Text of the determination
Case No: 300561 Determination Page 1 of 7
Case number: 300561
General Insurance - Domestic Insurance - Residential Strata Title - FSP
Decision - Denial of claim (Flood)
20 March 2013
Background
1. The Applicant is a body corporate. The Applicant, through its broker,
arranged a residential strata policy with the Financial Services Provider
(FSP). The relevant period of insurance operated for twelve months
beginning from 31 May 2010. The policy covered the building and common
property in New Farm Queensland, up to a sum insured of $6,500,000. A nil
excess applied for most claims.
2. The Applicant lodged a claim for water inundation damage to the floor level
carpark. In particular, damage was sustained to the lift equipment and
internal doors and walls.
3. Damage was also sustained to the pool but the Applicant has not included
this in its dispute.
4. The FSP denied the claim on the basis the damage was due to “flood”. The
Applicant has disputed this.
Summary of Applicant ’s position
5. The Applicant’s submission is predominantly based on the FSP’s application
of the “Flood” exclusion to the circumstances of the loss. In particular, it
submits that:
The damage was not due to inundation by direct overland flow but
rather a combination of sewer overflow and backflow of flood waters
through the sewerage system.
As a sewerage system is not a natural watercourse or part of the river,
then any water which overflowed from it cannot fall within the policy
definition of “Flood”.
6. Further and in the alternative, as the electricity to the building was
disconnected, this resulted in the sewerage pumps not working. This in turn
caused the inundation as the combination of sewerage overflow and
backflow of flood waters would have been catered for by an operational
sewer pump. Given this, the proximate cause of the Applicant’s loss is the
Determination Determination
Case No: 300561 Determination Page 2 of 7
failure of the water pumps due to the interruption of the power supply, not
“Flood”.
7. The Applicant refers to a previous Determination issued by FOS (case
number 258547) in support of this alternative argument.
8. Based on the above, the Applicant seeks indemnity for the losses sought.
Summary of FSP’s position
9. The FSP relies on a hydrol ogist’s evidence and the following policy
provisions to substantiate its position:
“ General definitions – the meaning of some words ...
Flood
means when water that is normally contained in a Water Catchment
System increases because of rainfall or snow melt (whether in the
immediate region or elsewhere) or is deliberately released by an
authority, and the water overflows onto land that is not normally
covered by water.
...
Water Catchment System
means:
a . a river, creek, other natural watercourse or lake, whether they
are in their original state or have been modified, are named or
unnamed, or normally dry that only run during periods of rain;
b . a dam, reservoir, storm water channel or canal.
...
Exclusions – what we do not insure
1. We will not pay for loss or damage:
a . caused by Flood.”
Issue
10. Whether the FSP is entitled to deny the Applicant’s claim on the basis it was
due to “Flood”.
Reasons for decision
11. Due to the nature of the dispute, the parties have been informed that the
matter has been referred to the Panel for Determination in line with the
Operational Guidelines to the Service’s Terms of Reference. This dispute
has not been the subject of a FOS Recommendation and has proceeded
directly to Determination.
Case No: 300561 Determination Page 3 of 7
12. This decision has been made by a Panel consisting of an Ombudsman, a
representative with extensive experience in the insurance industry and a
representative with extensive experience in consumer claims.
13. The onus is on the Applicant to establish, on the balance of probabilities, that
it suffered a loss caused by a risk insured against (in this case, accidental
damage). Once this has been established on the face of the facts, the onus
shifts to the FSP to show, on the balance of probabilities, the claim falls
within an exclusion of the contract of insurance.
14. The Panel accepts the Applicant is able to establish a prima facie claim
given there is no dispute the loss was accidental. Accordingly, the onus is on
the FSP to establish the loss was proximately caused by “Flood”.
Hydrology evidence
15. The FSP has provided a copy of the hydrologist’s site specific report, which
is dated 18 November 2011 and contains the following of relevance:
The floor level of the carpark was inundated to a maximum depth of
between 250 and 400mm. The swimming pool at the rear of the
property was inundated to a depth of about 100mm.
Stormwater runoff from the driveway is collected in stormwater pits
which also drain to the river via the outlet pipes. Prior to the January
2011 event, these outlet pipes had flap valves fitted to prevent
backflow. However, these were washed away by the January 2011
event.
