect of the second claim, the FSP relies on its engineer’s re port which
found that the damage was caused by faulty construction works undertaken
by the builder (T) engaged by the Applicants to repair the initial damage.
Case No: 301108 Determination Page 3 of 7
17. Accordingly, the FSP considers that the second claim falls within the specific
exclusion under th e policy for loss or damage “occurring from or arising out
of ... gradual deterioration, wear and tear, lack of maintenance, faulty
workmanship, faulty design or structural defects .”
Issues
18. Whether the Applicants are entitled to indemnity for the damage to the
culvert and driveway which is the subject of their second claim.
Reasons for decision
19. Due to the nature of the dispute, the Service has considered it appropriate to
expedite the dispute in accordance with the Operational Guidelines to the
FOS Terms of Reference. Therefore, this dispute has not been the subject of
a FOS Recommendation and has proceeded directly to Determination. The
parties have been previously advised that a Determination will be issued in
this case.
20. I am satisfied that a full exchange of all relevant material has taken place
between the parties and that each party has had the opportunity of
addressing any issues raised.
21. The Applicants have alleged that the FSP has breached the General
Insurance Code of Practice, the Trade Practices Act 1974 (Cth) and the
Competition and Consumer Act 2010 (Cth). These matters are outside the
scope of this Determination and therefore I do not propose to deal with them
here.
22. The Applicants have also provided additional material relating to a claim for
storm damage to their roof in December 2010. This material is not directly
relevant to the current dispute.
PDS / policy wording
23. The Applicants state that they were not provided with a copy of the policy
wording on inception of the policy, or at any time prior to lodging the initial
claim. The Applicants acknowledge that they had received the policy
schedule as well as “consumer guides providing general highlights of the
policy ” but not “the actual language”.
24. The FSP says that the Applicants were provided with copies of the PDS
following inception of the policy by telephone in August 2010 and when a
renewal notice for the policy was sent in July 2011.
25. For the FSP to be able to rely on delivery of the PDS to the Applicants, the
FSP needs to establish, on the balance of probabilities, that it sent the PDS
to the Applicants’ last known address. The FSP’s records regarding
Case No: 301108 Determination Page 4 of 7
despatch of the PDS and evidence as to the FSP’s usual process for
despatch may assist in establishing that the document was sent.
26. I have reviewed the copies of the PDS provided and note that Section 2
(headed “The Policy Wording”) contains the actual policy wording.
27. I have also reviewed:
templates of the letters sent to the Applicants in August 2010 and July
2011 which purportedly enclose copies of the policy schedule, the
Applicants’ responses to the application for insurance and the PDS;
and
two statutory declarations by an employee of the FSP (“CS”) which set
out the procedures adopted by the FSP for sending policy
documentation, state t hat CS has reviewed the FSP’s records in
relation to the policy documents and renewal notice sent to the
Applicants in August 2010 and July 2011 respectively and confirm that
these records do not disclose any anomalies (such as return to sender
notifications).
28. I consider that the statutory declarations do not conclusively establish that
the PDS was sent and received by the Applicants. However, I note that the
Applicants have acknowledged receiving “consumer guides” providing
general highlights of the policy. From the materials provided to the Service, it
is not clear which documents would satisfy this description, although that it
could be a reference to the PDS.
29. Having reviewed the material provided to the Service, I consider that it is
sufficient to establish, on the balance of probabilities, that the Applicants
received a copy of the PDS (incorpo rating the policy wording).
Policy exclusion
30. The policy contains specific exclusions for loss or damage arising from
gradual deterioration, wear and tear, lack of maintenance, faulty
workmanship, faulty design and structural defects.
31. In denying the Applicants’ second claim, the FSP relied on a report prepared
by its engineer (N) following a visual inspection of the damage to the
Applicants’ culvert and driveway. N’ s report states that:
the primary cause of the damage to the driveway is “the inadequate
standards of construction achieved by [T]” in its rectification work
undertaken less than 12 months before;
specific issues identified in relation to T’s repairs to the driveway
include inadequate depth and quality of the gravel pavement,
ineffective subsoil drainage provisions and inadequate surface water
drainage provisions;
the failed sections of the driveway are beyond repair and require
complete reconstruction;
Case No: 301108 Determination Page 5 of 7
specific issues identified in relation to T’s repairs to the culvert include
failure to install an upstream apron and vertical cut-off wall, failure to
install a downstream apron and vertical cut-off wall and failure to install
additional scour protection in the form of rock, concrete facing or similar
material;
while the culvert did not suffer any significant damage as a result of the
storm inundation, it has suffered relatively minor damage from the
storm and previous weather events; and
the defects in the construction of the culvert have left it prone to
damage. Unless rectification words are undertaken, the existing
problems are likely to progress further, leading to the eventual collapse
of the culvert.
