Flood inundation claim and loss of rent claim declined under flood exclusion
Summary
The Applicant's rental house was damaged by water inundation in January 2011 and the FSP denied the building, contents and loss of rent claims under the flood exclusion. The Panel found the house was ultimately inundated by flood and that the Applicant had not established a covered cause of the initial inundation.
The insured bears the onus to establish a prima facie claim within the policy, and the evidence was insufficient to show the initial inundation was caused by stormwater rather than excluded flood.
Issues
- Claim denial primary · not upheld
“The Applicant has not established on the balance of probabilities a claim within the terms of the policy.”
- Inadequate claim investigation secondary · unclear
“A specific inspection of the Applicant's site was not performed, and the FSP's hydrology report had discrepancies.”
Subjects and remedies
home or building damagenatural disasterno remedy
Text of the determination
Case No: 298834 Determination Page 1 of 8
Case number: 298834
General Insurance - Domestic Insurance - Home Building – FSP decision –
Denial of claim
08 April 2013
Background
1. The Applicant held a landlord’s insurance policy with the Financial Services
Provider (FSP).
2. The policy provided cover for loss or damage to the Applicant’s contents in
his tenanted house and certain types of damage to the building.
3. His house in Goodna, Queensland, was damaged by water inundation in
January 2011 and his tenant moved out of the property. The Applicant
attended to the repairs of the building.
4. In August 2011, he lodged a claim with the FSP for the damage to the
building and his contents and also claimed for the loss of rent he suffered.
5. The FSP denied the claim on the basis that the damage was caused by
flood, which is excluded under the policy. It also denied the loss of rent
claim.
6. The Applicant disagrees with the decision and wants the FSP to pay his
claims.
Summary of Applicant’s position
7. The Applicant says that the weather data available, combined with his
tenant’s advice of previous drain age problems in the area and his
eyewitness account of the event, are sufficient to establish that the damage
to his property was the result of an insured event.
8. He understands that a claim for another property in the same street as his
house but in a lower lying area was accepted for stormwater damage by the
FSP.
9. The Applicant says that the peak inundation of his house was approximately
0.5 – 0.6m, much higher than the height which is indicated in the hydrology
report relied upon by the FSP. He contends that the inundation was due to
stormwater.
Determination
Case No: 298834 Determination Page 2 of 8
Summary of FSP’s position
10. The FSP says that the hydrological evidence indicates that the inundation of
the Applicant’s property was due to flood, which is excluded from cover
under the policy.
11. The site specific hydrology report it obtained from “WP” also shows that
overland stormwater runoff could not have caused the volumes of water
which inundated the Applicant’s property.
12. The FSP says that the cover over the Applicant’s building was limited to loss
or damage as a result of theft by tenants, deliberate or intentional damage
by tenants and malicious damage or vandalism by tenants.
13. It argues that any cover for loss of rent is limited to that resulting from
damage or loss to contents; it says that the Applicant’s loss of rent claim is
not payable as the majority of the damage was to the Applicant’s building
which was not covered.
14. The FSP relies on the following policy provisions:
“ Exclusions
Our insurance is designed to provide protection for you in the event of
something happening which has been insured against.
Under some circumstances, this policy will not provide any insurance cover to
you. For example, we do not pay for loss or damage caused by:
Erosion.
Flood.
Any event that does not occur within the period of insurance.
...
Section 1
A: RENT AND LEGAL EXPENSES
...
LOSS OF RENT FOLLOWING DAMAGE OR LOSS TO YOUR BUILDINGS
AND/OR CONTENTS
Where your certificate of insurance shows that buildings are insured, we
will pay the loss of rent as a result of:
• the buildings or sections of the buildings being unable to be lived in for at
least 7 days after damage or loss from an listed event in Section 1-B
“Buildings and Contents” has occurred.
• other p roperty located near the buildings being damaged by a listed event
in Section 1- B “Buildings and Contents”, and access to the buildings is
prevented for at least 7 days.
Where your certificate of insurance shows contents are insured, we will
pay the loss of rent as a result of:
Case No: 298834 Determination Page 3 of 8
• damage or loss to the contents after an listed event in Section 1-B
“Buildings and Contents” has occurred which causes the buildings to be
unable to be lived in for at least 7 days.
• other property located near the buildings being damaged by a listed event
in Section 1- B “Buildings and Contents”, and access to the contents is
prevented for at least 7 days.
We will pay loss of rent for up to 52 weeks, including a reletting period of up
to 6 weeks. The reletting period will start when the damage or loss to the
buildings and/or contents has been repaired or replaced .
...
Section 1
B: BUILDINGS AND CONTENTS
WHAT IS INSURED
Your buildings and/or contents as set out in your certificate of insurance
are insured if they are destroyed, lost or damaged. They are insured only of
you own them, or are liable for them.
...
We will cover your buildings and contents for the listed events below. There
must be damage or loss from one of these events to the buildings or
contents , for you to make a claim .
...
Storm, rainwater or wind. ...
...