Sewerage from the property drains to a sealed sump under the floor of
the carpark and is pumped from there into the sewerage pipe in G
Street.
An insured’s representative p rovided the following version of events:
There is a sewerage surcharge point in the carpark which has
overflowed on previous occasions.
Power to the property was switched off at approximately 0830
hours on 12 January. As a result, the sewer pumps which would
have pumped away the sewerage stopped working.
They sandbagged all of the stormwater floor drains in the
carpark at about midday on 12 January. Water was about
halfway up the driveway at this time.
They also built a sandbag levee across the driveway and across
the entrance to the pool equipment room.
The initial entry of water into the basement was via the sewer
overflow point.
Water first entered the carpark between 3.00pm and 5.00pm on
12 January 2011.
Case No: 300561 Determination Page 4 of 7
They set up a pump to direct water from behind the levee back
to the river.
They have never previously had water in the basement except
by overflow from the sewer.
Hourly rainfall records were obtained from the Brisbane City gauge,
located 1.2km west of the property. The peak 1 hour rainfall intensity on
11 January 2011 was 12.6mm/hr which occurred on or around 1100
hours. A higher 1 hour period of rainfall (29 mm/hr) occurred in the
afternoon of 9 January 2011. Very little rainfall was recorded after 1800
hours on 11 January 2011.
The average recurrence i nterval (ARI) of rainfall periods were generally
less than 1 year. This indicates that higher peak rainfall intensities are
regularly experienced in Brisbane.
The estimated peak Brisbane River water level in the vicinity of the
property, based on information received from the Brisbane City Council,
is approximately 3.4m AHD. An interpolated graph was provided based
on the recorded water levels of the Brisbane River at the Brisbane City
Alert gauge (which is upstream of the property) and the Bowen Hills
Alert gauge (which is located 5km downstream of the property).
16. Following this, the hydrologist provided the following findings:
a. Given the fact local rainfall was not exceptional, stormwater runoff from
the local catchment would normally occur within 15 minutes and the
actual inundation occurred 15 hours after the rainfall ceased; the
property was not inundated by stormwater runoff.
b. The estimated Brisbane River water level in the vicinity of the property
would have reached the floor level of the carpark at approximately 1330
hours on 12 January.
c. If the sandbag levee had not been constructed across the driveway, the
carpark would have been inundated by direct overland flow. Further,
floodwaters through the site’s stormwater drainage system would have
occurred if the drain outlets had not been blocked by sandbags.
d. It is possible the carpark was inundated by the sewer pipe. Further, it is
likely floodwater entered into the sewerage system through inspection
openings, surcharge points and unsealed joints and cracks in the sewer
pipe network.
e. Once power was lost to the property, it is possible that sewerage
accumulating in the on-site sump could have overflowed through the
sewerage overflow point in the carpark. However, the initial inflow to
the carpark did not occur until approximately 6 hours after power was
lost. The timing of the initial inundation, which occurred at
approximately the same time that river levels reached the floor level of
the carpark, suggests that floodwater (via backflow through the sewer
system) played a role in the property’s inundation.
17. The hydrologist then concluded the following:
Case No: 300561 Determination Page 5 of 7
“The initial inundation of the carpark above floor level did not occur until about
15 hours after local rainfall had ceased. Hence, the subject property was not
inundated by stormwater runoff.
In our opinion, it is likely that the carpark of the subject property was
inundated above floor level by a combination of sewer overflow and backflow
of floodwaters through the sewerage system. With the limited available
information, it is not possible to accurately determine the relative contribution
of sewerage and floodwaters to the inundation of the carpark.
The swimming pool deck area at the rear of the subject property was
inundated by direct overflow of floodwaters from the Brisbane River.”
18. The FSP sought additional clarification from the hydrologist as to how the
water entered the sewerage system. The hydrologist responded in an email
dated 18 November 2011, that stated the following:
“Floodwater from the river flowed back through the stormwater drainage
system to inundate low-lying areas of New Farm, particularly around New
Farm Park, as show in Figure 5 of our report. Water overflowing from the
stormwater system would have spread across the ground and then entered
the sewerage system through inspection openings, surcharge points, joints
and cracks.
