Determination 300537

Denial of concrete slab damage and quantum of restumping under storm water run-off claim

FirmFinancial Firm (Unknown - Insurer)
Decided2012-11-15
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded$5,200
Non-financial loss—
Amount claimed$10,400
SourceAFCA PDF

Summary

Following an earlier determination that stormwater damaged the home, the insureds disputed the concrete slab damage and restumping. AFCA found the slab cracking was not caused by the insured event, but ordered the insurer to cash settle 50% of the $10,400 restumping quote with statutory interest.

The insureds had to prove the slab damage resulted from the insured event, and as the insurer gave no expert view on restumping, AFCA resolved that item on a 50/50 basis.

Issues

Subjects and remedies

home or building damagenatural disasterpay claimpay interest

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Case No: 300537 Determination Page 1 of 5 Case number: 300537 General Insurance - Domestic Insurance - Home Building - FSP Decision - Denial of Claim - Storm Water Runoff - Quantum 8 November 2012 Background 1. On 7 November 2012, the Financial Ombudsman Service (FOS) issued a Determination in favour of the Applicants and against the Financial Services Provider (FSP). In part the Determination states: “48. On the basis of the available information, the Panel determines that the FSP must indemnify the Applicants for the loss sustained by stormwater run-off. The Panel accepts stormwater would have inundated the property to at least floor level. 49. The FSP is to prepare a scope of works to identify all damage caused by the stormwater run-off and an appropriate costing for the rectification of same. It is required to agree a costing with the Applicants and then cash settle the Applicants on that basis. 50. ... 52. If there are any issues which are unable to be resolved between the parties, these may be referred back to the service for further assistance.” 2. On 10 April 2012, the Applicants contacted FOS as a dispute had arisen over the extent of rectification to be provided for the repair/reinstatement of their home. Specifically the issue arose over whether the concrete slab was damaged by the insured event and whether the cost of repair/replacement should be covered by the FSP. The Applicants also queried whether the FSP should cover the cost of restumping the home and sought the return of some damaged items. 3. FOS sought a response from the FSP. The FSP considered that the damage to the concrete slab pre-dated the insured event and was not part of the claim. It declined to indemnify the Applicants for this part of their loss. 4. The Applicants seek a further Determination on this issue. Summary of Applicants ’ position 5. The Applicants say that the concrete slab and the stumps were damaged with the rest of the home as a result of the inundation by stormwater run-off. Addendum Determination Case No: 300537 Determination Page 2 of 5 It is their opinion that this was due to foundation movement at the time of the insured event. 6. They concede that the FSP has been helpful in some respects but seek the return of some items held by an agent of the FSP. Summary of FSP’s position 7. The FSP says that it has already cash settled the Applicants for $69,108.60 to address the damage covered within the scope of the original Determination. It later paid an additional $4,100 to cover the cost of plumbing works requested by the Applicants. The FSP considers that the concrete slab was not damaged by stormwater run-off and had been deteriorating over time. 8. It relies upon evidence and further reports from its experts on this issue. Issues 9. Whether the FSP has discharged its liability for the matter. 10. Whether the replacement of the concrete slab or the stumps should be covered within the proposed scope of works. Reasons for Decision 11. The Panel is satisfied that a full exchange of the relevant information has taken place between the respective parties and that each party has had the opportunity of addressing any issues raised. 12. Primarily, this further dispute centres around the specific issue of whether the FSP is liable to cover the Applicants for the possible replacement of the concrete slab of the home. It will also consider the potential for other issues, including the restumping of the house. Concrete slab 13. It is the Applicants’ contention that the concrete slab was damaged as a result of the run-off event that affected their home. They state that no prior issues had been present and distinct cracking developed with the concrete in the time immediately after the storm event. 14. The FSP retained an expert (FM) to visit the home and review the extent of the damage. FM, in an email dated 13 March 2012, formed the opinion that: “... the pattern of the observed cracking in the concrete slab is unintended stress relief mechanism in the absence of proper steel reinforcement as a result of the long-term concrete slab shrinkage. Case No: 300537 Determination Page 3 of 5 In addition, it is also likely that long-term consolidation of inadequately compacted fill material had occurred under the kitchen floor. [The expert’s] soil testing at this region on 6 April 2011 identified that the subject region is founded in very soft clayey silt/fill material, and it appears that the silt/fill material has undergone long term consolidation settlement due to inadequate bearing capacity of the soil foundation. In summary, in [the expert’s] opinion, the observed distress of the concrete slab does not appear to have been caused by the alleged flood event in January 2011...” 15. The damaged areas of the slab were identified in the kitchen, laundry, toilet and shower. 