Text of the determination
Case No: 298972 Determination Page 1 of 10
Case number: 298972
General Insurance - Domestic Insurance - Home Building & Contents - FSP
Decision - Claim amount
4 July 2013
Background
1. The Applicants (SD & SM) held a Home Building and Contents Insurance
Policy (the policy) with the Financial Services Provider (FSP).
2. A claim was lodged for significant damage to their home, due to a fire on 26
August 2011.
3. The FSP accepted the claim and settled the contents component on a total
loss basis and determined the home to be repairable. It proceeded to cash
settle the building component of the claim in the amount of $241,684.30.
4. The Applicants remain dissatisfied with the FSP‟s settlement offer and
maintain that their home should be demolished and rebuilt as opposed to
being repaired.
Summary of Applicants ‟ position
5. The Applicants are concerned about the manner in which the FSP intends
on cleaning and repairing their home. Further, there are asbestos related
issues with the remaining ceilings and insulation at the property.
6. The bricks are not fire rated with the remaining mortar brittle; they do not
believe the smell of fire damage left in the dwelling will ever go away.
7. The house seems to be moving with the floorboards all uneven and sinking.
The front porch seems to be separating from the house and the ceiling in the
sunroom is starting to droop more.
8. Their preferred builder “BH” has recommended demolition of their home and
this is what the Applicants are also seeking under the claim.
Determination
Case No: 298972 Determination Page 2 of 10
Summary of FSP‟s position
9. It is an accepted principle of insurance law that it is the contract of insurance
that sets out the terms and conditions of the cover sold. The FSP accepts
the Applicants have a valid claim under the policy.
10. In saying that, the FSP maintains the policy is such that it clear ly and
unambiguously provides that the decision on how to settle a claim (i.e. repair
the damage, replace the building or contents or cash settle an insured for the
cost to repair or replace the loss) lies with the FSP and not the policyholder.
11. The FSP has accepted liability and given the Applicants‟ preference to utilise
the services of their preferred repairer (sic), it cash settled the claim in an
amount equal to what it would cost the FSP to undertake the required
repairs.
12. The FSP obtained two separate repair quotes and reviewed these alongside
the Applicants‟ preferred repairers‟ quote (demolish and rebuild). It deemed
the most complete and compatible quote was the one submitted by “DW”.
13. The FSP acknowledges the Applicants‟ quote is predicated on their opinion
that the home should be demolished and rebuilt. However, it maintains that
on the basis of the available advice obtained from engineers, the home is
safe and structurally sound to repair.
14. The FSP‟s assessors, builders and engineers deal with fire d amage claims
on a regular basis and so possess the required knowledge and expertise to
determine whether they are able to repair damage of this nature.
15. The FSP notes the engineer “GB” commissioned by the Applicants
expressed some minor concerns in respect to scope of works relied upon by
the FSP and it maintains these have been dealt with in its authorised repair
works used to calculate the offer of settlement. Also, it notes apart from the
minor issues GB did not determine that the home was not repairable.
16. The Applicants‟ preferred builders‟ quote has been submitted in the amount
of $275,863.64, which it notes is significantly higher than the quote
submitted by its preferred builder. Accordingly, in putting its offer of
settlement to the Applicants in the amount $241,684.30, it has fulfilled its
obligations under the policy.
17. There was no evidence of subsidence when the FSP‟s appointed
consultants attended the insured property, nor was there any damage to the
foundations. In saying that, the FSP maintains tha t if the Applicants believe
this to be the case, they are entitled to obtain appropriate expert evidence to
support their contention, which the FSP would be happy to consider under
the claim.
18. The FSP relies on the following policy provisions:
“ What you are covered for Page 19
Insured events 1 to 12
Case No: 298972 Determination Page 3 of 10
When covered under this policy, the home and contents are insured for loss
or damage at the insured address by any of the 12 insured events, if they
happen in the period of insurance.
…
How we settle your claim Page 61
We choose how your claim is settled
If we agree to pay a claim for loss, theft or damage to the home, unit or
contents we will decide if we will:
–– repair damage new for old or
–– replace home or contents new for old or
–– pay you what it would cost us to repair or replace the home or contents new
for old.
The meaning of new for old is defined below.
We will not:
–– pay extra to replace the home or contents to a better standard,
specification or quality than it was before the loss or damage occurred except
as stated in „new for old‟ on the next page
–– fix a fault that existed before the loss or damage occurred.