If the sewer pumps had kept working it is possible that the carpark would not
have been inundated. It would depend on the characteristics of the pump and
the details of plumbing connections between the sump and the street sewer
network.”
19. The Applicant has not disputed the hydrologist’s findings with respect to how
the property was inundated. In particular, it appears to accept that the water
which caused the damage for the items in dispute was a combination of
sewerage overflow and backflow of floodwaters, although the Applicant has
disputed the reference to the word “Flood” in these circumstances.
20. Having considered the hydrology evidence, the Panel accepts his conclusion
regarding the likely source and method of inundation. This is based on the
fact it is consistent with the objective data (i.e. rainfall recorded from a
station proximate to the property and river level data), is relatively consistent
with the Applicant’s evidence and plausible on the face of it.
21. In addition, the findings are not refuted by the Applicant and the hydrologist
is appropriately qualified to provide an opinion on this factual issue.
Power Interruption
22. The hydrologist conceded the possibility that the damage could have been
avoided if the sewer pumps had kept working. Although he i ndicated further
details would be necessary to conclusively determine this issue, it is clear
that there is a reasonable and probable prospect the inundation could have
been avoided if the sewer pump was operational.
Case No: 300561 Determination Page 6 of 7
23. The FSP sought additional information from company E regarding the power
interruption as E manages the power supply to this area. E responded to the
FSP’s enquiry in an email dated 21 December 2011, stating the following:
“In reply we advise that our records indicate that supply was disconnect ed
due to Brisbane floods around 1:15 p.m. on 12 January 2011 with the feeder
being restored around 4:00 p.m. on 15 January 2011.
In general, [E’s] response during the flood was to isolate all potentially
affected sites to ensure safety and then restore power gradually as the
affected sites were inspected or isolated.”
24. The FSP has relied on this email as evidence that the proximate cause of
the power interruption was “Flood”. However, the Panel considers this is
misconceived for a number of reasons.
25. Referen ce to the word “flood” has different usages and meaning depending
on its context. For instance, insurance policies can vary in how they
specifically define this term. Ordinary usage of the term, both by the ordinary
public and the media, can also vary. For instance, an event can be described
as “flood” because there was a significant accumulation of stormwater as a
result of intense rainfall. However, this can also be described as “flash flood”
(another term that can be defined differently by insurers). This illustrates the
fact that a party’s reference to “flood” should not be considered as
conclusive, particularly when the relevant contract has a specific meaning
that may be substantively different to the meaning that party attributed to the
word.
26. Further, it is this policy definition and its application to these facts that has
formed the substance of the Applicant’s dispute.
27. In this instance, “Flood” occurs when water normally contained in a “Water
Catchment System” overflows onto land that is not normall y covered by
water. Accordingly, if the FSP is to establish the proximate cause of the loss
was “Flood”, then the Panel must be satisfied the dominant and efficient
cause of the power interruption was due to the water normally contained in a
“Water Catchment System” overflowing onto land not normally covered by
water.
28. The email from E does not establish this. Instead, based on the Panel’s
reading, it appears the power interruption was a preventative measure in
anticipation of the potential risk of “Flood”. This, in the Panel’s opinion, does
not establish that the power interruption was actually proximately caused by
“Flood”.
29. In particular, there is no evidence to suggest that the power would have
been interrupted by a “Flood”, if E had not switched the powe r off.
30. Given this and bearing in mind the onus of proof borne by the FSP in respect
of a claim against accidental damage indemnification, the Panel is not
satisfied that the FSP is able to establish, on the balance of probabilities,
that the damage being claimed by the Applicant was proximately caused by
“Flood”.
Case No: 300561 Determination Page 7 of 7
31. Accordingly, the Panel accepts that the Applicant is entitled to be
indemnified for the items sought.
Determination
32. On the basis of the available information the Panel determines that the FSP
is required to indemnify the Applicant for the items being sought in this
dispute.
33. In the event any aspect of the claim is resolved by way of cash settlement,
the FSP is to pay interest on any sum paid in accordance with section 57 of
the Insurance Contracts Act 1984 from 1 April 2011 (the date it initially
denied the claim) to the date when payment is affected.