16. The concern is whether the cracking in the slab was a result of the effects of time, inadequate construction, the extraordinary effects of the stormwater run-off, some other hitherto unknown cause, or a combination of several contributing factors. 17. To be successful in their claim, the Applicants are required to show that the damage to the concrete was specifically related to an insured event. 18. In its report of 28 March 2012, FM reviewed the damage to the concrete floor carefully and expressed the opinion that the “distress” to the slab had occurred over a long period of time. The soil in which it resides is “... prone to long term settlement” and the slab was “constructed in unreinforced layers and sections leaving it unable to withstand the imposed pressure resulting from this settlement.” 19. FM considered that the crack from the laundry floor pre-dated the insured event and had been present for several years (based on the decay surrounding it). The crack in the kitchen was more recent but not considered claim related. Another crack has since had a timber floor constructed over it. 20. FM attributed the damage to the slab to poor foundation preparation, slab construction and site drainage. 21. There is no doubt that the Applicants’ slab has suffered cracking and is in need of repair, however that in itself is not sufficient to entitle the Applicants to indemnity. For this to occur the Applicants are required to show that the cracking resulted from the insured event. The Applicants have not provided any evidence to support their claim other than to reiterate their view that the cracking occurred at the time of the other damage 22. The Panel is of the view that there is no persuasive evidence that the insured event was the cause of the observed slab damage. In all likelihood, a number of factors have contributed to the cracking of the slab in certain places over an extended period of time, as deta iled in the engineer’s report, and the Panel is satisfied that these defects are not claim related. 23. On this basis, in the Panel’s view, the damage to the slab cannot be attributed to the stormwater run-off and therefore that the FSP is not liable to indemnify the Applicant for this aspect of the claim. Case No: 300537 Determination Page 4 of 5 Stumps and other issues 24. The Applicants were unhappy that the amounts allowed for in the scope of works did not reflect what the relevant items actually cost them to repair and/or replace. 25. The Panel notes that the Applicants secured their own builder to attend to the work at the home and were later drawn into a dispute (outside of FOS) over the work done. This dispute has since been resolved. 26. Insofar as the Applicants retained their own builder and he might have charged more than what the FSP’s contractors quoted, the Panel is of the view that the Applicants are not entitled to seek the difference. There is no evidence that the FSP refused to attend to the work or that the cost of such work was unreasonable. 27. Therefore the Panel determines that the FSP is not required to pay any additional costs in respect of the scope of work agreed and quoted. 28. The Applicants’ builder quoted to restump the home and the Applicants question whether this should be included in the work to be undertaken by the FSP also. 29. Whilst the Applicants retained a builder to attend to this work (and the Panel has no doubt that it was required), this of itself was not determinative of whether the FSP should cover the restumping of the home. 30. It was noted in the Determination that there appeared to be considerable damage to the stumps that pre-dated the insured event, although CL for the FSP conceded that “ i t’s possible some of the damage to the stumps could have been exacerbated due to the storms.” 31. The FSP had not included any allowance for this aspect of the claim; the scope of works drafted by BB does not appear to include any allowance for the restumping of the home. 32. Bearing in mind the original Determination, the failure of the FSP to address this or provide specific expert opinion on this issue causes difficulty in addressing this aspect of the dispute. 33. The only basis for determining an appropriate amount is that provided by the Applicants’ builder CW. The quote from CW includes an amount of $10, 400 plus GST for “restumping works. In the circumstances, given the time that has elapsed in this dispute the Panel believes it is fair in all the circumstances to resolve this dispute on a 50/50 basis. As the quotation is for $10,400 the Panel determines that the FSP is to cash settle the Applicants for an amount of $5,200 (subject to applicable GST) being 50% of the restumping works. 34. The Applicants also raised the issue that some of their items were given to a service provider for the FSP to restore and they had not been returned. The Case No: 300537 Determination Page 5 of 5 Case Manager discussed the matter with the male Applicant and confirmed that these items have since been returned to them. 35. The male Applicant further suggested that the returned state of the items were not to his liking, although this has not been raised with the FSP or the service provider. No formal complaint was raised with the Service or the FSP and no opportunity has been given for the issues to be addressed. In the circumstances, the Service proposes to take the matter no further in this Addendum Determination. Determination 36. On the basis of the available information and the above reasons, the Panel determines that:  the FSP is not liable to cover the Applicants for the damage to the concrete slab; and  it must settle the Applicants for 50% of the cost of re-stumping the property by payment of a sum of $5,200 (subject to GST). 37. The FSP is required to include interest at the statutory rate from 5 March 2011 until the date of payment. 38. Payment of this amount will satisfy in full the FSP’s obligations with repect to this dispute.