New for old means :
new materials, new items
we replace or repair with new items or new materials that are available at the
time of replacement or repair from Australian suppliers.
new for old, regardless of age
we replace or repair new for old regardless of age, with no allowance for
depreciation.
For example, a leather lounge which was purchased 5 years ago for $5,000
and now worth $2,000, will be replaced with a brand new leather lounge
equivalent to your old lounge when it was new. Cover is not limited to $2,000.
same type, standard and specification as when new
we replace or repair to the same type, standard and specification as when
new. If the same is not available, it means of a similar type, standard and
specification when new. It can be a different brand.
New for old does not :
include paying the extra cost of replacing or purchasing an extended
warranty on any home or contents item or
mean of a better standard, specification or quality than when new.
…
How we settle home claims Page 63
If we agree to pay a claim for loss, theft or damage to the home, we will
decide if we will:
–– repair damage new for old or
–– rebuild the home new for old or
Case No: 298972 Determination Page 4 of 10
–– pay you what it would cost us to repair or rebuild the home new for old.
…
When we repair or rebuild the home
We will do our best to obtain new materials that are the same type, standard
and specification as when new. If the same is not available, we will use new
materials of a similar type, standard and specification that are commercially
available and compliant with the latest building regulations.
…
Lifetime guarantee on home repairs Page 67
When we repair or rebuild your home, we guarantee the quality of materials
and workmanship of that work for the lifetime of your home if we:
authorise and
arrange and
pay the builder or repairer directly for this work.
What we guarantee
We guarantee the material used and standard of the workmanship to be free
of defects. If a defect arises in the lifetime of your home as a result of poor
quality workmanship or use of incorrect materials, then we will rectify the
problem.
This guarantee does not apply :
to repairs you authorise or make yourself
to loss, damage or failure of any electrical or mechanical appliances or
machines
to wear and tear consistent with normal gradual deterioration of your
home (e.g. paint peeling off after its expected life cycle, wood rotting
from moisture in the air or ground, roofs weathering or a hot water tank
leaking after its guaranteed life)
where we agree with a repair quote and we give you, or the builder or
repairer, a cheque for the cost of the repairs and you arrange the
repairs. ”
Issue
19. Whether the FSP‟s assessment, decision to declare the insured building
repairable and resultant offer of settlement is reasonable under the policy.
Reasons for decision
20. As advised to the parties, FOS has considered it appropriate to expedite the
dispute in accordance with the Operational Guidelines to the FOS Terms of
Reference. This is because of the complex nature of the issues. This dispute
has not been the subject of a FOS Recommendation and has proceeded
directly to Determination.
Case No: 298972 Determination Page 5 of 10
21. This decision has been made by a Panel consisting of an Ombudsman, a
representative with extensive experience in the insurance industry and a
representative with extensive experience in consumer claims.
22. Prior to arriving at a determination the Panel has read and considered all the
material submitted by the parties to FOS.
23. The Panel is satisfied the parties do not dispute the following:
The Applicants held a current home building and contents insurance
policy with the FSP at the time of the loss.
The FSP provided and the Applicants received the relevant policy
documentation including the Product Disclosure Statement (PDS) prior
to the loss.
The insured home and contents were significantly damaged due to the
insured event „Fire‟ and for which the FSP has accepted a claim under
the policy.
The contents loss component of the claim has been settled on the
basis of a total loss for which the FSP has issued and the Applicants
have accepted payment ($128,179) under the claim.
Further, the FSP has also provided indemnity to the Applicants for
alternate accommodation and storage costs under the claim.
The dispute between the parties essentially relates to whether the FSP
is accurate in assessing the home as repairable or whether the home
should be completely demolished and rebuilt under the claim.
24. The Panel notes the parties have made available multiple consultants‟
reports in support of their positions. There has been an exchange of material
between the parties. Each party therefore is aware of the issues and has had
the opportunity to comment. The reports state in part:
Assessor‟s Report
An inspection of the insured property was completed on 29 August
2011.
The Applicants advised that on return from the beach they found their
home on fire and the fire brigade was already on site.
Due to the intensity of the fire access into the home was not possible till
the following day. It was noted that major structural damage had
occurred to several rooms with the living areas extensively smoke and
water damaged.
