After a fire and subsequent demolition of a farm home, the FSP deducted $64,251 demolition and debris costs from the building settlement. AFCA ordered the FSP to pay the full $280,000 sum assured plus the $64,251 demolition amount as an additional benefit, with no interest.

The panel found the policy wording ambiguous and construed it against the FSP as drafter, so the demolition costs were payable as an additional benefit over the sum insured.

Issues

Subjects and remedies

home or building damagepay claim

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Case No: 299018 Determination Page 1 of 6 Case number: 299018 General Insurance - Domestic Insurance - Home Building - FSP Decision - Claim amount 26 March 2013 Background 1. The Applicants incepted a farm insurance policy with the Financial Services Provider (FSP) on 19 July 2011 which included cover for the home building and contents. 2. On 27 April 2012 a fire occurred in the home building causing damage to the insured property and a claim was lodged under the policy. The FSP appointed a loss assessor to attend the property and report on the damage. 3. In his report dated 30 April 2012 the building was described as an older style dwelling constructed of timber frame having exterior fibro cement asbestos walls and interior walls and ceilings of combined asbestos sheeting and old hair type plaster. 4. It was arranged for a building consultant to provide a scope of works and quotes for repairs were obtained based on the scope of works. The building consultant noted asbestos related material needed to be attended to by an asbestos remover. 5. The FSP initially deemed the building to be a repairable proposition based on initial reports. Temporary accommodation was arranged for the Applicants. Contents were deemed a total loss due to friable asbestos damage and the FSP paid the sum insured for contents noted on the policy. Arrangements were made to have the asbestos removed from the site. 6. However, during this process there became an issue with subsidence damage caused to the building due to the volume of water used to extinguish the fire. In light of the subsidence damage and asbestos issue, it was deemed that the building should be treated as a total loss and be completely demolished. The building was demolished at the FSP‟s request. 7. The FSP offered settlement on the buildings sum insured of $280,000 less $64,251 for demolition and removal of debris costs advising its liability in response to the building claim was therefore $215,749. 8. The Applicants dispute the FSP‟s entitlement to deduct the demolition and removal of debris costs from the settlement of the claim. Determination Determination Case No: 299018 Determination Page 2 of 6 Summary of Applicants ’ position 9. The Applicants say they were advised that demolition costs would not be deducted from the building sum insured based on enquiries made to the FSP. 10. They say their email enquiry of 31 May 2012 to the FSP regarding demolition costs was not responded to. 11. They say after they found out the building was demolished they were told no matter what the cost was to demolish the building the cost would not come out of the sum insured. 12. They say the FSP has confirmed this in its notes of 6 July 2012 that they were told that the cost of demolition works for the building was not deducted from the sum insured. 13. The Applicants say they were never informed of the cost for the removal of asbestos and debris. They accept that a qualified person is required to remove the asbestos but they say the demolition of the building would have been able to be completed by them had they known the cost was going to be deducted from the sum insured. Summary of FSP’s position 14. The FSP says it is entitled to deduct from the settlement amount the cost of demolition and asbestos removal. 15. It says if it is found that representations were made, the Applicants have not been sufficiently prejudiced such that equity would intervene and it would not be estoppped from deducting the costs from the settlement. 16. The FSP says in terms of payment of monies the Service should not order it to make any payment to any particular person and that the Service should determine that:  The FSP has a liability to indemnify under the policy the sum of $280,00 for damage to the buildings at the property;  The FSP has already made payment in the sum of $64,251 in partial discharge of its liability.  In respect of the balance of $215,749 it is not obliged to pay that balance or any part thereof until the Applicants or their financial institution: - It is agreed upon a direction to be given to it about payment of the balance, or - In the absence of such an agreement, a Court has determined which of those parties it is obliged to make the payment of the balance to. Case No: 299018 Determination Page 3 of 6  Further or alternatively, FOS should consider that because the financial institution has an interest and cannot participate in the FOS forum, it should determine that FOS is an inappropriate forum and the dispute should be addressed by a Court 17. The FSP relies on the following policy provisions: “ (4) If you have a valid claim under Section 2 for loss, destruction, or damage to the Home Building or Contents, we will also insure you for the following Additional Benefits. You must obtain our written consent prior to any cost being incurred. Additional Benefit Limits to Additional Benefits , not in addition to the Sum Insured unless otherwise stated (b) Extra Costs We will pay for the reasonable incurred costs of temporary protection, demolition, and removal and disposal of debris.” Issue 18. Whether the FSP was entitled to deduct the demolition and removal of debris costs from the building settlement amount. Reasons for decision 19. Due to the nature of the dispute, this matter has been referred to the Panel for Determination in line with the Operational Guidelines to the FOS‟s Terms of Reference. 20. The Panel consists of an Ombudsman, a representative with extensive experience in insurance industry matters and a representative with extensive experience in consumer claims. 