Determination 299058
Cash settlement amount for storm-damaged retaining wall disputed
Summary
The insured disputed the FSP's cash settlement for a retaining wall damaged by a neighbour's burst pipe, arguing for higher quotes and underpinning. AFCA removed the 20% deduction, added underpinning, ordered the balance paid with interest, and kept the FSP's builder.
Underpinning the neighbour's property was a necessary cost of repairing the covered damage, and the FSP could not make an unexplained 20% deduction for pre-existing damage or shared-wall benefit.
Subjects and remedies
home or building damagepay claimpay interestrepair or rectify
Text of the determination
Case No: 299058 Determination Page 1 of 7
Case number: 299058
General Insurance - Domestic Insurance - Home Building - FSP Decision -
Claim amount
21 May 2013
Background
1. The Applicant and her husband are insured under a home building and
contents policy with the Financial Services Provider (FSP). The relevant
period of insurance is 24 October 2011 to 24 October 2012.
2. On 7 March 2012 the Applicant contacted the FSP to lodge a claim as a
result of damage caused to a retaining wall on the property. It was reported
the damage was caused by a burst pipe on a neighbouring property.
3. Make safe repairs were undertaken to restrain the retaining wall. The FSP
accepted the claim and obtained engineers’ reports, scope of works and
quotes based on the scope of works.
4. The FSP offered cash settlement for repairs for the amount of $86,885 less
the policy excess of $500 on the basis that it was only obliged to pay:
80% of $102,794 (incl GST) to repair the damaged section of the
retaining wall: $82,235.20;
$750 policy matching benefit;
$4,400 for alternative accommodation – 8 weeks @ $550 per week.
The Applicant rejected this offer and asked for reconsideration by the FSP.
5. The FSP reviewed its offer of settlement and increased its offer to
$102,635.20 less the policy excess of $500. Its offer comprised of:
80% of $102,794 (incl GST) to repair the damaged section of the
retaining wall: $82,235.20;
80% of $20,000 (incl GST) to replace the remaining undamaged portion
of the retaining wall: $16,000; and
$4,400 for alternative accommodation – 8 weeks @ $550 per week.
The FSP paid the amount of $102,135.20 to the Applicant.
6. The Applicant has referred this matter to the Service as she does not believe
the FSP ’s settlement amount is sufficient for the repair of the retaining wall.
Determination
Case No: 299058 Determination Page 2 of 7
Summary of Applicant’s position
7. The Applicant is dissatisfied the FSP has based its settlement offer on the
lowest quote obtained. She says the quote was based on a deficient scope
of works.
8. The Applicant says the underpinning of the neighbour’s property is part of
the repair process required. Accordingly, the cost to underpin the
neighbour’s property should also be factored into the settlement to her. The
neighbour will not allow access for repairs until such time as a guarantee is
given for the repairs to be conducted.
9. The Applicant is dissatisfied the FSP has deducted 20% from the settlement
amount on the basis it says the neighbour obtains a benefit from the
retaining wall as well as it being a shared wall.
10. The Applicant says she owns the full 100% portion of the retaining wall.
11. The Applicant says quotes to properly repair the retaining wall range
between $350,000 and $450,000.
Summary of FSP’s position
12. The FSP asserts it is entitled to maintain its current settlement offer for the
following reasons:
the Applicant has not provided sufficient evidence to suggest why it
should increase its offer;
the damage has been known to the Applicant since 2011 which is
proven by the previous claim where damage to the retaining wall was
denied;
the reports from the engineer indicate that the damage is only evident
to a portion of the retaining wall and not the entire retaining wall. The
Product Disclosure Statement (PDS) supports its decision to cover only
the damage areas;
reports obtained from the surveyor state the retaining wall is s hared on
both properties;
the engineer reports state the retaining wall benefits both properties;
the retaining wall was not damaged entirely and solely by the burst
pipe. Other factors included causes which are excluded under the
policy.
13. The FSP relies on the following policy provisions:
“ The policy doesn’t cover everything
General exclusions-apply to the overall policy
Unless included in additional cover, we will not cover loss, damage or legal
liability caused by:
Case No: 299058 Determination Page 3 of 7
...
wear and tear and a lack of maintenance, including rust, corrosion,
deterioration, except in the case of escape of liquid (refer page 21), or
legal liability claims;
gradual loss or damage of any kind;
structural defects and faulty workmanship in the construction of the
building or lack of maintenance to the building and/or contents;
...
erosion or earth movement including shrinkage;
subsidence and landslide, address it happens immediately following
an earthquake or explosion;
...
