Home / Financial Firm (Unknown - Insurer) / Determination 300648

Determination 300648

Bathroom water damage claim: faulty workmanship and gradual deterioration exclusions, quantum of leaking pipe damage

FirmFinancial Firm (Unknown - Insurer)
Decided2013-09-11
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded$5,132
Non-financial loss—
Amount claimed$65,120
SourceAFCA PDF

Summary

The applicant sought a full bathroom rebuild for water damage, which the FSP denied under the faulty workmanship and gradual deterioration exclusions. The addendum confirmed the majority damage was excluded, and ordered the FSP to cash settle $5,632 for leaking pipe damage less the $500 excess, rejecting the applicant's larger rebuild quotes.

The Panel's earlier determination limited the FSP's liability to damage caused by the leaking pipe, so repair quotes for a full bathroom renovation exceeded the scope of the obligation and the FSP's updated costing discharged it.

Issues

Subjects and remedies

pay claim

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Case No: 300648 Determination Page 1 of 3 ADDENDUM DETERMINATION Case number: 300648 General Insurance – Domestic Insurance Home Building Insurance – Water damage – Policy exclusions – Faulty workmanship; gradual deterioration 22 August 2013 Background 1. On 11 October 2011, the Applicant lodged a claim for water damage to the bathroom floor and walls which the Applicant submits was caused by a leaking pipe in the shower recess. 2. The Financial Services Provider (FSP) denied liability on the ground the water damage was caused by a faulty waterproofing membrane in the shower recess due to faulty workmanship. 3. The Applicant submitted quotations for the cost of repairs from two builders as follows: 15 October 2011 from builder IG $65,120 including GST; and 16 October 2011 from builder D $61,050 including GST. Both quotations were for a complete rebuild of the bathroom. 4. The FSP appointed building consultants, MK and S to inspect and report on the damage subject to the Applicant’s claim. 5. Both MK and S reported that the damage had been caused by the failure of the waterproofing membrane in the shower recess and a leaking pipe to the shower. Further, both MK and S stated that the waterproofing membrane leaked due to:  defects in design, structure, materials or workmanship; and/or  wear and tear, gradual deterioration. 6. The Applicant did not submit any evidence to refute the building consultants’ opinions. 7. However, both MK and S confirmed that some damage to the insured property had been caused by the leaking shower pipe. Building consultant S reported that the damage caused by the leaking shower pipe would be Determination Case No: 300648 Determination Page 2 of 3 restricted to the bottom plate between the bathroom and bedroom 2 and associated wall linings only. 8. S was also of the opinion that the leaking pipe would only have contributed to approximately 10% of the damage to the dwelling. 9. The dispute was referred to the FOS Panel for determination. Reasons for Decision 10. The Panel determined that the majority of the damage to the Applicant’s home was caused by water escaping from the leaking/faulty shower membrane and was the result of defects in design, structure, materials or workmanship. 11. Accordingly, such damage was excluded from the policy cover. 12. However, the Panel also determined that the FSP was to indemnify the Applicant for damage caused by the leaking water pipe, namely damage to the bottom plate between the bathroom and bedroom 2 and associated wall linings and any associated exploratory costs. 13. The Panel was unable to determine the amount payable in respect of the damage caused by the leaking pipe and directed the FSP to undertake a scope of works and current costing on the resultant damage. 14. The FSP obtained a quotation for repairs from MK who on 31 May 2013 quoted the cost of repairs to be $3,564 including GST. However, this quotation was based on an inspection of the Applicant’s property on 14 November 2011. 15. MK carried out a further inspection on 16 July 2013 and increased the quote for the cost of repairs to $5,632 including GST. 16. The Applicant disputed the quotation and submitted that on e of the FSP’s building consultants had quoted the cost of repairs to be $160,000 and the FSP should pay him 10% of that amount, that is, $16,000. 17. The FSP stated that it had not received a quotation for the amount of $160,000 and the Applicant has not been able to substantiate his allegation. 18. The Applicant engaged two builders to submit quotations for repairs. On 24 June 2013 builder D quoted $35,420 including GST and on 3 July 2013 builder M quoted $39,380 including GST. 19. However, the quotations from builde rs D and M included a complete renovation of the bathroom which is not in accordance with the Panel’s Determination. 20. The Panel’s Determination at paragraph 53 stated: Case No: 300648 Determination Page 3 of 3 ‘However, as noted, the Panel determines that the FSP is to indemnify the Applicant for damage caused by the leaking shower (pipe), namely the damage to the bottomplate between the bathroom and bedroom 2, and associated wall linings, and any associated exploratory costs.’ 21. The Applicant has been informed by FOS on several occasions that any quotations were to be in respect to the determination in paragraph 53. The Applicant’s builders’ quotation clearly exceeded the Panel’s Determination. 22. The FSP has provided an updated quote for the repairs detailed in the Panel’s Determination in the amount o f $5,632. The Applicant has not provided any evidence to support his view that this amount is insufficient to meet the FSP’s obligations under the Determination. He has instead provided quotations in respect of a scope of works which far exceeds the Panel’ s Determination. 23. In the absence of any evidence that the FSP’s offer fails to meet its obligations as determined, the Panel is satisfied that payment of this amount would fully discharge its obligations in respect of this dispute. Determination 24. Accordingly, the Panel determines that the FSP is only liable to cash settle the Applicant’s claim for the amount of $5,632 including GST, in accordance with the MK quotation dated 16 July 2013, less the policy excess of $500.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.