21. An exchange of the information submitted by the parties has taken place between each party and each has had the opportunity to address any issues raised. 22. The Panel does not intend to recite details of the information in this Determination except where it is considered relevant. Jurisdiction 23. The FSP has raised the issue that the Service is not the appropriate forum to deal with this dispute. This is because the building was under a mortgage with a financial institution at the time of the loss. The Service has dealt with building disputes previously when the property was under a financial Case No: 299018 Determination Page 4 of 6 encumbrance and there is no involvement with the financial institution, as with this case. 24. As the nature of the dispute entails the FSP‟s liability to deduct monies from the settlement which it says it is entitled to and the Applicants disagree with this, the Panel sees no valid reason as to why it cannot proceed to determine this matter in accordance with the Service‟s Terms of Reference. 25. The issue as to whom the FSP pays the monies to for the building claim is a matter that can be addressed by the parties following the determination taking into account their obligations under the Credit Act. Deduction of the costs of demolition and removal of debris 26. The FSP has deducted the amount of $64,251 from the sum insured of $280,000. The $64,251 was made up of two amounts:  $22,858.00 (for the removal of friable asbestos and contents)  $41,383.00 (asbestos removal and demolition of property). 27. The Panel notes the Applicants emailed the FSP on 31 May 2012 asking: “Also, is the removal of contents and debris material does that come out of the house insurance or is it separately insured, the policy I read is a bit unclear”. 28. The FSP did not respond to the email. 29. Nevertheless, the Applicants have indicated they were later advised by the FSP that the disputed costs were an additional benefit and not deducted from the sum insured. This was in a phone conversation that took place on 6 July 2012. 30. The FSP says the conversation addressed the proposed deduction of an overpayment for accommodation from the settlement amount and it may be that there is some confusion as to what was said to the Applicants in relation to the cost of the demolition works. 31. Although the Applicants may have been confused as to the demolitions costs prior to the phone call, the Panel observes this was no longer the case as according to the note transcribed onto the FSP‟s file record it states: “(2) deduct the overpayment of $12,580.50 from building settlement [male Applicant] advised the shed was already delivered. Advised that the cost of demolition works of the building is NOT taken from the DH sum insured, the additional benefit looks after this therefor (sic) whatever the agreed settlement is, they will only be $12,580.50 out of pocket. He seemed to have accepted this in light that he through (sic) the demolition costs was incl in the DH sum insured.” 32. The FSP says that the question is whether assuming that a representation was made it should be estopped (prevented) from deducting the costs of demolition and removal. Case No: 299018 Determination Page 5 of 6 33. It says to establish an equitable estoppel, the Applicants must prove each of the following elements:  The Applicants assumed a particular legal relationship existed, or would come to exist, between the Applicants and the FSP;  The FSP induced the Applicants to adopt that assumption or expectation;  The Applicants acted or abstained from acting on the faith of the assumption or expectation;  The FSP know of the Applicants‟ action or intended the Applicants to act in that way;  The Applicants‟ action or in action will cause them to suffer detriment if the assumption or expectation is not fulfilled; and  The FSP has failed to act to avoid the detriment by fulfilling the expectation or otherwise. 34. However, notwithstanding the FSP‟s arguments in relation to estop pel, the Panel has a fundamental issue with the relevant wording of the PDS. ‘Additional Benefit’ is qualified by ‘Limits to Additional Benefits, not in addition to Sum Insured unless otherwise stated’ of which relevantly in this instance under ‘Extra Cost s’ the FSP undertakes to pay the reasonable incurred cost of ‘demolition, and the removal and disposal of debris’ . However, a careful examination of all the above italicised phrases, reveals it not to be an additional benefit – as would be presumed by the reasonable person, as something over and above what is already offered by the policy, but rather, as its operation is intended by the FSP, the costs attaching to ‘demolition etc’ are intended to fall within the totality of the sum assured. It clearly there fore confers no additional benefit (emphasis added) whatsoever. 35. In the circumstances of a broad form contract, such as this, where the party establishing the contract has employed words reasonably capable of causing confusion, the doctrine of contra profe rentum, requires the Panel to determine the appropriate meaning of the offending words, in a manner most beneficial to the interests of the party not establishing the contract, namely the Applicants. 36. Accordingly, having considered the potentiality for est oppel, contra proferentum and pursuant to its mandate to do what is „fair in all the circumstances‟, the Panel determines the particular facts of this case require the FSP to pay the Applicants the sum of $64,251 pursuant to the „Additional Benefit‟ confer red by the policy, over and above the total sum assured of $280,000. In light of the particular circumstances outlined above, the Panel will not stipulate that interest is to accrue to this additional payment. Case No: 299018 Determination Page 6 of 6 Determination 37. On the basis of the available information the Panel determines the FSP pay the Applicants the sum assured of $280,000 and pursuant to the „Additional Benefit‟ relating to „demolition etc‟ the invoiced amount of $64,251 , for the settlement of the building claim. 38. The Applicants are to get authorisation from their financial institution as to whom the FSP is to make payment to.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.