We do not provide cover for damage by Flood. Flood is when water from a
creek, lake, reservoir, dam or navigable canal overflows onto normally dry
land. Water that escapes from an irrigation canal is not flood. ”
15. The FSP relies on the following contract provisions:
“ RENEWAL INVITATION AND RENEWAL SCHEDULE
...
SUMMARY OF COVER “Attached Summary”
...
Where your schedule shows you have cover for buildings up to $50,000, this
insurance cover is limited to:
Theft by tenants,
Malicious damage or vandalism by tenants,
Deliberate or intentional damage by tenants.
...
Details of your policy cover
This schedule must be attached to and read as part of the Company’s policy.
...
Case No: 298834 Determination Page 4 of 8
SECTION WHAT IS INSURED SUM INSURED PREMIUM
...
1. BUILDINGS 1 PRIVATE HOUSE UP TO $50,000 $1.00
INCLUDING REPLACEMENT BENEFIT”
Issues
16. Whether the damage to the Applicant’s house and contents was caused by
flood.
17. Whether the FSP is liable for the loss of rent suffered by the Applicant.
Reasons for decision
18. Due to the nature of the dispute, it has been referred to the Panel for
Determination in accordance with the Operational Guidelines to the Financial
Ombudsman Service’s Terms of Reference.
19. This decision has been made by a Panel consisting of an Ombudsman, a
representative with extensive experience in insurance industry matters and a
representative with extensive experience in consumer claims.
20. There has been an exchange of information between the parties and the
Panel is satisfied that each party has had an opportunity to address the
issues raised.
21. It is an accepted principle of general insurance law that an insured bears the
onus to establish that, on the face of the facts, they have suffered a loss
caused by an event to which the policy responds. This is known as a prima
facie claim. Once so established, the onus shifts to the insurer to prove that
an exclusion applies if it seeks to deny or limit its liability for the loss.
22. In his submission, the Applicant provided information from the Bureau of
Meteorology and from the overview hydrology report commissioned by the
Insurance Council of Australia (ICA) in support of his position that heavy rain
affected his area in the lead up to and during the inundation event.
23. The Applicant says that “MG” who was his tenant for 10 years has advised
that the local area has a history of drainage problems and that the front yard
of the property often contains large puddles of water during heavy rain.
24. According to the Applicant, MG has stated that there was significant rainfall
in the days leading up to the inundation. MG does not identify whether the
inundation is from stormwater.
Case No: 298834 Determination Page 5 of 8
25. The FSP has stated that an assessor was appointed to the Applicant’s claim
but as the Applicant has attended to the repairs to the property there was no
damage to assess.
26. Given the Applicant lodged the claim more than six months after the
inundation occurred and after the repairs had taken place, the Panel accepts
that sending someone out to inspect and assess the damage to the
Applicant’s property would have been a fruitless exercise.
27. Once its claim denial decision was disputed, the FSP obtained what it refers
to as a “site specific” hydrology report which, according to the FSP, confirms
that the damage was caused by flood.
28. A report by hydrology firm “ WP ” titled “Hydrology Report r elating to the
January 2011 Storm” has been provided to the Service. The report by WP
dated 20 July 2012 states the following about the Applicant’s property and its
situation:
The site comprises a single storey dwelling.
Available terrain elevation data indicates that the ground level at the
dwelling ranges between 16.0m AHD and 16.1m AHD.
The ground level of [P] Street is approximately 16.4m AHD immediately
adjacent to the dwelling.
A ridge of high ground (16.5m AHD) is located along Brisbane Terrace,
210m north of the dwelling.
29. WP also stated the following about its observations:
“At the time of the inspection, there was little evidence of inundation. This can
be attributed to the time between the flood event and the inspection.
Figure 3 and Figure 4 indicate low lying areas, 150 metres east of the
dwelling. It was noted ( in previous inspections carried out on the 24 th January
2012 ) that pooling occurs in these areas after period of rainfall ” .
(WP’s italicized emphasis)
30. The report by WP went on to include the following as part of its observations:
An aerial image (Nearmaps) at the site taken shortly after the peak
flood level (13 January 2011) shows the peak flood extent and
indicates that the Applicant ’s property was inundated during the event.
Analysis of the available topographic data for the area indicates that the
approximate level of inundation was 16.2m AHD.
31. WP examined data from the Moggill Alert rainfall gauge, which is 3.7km
northwest of the Applicant’s property and stated the following:
The rainfall recorded at the Moggill Alert is most indicative of the local
rainfall at the Applicant’s property.
Case No: 298834 Determination Page 6 of 8
The gauge shows continuous rain falling from 10.00am Sunday 9
January 2011 until 10.00am 11 January 2011, delivering 60mm in this
24 hours period.
A further 80mm was recorded on 11 January 2011 between 1 .00pm
and 2.40pm.
The peak rainfall intensity of the rainfall event was estimated to have an
Average Recurrence Interval (ARI) of between 1 and 2 years.