Events you are covered for
The following insured events apply to both building and contents cover under
the residential investment home packages subject to the exclusions set out on
pages 18 to 20 and any additional exclusions set out below.
Insured events
We will cover you for loss or damage to your building and/or contents caused
by the events and detailed in this section. The loss or damage must occur at
the insured address.”
Issue
14. Whether the FSP’s offer of settlement fulfils its obligations under the terms
and conditions of the policy.
Reasons for decision
15. FOS has considered it is appropriate to expedite the dispute in accordance
with clause 8.6 of the FOS Terms of Reference. This is because of the
substantive quantum involved. This dispute has not been the subject of a
FOS Recommendation and has proceeded directly to Determination.
16. This decision has been made by a Panel consisting of an Ombudsman, a
representative with extensive experience in insurance industry matters and a
representative with extensive experience in consumer claims.
17. There has been an exchange of material between the parties. For the sake
of brevity, the Panel does not intend to recite material in this Determination
except where considered relevant to the FSP’s decision to deny the claim.
18. It is not in dispute that an event covered by the policy has caused damage to
the retaining wall. What is in dispute is the FSP’s offer of settlement for the
repairs to the retaining wall.
Case No: 299058 Determination Page 4 of 7
19. The Panel notes the FSP’s reference to policy exclusions. However, the
Panel is uncertain as to how these exclusions apply. The FSP has not
provided a succinct argument in regards to exclusions applying to this case.
Rather, it has taken a broad approach in referring to several exclusions
without identifying the application as to how the exclusions apply.
20. The Panel notes the FSP’s settlement offer included a deduction of 20% for
pre- existing damage. The Panel is unable to find anywhere in the FSP’s
submission or material the basis of this figure.
21. The FSP has also made reference to the retaining wall being a shared wall
as well as providing a benefit to the neighbour’s property. The Applicant says
she is 100% responsible for the retaining wall. The information provided
would suggest that the retaining wall is predominantly contained within the
Applicant’s property.
22. The Panel is satisfied the Applicant is responsible for the retaining wall and
therefore no deduction should be made in the settlement on the basis that it
is a shared wall. The fact the wall may provide a benefit to the neighbour is
not an issue.
23. Without a proper basis as to how the FSP arrived at a 20% deduction the
Panel does not consider this allowance should be factored into the
settlement.
24. Further, the Panel notes damage to the retaining wall was brought to the
FSP’s attention in October 2011, approximately two months prior to the
discovery of the burst pipe. There is nothing to suggest the pipe was not
leaking at that time. There is no suggestion the FSP gave advice to the
Applicant at that time to take remedial action.
25. The Panel notes the policy covers loss or damage at the insured address.
Under the policy for “settling building claims” the Applicant is covered for the
costs which are incurred to repair or rebuild the damaged part of the
building.
26. In this case to undertake the repairs properly to the retaining wall,
underpinning must take place to the neighbouring property. The FSP has
excluded the cost of repairs for underpinning from its offer of settlement.
27. However, the Panel would consider that the cost of underpinning, even
though it is to the neighbour’s property, is still a cost that needs to be
incurred to repair the damage.
28. The Panel therefore opines that the cost of underpinning should be included
in any repair costs offered to the Applicant.
29. The builder (AS) on whose quote the FSP has relied upon also quoted an
amount of $41,975 for the underpinning. The FSP is to pay this amount to
the Applicant.
Case No: 299058 Determination Page 5 of 7
30. The Panel notes the Applicant’s concern regarding the scope of works relied
upon and the fact that the builder (AS) on whose quote the FSP has based
its offer on makes no allowance for variations.
31. The Applicant says she prefers the higher quotes obtained as being a more
accurate cost of repairs. The FSP says these quotes are overinflated and
that the builders do not want to undertake the work. There is no substantive
evidence that any of the other builders did not want to take the work.
32. Nonetheless, the policy allows the FSP to pay the amount it determines to
be the reasonable cost in repairing the damaged part of the building. AS has
established his cost for identified repairs and the FSP was entitled to rely on
his quote.
