Home / Financial Firm (Unknown - Insurer) / Determination 300648
Determination 300648
Bathroom water damage claim: faulty workmanship and gradual deterioration exclusions, quantum of leaking pipe damage
Summary
The applicant sought a full bathroom rebuild for water damage, which the FSP denied under the faulty workmanship and gradual deterioration exclusions. The addendum confirmed the majority damage was excluded, and ordered the FSP to cash settle $5,632 for leaking pipe damage less the $500 excess, rejecting the applicant's larger rebuild quotes.
The Panel's earlier determination limited the FSP's liability to damage caused by the leaking pipe, so repair quotes for a full bathroom renovation exceeded the scope of the obligation and the FSP's updated costing discharged it.
Issues
- Claim denial primary · upheld
“the Panel determines that the FSP is to indemnify the Applicant for damage caused by the leaking shower (pipe), namely the damage to the bottomplate... and associated wall linings”
- Claim amount dispute secondary · not upheld
“In the absence of any evidence that the FSP's offer fails to meet its obligations as determined, the Panel is satisfied that payment of this amount would fully discharge its obligations”
Subjects and remedies
pay claim
Text of the determination
Case No: 300648 Determination Page 1 of 3
ADDENDUM DETERMINATION
Case number: 300648
General Insurance – Domestic Insurance Home Building Insurance – Water
damage – Policy exclusions – Faulty workmanship; gradual deterioration
22 August 2013
Background
1. On 11 October 2011, the Applicant lodged a claim for water damage to the
bathroom floor and walls which the Applicant submits was caused by a
leaking pipe in the shower recess.
2. The Financial Services Provider (FSP) denied liability on the ground the
water damage was caused by a faulty waterproofing membrane in the
shower recess due to faulty workmanship.
3. The Applicant submitted quotations for the cost of repairs from two builders
as follows:
15 October 2011 from builder IG $65,120 including GST; and
16 October 2011 from builder D $61,050 including GST.
Both quotations were for a complete rebuild of the bathroom.
4. The FSP appointed building consultants, MK and S to inspect and report on
the damage subject to the Applicant’s claim.
5. Both MK and S reported that the damage had been caused by the failure of
the waterproofing membrane in the shower recess and a leaking pipe to the
shower. Further, both MK and S stated that the waterproofing membrane
leaked due to:
defects in design, structure, materials or workmanship; and/or
wear and tear, gradual deterioration.
6. The Applicant did not submit any evidence to refute the building consultants’
opinions.
7. However, both MK and S confirmed that some damage to the insured
property had been caused by the leaking shower pipe. Building consultant S
reported that the damage caused by the leaking shower pipe would be
Determination
Case No: 300648 Determination Page 2 of 3
restricted to the bottom plate between the bathroom and bedroom 2 and
associated wall linings only.
8. S was also of the opinion that the leaking pipe would only have contributed
to approximately 10% of the damage to the dwelling.
9. The dispute was referred to the FOS Panel for determination.
Reasons for Decision
10. The Panel determined that the majority of the damage to the Applicant’s
home was caused by water escaping from the leaking/faulty shower
membrane and was the result of defects in design, structure, materials or
workmanship.
11. Accordingly, such damage was excluded from the policy cover.
12. However, the Panel also determined that the FSP was to indemnify the
Applicant for damage caused by the leaking water pipe, namely damage to
the bottom plate between the bathroom and bedroom 2 and associated wall
linings and any associated exploratory costs.
13. The Panel was unable to determine the amount payable in respect of the
damage caused by the leaking pipe and directed the FSP to undertake a
scope of works and current costing on the resultant damage.
14. The FSP obtained a quotation for repairs from MK who on 31 May 2013
quoted the cost of repairs to be $3,564 including GST. However, this
quotation was based on an inspection of the Applicant’s property on 14
November 2011.
15. MK carried out a further inspection on 16 July 2013 and increased the quote
for the cost of repairs to $5,632 including GST.
16. The Applicant disputed the quotation and submitted that on e of the FSP’s
building consultants had quoted the cost of repairs to be $160,000 and the
FSP should pay him 10% of that amount, that is, $16,000.
17. The FSP stated that it had not received a quotation for the amount of
$160,000 and the Applicant has not been able to substantiate his allegation.
18. The Applicant engaged two builders to submit quotations for repairs. On 24
June 2013 builder D quoted $35,420 including GST and on 3 July 2013
builder M quoted $39,380 including GST.
19. However, the quotations from builde rs D and M included a complete
renovation of the bathroom which is not in accordance with the Panel’s
Determination.
20. The Panel’s Determination at paragraph 53 stated:
Case No: 300648 Determination Page 3 of 3
‘However, as noted, the Panel determines that the FSP is to indemnify the
Applicant for damage caused by the leaking shower (pipe), namely the damage
to the bottomplate between the bathroom and bedroom 2, and associated wall
linings, and any associated exploratory costs.’
21. The Applicant has been informed by FOS on several occasions that any
quotations were to be in respect to the determination in paragraph 53. The
Applicant’s builders’ quotation clearly exceeded the Panel’s Determination.
22. The FSP has provided an updated quote for the repairs detailed in the
Panel’s Determination in the amount o f $5,632. The Applicant has not
provided any evidence to support his view that this amount is insufficient to
meet the FSP’s obligations under the Determination. He has instead
provided quotations in respect of a scope of works which far exceeds the
Panel’ s Determination.
23. In the absence of any evidence that the FSP’s offer fails to meet its
obligations as determined, the Panel is satisfied that payment of this amount
would fully discharge its obligations in respect of this dispute.
Determination
24. Accordingly, the Panel determines that the FSP is only liable to cash settle
the Applicant’s claim for the amount of $5,632 including GST, in accordance
with the MK quotation dated 16 July 2013, less the policy excess of $500.