Given the negligible size of the local catchment draining to the site, it is
unlikely that inundation would have occurred due to stormwater runoff
resulting from local rainfall.
According to available topographic data, the elevation of low lying,
marsh area located 150m east of the property lies approximately 3m
lower than the ground levels at the dwelling itself. Given the low
intensity rainfall, water levels in this area would not have pooled
sufficiently to inundate the dwelling purely as a result of local rainfall.
32. With respect to the river water levels in the vicinity of the Applicant’s
property, WP stated the following:
Data from the Brisbane River Moggill Alert and Jindalee Alert gauges
(approximately 7.2km upstream and 12.3km downstream of the
Applicant’s property respectively) was examined.
The Moggill Alert gauge recorded a peak level of 17.87m AHD at
2.00pm on 12 January 2011.
The Jindalee Alert gauge recorded a peak level of 12.9m AHD at
5.50pm on 12 January 2011.
An interpolation of the hydrographs from the two gauges provides an
estimate of the peak water level of approximately 16.1m AHD in the
vicinity of the Applicant’s property occurring at about 3.30pm on 12
January 2011. This is in agreement with observed debris marks in the
vicinity of the site (16.2m AHD).
As the ground level of the Appli cant’s property is between 16.0 m AHD
to 16.1m AHD, the site is considered to be below the peak flood level.
33. WP concluded the report by opining that the cause of the inundation of the
Applicant’s property was flow exceeding the confines of the Brisbane River
and backing up into the unnamed tributary and lower ground to the east of
the site and onto the site itself.
34. The Panel notes that whilst the report refers to a site inspection it is titled a
desktop assessment. It does not identify the date of the attendance at the
property or provide any photographs of the property. This may be explained
by the fact the property had been repaired. It does not explain a number of
errors that appear in the report. The report, which states the level of [P]
Street (which sho uld in fact be “Close”) is 16.4 m AHD, compared with the
levels on the site which range from 16.0m AHD to 16.1m AHD. A review of
the Ipswich City Council (ICC) “flood maps” available on the ICC website
Case No: 298834 Determination Page 7 of 8
show that the minimum level of t he Applicant’s property is 15.7m AHD while
the maximum is 16.8m AHD. This is significantly different to the information
provided by WP in its report.
35. The Applicant has stated that the inundation rose to approximately 0.5 –
0.6m in height, which is again different to the estimate by WP of the peak
level of inundation at the property. While noting that the Applicant does not
live at the property and was not present at the time of inundation, the Panel
acknowledges that he instituted (and paid for) repairs to the property and
accepts that his estimate of the level of damage at his property is based on
some degree of experience.
36. The FSP did not assess the damage but as outlined earlier, the Panel
accepts that any attempt to assess the damage after the Applicant affected
repairs would have been futile.
37. Enquiries by the Service’s Case Manager have revealed that a specific
inspection of the Applicant’s site was not performed . Although a specific
inspection of the site affected by inundation is not considered by the Panel to
be vital to a proper assessment of the cause of the inundation, it is
considered to be extremely valuable.
38. If such a site inspection had been undertaken, even if it was after the repairs
to the property had been completed, the Panel is of the view that any
obvious discrepancies in its desktop assessment (such as the height of the
street relative to the height of the property itself) would have been identified
by the hydrologist.
39. Given the discrepancies between the report by WP and information available
in the public domain, including that pertaining to the terrain elevation of the
Applicant’s property and the re lative height of the street, the Panel finds the
report by WP is of limited assistance in determining the cause of the initial
inundation of the property. The inconsistency in the data would potentially
impact on the likely timing of any initial inundation and the source of that
inundation.
40. The FSP has made reference to other sources of information regarding the
inundation, including ICA hydrology reports and flood maps provided by the
Brisbane City Council. The Panel notes that the ICA hydrology report spa ns
6 volumes and the FSP did not provide any extracts from the reports or any
information about the specific sections of these reports upon which it relied.
In addition, although the FSP provided a link to the website to the flood
maps, the Panel found that the website linked was inaccessible.
41. Despite the problems with the information provided by the FSP, it is the
Applicant that bears the onus to establish a prima facie claim under the
terms of the policy. The Panel, while accepting that there was significant
rainfall over the period up to 12 January 2011 has been provided no
information as to the time of the initial inundation, direction of flow,
eyewitness or other witness accounts as to the stormwater runoff or other
information to establish the initial inundation was due to stormwater runoff
Case No: 298834 Determination Page 8 of 8
and fell within the terms of the policy. If the hydrology is accepted then initial
stormwater runoff is an unlikely cause of inundation.
42. The Panel is satisfied that the information when considered as a whole is
sufficient to establish that the property was ultimately inundated by flood.
The information is not sufficient to determine the cause of the initial
inundation. In the circumstances, the Panel is not satisfied the Applicant has
met the onus on him to establish on the balance of probabilities a claim
within the terms of the policy.
Determination
43. Accordingly the Panel determines the FSP is not liable to meet the claim as
the Applicant has not established on the balance of probabilities a claim
within the terms of the policy.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.