Determination 299771
Hail damage roof claim limited to assessed insured-event damage
Summary
The applicants claimed full reglazing of their polycarbonate roof after a December 2011 hail storm and rejected the FSP's offer. AFCA found the roof damage was largely wear and tear from lack of maintenance and that the FSP's liability was limited to damage caused by the insured hail event.
Loss arising from wear and tear and lack of maintenance is excluded, so the FSP may limit indemnity to damage caused by the insured storm event.
Issues
- Claim denial primary · not upheld
“The FSP was entitled to reduce its liability to the Applicants under the claim in line with the relevant policy provisions.”
- Claim amount dispute secondary · not upheld
“The FSP is only liable to provide indemnity for the costs involved in the repair of the damage assessed to be the result of the insured event.”
Subjects and remedies
home or building damagenatural disasterno remedy
Text of the determination
Case No: 299771 Determination Page 1 of 7
Case number: 299771
General Insurance - Domestic Insurance - Home Building - FSP Decision -
Denial of claim
30 April 2013
Background
1. The Applicants held a Home Building and Contents Insurance policy (the
policy) with the Financial Services Provider (FSP).
2. A claim was lodged under the policy for damage to the insured building
which occurred during a significant hail storm in the vicinity of the property
on 25 December 2011.
3. The FSP accepted the claim however limited its liability under the claim to
damage it assessed to be due to the insured event.
4. The Applicants remain dissatisfied with the FSP‟s final decision and are
seeking complete indemnity for their loss under the policy.
Summary of Applicants’ p osition
5. The Applicants‟ polycarbonate Perspex dome ceiling/roof was severely
damaged during a significant hail storm in December 2011.
6. The severe hail storm caused polycarbonate 4.55mm atrium curved dome
roof sheeting to dislodge from the roof frame. The roof seals have broken
which allows stormwater ingress into their home.
7. There were no issues with the roof prior to the storm. Maintenance works
had not been carried out due to the difficulty of access to the point of
rainwater given the steep gradient surrounding the metal deck roof and
obvious high cost of repairs.
8. The Applicants believe due to the difficulty in accessing the damaged area
none of the FSP‟s appointed consultants actually accessed the area of
concern seeing it was too dangerous. The Applicants were advised that the
whole roof would be tarped as a make safe measure, however only the front
section was covered leaving the rear (major leaking section) without cover.
9. The FSP had requested the Applicants to obtain their own quotes to repair
the roof and internal damage, which the Applicants arranged and submitted
Determination
Case No: 299771 Determination Page 2 of 7
to the FSP. However, its offer of settlement is ridiculous and does not even
account for a quarter of the actual costs to undertake the necessary repair
works.
10. The Applicants have been living in distress and fail to see why the FSP is not
accepting to cover them for the damage. There is an obvious opening in the
roof which is clear to the eye and requires immediate attention. They are
seeking for the FSP to repair, rebuild or pay them the cost to repair or rebuild
the damage i.e. the FSP accept complete responsibility for the assessed
damage.
Summary of FSP’ s position
11. It is an accepted principle of insurance law that the onus rests with the
Applicants to establish the loss claimed was due to an event insured under
the policy. The FSP does not accept the Applicants have been able to
establish the damage claimed is due to an insured event.
12. The FSP appointed several consultants‟ to the claim to inspect the damage
claimed and determine the cause and extent of the loss. The opinions
provided by the consultants establish that there was no evidence that the
loss was claim related, rather was consistent with poor maintenance and
wear and tear.
13. The FSP acknowledges receipt of the Applicants‟ quote of repairs however
maintains it includes repairs which are not included in the approved scope of
works (SOW).
14. Accordingly, the FSP maintains it was entitled to limit its liability under the
claim to only that damage which was found to be due to the insured event.