The assessor noted what he believed to be asbestos fragments
throughout several rooms and recommended a hygienist be appointed.
The Applicants advised the assessor that stormwater had been
entering the home through the holes left in the roof causing further
damage.
Case No: 298972 Determination Page 6 of 10
The Assessor was unsure of the exact ignition source.
Repair of the home was recommended with the appointment of an
engineer also suggested.
„DW‟s‟ Scope of Works
Notes the existing residence as being partially damaged by fire.
The document provided a detailed itemised scope of works in respect
to repairing the insured property.
The scope of works presents a reinstatement of the insured property to
its condition prior to the fire.
All works quoted to be completed in accordance with „Building Co de of
Australia‟, and all current Australian Standards, OH&S, Work Cover,
EPA, Local Council approvals and requirements.
„GB‟s‟ Report dated 26 March 2012
Attended the property 12 March 2012, in the presence of one of the
homeowners to provide structural advice following the house fire.
In particular, to comment on the proposed repairs to the damaged
brickwork roof, timber framing, settlement of subfloor supports and
damage to tiled entry.
GB had been provided with a copy of DW‟s scope of works to aid with
its inspection of the property.
GB noted that the building consists generally of a timber frame/roof and
walls clad with brick veneer and concrete roof tiles. The floor is
elevated above surrounding ground levels and consists generally of
timber floorboards, timber bearers and joists supported on engaged
piers at the perimeter and isolated masonry piers within.
Brickwork
Damage to the brickwork consisted mainly of smoke staining except to
the lounge room walls where some sections of brickwork near the top
of the wall, near the windows, the electrical switchbox and air
conditioner penetrations were found to be loose to hand pressure.
Such damage is likely to be damage to mortar and/or brick ties. The
bricks themselves were generally in a sound condition and could be re-
used.
DW correctly identified that repairs are required, however, the
Applicants need to confirm with the FSP that the proposed repairs
include:
Removing the brickwork above the compromised mortar and
relaying of only sound (uncracked) bricks.
The damaged brick ties to be replaced with new ties in line with
the „AS3700 Masonry Code‟.
Case No: 298972 Determination Page 7 of 10
Any other area of the mortar in the lounge room walls that are
cracked or otherwise damaged will be re-pointed to maintain
integrity and insulation of walls.
Roofing
While concrete tiles are known to be combustion resistant, GB
suggested that multiple handling may increase risk of damage to the
tiles and matching the finish on new versus old tiles may be
challenging.
Recommended the Applicants confirm with the FSP that all new roof
tiles are to be used.
Recommends inspection of the sunroom roof sheeting by a roof
plumber once the ceiling linings are removed to confirm roofing is
sound and waterproof.
Wall Framing
Notes that DW has allowed for all damaged walls to be replaced.
Floor Framing
No concerns noted.
Settlement of Floor
GB discussed variations of levels across the floor and possible
influences on this with the Applicants.
GB advised that it is normal practice to have to re-level stumps from
time to time to in order to keep floors level (such as the Applicants),
however, there also existed the possible influence of change in
moisture levels in the soil.
It noted the ground in the sub-floor area, exposed by the cut out areas
of flooring, was noticeably wet. If water is ponding under the building,
the unusual moisture conditions may reduce the bearing capacity of the
foundation leading to settlement.
Recommended moisture levels in the sub-floor be assessed.
Damage at tiled entries
Notes DW includes within the scope of works for the tiling to front the
front porch to be demolished and replaced.
Recommended that the Applicants ensure these works include
provision for flexible jointing adjacent to the existing building.
Assessor‟s Report
The Applicants‟ engineer has referred to a number of areas of concern,
these are addressed in the FSP‟s approved scope of works.
The policy does not extend cover to include repairs to undamaged
areas of the home in order to achieve a match.
Case No: 298972 Determination Page 8 of 10
The concerns raised by GB are not major in content and do not provide
any reason why the home cannot be repaired back to its pre -event
condition.
Notes the Applicants were not prepared to allow the FSP‟s preferred
builder to undertake the approved repairs, and therefore maintains that
a cash set tlement or review through the FSP‟s appeals process are
options available to them.
Letter from builders “BH”
BH refused to provide a quote for renovations to the existing home as
he believes the home is damaged beyond repair.
During the inspection he noticed the cracked external walls, fire charred
timber and subsidence under the floor foundations.