33. The Panel is conscious that this is a complex matter in regards to the repair
of the retaining wall and it certainly does not want to see the Applicant
financially disadvantaged due to the FSP’s decision to cash settle and not
undertake the repairs.
34. Therefore the Panel believes it appropriate in this case to consider clause
8.2 of the Terms of Reference which states:
“ 8.2 Dispute resolution criteria
Subject to paragraph 8.1, when deciding a Dispute and whether a remedy
should be provided in accordance with paragraph 9, FOS will do what in its
opinion is fair in all the circumstances, having regard to each of the following:
a) legal principles;
b) applicable industry codes or guidance as to practice;
c) good industry practice; and
d) previous relevant decisions of FOS or a Predecessor Scheme (although
FOS will not be bound by these). ”
35. The Panel, having previously met and deliberated upon this matter on 18
March 2013, was prepared to issue this Determination on 25 March 2013.
However, on 18 March 2013, the Applicant had also submitted additional
information in respect of the complaint (of which the Panel was unaware on
18 March) which required consideration and e xchange with the FSP. As a
result, further exchanges occurred between the Complainant and the FSP.
The FSP and the Applicant were fully informed of the timing issues
described above.
36. The Panel then met again on 15 May 2013 and discussed these exchanges,
with the information contained therein. All of this material has been carefully
considered by the Panel. Pursuant to those deliberations and
notwithstanding the additional material adduced by the Applicant and the
FSP’s responses, the Panel considers its ori ginal reasoning in respect of this
matter remains apposite. Accordingly, the Panel determines as iterated
below.
Case No: 299058 Determination Page 6 of 7
37. Although the Applicant may have concerns, the Panel determines the
Applicant is to allow AS to undertake the repairs. However, if there are
further costs that are identified by AS as part of the repair process, then
these costs should be borne by the FSP. The Applicant should obtain any
quotes or invoices from AS and pass them on to the FSP for payment.
Insofar as the neighbours’ alleged intrans igence in respect of access
continues, the Panel would expect AS, with the assistance of Gold Coast
City Council, to effect the necessary access permission. The FSP is to retain
full responsibility for tasking AS with the entirety of the repair process; in the
event AS is not prepared to now undertake these repairs, the FSP is
required, as a matter of urgency, to source a builder who will undertake the
necessary repairs including the requisite access permission of the
neighbours.
Determination
38. On the basis of the available information the Panel determines there is no
basis to allow the FSP to deduct 20% from the settlement in respect of repair
to the damaged wall on the basis of pre-existing damage or the retaining wall
being a shared wall. The FSP is to increase its offer by $20,558.80, giving a
total of: $102,794.
39. The FSP is to maintain its payment towards replacement of the remaining
undamaged wall, but is not to deduct a 20% contribution: that is, the FSP is
required to pay $20,000 in lieu of $16,000 referred to in paragraph 5 above.
40. The offer of the FSP of $4,400 for alternative accommodation (8 weeks at
$550 per week) is to be maintained and extended, if required, depending on
the length of time taken by the FSP’s preferred contractor AS or any other
competent contractor, should AS not elect to undertake the work.
41. The FSP is also to pay the Applicant the further amount of $41,975 to cover
the cost of underpinning.
42. The total of the above is $169,169 with the excess deducted provides:
$168,669. It is now clear from the material before the Panel the FSP has
already paid its final offer figure of $102,135.20 to the Applicant. The FSP is
to cash settle the outstanding balance of $66,533.80 with interest at the
statutory rate applying from the date the FSP made its revised offer of
$102,135.20 to the Applicant to date of acceptance of this Determination by
the Applicant.
43. In addition the FSP is to make payment to the Applicant for any unidentified
costs which may arise for repairs that are required to be undertaken by AS
or any other competent contractor as alternate to AS. In the event AS is no
longer prepared to undertake the entirety of the repair process, the FSP, as
a matter of urgency, is to source a builder who will undertake the repair
process on the same basis as outlined in paragraph 37 above. The FSP is to
make payment on the availability of an invoice or quote. As the total home
Case No: 299058 Determination Page 7 of 7
sum insured is $277,745 the amount available under this provision will be
$109,076 being the house sum assured less the pa yment of $168,669.