15. The FSP relies on the following policy provisions:
“ Important Information
This policy does not cover some events, circumstances and situations
As you read through this policy, you will see there are some events,
circumstances and situations it does not cover. To make sure you are aware
of these exclusions, please read the whole policy carefully including the
section
…
What We Cover – Insured Events
You are covered for damage or loss to your home building occurring during
the period of cover and caused by the following events:
Storm and rainwater including stormwater runoff from areas surrounding the
site, or water escaping from any water main, drain, pipe, street gutter,
guttering or surface
The Claim
Case No: 299771 Determination Page 3 of 7
If we agree to pay a claim for loss, theft or damage to the building, we will
decide if we will:
Repair damage to the building
rebuild the building
pay you what it would cost us to repair or rebuild on a new for old basis
…
What We Do Not Cover - General Exclusions
You are not covered under any section of the policy for damage, loss, cost or
liability caused by or arising from or involving:
wear and tear, rust, deterioration or corrosion
…
Damage or loss caused by water seeping into or otherwise entering your
building due to:
a defect or fault in the design, structure or construction of your building where
you could reasonably be expected to be aware of the defect or fault, building
alterations, renovations or additions. ”
Issue
16. Whether the FSP was entitled to deny liability to the Applicants under the
claim in line with the relevant policy provisions and having regard to the
circumstances of the loss.
Reasons for Decision
17. As advised to the parties, FOS has considered it appropriate to expedite the
dispute in accordance with the Operational Guidelines to the FOS Terms of
Reference. This is due to the circumstances of the dispute. This dispute has
not been the subject of a FOS Recommendation and has proceeded directly
to Determination.
18. I have reviewed the submissions of the parties in relation to the terms and
conditions of the policy and will only refer to the relevant submissions and
materials raised.
19. I am satisfied the parties do not dispute the following:
The Applicants held a current home building and contents insurance
policy with the FSP at the time of loss.
The FSP provided and the Applicants received the relevant policy
documentation including the Product Disclosure Statement (PDS).
A significant hail storm occurred in the vicinity of the insured property
on 25 December 2011.
Case No: 299771 Determination Page 4 of 7
The insured building did sustain damage arising from the hail storm
however the extent of the damage remains in contention between the
parties.
The policy provides indemnity for loss or damage arising from a hail
storm, this being considered an insured event.
The FSP has accepted to provide inde mnity for the resultant internal
water damage however declined cover for the external roof.
The Applicants did not undertake maintenance works on the roof due to
the difficulty of access and given the steep gradient surrounding the
metal deck roof and obvious high costs involved.
20. I have been provided with various consultants‟ reports commissioned by the
FSP in its effort to establish the cause and extent of the damage subject to
the claim. I am satisfied that these reports have been exchanged between
the parties, each having had the opportunity to comment. In the interest of
brevity I will only reiterate information from these reports I find necessary in
providing this Determination.
C’s Report dated 3 January 2012
Found where the (roof‟s) edges have been se aled with sealant it
appeared to have broken down and allowing water ingress to occur.
In C‟s opinion, the installation project was very poor and C suspected
that the Applicants had been aware of this prior to the date of loss.
There are serious defects at the house which the builder or owners are
responsible for.
The damage caused by the insured event includes a broken skylight
cover and broken glass to downstairs window. There was very little
internal damage as most of the surface was either glass or tiles.
FSP Assessor’s Report
An assessment at the insured property was undertaken on 10 January
2012.
The inspection confirmed both plaster ceilings (games room & alcove)
had water damage.
Inspection of the dome showed the panels had shifted from their top
hast mountings and appeared to be caused by undue flexing.
The inspection was only conducted from floor level as the roof was too
high and would require appointment of a builder to inspect. No hail
damage was noted from ground level.
The Applicants were advised the FSP would cover damage to internal
ceilings under the claim.
Case No: 299771 Determination Page 5 of 7
SR’s (Roof Specialists) Report
The consultants attended the insured address on 1 May 2012 to
complete an assessment of the roof.
It noted previous attempts to repair leaks had been made on the roof by
applying sealant to the join strips.
Glass windows also had ongoing leaks due to poorly sealed flashing at
the rear of these.
A combination of three types of materials (steel, Perspex and
aluminium) used in the construction of the roof has resulted in
expansion and contraction between these materials over time.
Along with the occasional buffeting of strong winds, this (expansion and
contraction) has caused the joiners between the Perspex sheets to
open and allow water ingress.
A large indentation on the Perspex roof noted and likely outcome was
impact by falling antenna which had been recently replaced as the old
antenna was found lying on the ground nearby.