32. Based on N’s report, the FSP denied the Applicants’ second claim on the
basis that the damage fell within the specific policy exclusion for faulty
workmanship and design. The FSP also noted the specific exclusion for
storm or rainwater damage to driveways.
33. The Applicants have not disputed that the damage the subject of the second
claim was caused by inadequacies in the initial rectification work undertaken
by T. I consider that N is suitably qualified to opine on the matter and
therefore accept the conclusions reached in his report.
34. Accordingly, I consider that the damage which is the subject of the
Applicants’ second claim:
falls within the specific policy exclusion for faulty workmanship and
design; and,
to the extent the claim relates to the driveway, also falls within the
specific policy exclusion for storm or rainwater damage to driveways.
Handling of claims
35. Even though I have found that the damage to which the second claim relates
is excluded under the terms of the policy, it remains for me to consider
whether there is any other basis on which the FSP may be liable.
36. The Applicants allege that the FSP has failed to manage their claims
properly. In particular, the Applicants claim that they have experienced long
delays in the handling of their claims. The Applicants suggest that:
the FSP’s failure to properly handle the Applicants’ initial claim required
them to take matters into their own hands by engaging builders to
repair the damage; and
the FSP’s delay in progressing the initial claim resulted in the
Applicants’ preferred builder (“K”) being unavail able to attend to the
repairs as a matter of priority, necessitating the engagement of T
instead.
37. The materials provided to the Service establish that:
Case No: 301108 Determination Page 6 of 7
after the Applicants lodged the initial claim, there was a delay of
approximately 3 weeks before the FSP ’s loss adjuster visited the
Applicants’ property to assess the damage to their culvert and
driveway;
there was some miscommunication between the FSP and its loss
adjuster regarding the provision of his report;
approximately 3 weeks after the visit by the loss adjuster, the
Applicants received a letter from the FSP denying their claim on the
basis that it fell within the exclusion for stormwater damage to
driveways;
approximately 3 weeks later, the Applicants wrote to the FSP disputing
the denial. The Applicants argued that:
i. the culvert falls within the definition of “home” under the policy;
ii. stormwater damage to the culvert does not fall within the
exclusion for damage to driveways; and
iii. accordingly, the FSP should indemnify them for damage to the
culvert;
approximately 2 weeks later, following further discussions between the
Applicants and the FSP, the FSP offered to settle the initial claim by
paying the costs of repairing the culvert; and
approximately 4 weeks later, the FSP made a formal settlement offer of
$37,315.60.
38. I accept that the Applicants experienced difficulties in the handling of their
initial and subsequent claims and that the claims process was frustrating for
them. However, based on the chronology set out above, I do not consider
that the F SP has unduly delayed its consideration of the Applicants’ initial
claim, particularly when considered in the context of the pressure the
insurance industry was under as a result of the widespread natural disasters
which beset Queensland and Victoria in early 2011.
39. Under section 13 of the Insurance Contracts Act 1984 (the “Act”), each party
to a contract of insurance is required to act towards the other party with the
utmost good faith in respect of any matter arising under or in relation to the
contract. Section 14 of the Act provides that a party may not rely on a
provision in the contract in circumstances where to do so would be to fail to
act with the utmost good faith.
40. As outlined above, the FSP initially denied that part of the Applicants’ claim
which related to the culvert. However, following the receipt of submissions
from the Applicants, the FSP subsequently reviewed and reversed its
decision. I consider that the FSP acted reasonably promptly in this regard.
41. I note that it is not possible to determine what would have occurred in the
event that the FSP initially accepted the Applicants ’ claim for the damage to
the culvert (i.e. whether the FSP or the Applicants would have arranged for
repairs, whether K or T would have been engaged to conduct the repairs
Case No: 301108 Determination Page 7 of 7
and, assuming K had been engaged, whether the repairs would have been
completed satisfactorily).
42. In the circumstances, I consider that the FSP has acted fairly and reasonably
in dealing with the Applicants’ initial claim, and has complied with its
statutory duty to act with the utmost good faith. Accordingly, the FSP is
entitled to rely on the terms of the policy and should not be required to
indemnify the Applicants for the further damage to their culvert and driveway
arising out of the initial rectification works.
Conclusion
43. For the reasons outlined above, I consider that the FSP is entitled to rely on
the exclusions under the policy to deny liability for the Applicants’ second
claim.
44. I note that, in circumstances such as the present where the Applicants have
accepted a cash settlement from the FSP and have engaged a builder to
conduct rectification work, their remedy for the defective work is properly
against the builder who carried out the work.
Determination
45. On the basis of the available information I determine that the FSP is entitled
to deny indemnity in respect of the Applicants ’ second claim for damage to
their culvert and driveway.