There has been further rain damage over the previous twelve months.
He had grave doubts that the smell of fire damage will not be
eradicated. The subsidence in the under floor area will only create an
ongoing problem.
He was of the opinion the only option available to the Applicants is for
the existing structure to be demolished and re-built.
BH provided a quote for the demolition and re-build of the home in the
amount of $286,950 (open for 60 days from 26 June 2012).
25. The Panel has considered the available evidence and in addition to the
various reports found the extensive photographic evidence to be of great
assistance. The Applicants are of the opinion that it is not reasonable to
repair their home and that the FSP should be required to completely
demolish the remaining structure and authorise rebuilding of their home
and/or a cash settlement equal to the cost to undertake these works.
26. The FSP acknowledges the Ap plicants‟ position and concerns , however,
maintains that the policy allows for the FSP to elect the manner in which a
claim is to be settled (repair, rebuild or cash settle). Further, on the basis of
the available evidence, it is clear that the insured home is repairable and as
the Applicants were not prepared to use the services of its preferred builder,
it has cash settled the claim.
27. The Panel notes all but one of the commissioned consultants by the parties
to this dispute acknowledges that the insured dwelling was repairable. The
only consultant to oppose this view is BH, the Applicants‟ preferred builder,
as he was not prepared to provide a quote for repairs and maintains the
structure needs to be demolished and re-built.
28. The Panel notes that although BH expressed the above opinion, he has not
made available any substantiating evidence to establish his position in this
regard. In such circumstances and having regard to the experience and
qualifications of the consultants in question, the Panel does not find it
Case No: 298972 Determination Page 9 of 10
reasonable to prefer the above noted opinion of BH, over the other
consultants‟ opinions and reports.
29. The Panel acknowledges that the engineers (GB) have provided some
recommendations to the Applicants in respect to the scope of works
authorised by the FSP. However, on the whole the Panel accepts that these
recommendations do not qualify as major concerns and overall GB‟s report
does support the fact the home is repairable and does not conclude or
suggest the home is beyond repair or it is unsafe to so do.
30. The Panel having considered the available information does note the
concerns raised in relation to the moisture levels of the sub -soils and
determines that it would be reasonable to expect the FSP to undertake
reasonable investigation into this aspect of the dispute. The investigation is
to be undertaken with the intention of determining whether as a result of the
exposed (due to damage to the roof from the event) sub-soil areas, there
has been any impact on the floor levels and the bearing capacity of the
foundations.
31. Further, the Panel notes the Applicants‟ reference to possible issues
surrounding the presence of asbestos within the home. In saying that, the
Applicants have not made available any evidence establishing there are
issues in this regard. The available evidence shows that the FSP authorised
adequately qualified consultants to attend to the asbestos present at the
home; appropriate certification was then issued advising all was clear and to
standard.
32. The Panel is satisfied that the available information establishes that although
the insured property was substantially damaged by the insured event, the
resultant damage can be repaired and the home restored to its pre-event
condition. There is not sufficient evidence to support the Applicants‟
contention that the FSP should be obliged to authorise the complete
demolish and re-build of the insured dwelling under the claim.
33. The Panel notes that the FSP has issued a cash settlement on the basis the
Applicants were not prepared to allow for its preferred builder to undertake
the authorised repairs, however, the Applicants have refuted this suggestion.
The Panel acknowledges that the policy allows for the FSP to elect the
manner by which it intends on settling a claim, however, under the
circumstances, it would not be unreasonable to allow the Applicants to
accept the FSP‟s original offer to undertake the repairs if that is what they
would now prefer under the claim.
Determination
34. On the basis of the available information the Panel determines:
The FSP has established, on the balance of probabilities that the
insured building was both safe and economical to repair under the
claim.
Case No: 298972 Determination Page 10 of 10
The FSP is to allow for the Applicants to choose whether they would
prefer for it to undertake and complete the authorised repairs under the
claim, as opposed to being cash settled for the cost of repairs.
In the instance the Applicants continue to prefer the claim to be settled
by way of cash settlement, the FSP is entitled to settle the claim in line
with the scope of works made available by its preferred repairer.
The FSP is to undertake further investigation into the moisture levels of
the sub-floor area as recommended by GB, to determine if there has
been any adverse affect on the bearing capacity of the foundation due
to the introduction of moisture through the damaged roof and flooring.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.