The described items are not the result of recent hail related damage,
and are due to long term maintenance issues.
Damage from hail event was to a lower north facing skylight and one
panel damaged by antenna (although C couldn‟t be sure whether the
antenna damage occurred during the most recent storm event).
The assessment required five persons, access scaffolding, an
extensive guy rope system, harness and a ridge creeper.
Many obvious joins in the Perspex roof were sealed during the
assessment and the tarpaulin was re-installed on the front upper roof.
JS’ Expert Assessment Report dated 26 August 2012
An inspection of the metal deck roof and associated flashings found
that there was only one area of rainwater ingress emanating from any
metal roof flashings all metal roof system. That was an area to the
south side of the roof where destructive testing has not been reinstated
and there was an obvious opening in the roof due to a failure to
reinstate past destructive testing.
It was their professional opinion that the vast majority of leakage was
emanating from deteriorated synthetic flashings at the base of the
Perspex vaulted roof immediately above both sides of metal deck
roofing. This deterioration presented as obvious maintenance works
and JS found no on-site evidence to give credence to any contention
that leakage was the result of a storm created opening source storm
event.
The inspection specifically of the Perspex roof found „ NO ‟ evidence that
was consistent with hailstone damage or a storm created opening. The
only possible storm damage was to a plastic skylight dome.
Case No: 299771 Determination Page 6 of 7
Js made the following recommendations:
the plastic skylight dome be replaced as part of storm damage
works.
the Applicants engage experience tradesmen, both a Perspex
installer and a licensed roof plumber to attend to obvious
maintenance issues that are present in the area of the barrel
vault roof identified in this report.
21. I note the Applicants have made available a quote dated 28 May 2012 for
repairs from their preferred repaired „A‟ in the amount of $142,251 which is
exclusive of any special site conditions, OH&S requirements and
computations, planning/building permits and compulsory insurance. The
scope of works would include the reglazing of the entire existing barrel vault
(roofing) along the ridge of the home in a dark grey polycarbonate.
22. It is an accepted principle of insurance law that the onus rests with an
insured to prove, upon the balance of probabilities, that they have sustained
a loss caused by an event insured for under the policy in force at the date of
loss ( Regina Fur Co. Ltd v Bossom (1957) 2 Lloyd’s Rep 466) .
23. There is no dispute the property sustained some hail related damage in t he
hailstorm on 25 December 2011. The onus therefore shifts on to the FSP to
establish an entitlement to reduce/limit its liability under the claim in line with
the provisions of the policy.
24. The available consultants‟ reports are significantly consistent in respect to
their findings i.e. there was some minor damage associated with hail impact
however the majority of issues with the roof and cause for water ingress
were related to a lack of maintenance and wear and tear. It has not been
disputed by the Applicants that maintenance works were not carried out in
respect to the roof due to difficulty of access and given the steep gradient
surrounding the metal deck roof and obvious high costs involved.
25. In the absence of any evidence to the contrary I am satisfied that the
consultants‟ opinions (including photographic evidence) establish, on the
balance of probabilities, that the polycarbonate Perspex dome roof was
subject to significant wear and tear arising from a lack of maintenance over
its lifetime. Loss or damage arising from such circumstances is excluded
from cover under the policy.
26. Accordingly, I am satisfied that the FSP is not obliged under the policy to
provide indemnity to the Applicants for the complete reglazing of the
polycarbonate Perspex dome roof as expected by the Applicants and quoted
by A.
27. The FSP (in addition to accepting to cover the internal water damage) is only
liable to provide indemnity to the Applicants for the costs involved in the
repair of the damage assessed to be the result of the insured event i.e.
skylight cover, broken window glass and allowing the benefit of the doubt,
the damaged Perspex sheet damaged by impact of the falling antenna.
Case No: 299771 Determination Page 7 of 7
Determination
28. On the basis of the available information I determine that the FSP was
entitled to reduce its liability to the Applicants under the claim in line with the
relevant policy provisions and circumstances surrounding the loss.
29. Accordingly, the FSP‟s l iability under the claim is limited to the broken
downstairs window, cracked skylight screen and the Perspex sheet
damaged due to impact from the falling antenna.